Professional Documents
Culture Documents
Procedure Operation
Procedure Operation
REMINDERS:
ALWAYS CHECK WATER LEVEL OF RAW TANK AND PRODUCT TANK BEFORE OPERATING.
WATER SHOULD BE AT HIGH LEVEL.
CHECK TDS, READING SHOULD BE BELOW 10PPM.
START UP STEPS:
STEP 2: OPEN VALVE AT DISPENSING AREA TO REFILL GALLON WITH PURIFIED WATER.
STEP 2: OPEN VALVE AT DISPENSING AREA TO REFILL GALLON WITH MINERAL WATER.
REMINDERS:
DO NOT PROCESS PURIFIED AND REFILL MINERAL AT THE SAME TIME OR VICE VERSA.
DO NOT PUT ANY KIND OF VALVE OR RESTRICTION VALVE ON WASTE WATER CONNECTION.
ALWAYS CHECK WATER LEVEL OF RAW TANK AND PRODUCT TANK DURING OPERATIONS.
DO NOT LEAVE EQUIPMENT UNATTENDED DURING OPERATION.
SWITCH OFF UV WHEN NOT IN USE.
IMPORTANT: