You are on page 1of 8

INTERNAL

OIS
SITE
READINESS
PROCEDURE
GLOBAL IM: IIT APPLICATIONS

REFERENCE NUMBER:
Version 2.0
Last revision date: 2018-02-27
First implementation date: 2018-02-16
INTERNAL

NAME POSITION SIGNATURE DATE

IIT Application
AUTHOR: Gavin Ramsamy
Specialist
IIT Application
OWNED BY: Franco de Bruyn
Manager
REVIEWED IIT Senior
Frikkie Kriel
BY: Developer
APPROVED
BY: Head of IM
Theo van Staden
Executive Regional Support
Head/HOD:

OiS Readiness Procedure - Version 2.0


2 of 8
INTERNAL

Contents

1. Aim .................................................................................................................................................. 4
2. Scope .............................................................................................................................................. 4
3. Definitions........................................................................................................................................ 4
4. Abbreviations................................................................................................................................... 4
5. Responsible for Review .................................................................................................................. 4
6. Responsible for Implementation...................................................................................................... 4
7. General............................................................................................................................................ 4
7.1 Contravention .......................................................................................................................... 4
7.2 Distribution .............................................................................................................................. 5
7.3 Additional Information ............................................................................................................. 5
8. Safety Requirements for this Standard ........................................................................................... 5
9. Standard .......................................................................................................................................... 5
9.1 Hosting Requirements – Production Application Server ......................................................... 5
9.2 Production Database Server ................................................................................................... 5
9.2.1 Additional DBMS Information. ................................................................................................. 5
9.3 Supported Client Platforms. .................................................................................................... 6
9.4 Preparation .............................................................................................................................. 6
9.4.1 Site Engagement ..................................................................................................................... 6
9.4.2 Readiness Investigation .......................................................................................................... 6
10. History of Changes .......................................................................................................................... 7
11. Record Control ................................................................................................................................ 7
12. References ...................................................................................................................................... 7
13. Appendices...................................................................................................................................... 7
13.1 SQL Hosted Server Standard Operating Environment ........................................................... 7
13.2 Readiness and Preparation Template .................................................................................... 8

OiS Readiness Procedure - Version 2.0


3 of 8
INTERNAL

1. Aim
Set out to give clear and concise requirements with regards to installing and running OiS. The
document also contains a list of questions which will be used to determine the site maturity and
readiness for the implementation of OiS

2. Scope
This applies to all sites that will require the implementation of this product.

3. Definitions

Term Definition

4. Abbreviations
OiS Operational Intelligence Suite
IIT Industrial Information Technology
SQL Structured Query Language
SSRS SQL Server Reporting Services
CPU Central Processing Unit
IIS Internet Information Services
DBMS Database Management System
SOE Standard Operating Environment
MES Manufacturing Execution Systems
PLC Programmable Logic Controller
SCADA Supervisory Control and Data Acquisition
MDE Manual Data Entry

5. Responsible for Review


The IIT Application Specialist will be responsible for the review of this document. In the event of
architectural changes this document will need to be reviewed.

6. Responsible for Implementation


The implementation of the described standard will be an assigned task of IIT across the entire
supported landscape and persisted accordingly when new sites are introduced.

7. General
7.1 Contravention
Breach of this Standard may lead to disciplinary / legal action. Additionally, to the aforementioned,
integrity of the described environments could be severely compromised which in turn has the potential
to result in service outages and possible loss of business data or production.

OiS Readiness Procedure - Version 2.0


4 of 8
INTERNAL

7.2 Distribution
# Distributed to Physical Copy Electronic Copy
1 Occupational Hygienist Anglo Platinum
2 Site IM Intranet> Policies and
Standards

7.3 Additional Information


None

8. Safety Requirements for this Standard


None to be applied.

9. Standard
9.1 Hosting Requirements – Production Application Server
Preferred Minimum
CPU and Cores 2 CPU x 4 Cores 1 CPU x 4 Cores
Operating System Microsoft Server 2016 Microsoft Server 2016
Memory 16 GB RAM 8 GB RAM
Storage System Disk [C:\] 100 GB 80 GB
Storage Data Disk [D:\] N/A N/A
.NET 4.5 Framework or later 4.5 Framework
IIS (Internet Information Services) 7 7

