Dear Tom,
Yours sincerely
Flavio Alushi
Plan SE
Victorian: Load bearing external walls with Timber walls on first floor, and Timber/masonry internal walls on
the ground floor. Timber floors on the ground and first floor.
Not all areas could be seen during the visit. Opening up works where necessary have been noted on the
main design drawings. Alterations to the plans may be required once the opening up works have been
completed. Such alterations may be charged at our hourly rates.
New side extension has been designed. Existing rear and side wall to be demolished and supported by steel frame.
This information and associated calculations are provided for Part A of the building regulations only. There are items
of Part A which will form part of the subcontractor’s design responsibility e.g. connection design, precast elements,
timber trusses, timber frame, glass etc. All other sections of the building Regulations are outside of PLAN SE brief.
Subcontractor Design items to be provided 1 week prior to undertaking works for the Contract Administrator’s
approval may cover:
o Structural steelwork connections and base plates designed by steelwork contractor. Connection
design is the contractor’s Design & responsibility. Loads are to be taken from attached calculations.
Allow a minimum of 75kN Axial Load and 80kN shear load to all connections unless noted otherwise.
Contractor to supply Fabrication drawings & Calculations
• Stair cases
o Temporary Propping is the contractor’s Design & responsibility. Loads are to be taken from attached
calculations. Design to allow for full dead loads and 25% live loads. Lateral loading and overall
stability of the structure must be considered.
Setting out from and to the architect’s information. The contractor must pay particular attention to be paid to
vertical elements, stairs, head room.
Items not required by Part A of the building regulations: Services searches for Electrical, drainage, Thames Water,
Comms, gas etc. by others. Not with PLAN SE brief
UDL Concentrated
Loads kN
kN/m2
Specific Dead loads are shown in the loading sheets. Specific to this project we have considered:
Partition loading
• Block work partitions over 2.6m high = calculated partition loading on floor specifically
A conservative approach to wind load in the South East allows for 0.6 kN/m2
Lateral stability of the structure is maintained from the use or box frames on original building and the rear extension.
From the existing, proposed and adjacent structures the lateral actions that should be considered are:
• Roof Trusses
• Portal Bases
A Terrace block acts as one structure. We do not consider it appropriate that each individual dwelling requires its
own independent stability frame capable of carrying all wind loads. The party wall act acknowledges this in so far as
when removing a middle terrace, one is required to stabilise the walls. PLAN SE Approach is:
• Rear additions should provide their own stability for the full wind load applied to the structure.
• Internal walls of the main building can be designed to carry 1/2 of the wind load with the remaining 1/2
being shared with the terrace.
• Internal wall loads should be designed to carry the notional load of the laterally supported structure this may
included the notional load of the party walls
• End of terrace structures should be designed for the full wind load.
It is recommended to undertake
Use Sulphate resistance cement to be used in foundations and all concrete against ground.
MC Strips founded on the clay to a suitable depth. The final formation will be to the BCO’s approval.
3. Utilities
The contractor must ensure that utilities are checked before undertaking any excavations. PLAN SE have not
completed a utilities Search.
‘Principal Designer’. Clients are required to appoint a ‘Principal Designer’ for all projects involving
more than one contractor (trade contractor) on site at one time. PLAN SE
does not provide the service of either Principal Designer and Client duties.
Clients duties The Client has a new duty to ensure that both the Principal Designer and
strengthened. Principal Contractor comply with their duties.
Client’s “key project Under CDM2015 the Principal Designer only has to provide advice to the
advisor” role removed Client with respect to Pre-Construction Information. Clients that need help
with their duties are advised in the HSE Guidance Document to seek
competent specialist advice.
Duties to be applicable to For domestic projects involving more than one contractor the Principal
domestic projects. Contractor will normally assume the Client duties. The domestic Client can
choose to appoint a Principal Designer for the project.
Principal Designer and Clients must appoint both a Principal Designer and a Principal Contractor.
Principal Contractor Principal Designer’s duties include identifying and controlling risks, assisting
required for all projects the Client in the production of Pre-Construction Information, and the
with more than one preparation of the Health and Safety File. Principal Contractor duties include
“trade” Contractor on site. the planning, management and co-ordination of the construction phase of
the project.
