You are on page 1of 1

A'-B

A'6

GENERAL SHEET NOTES -


A'-5

02
03 A'-C NO. DATE ISSUE
A-211
FLOOR PLANS 1
2
05/13/2020
06/05/2020
Concept Design Final
SD 50%
3 2020/08/07 Concept MP Redesign 1
A LETTERED KEY NOTES DO NOT IMPLY SEQUENCE.
4 2020/08/11 Concept MP Redesign 2
CONTRACTOR TO PERFORM WORK AS REQUIRED PER WORK
SEQUENCE. 7 2020/08/27 Concept MP Redesign 3

04 13
A-
2
8 2020/09/10 Concept MP Redesign 4

05 13
A-
A'-D B ALL METAL STUD IS 25 GAUGE STEEL STUDS @600mm O.C.,

2
U.N.O. 16 2020/10/13 Schematic Design Rev 7
1 C ALL PARTITIONS ABOVE GLASS PARTITIONS <LOCATIONS> TO 20 2020/10/23 Schematic Design Rev 11
A-312 BE TYPE G01 U.N.O.
D ALL UNFINISHED COLUMNS TO RENDERED WITH FINISH
CONCRETE, U.N.O.
E PATCH AND REPAIR EXISTING WALLS AND PARTITIONS
SCHEDULED TO REMAIN, INCLUDING CORE WALLS AND
COLUMN ENCLOSURES. PREPARE WALLS AS REQUIRED FOR
A'-4
SCHEDULED FINISHES.
F ALL DIMENSIONS ARE TO FACE OF GYP BOARD U.N.O.
G MAINTAIN DIMENSIONS INDICATED TO BE "CLEAR", "HOLD" OR
"MIN”. REVIEW VARIATIONS ON THESE DIMENSIONS WITH THE
ARCHITECT BEFORE BEGINNING CONSTRUCTION.
H REVIEW DIMENSIONS NOTED WITH "VIF" WITH ARCHITECT
BEFORE BEGINNING CONSTRUCTION.
0
A- 1 J LAY OUT ALL PARTITIONS AND DOOR LOCATIONS ON FLOOR,
21
3 A'-3 FOR REVIEW AND ACCEPTANCE BY ARCHITECT PRIOR TO
G2-5 MPR PROCEEDING WITH CONSTRUCTION.
2.2.3 K PROVIDE BANDING AND BLOCKING AT WALL HUNG EQUIPMENT
438.5 m²
AND FURNISHINGS. COORDINATE LOCATIONS WITH
ARCHITECT.
L COORDINATE LOCATIONS OF ACCESS PANELS IN WALL AND
A'-2
CEILINGS WITH ARCHITECT PRIOR TO INSTALLATION. WHERE
EXISTING ACCESS PANELS CONFLICT WITH NEW WORK,
CONTACT ARCHITECT TO COORDINATE NEW LOCATION FOR
ACCESS PANELS.
M REFER TO AV DRAWINGS FOR MOUNTING HEIGHTS AND
CONDUIT REQUIREMENTS AT LOCATIONS OF MONITORS AND
AV EQUIPMENT.

03 13
A-
2
N REPAIR AND/OR REPLACE DAMAGED EXISTING CONVECTOR SEAL
ENCLOSURES. REPLACE MISSING GRILLE AS REQUIRED.
A'-1
O MANUFACTURER'S NAME, TRADEMARK, AND LOGOS SHALL
NOT BE VISIBLE

2 2

02 13
A-
A-311 A-312 N

2
A-8

KEY PLAN

4300 1045 Huai Hai Middle Road


2-RUN STAIR Huai Hai Plaza
38th Floor, Suite 3803
Shanghai 200031 China
T. + 86 21 6252 1040
A-6

Owner:
G5 G5 G5 G5
G5 2.1.5 2.1.5 2.1.5
2.1.5 Van Giang Commerce and Tourism Township, Xuan
2.1.5 80.7 m² 80.7 m² 80.7 m² 80.5 m² MARKUP LEGEND
7800

80.7 m² Quan Commune, Van Giang district, Ecopark, Vietnam


G4
G4 UP Construction Manager:
2.1.4
81.8 m² 2.1.4 Stair PARTITION
80.7 m² 10
34.8 m²
Wall Partition Rw+c ≥ 39dB
A-5

Civil / Site:
Wall Partition Rw+c ≥ 47dB
4200

Corridor
10
274.6 m²
A-4
Wall Partition Rw+c ≥ 56dB
Landscape:
Learning Sup. Learning Sup.
2.4.3.1 2.4.3.2

EQ
31.5 m² 31.3 m²
CMU WALLS
UP Learning
Commons Wall Partition Rw+c ≥ 49dB
9000

G4 2500
STORAGE
4
DB CL 2.2.1
Structural:
2.1.4 10 85.7 m²
9.9 m²
88.6 m² 3 m²
1 Learning Sup. Learning Supp.
Wall Partition Rw+c ≥ 60dB
1200

EQ
A-311 2.4.3.1 2.4.3.2 2
01 31.5 m² 33.5 m²
A-321
A-212 MEP:
A-3
IDF
LINING
10
Lining
4200

3 m²
Corridor
10
A-2
274.6 m²
GLASS PARTITION PROJECT TITLE:
Stair 02
10 Glazing Partition Rw+c ≥ 37dB
UP
31.1 m² A-212
ECOPARK DAESUNG
Glazing Partition Rw+c ≥ 47dB
INTERNATIONAL
7800

Boy's Toilet
2.4.6
18.7 m²
G4 G3 DOOR
2.1.4
89.9 m²
G4
2.1.4
79 m²
G3
2.1.3
79 m²
G3
2.1.3
79 m²
2.1.3
79 m²
G3
2.1.3
79 m²
G3
2.1.3
79 m²
Girl's Toilet
2.4.6
14.9 m²
SCHOOL
A-1 Door Rw+c ≥ 30dB
800

Door Rw+c ≥ 34dB HANOI, VIETNAM

Door Rw+c ≥ 40dB

Double door Rw+c ≥ 45dB PROJECT No: 82630

DRAWING TITLE:
6600 9000 9000 9000 9000 9000 9000 8800
LEVEL 3 ZONE A
A-A A-B A-C A-D A-E A-F A-G A-H A-I
82630_ARCH_2020_detached.rvt

01
A-211

SCALE: 1 : 200

A-131
11/6/2020 7:51:44 PM

2
AS-301

L3 - ZONE A SCHEMATIC DESIGN


1 1 : 200
2020.11.06