9.2 Production Database Server


Preferred Minimum
CPU and Cores 2 CPU x 4 Cores 1 CPU x 4 Cores
Operating System Microsoft Server 2016 Microsoft Server 2016
DBMS SQL Server 2016 Std SQL Server 2016 Std
Memory 32 GB RAM 16 GB RAM
Storage System Disk [C:\] 100 GB 100 GB
Storage Data Disk [D:\] (Data) 400 GB 400 GB
Storage Data Disk [E:\] (Temp DB) 100 GB 100 GB
Storage Data Disk [F:\] (Log) 200 GB 200 GB
Storage Data Disk [G:\] (Backup) 200 GB 200 GB
.NET 4.5 Framework or later 4.5 Framework
SSRS Yes Yes

9.2.1 Additional DBMS Information.


The Reporting server can be an instance residing on another server but should be ringfenced to that
site to ensure maximum availability on the reporting.
SQL Server Installation SOE document explaining the reasons for disk partitioning is provided on
appendix 13.1 on this document. SQL SOE Document

OiS Readiness Procedure - Version 2.0


5 of 8
INTERNAL

9.3 Supported Client Platforms.


Preferred Minimum
Operating System Windows 10 Windows 7
Browser MS Internet Explorer 11 or later 11
Browser MS Edge Latest Latest
Browser Google Chrome Latest Latest

9.4 Preparation

9.4.1 Site Engagement


The following individuals on site should be engaged to have buy-in of the product.
 General Manager
 Occupational Hygienist
 Service Delivery Specialist
 IM Representative
 Control & Instrumentation
 MES Specialist

9.4.2 Readiness Investigation


The following question should be submitted to site for feedback. This will assist in
identifying if the site is ready for implementation.

9.4.2.1 Infrastructure
1. Is there enough space on the current on-site virtual hosts to accommodate the
addition of two new servers?
2. Will SQL Server licenses be required?
3. Will MS Operation System licenses be required?
4. Do you foresee any additional hardware and software related costs with regards to
hosting the application?

9.4.2.2 Automated Systems


1. Are there any real-time monitoring solutions currently implemented?
2. If the above is true the following information should be gathered.
 Systems Documentation
 Business Owner
 Integration options
3. What type of sensors and equipment is currently implemented on site?
4. Are the sensors/equipment connected to PLC’s and is the data available in a
historian?
5. What type of historians are operational on site?
6. What form of historian integration is available?
7. Are there enough tag licenses available on the historian should there be a need to
add additional equipment?
8. Do you have personal on site that can procure and install additional sensors?
9. Can your site personal configure the sensors to report on your current SCADA’s?
10. Is there a need for visualizing this on monitors across the site?
11. Are there any special requirements that you foresee? This can be expanded – based
on this, detailed requirements gathering must be done by a business analyst.

9.4.2.3 Standalone Systems - MDE Requirements.


1. Are there currently any standalone systems on/off site that requires integration?
2. How is the data extracted from these systems?
3. How often is the extraction done?
4. By who is the extraction done?
OiS Readiness Procedure - Version 2.0
6 of 8
INTERNAL

5. Can you provide data extracts, formats/examples etc?


6. Is there any plan in place to replace\automate these systems in the future?
7. Is there any vendor\third party involvement?
8. Are you aware of any possible integration methods to help automate this process?

The readiness and preparation template should be used to complete the above exercise
Refer to appendix 13.2 Readiness and Preparation Template

10. History of Changes

Reason for Change - Index


A. As a result of incidents B. As a result of audit findings
C. New / changes in governance documents D. Changes in legislation
E Changes in technology F. Changes in machinery/equipment
G Results of risk assessments H. Change in training requirements
I. New document format J. Change due to spelling or grammatical error
K. To integrate a special instruction into the document control system

Revised Changes Made


Date of Item Reason Name of
change (Paragraph Code reviewer
number)
2018-02-27 Readiness Split into multiple parts, added infrastructure, Gavin Ramsamy
Investigation automation and MDE.

11. Record Control


Records to be maintained in accordance with this Standard (refer to the AngloAmerican Record
retention schedules for retention periods and disposal methods):

Responsible Location
Reference Responsible Retention Method of
Identification for of storage
number for filing period disposal
maintenance area

12. References
None

13. Appendices
Additional to the described standard, production environments will also have to adhere to other
already defined standards and procedures.

13.1 SQL Hosted Server Standard Operating Environment

MS SQL Server
hosted server.doc

OiS Readiness Procedure - Version 2.0


7 of 8
INTERNAL

13.2 Readiness and Preparation Study

OiS Site Readiness


and Preparation Study.doc

13.3 Architecture

OiS - Architectural
Drawing.pdf

OiS Readiness Procedure - Version 2.0