Construction Phase Plan is The Client is to ensure that a Construction Phase Plan, provided by the
required for all projects. Contractor or Principal Contractor, is in place before any works commence.
Threshold for notification. Notification to the HSE is required for any project exceeding 30 construction
days with 20 or more workers, or if the project exceeds 500 person days.
‘Explicit competence’ The Client will need to ensure those that are to be appointed (i.e. Designer,
requirements removed. Contractor or Principal Contractor and Principal Designer) can demonstrate
appropriate information, instruction, training and supervision.
Please see detailed risk assessment. Due to the nature of the site, there are some risks that we have not been able
to eliminate
• Beams are required to be clear span. The contractor will need to consider how these are to be erected.
o The contractor must consider the propping and ensure that loads are carried down to ground
o The contractor must provide us with their temporary works proposals prior to beginning and
propping.
5. Party walls
4.1 Party walls
Footings are lower than, and within 3m, of adjacent property.
Footings are below a 45º line , and within 6m, of adjacent property.
Removal of masonry from a party wall such as jabs and chimneys
We have considered the structural implications for a party wall award. There may be other non-structural items that
result in a party wall notice being required: flashings, drainage, enclosure etc.
6. Structural Design
Calculations to be checked by local Authority before work commences. Client to ensure all of contractors’ works on site to comply with and
meet Approval of the relevant British Standards and the Local Authority including Building Control and Planning Departments. Maximum
liability for these works is equal to the fee being paid.
Dimensions: Note that all dimensions shown on the drawings are indicative and should be checked prior to start of the works on site. It is the
responsibility of the client to notify the Designer of any discrepancies. The same applies to the alignment of walls and general layouts. All
existing foundations and lintels to be exposed to verify suitability and to be checked for adequacy and/or replaced or surrounded in 150mm
concrete cover if necessary. Prior to commencement a trial hole and /or soil report/investigation and an inspection of any trees in the areas
may be required.
Structural Calculations Loadings: We do not have access to any plans of building as they were originally constructed. Consequently, structural
calculations are based upon assumptions. The client should be aware that the calculations have limitations based upon the information
forthcoming. We are not privy to the original construction details of the building from the time of its construction.
All Steel Beams to have minimum of 1/2hr Fire Resistance via ‘ Nullifire’ Paint or 19mm Gyproc Plank tied with 1.6mm wire binding @ 100mm
c/c and finished in Carlite Bonding 16mm thick. The dimensions of all steel sections required should be measured on site by the client (or their
representative contractor or steelwork fabricator). Where the wall above is wider than the steel (supporting it) below there is the need to weld
a 12mm thick plate to the top flange/s of the steels to ensure that the wall/steel interface are the identical width.
All below ground steelwork must be concrete encased with minimum 100mm thickness.
7. Structural Calculations
Section sizes
Member numbers
Max BM (ULS)
Max SF (ULS)
Deflection (SLS)
Reactions (SLS)
STEEL DESIGN
----------------------------------------------------------------------------------------------------------------------------- -----------
CODE: BS-EN 1993-1:2005/NA:2008/A1:2014, Eurocode 3: Design of steel structures.
ANALYSIS TYPE: Member Verification
----------------------------------------------------------------------------------------------------------------------------- -----------
CODE GROUP:
MEMBER: 1 Simple member_1 POINT: 3 COORDINATE: x = 1.00 L = 3.00 m
----------------------------------------------------------------------------------------------------------------------------- -----------
LOADS:
Governing Load Case: 5 ULS /2/ 1*1.35 + 2*1.35 + 3*1.50
----------------------------------------------------------------------------------------------------------------------------- -----------
MATERIAL:
S275 ( S275 ) fy = 275.00 MPa
----------------------------------------------------------------------------------------------------------------------------------------
STEEL DESIGN
----------------------------------------------------------------------------------------------------------------------------------------
CODE: BS-EN 1993-1:2005/NA:2008/A1:2014, Eurocode 3: Design of steel structures.
