LEGEND: Date: 08 Aug 2022
FOUNDATION BEAM SHOP DRAWING
1-1 1-2 I FB-1-001
200
TOC 79.70 COLO 2 = 3
TOC 79.70
TOC 79.70 TOC 80.25 MECH PLANT= 4 Datacenter Indonesia
850 200
550
600
1400
GENSET = 5 Karawang International Industrial City (KIIC)
TOC 79.70
1050
1050
1600
BOC 78.65 COOLING TOWER = 6 West Java, Indonesia
200
TOC 78.65
1050
1050
1000
850 200550
FB-1-001 BOC 78.65 CONSUMER = 7
MAKE UP WATER TANK AREA = 8
1600
BOC 78.65
1400
300 WATER PROCESS TREATMENT (INDUSTIAL) = 9 Engineer
1200
1200
FB-1-001 FB-1-146 DOMESTIC WATER PLANT = 10
1200
BOC 78.65 300Wx1050D 400Wx1050D FIRE PUMP ROOM = 11
TOFB:79.700 m TOFB:79.700 m GUARD HOUSE = 12
BOC 78.65 600 SWITCH ROOM = 13 152 Beach Rd, #16-00 Gateway East, Singapore 189721
PLN SUBSTATION = 14
FB-01-001 Section 1 Section 2 Section 3 Section 4
Note :
280 I NOTE:
1450 3750 1950 150 150 1950 3750 1300 150 150 1300 4400 1300 150 150 1300 4400 1300 150 150 300 720 3180 300 1120 1450 1450 STEEL STRUCTURE ELEMENTS ARE SHOWN
111 Somerset Road, Unit #07-10 TripleOne Somerset
TOC 80.25 TOC 80.25 SCHEMATICALLY. Singapore 238164
TOC 80.25 TOC 80.25 TOC 80.25 TOC 80.25 TOC 80.25 REFER TO STEEL STRUCTURE DETAILS FOR Note :
800 100
800 100
EXACT LOCATIONS AND DIMENSIONS.
200
230
600
600
600
600
1600
1600
1600
1600
1600
1600
1600
1400
1370
700
700
BOC 78.65 BOC 78.65 BOC 78.65 BOC 78.65 BOC 78.65 Status
FB-1-002 FB-1-003 FB-1-004 FB-1-005 FB-1-006 250 350 BOC 78.65 Approved with comment Rejected
BOC 78.65
600Wx1600D 600Wx1600D 600Wx1600D 600Wx1600D 600Wx1600D 600 250 350 Signature : Date :
1 : 75 1 : 75
10 10 10 10 11 10a
600
600
250 350
250 350 Status
600 100
TOC 79.70 Construction Supervision
550
600
600
600
600
600
600
600
800
BOC 79.65 BOC 79.65
30.00
BOC 79.65 BOC 79.65 BOC 79.65
100
BOC 79.55
200
1600
°
FB-1-012 FB-1-013 FB-1-014 FB-1-015 1730 173 FB-1-016 3947
1050
1000
1000
300Wx600D 300Wx600D 300Wx600D 300Wx600D 300Wx600D BOC 79.45 TOC 78.65 TOC 78.65
TOFB:80.250 m TOFB:80.250 m TOFB:80.250 m TOFB:80.250 m TOFB:80.250 m International Financial Centre, Tower 2 Lt. 26,
Jl. Jenderal Sudirman, Kuningan, Kuningan Tim., Kecamatan
Setiabudi, Jakarta, Daerah Khusus Ibukota Jakarta 12920
1200
1200
Note :
FB-1-012--016
1 : 75
Section 6 Section 7 Status
1-1 1-2 1-3 1-4 1-5 1-6 Approved with comment Rejected
I Signature :
General Contractor
Date :
550 5300 1450 1450 4400 1450 1450 4400 1450 1450 4400 1450 1450 4600 1450
TOC 80.25 TOC 80.25 TOC 80.25 TOC 80.25 TOC 80.25 I Refer to Ramps & Jl. Pancoran Timur II no 3
