You are on page 1of 1

GENERAL SHEET NOTES - NO.

DATE ISSUE

FLOOR PLANS 1
2
05/13/2020
06/05/2020
Concept Design Final
SD 50%
3 2020/08/07 Concept MP Redesign 1
A LETTERED KEY NOTES DO NOT IMPLY SEQUENCE.
4 2020/08/11 Concept MP Redesign 2
CONTRACTOR TO PERFORM WORK AS REQUIRED PER WORK
SEQUENCE. 7 2020/08/27 Concept MP Redesign 3
B ALL METAL STUD IS 25 GAUGE STEEL STUDS @600mm O.C., 8 2020/09/10 Concept MP Redesign 4
U.N.O. 10 2020/09/21 Concept MP Redesign 5
C ALL PARTITIONS ABOVE GLASS PARTITIONS <LOCATIONS> TO 11 2020/09/22 Concept MP Redesign 5.1
BE TYPE G01 U.N.O. 12 2020/09/23 Concept MP Redesign 5.2
D ALL UNFINISHED COLUMNS TO RENDERED WITH FINISH 16 2020/10/13 Schematic Design Rev 7
CONCRETE, U.N.O. 17 2020/10/14 Schematic Design Rev 8
E PATCH AND REPAIR EXISTING WALLS AND PARTITIONS 18 2020/10/15 Schematic Design Rev 9
SCHEDULED TO REMAIN, INCLUDING CORE WALLS AND 19 2020/10/16 Schematic Design Rev 10
700
02 COLUMN ENCLOSURES. PREPARE WALLS AS REQUIRED FOR
B'-A 20 2020/10/23 Schematic Design Rev 11
B'-3 F.O. A-333 SCHEDULED FINISHES.
A'6
G. 7800 21 2020/10/28 Schematic Design Rev 11.1
F ALL DIMENSIONS ARE TO FACE OF GYP BOARD U.N.O.

G.
500
600 22 2020/10/31 Schematic Design Rev 11.2

F.O.
B'-B
3120 G MAINTAIN DIMENSIONS INDICATED TO BE "CLEAR", "HOLD" OR
1200 0
B'-2
TYP "MIN”. REVIEW VARIATIONS ON THESE DIMENSIONS WITH THE
. 7800 ARCHITECT BEFORE BEGINNING CONSTRUCTION.

2800
B'-C H REVIEW DIMENSIONS NOTED WITH "VIF" WITH ARCHITECT

1
A-24
BEFORE BEGINNING CONSTRUCTION.

063
7800 J LAY OUT ALL PARTITIONS AND DOOR LOCATIONS ON FLOOR,
B'-D FOR REVIEW AND ACCEPTANCE BY ARCHITECT PRIOR TO
Conference Rm. PROCEEDING WITH CONSTRUCTION.
3.8.5.3 1800 K PROVIDE BANDING AND BLOCKING AT WALL HUNG EQUIPMENT
01
Interview Rm. 7800

7800
16.7 m²
02 A-332 4.2.4 B'-E
AND FURNISHINGS. COORDINATE LOCATIONS WITH
Assistant Head of A-332 B'-1
Office
11.5 m² 01 ARCHITECT.

0
Interview Rm. A-333

1840
School

A-232
3.8.5.1 L COORDINATE LOCATIONS OF ACCESS PANELS IN WALL AND
4.2.4

01
02
Cafe 9.4 m² 700
6.2.1 3000
11.8 m²
F.O. CEILINGS WITH ARCHITECT PRIOR TO INSTALLATION. WHERE
119.1 m² Testing Rm. G. EXISTING ACCESS PANELS CONFLICT WITH NEW WORK,
4.2.3
Office 18.1 m² CONTACT ARCHITECT TO COORDINATE NEW LOCATION FOR

A-24 .O.G.
ACCESS PANELS.