ANALYSIS TYPE: Member Verification
----------------------------------------------------------------------------------------------------------------------------- -----------
CODE GROUP:
MEMBER: 2 Simple member_1 POINT: 3 COORDINATE: x = 1.00 L = 3.00 m
----------------------------------------------------------------------------------------------------------------------------- -----------
LOADS:
Governing Load Case: 5 ULS /4/ 1*1.35 + 2*1.35 + 3*1.05 + 4*1.50
----------------------------------------------------------------------------------------------------------------------------- -----------
MATERIAL:
S275 ( S275 ) fy = 275.00 MPa
----------------------------------------------------------------------------------------------------------------------------------------
STEEL DESIGN
----------------------------------------------------------------------------------------------------------------------------- -----------
CODE: BS-EN 1993-1:2005/NA:2008/A1:2014, Eurocode 3: Design of steel structures.
STEEL DESIGN
----------------------------------------------------------------------------------------------------------------------------- -----------
CODE: BS-EN 1993-1:2005/NA:2008/A1:2014, Eurocode 3: Design of steel structures.
ANALYSIS TYPE: Member Verification
----------------------------------------------------------------------------------------------------------------------------- -----------
CODE GROUP:
MEMBER: 4 Simple member_4 POINT: 3 COORDINATE: x = 1.00 L = 3.00 m
----------------------------------------------------------------------------------------------------------------------------- -----------
LOADS:
Governing Load Case: 5 ULS /2/ 1*1.35 + 2*1.35 + 3*1.50
----------------------------------------------------------------------------------------------------------------------------- -----------
MATERIAL:
S275 ( S275 ) fy = 275.00 MPa
----------------------------------------------------------------------------------------------------------------------------------------
STEEL DESIGN
----------------------------------------------------------------------------------------------------------------------------- -----------
CODE: BS-EN 1993-1:2005/NA:2008/A1:2014, Eurocode 3: Design of steel structures.
ANALYSIS TYPE: Member Verification
----------------------------------------------------------------------------------------------------------------------------- -----------
CODE GROUP:
MEMBER: 5 Simple member_5 POINT: 3 COORDINATE: x = 1.00 L = 3.00 m
----------------------------------------------------------------------------------------------------------------------------------------
LOADS:
Governing Load Case: 5 ULS /2/ 1*1.35 + 2*1.35 + 3*1.50
----------------------------------------------------------------------------------------------------------------------------------------
MATERIAL:
S275 ( S275 ) fy = 265.00 MPa
----------------------------------------------------------------------------------------------------------------------------- -----------
BUCKLING PARAMETERS:
STEEL DESIGN
----------------------------------------------------------------------------------------------------------------------------- -----------
CODE: BS-EN 1993-1:2005/NA:2008/A1:2014, Eurocode 3: Design of steel structures.
ANALYSIS TYPE: Member Verification
----------------------------------------------------------------------------------------------------------------------------- -----------
CODE GROUP:
MEMBER: 6 Simple member_6 POINT: 2 COORDINATE: x = 0.50 L = 0.78 m
----------------------------------------------------------------------------------------------------------------------------- -----------
LOADS:
Governing Load Case: 5 ULS /2/ 1*1.35 + 2*1.35 + 3*1.50
----------------------------------------------------------------------------------------------------------------------------------------
MATERIAL:
S275 ( S275 ) fy = 265.00 MPa
------------------------------------------------------------------------------------------------------------------ ----------------------
STEEL DESIGN
----------------------------------------------------------------------------------------------------------------------------- -----------
CODE: BS-EN 1993-1:2005/NA:2008/A1:2014, Eurocode 3: Design of steel structures.
ANALYSIS TYPE: Member Verification
----------------------------------------------------------------------------------------------------------------------------- -----------
CODE GROUP:
MEMBER: 7 Simple member_7 POINT: 1 COORDINATE: x = 0.00 L = 0.00 m
----------------------------------------------------------------------------------------------------------------------------- -----------
LOADS:
Governing Load Case: 5 ULS /4/ 1*1.35 + 2*1.35 + 3*1.05 + 4*1.50
----------------------------------------------------------------------------------------------------------------------------- -----------
MATERIAL:
S275 ( S275 ) fy = 275.00 MPa
----------------------------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------------- -----------
Section OK !!!
STEEL DESIGN
----------------------------------------------------------------------------------------------------------------------------- -----------
CODE: BS-EN 1993-1:2005/NA:2008/A1:2014, Eurocode 3: Design of steel structures.