Pancoran, Jakarta 12780, Indonesia
Stairs Drawings (021) 7982223 , (021) 7944142
600
600
600
600
600
Refer to Ramps & TOC 80.25 Contractor Design Team
Stairs Drawings
800 100
FB-1-022 FB-1-023 FB-1-024 FB-1-025 FB-1-026
230
Drawn By
BOC 79.65 BOC 79.65 BOC 79.65 BOC 79.65 BOC 79.65 TOC 80.25 M.D
300Wx600D 300Wx600D 300Wx600D 300Wx600D 300Wx600D Checked By
M.T
TOFB:80.250 m TOFB:80.250 m TOFB:80.250 m TOFB:80.250 m TOFB:80.250 m
800 100
1370
230
700
TOC 78.65 Revisions
1600
1600
No. Date Description
1370
FB-1-022--026 A 28 APRIL 2022 FOR APPROVAL
700
1200
1200
B 28 JULY 2022 FOR APPROVAL
1 : 75
10 10 10 10 10
BOC 78.65 250 350
1-1 1-2 1-3 1-4 1-5 1-6 600
Section 8 Section 9
150 150 5700 1450 1450 4400 1450 1450 4400 1450 1450 4400 1450 1450 4600 1450 1 : 75 1 : 75
TOC 80.25 TOC 80.25 TOC 80.25 TOC 80.25 TOC 80.25 H H No. Dwg. No.
Reference Drawing
1. JKT02-S-C-110-1
200
2. JKT02-S-D-110-1
600
600
600
600
600
3. JKT02-S-E-235-1
4. JKT02-S-F-110-1
FB-1-032 FB-1-033 FB-1-034 FB-1-035 FB-1-036 TOC 80.25 TOC 80.25 5. JKT02-S-F-111-1
400 200
370 230
BOC 79.65 BOC 79.65 BOC 79.65 BOC 79.65 BOC 79.65
300Wx600D 300Wx600D 300Wx600D 300Wx600D 300Wx600D 6. JKT02-A-D-202-1
200
230
TOFB:80.250 m TOFB:80.250 m TOFB:80.250 m TOFB:80.250 m TOFB:80.250 m
BOC 79.65 150 150
BOC 79.65 150 150
300
300
Key Plan
FB-1-032--036 Section 10 Section 10a
1 : 75 1 : 75 1 : 75
10 10 10 10 10
400 200
370 230
m NORTH
0°
TOC 80.25 TOC 80.25
200
45.0
180 100
600
600
600
600
600
600
600
TOC 80.15
600 100
Drawing Title
50 230
FOUNDATION BEAMS ELEVATIONS
FB-1-043 FB-1-044 FB-1-045 FB-1-046 FB-1-047 FORMWORK
45.0
BOC 79.65 BOC 79.65 BOC 79.65 BOC 79.65 BOC 79.65 300 175 COLO 1
300Wx600D 300Wx600D 300Wx600D 300Wx600D 300Wx600D 50 360 360 50 BOC 79.65 SHEET 1
0°
TOFB:80.250 m TOFB:80.250 m TOFB:80.250 m TOFB:80.250 m TOFB:80.250 m BOC 79.55
Scale at A1
1 : 75
150 150 Discipline
300 STRUCTURE
Suitability
ISSUED FOR CONSTRACTION
Section 11 Section 12 Drawing Number Rev
FB-1-043--047 1 : 75 1 : 75 JKT02-JO-SHD-STR-2005 B
A
Do not scale
1 : 75 CONFIDENTIAL INFORMATION : This drawing/document and all design, details, inventions or developments covered or derived thereby are confidential and the exclusive property of the owner (or its affiliates), which reserve all rights in the is drawing/document. Copying, reproduction, duplication, or distribution to a third party, in whole or in part, is forbidden unless expressly authorised in writing.