0 1 2 3 4 5

Flood Zone 2/3 flood proofing/resilience and resistance


techniques:

Finished floor level of extension to be no lower than the


existing finished floor level, approximately 150mm above
ground level.

External cavity wall construction with brickwork and


lightweight aggregate block inner leaf having an internal
finish of 2 coat plaster with closed cell insulation board in
cavity.

Engineering brickwork to be used for inner and outer


leaf below damp proof course.

150mm thick ground bearing concrete ground floor


slab on 1200 gauge polythene damp proof membrane
on well compacted hardcore.
Sand/cement screed floor finish on closed cell insulation
board.

Doors and windows to be of UPVC construction with


silicon mastic seal to masonry reveals.

Service entries to be sealed with expanding foam.


Electrical sockets to be located above floor level
with ring mains located within ceiling with drops to
ground floor sockets.

Rainwater attenuation to be provided by the use of


water butts.

Revisions

A. Roof plan and EA flood proofing/resilience and


resistance techniques added 15/10/22
B. Building Regulations upgrade 14/3/23
C. Vehicular hardstanding and dropped kerb amended 5/4/23

0 1 2 3 4 5

CDM Regulations 2015

Contractor to undertake a manual handling assessment of lintels


and steelwork required for the project. CLIVE BALDWIN Building Design
Contractor to undertake a refurbishment and demolition survey
to determine if asbestos is present. Witches Moon, Stony Lane, Little Kingshill, Bucks. HP16 0DS.
Easy clean hinges to be fitted to windows where access for Telephone: 01494 936869
Note: steel beams and timber beams are
cleaning is restricted from ground.
for guidance only and subject to confirmation
Client to ensure that suitable access equipment is used to clean
by structural engineer
and maintain windows and restricted areas.
13 RUSHBURN
Due to the close proximity of boundary and adjacent footpath WOOBURN GREEN
and building a suitable scaffold and guarding will be required to
ensure that the proposed works can be safely undertaken from
within the site and that adequate measures are in place to protect Proposed extension & alterations
members of the public.
Client to ensure that smoke alarms are regularly checked to Scale: 1:50, 1:100 @ A1 Date: MARCH 2022
ensure their operation.

2210/02C
Scale this drawing for Planning purposes only.
All dimensions are to be checked on site and any discrepancies reported.