ANALYSIS TYPE: Member Verification
----------------------------------------------------------------------------------------------------------------------------- -----------
CODE GROUP:
MEMBER: 8 Simple member_8 POINT: 3 COORDINATE: x = 1.00 L = 3.00 m
----------------------------------------------------------------------------------------------------------------------------------------
LOADS:
Governing Load Case: 5 ULS /5/ 1*1.35 + 2*1.35 + 3*1.50 + 4*0.75
----------------------------------------------------------------------------------------------------------------------------------------
MATERIAL:
S275 ( S275 ) fy = 275.00 MPa
----------------------------------------------------------------------------------------------------------------------------- -----------
----------------------------------------------------------------------------------------------------------------------------- -----------
VERIFICATION FORMULAS:
Section strength check:
N,Ed/Nt,Rd = 0.00 < 1.00 (6.2.3.(1))
My,Ed/MN,y,Rd = 0.32 < 1.00 (6.2.9.1.(2))
Mz,Ed/MN,z,Rd = 0.05 < 1.00 (6.2.9.1.(2))
(My,Ed/MN,y,Rd)^ 2.00 + (Mz,Ed/MN,z,Rd)^1.00 = 0.16 < 1.00 (6.2.9.1.(6))
Vy,Ed/Vy,T,Rd = 0.00 < 1.00 (6.2.6-7)
Vz,Ed/Vz,T,Rd = 0.06 < 1.00 (6.2.6-7)
Tau,ty,Ed/(fy/(sqrt(3)*gM0)) = 0.00 < 1.00 (6.2.6)
Tau,tz,Ed/(fy/(sqrt(3)*gM0)) = 0.00 < 1.00 (6.2.6)
Global stability check of member:
My,Ed/Mb,Rd = 0.52 < 1.00 (6.3.2.1.(1))
----------------------------------------------------------------------------------------------------------------------------------------
LIMIT DISPLACEMENTS
STEEL DESIGN
----------------------------------------------------------------------------------------------------------------------------- -----------
CODE: BS-EN 1993-1:2005/NA:2008/A1:2014, Eurocode 3: Design of steel structures.
ANALYSIS TYPE: Member Verification
----------------------------------------------------------------------------------------------------------------------------- -----------
CODE GROUP:
MEMBER: 9 Simple member_9 POINT: 3 COORDINATE: x = 1.00 L = 3.60 m
----------------------------------------------------------------------------------------------------------------------------- -----------
LOADS:
Governing Load Case: 5 ULS /5/ 1*1.35 + 2*1.35 + 3*1.50 + 4*0.75
----------------------------------------------------------------------------------------------------------------------------------------
MATERIAL:
S275 ( S275 ) fy = 265.00 MPa
--------------------------------------------------------------------------------------------------------- -------------------------------
----------------------------------------------------------------------------------------------------------------------------- -----------
VERIFICATION FORMULAS:
Section strength check:
N,Ed/Nc,Rd = 0.00 < 1.00 (6.2.4.(1))
My,Ed/My,c,Rd = 0.12 < 1.00 (6.2.5.(1))
Vy,Ed/Vy,T,Rd = 0.00 < 1.00 (6.2.6-7)
Vz,Ed/Vz,T,Rd = 0.37 < 1.00 (6.2.6-7)
Tau,ty,Ed/(fy/(sqrt(3)*gM0)) = 0.29 < 1.00 (6.2.6)
Tau,tz,Ed/(fy/(sqrt(3)*gM0)) = 0.17 < 1.00 (6.2.6)
Global stability check of member:
My,Ed,max/Mb,Rd = 0.13 < 1.00 (6.3.2.1.(1))
N,Ed/(Xy*N,Rk/gM1) + kyy*My,Ed,max/(XLT*My,Rk/gM1) + kyz*Mz,Ed,max/(Mz,Rk/gM1) = 0.14 < 1.00 (6.3.3.(4))
N,Ed/(Xz*N,Rk/gM1) + kzy*My,Ed,max/(XLT*My,Rk/gM1) + kzz*Mz,Ed,max/(Mz,Rk/gM1) = 0.14 < 1.00 (6.3.3.(4))
---------------------------------------------------------------------------------------------------------------- ------------------------
LIMIT DISPLACEMENTS
STEEL DESIGN
----------------------------------------------------------------------------------------------------------------------------- -----------
CODE: BS-EN 1993-1:2005/NA:2008/A1:2014, Eurocode 3: Design of steel structures.
