Professional Documents
Culture Documents
2 4
- -
BEAM 2
BEAM 2
INDICATES
PMO
PRIMARY BEAM 1 ORIENTATION
BEAM 1 1 W
-
BEAM 1 3 W - GREATER THAN OR EQUAL TO 200
LESSER THAN OR EQUAL TO 300 W
- 2T20 GREATER THAN OR EQUAL
BEAM 1 - PRIMARY BEAM TO 150 LESS THAN 200
BEAM 2 - SECONDARY BEAM BEAM 1 - PRIMARY BEAM
OR EQ. TO 750
LESS THAN
LESS THAN OR EQ. TO 1500
GREATER THAN 750 AND
SLAB REINFORCEMENT
ARCHITECT CONSULTANT
SLAB REINFORCEMENT
SECONDARY BEAM REFT. - T2 PRIMARY BEAM REFT. - T1 SECONDARY BEAM REFT. - T2 PRIMARY BEAM REFT. - T1 ANCHORED OUTSIDE
PRIMARY BEAM REFT. - T1 SECONDARY BEAM REFT. - T2 PRIMARY BEAM REFT. - T1 SECONDARY BEAM REFT. - T2 VERTICAL FABRIC
T10-150 U
BARS
BEAM INTERSECTION (NO COLUMN SUPPORT) UPSTAND / DOWNSTAND REINF. (NON STRUCTURAL)
(U.N.O. IN BEAM SCHEDULE)
LAP LAP
LAP 1
The Residences
LAP
E.J
PROVIDE EXPANSION JOINT AS PER DETAIL, Description
MAX. DISTANCE BETWEEN JOINTS TO BE 20 METERS
LAP STRUCTURAL:
DEEP SEALANT
AT SUPPORT AT SUPPORT
FLOOR SLAB
2 OF 3
1 : 25 A1