You are on page 1of 1

OPERATING PROCEDURE

REMINDERS:

 ALWAYS CHECK WATER LEVEL OF RAW TANK AND PRODUCT TANK BEFORE OPERATING.
 WATER SHOULD BE AT HIGH LEVEL.
 CHECK TDS, READING SHOULD BE BELOW 10PPM.

START UP STEPS:

1. PLUG MAIN POWER


2. SWITCH ON RAW PUMP
3. SWITCH ON PRODUCT PUMP
4. WASH GALLON USING UNSCENTED DISHWASHING LIQUID.
5. SPRAY PRODUCT WATER INTO GALLON BEFORE REFILLING.

HOW TO REFILL PURIFIED WATER:

STEP 1: SWITCH ON UV PURIFIED.

STEP 2: OPEN VALVE AT DISPENSING AREA TO REFILL GALLON WITH PURIFIED WATER.

HOW TO REFILL MINERAL WATER:

STEP 1: SWITCH ON UV MINERAL.

STEP 2: OPEN VALVE AT DISPENSING AREA TO REFILL GALLON WITH MINERAL WATER.

REMINDERS:

 DO NOT PROCESS PURIFIED AND REFILL MINERAL AT THE SAME TIME OR VICE VERSA.
 DO NOT PUT ANY KIND OF VALVE OR RESTRICTION VALVE ON WASTE WATER CONNECTION.
 ALWAYS CHECK WATER LEVEL OF RAW TANK AND PRODUCT TANK DURING OPERATIONS.
 DO NOT LEAVE EQUIPMENT UNATTENDED DURING OPERATION.
 SWITCH OFF UV WHEN NOT IN USE.

IMPORTANT:

 CHECK MAINTENANCE SCHEDULE FOR REPLACEMENT OF FILTERS, BACKWASH, AND MEMBRANE


SCHEDULES.

You might also like