ANALYSIS TYPE: Member Verification
----------------------------------------------------------------------------------------------------------------------------- -----------
CODE GROUP:
MEMBER: 10 Simple member_10 POINT: 2 COORDINATE: x = 0.50 L = 1.50 m
----------------------------------------------------------------------------------------------------------------------------- -----------
LOADS:
Governing Load Case: 5 ULS /2/ 1*1.35 + 2*1.35 + 3*1.50
----------------------------------------------------------------------------------------------------------------------------------------
MATERIAL:
S275 ( S275 ) fy = 275.00 MPa
----------------------------------------------------------------------------------------------------------------------------- -----------
STEEL DESIGN
----------------------------------------------------------------------------------------------------------------------------- -----------
CODE: BS-EN 1993-1:2005/NA:2008/A1:2014, Eurocode 3: Design of steel structures.
ANALYSIS TYPE: Member Verification
----------------------------------------------------------------------------------------------------------------------------- -----------
CODE GROUP:
MEMBER: 11 Simple member_11 POINT: 2 COORDINATE: x = 0.50 L = 1.50 m
----------------------------------------------------------------------------------------------------------------------------- -----------
LOADS:
Governing Load Case: 5 ULS /5/ 1*1.35 + 2*1.35 + 3*1.50 + 4*0.75
----------------------------------------------------------------------------------------------------------------------------------------
MATERIAL:
S275 ( S275 ) fy = 275.00 MPa
--------------------------------------------------------------------------------------------------------- -------------------------------
STEEL DESIGN
----------------------------------------------------------------------------------------------------------------------------------------
CODE: BS-EN 1993-1:2005/NA:2008/A1:2014, Eurocode 3: Design of steel structures.
ANALYSIS TYPE: Member Verification
----------------------------------------------------------------------------------------------------------------------------- -----------
CODE GROUP:
MEMBER: 12 Simple member_12 POINT: 2 COORDINATE: x = 0.50 L = 1.62 m
----------------------------------------------------------------------------------------------------------------------------------------
LOADS:
STEEL DESIGN
----------------------------------------------------------------------------------------------------------------------------- -----------
CODE: BS-EN 1993-1:2005/NA:2008/A1:2014, Eurocode 3: Design of steel structures.
ANALYSIS TYPE: Member Verification
----------------------------------------------------------------------------------------------------------------------------- -----------
CODE GROUP:
MEMBER: 14 Simple member_14 POINT: 2 COORDINATE: x = 0.50 L = 2.00 m
----------------------------------------------------------------------------------------------------------------------------- -----------
LOADS:
Governing Load Case: 5 ULS /2/ 1*1.35 + 2*1.35 + 3*1.50
----------------------------------------------------------------------------------------------------------------------------------------
MATERIAL:
S275 ( S275 ) fy = 275.00 MPa
------------------------------------------------------------------------------------------------------------------ ----------------------
1. USE ONLY FIGURED DIMENSIONS. All dimensions in mm's. Refer to Architect's drawings for
setting out. This drawing is to be read in conjunction with all relevant Architects, subcontractors and
engineers drawings and specifications. Final co-ordination of cladding, drainage, insulation, steelwork,
and other elements is the responsibility of the contractor.
2. All dimensions and levels shown are based on survey drawings. The contractor is to satisfy
themselves that dimensions levels etc are sufficiently accurate to complete construction to the
necessary tolerances. Existing structure to be verified on site by the contractor and any discrepancies
reported immediately to Engineer.
3. Where applicable the contractor is to notify the local H.S.E. area office of the works using form
F10 (rev.) in accordance with the C.D.M. regulations, 2015. A copy of the notification is to be displayed
on site and copied to the Engineer. The client must appoint the Principal Designer and Principal
Contractor and comply with CDM Regulations for all projects: PLAN SE are not the Principal Designer.
