B-B NOTES :

T2-18 - PLT20*220
T2-16 - L50*50*5
DISCLAIMER : Design copy of this document is under PT. APKPlus property and only use for as stated project. Giving it to other and the use or comunication of the contents there of, are prohibited without permission and any damages or miss-use impact
T2-20 - L50*50*5 1:43 1. ALL DIMENSIONS IN MILIMETER

E-E T2-20 - L50*50*5


2. MATERIAL AND STANDARD :
F-F a). MEMBER : MILD STRUCTURE STEEL : ST-37/JIS-G3101-SS400
1:20 - HIGH STEEL QUALITY IS JIS G3101 SS540

E E T2-18 - PLT20*220 1:20 b). PLATE : MILD STRUCTURE STEEL : ASTM A36/JIS-G3101-SS400
T2-15 - L50*50*5 - HIGH STEEL QUALITY IS SM490YB
c). CONNECTION BOLT : JIS B1051 Gr.8.8/ ASTM A325
T2-15 - L50*50*5 F HOLE 24
T2-18 - PLT20*220 3. ONE SET OF FASTENER :
CONNECTION BOLT : 1 BOLT + 1 NUT + 1 SPRING WASHER & 1 PLAIN WASHER
HOLE 14 4. WELDS : AWS D1.1 E70XX

*6

T2-25
0.7 x THICKNESS OF PLATE

L60*60
T2-12 - L50*50*5 5. HOT DIP GALVANIZE ASTM - A123

- L60*6
-
T2-13
HITACHI ABB POWER GRIDS
T2-9 - L50*50*5

0*6
PT. ABB Power Grids Indonesia
RESPONSIBLE DEPT. : PRIMARY
PGGI - Engineering

F A P APPROVED
CONSTRUCTION DRAWING
SECONDARY
B APPROVED AS NOTED
D-D
D D C NOT APPROVED
1:20

*5
CIVIL
I INFORMATION

*50
REVIEW DATE :

50
T2-9 - L50*50*5 19/11/2021

-L

T2
APPROVAL DOES NOT RELIEVE OTHERS

T2-22
-7

T2-23 - L50*50*5

-1
CONTRACTOR'S RESPONSIBILITY FOR
T2 ERROR AND/OR DEVIATION FROM

7-
PLT5*50 CONTRACT REQUIREMENT

L5
0 16-11-2021 FOR APPROVAL

T2-23 - L50*50*5
T2-4 - L70*70*7

0*5
M- 12 x 40

0*
Rev. Date Prepared by DESCRIPTION

5
T2

0*5
OWNER :
-2

*5
50
-L5

-L
0 *5

9
T2-10 - L70*70*7

-1
M- 12 x 35
0*5

T2
T2-9 - L50*50*5
*5
*50
50

C-C CLIENT :
-L

1:20
-6

T2-3 - L80*80*8 T2-11 - L80*80*8


T2

T2-8 - L50*50*5
M- 12 x 40 T2-8 - L50*50*5

T2
T2-23 - L50*50*5

-2
4
C C M- 12 x 40 FABRICATOR :

-L
50

T2-23 - L50*50*5
T2-22
T2

*50
-1

PLT5*50
*5
-L5

0*5
0*5

PT. ANUGERAH PERKASA KONSTRUKSI PLUS


*5
0* 5

50

SIDOARJO
-L

M- 12 x 40
1
-2
T2

T2-8 - L50*50*5
T2-11 - L80*80*8

PROJECT TITLE :
0* 5

CIKARANG LISTRINDO MM2100-POWER STATION


0* 5

T2-11 - L80*80*8 M- 12 x 35 T2-3 - L80*80*8 DT20 AND 22 ASSOCIATED WORK


- L5
-5
T2

DRAWING TITLE :
are not under responsibility Of PT. APKPlus

A-A
6
T2-3 - L80*80*8

1:20 STEEL STRUCTURE


T2-3 T2-11 ISOMETRIC SHIELDING MAST
T2

PLT20*120 PLT20*120
-1

M- 12 x 40
-L5
0*5

Drawn by Checked by Checked by Validated by


0* 5

HOLE 28
0* 5

MKS DKT HJO


0* 5

Site Name / Site ID


L5

3D
-

Location
-5

T2-11 T2-3
T2

Date 18.11.2021
PLT20*120 PLT20*120
Tekla structures

Oracle Code
44

APAJ-97
Dwg. Reference
B B Dwg. Number APAJ/CKG/T2-/GA- Scale:NTS

Sheet
REV. 0
Total Sheet 01

DOC. STATUS : A B C D E F G H