The Client must ensure that the Principal Designer issues the Health and Safety File at tender stage,
The Contractor must have a Construction Phase Plan in Place prior to beginning works.
5. Concrete to be in accordance with BS8110. Concrete for mass concrete foundations to be To FND
3 in accordance with BS8500 (minimum strength 35N/mm², 20mm maximum aggregate size, 75mm
slump and ordinary Portland Cement). Reinforced concrete to be RC28/35 min (previous designation
C35N/mm²) unless noted otherwise.Minimum Cement contents 320kg/m3, Water cement ratio 0.55.2
Cubes to be taken for every 10m3, or every pour, and 1 tested at 28 days with the results provided to
the engineer.
2
(SP-01)
(SP-01)
2No. 50x200
500x100x140 6. Structural steelwork to be in accordance with ADVANCED275JR internally , for high grade steel
C24 Floor Joists
MC Padstone use ADVANCED355JR internally. BS5950 for design detail and workmanship. Steelwork must be
fabricated in accordance with BS EN 1090. Fabricated Steelwork must be provided with a CE Mark,
FPC, RWC and WQMS. All structural work and fire protection to the satisfaction of the Building Control
Officer.
2No. 50x200
Existing wall to surface cleanliness is to Swedish Standard SA2.5. Paint specification to be in accordance with
be removed BS5493. In shop applied high build Red zinc phosphate modified alkyd, to 75 microns. On site,
degrease and touch up as necessary using high build zinc phosphate modified alkyd to 60 microns.
Thicknesses are dry film thicknesses. Steelwork built into cavity to be galvanised inaccordance to EN
ISO 1461 with a minimum 85μm thickness. Site repairs to galvanising to be completed with Cold
2
Galvafroid or similar. Concrete Encased steelwork to have 2 additional site coats of bitumen paint.
(SP-01)
8. Unless noted otherwise, steelwork welds to be minimum 6mm fillet weld, all bolts to be grade 8.8
with minimum 16mm diameter. Overall lengths & Connection design is the responsibility of the
152x152x37 UKC
contractor and details where shown are indicative. Where loads are shown on the drawings, V =
Beam 1.6:
New stud wall Factored Shear loads, M = Factored Moments. Connection Calculations & Fabrication details are to be
Span of provided by fabricator to the Engineer prior to fabrication for connection approval and to the Architect
Assumed span
existing joists for setting out approval. Minimum 2M16 per connection and take 75kN tie force, 80kN shear unless
of existing joists
Staircase TBC noted otherwise. Bolt all double beams together with M16 at 600c/c with Spacer tubes. Where
Chimney to be TBC
TBC on site columns sit against masonry bolt back with M16 Resin Anchors at 450c/c staggered either side of
removed flange. Welding to comply with BS EN 288. Site welding if essential to be tested in accordance with
Beam 0.1: 254x254UKC89 the national steelwork specification and results provided to the engineer.
M=50kNm
encased in 100 thick V=130kN Beam 1.1: 254x254UKC89
concrete with D49 wire mesh 9. Contractor MUST provide fabrication drawings & connection calculations to the engineers two
weeks prior to fabrication for approval, final appearance to be agreed with the architect.
(galvanized)
M=50kNm
C3 Column: C3 Column: V=170kN New 50x200 10. Structural timber to be strength class C24, unless noted otherwise, in accordance with BS5268.
C3 Column All double & multiple timbers to be bolted with M10 at450c/c. All new timber in works to be tanalised
203x203x60UKC 203x203x60UKC C24 @300
New wall fully below New wall fully with cut ends treated before fixing. New timber connections to have proprietary galvanised steel fixings.
Joists
by others
SP-01 SP-01 SP-01
Rooflight
of existing joists permitted for exposed masonry brickwork. Block contraction joints required at 6m c/c and brickwork
Existing wall to TBC expansion joints at 12m c/c. Where existing new masonry meets existing masonry stainless steel furfix
be removed 2No. 140x100mm
connections are required. Provide stainless steel EML Bed joint reinforcement two course (150 and
Precast lintels 300 spacing) above and below all new window and door openings. Below DPCS, all masony to the
C1 Column: C1 Column Cranked C1 Column
C1 Column: Frost resistant. Block work below DPC to be sulphate resistant.
203x203x60UKC below point below New 50x150
203x203x60UKC
2No. timb.trimmers C24 @300 13. Padstones, required under all new beam bearing onto masonry, to be 1:1.5:3 mix, (C30). Or PC
Beam 1.2: 254x254UKC89
(To be confirmed by Building
M=60kNm Joists Lintels if noted. 15mm thick Plate can be used with engineers approval.
600mm wide MC footing
founded 1000 mm b.g.l.
V=120kN
Beam 0.2: 254x254UKC89 M=60kNm 14. Dry packing to be to be 2:1 Sand:Cement. Beams over 5m and to all underpins Dry pack to
encased in 100 thick V=120kN contain Fosroc CBex 100. Dry pack to be well rammed in. 48 hours to be left from drypacking to
by others
Rooflight
concrete with D49 wire mesh removal of any temporary supports.
Control)
15. The main contractor is to be responsible for the temporary stability of existing structures and
earthworks on the site and adjoining sites, and must take all necessary precautions to safeguard this
by others
deep Beam
Rooflight
16. Existing lintels to be inspected and replaced if showing signs of deterioration.
& Block floor
New 50x200
M=10kNm M=20kNm 17. Existing masonry to be inspected. Where cracked or debonded, repairs are as specified. If repairs
C2 Column: C24 @300
V=15kN V=40kN are not specified contact the engineer. Existing walls to be checked for lateral restraint. If restraint is
150x100x10RHS Beam 1.5: 203x133x25UKB Joists
Existing foundations TBC inadequate provide lateral restraint.
with 8mm bottom plate 2No. timb.trimmers
18. Provide Lateral Restraint straps (1200x30x3) at 1200centres to floors and roof. Provide Holding
Down straps (1200x30x3) at 1200centres roof sole plate.
C2 Column: 600mm wide MC footing C2 Column C2 Column
(SP-10)
(SP-10)
(SP-10)
150x100x10RHS founded 1000 mm b.g.l. below below 19. Use Ancon ST1 Wall ties for new cavity over 75mm. Fix at standard spacing. Less than 75mm
(To be confirmed by Building cavity standard wall ties to be used.
Control)
2
2
ALLOW FOR PILED FOOTING IN CASE OF CLAY
SOIL AND NEARBY TREE. TBC BY CONTRACTOR
AND AGREED WITH BCO.
Beam 1.3
Beam 1.2 Beam 1.1
Beam 1.5 Level TBC on site Level TBC on site - First issue for comments EM 01-09-22
due to existing joists due to staircase
Existing wall to be
removed
PLAN Structural Engineers
info@planse.co.uk
Existing concrete Existing floor to be
CLIENT:
lowered. TBC on site
slab TBC Thomas
Existing slab
New Beam&Block
floor SITE:
SECTION 1-1 SECTION 2-2 126 Astonville Street
0 1 2 3 4 5
2207 SP-01 -
Engineering Information Sheet/ Loadings
Project: Section Sheet
126 Astonville St L
Date Rev Date Description
By FA
Tel 07341149942 Cheked
Job Number Status Rev
info@planse.co.uk 2007
Reference
General Actions on Building Structure
LOADING
0.60 m
dead imposed wind
Partial safety factor 'γf' = 1.40 1.60 0.15 m
0.2
Horizontal load 'H' [kN/m] =
Moment load 'M' [kNm/m] =
Foundation s/w [kN/m 2 ] = 7.08 - -
0.3
Soil s/w [kN/m 2 ] = 4.00 - -
REINFORCEMENT DATA
27.75 kN/m2 27.75 kN/m2
Top reinforcement diameter 'Øtop' [mm] = N/A N.T.S.
Roof Space
Joists and Insulation 0.10 Total dead load=0.25
Soffit 0.15 Total live load=0.25
Live load 0.25 Total unfactored load=0.50
Timber floors
Boards and Joists 0.30 Total dead=0.45
Soffit 0.15 Total live load=1.50
Live load 1.50 Total unfactored load=1.95
WALL LOADS
Internal stud wall
Studding 0.20 Total unfactored load=0.50
2 x Plasterboard 0.30