500
3.8.5.1 UP
9.4 m²
M REFER TO AV DRAWINGS FOR MOUNTING HEIGHTS AND

F
1
Office CONDUIT REQUIREMENTS AT LOCATIONS OF MONITORS AND

7800
Admissions

085
Pantry 4.2.1 AV EQUIPMENT.
4.2.5 College Counseling 4.2.2 11.9 m²
Pro. Develop. + 6.4 m² 3.8.5.2 50.8 m² N REPAIR AND/OR REPLACE DAMAGED EXISTING CONVECTOR SEAL
Pantry 58.5 m² ENCLOSURES. REPLACE MISSING GRILLE AS REQUIRED.
Office O MANUFACTURER'S NAME, TRADEMARK, AND LOGOS SHALL

F.O.G.
Office

300
4.2.1
4.2.1 10.3 m² NOT BE VISIBLE
8.1 m²
B-8

Corridor
SCHOOL RECEPTION Floor : Minimum slab thickness of
4
10
T.O.F. -0.150 m
T.O.S. -0.400 m
Vestibule
10.1.1
22.5 m²
122.3 m²
IDF
10
3 m²
T.O.F. +0.000 m
T.O.S. -0.050 m
8.5 m²

Lobby & Theater


Vestibule
10.1.1
25cm (> 590 Kg/sqm) N
26 m²
Foyer T.O.F. +0.000 m
For Theatre and adjacent areas

9600
T.O.S. -0.050 m
7.1.1.1
361.4 m²
B-7
3700 400 Female's Toilet 3350
Office 1.2.10 KEY PLAN
Sports Medicine 26.3 m²
2625

2500
7.1.4.2
2230

6.3.2.1
29.4 m² 69.1 m²
3590

48 B-6
00
Light Lock Stair
IDF UP 7.1.3.4 MDB GALLERY
10

3400
10 12.9 m² 10 Light Lock DB DB
28.1 m²UP 7.1.1.1
Vestibule 3 m²
DB 25.1 m² 7.1.3.4 10
85.9 m²
10
1045 Huai Hai Middle Road
10.1.1 7.7 m² 9.1 m² 9.1 m²
10 Huai Hai Plaza
29.3 m² 3 m² B-5
38th Floor, Suite 3803
STORAGE Shanghai 200031 China
Pool Storage Men's Toilet 10
8.3.3 T. + 86 21 6252 1040
8000

1.2.10 25.9 m²
21.7 m² Janitor Rm.
Instructional Pool 10 32.1 m²
8.3.7 T.O.F. +0.000 m 9.2 m² Owner:
126.2 m² Pool Deck

9000
T.O.S. -0.050 m
Instrumental
8.3.1.2
501.9 m² Coach's Lockers Storage Van Giang Commerce and Tourism Township, Xuan
8.3.4 7.2.7 MARKUP LEGEND Quan Commune, Van Giang district, Ecopark, Vietnam
29.4 m² 26.6 m²
Music Room
B-4.1 Construction Manager:
7.2.1
157.4 m²
PARTITION
Black Box
B-4 Wall Partition Rw+c ≥ 39dB
7.1.3.1
328.2 m²
4000 4000 Pool
Civil / Site:

49000
Lockers/Showers/Toilet Wall Partition Rw+c ≥ 47dB
8.3.2 PERFORMING ARTS
66.5 m² 15000
COMMONS

9000
6000
7
78.9 m² Wall Partition Rw+c ≥ 56dB
B-3.1
Landscape:
1280
1700 1700
CMU WALLS
A-232

POOL BLEACHERS
03

B-3
8.3.6
Pool Coach's Office Music Room Wall Partition Rw+c ≥ 49dB Structural:

2300

2300
148.2 m²
3000
25040

8.3.1.1 8.3.4 7.2.2


388.1 m² 26.9 m² 128.8 m²

30.00
° 30.00
° Wall Partition Rw+c ≥ 60dB
B-2.2 Prop & Scene Stor.
7.1.2.3

9000
80.5 m² MEP:
1 Pool
A-331 Lockers/Showers/Toilet
Dressing Rm.
Stage Craft
7.1.2.6
LINING
8.3.2 Dressing Rm.
73.4 m² Corridor 7.1.2.2 37.3 m²
7.1.2.2
Lining
2400

10 16.2 m² 16.5 m² B-2.1


2950 2400 2400 2400 2400 2950 116.1 m²
15000
B-2
3 UP GLASS PARTITION PROJECT TITLE:
AS-190
B-1.1 Glazing Partition Rw+c ≥ 37dB
15500
ECOPARK DAESUNG
Backstage STAGE Glazing Partition Rw+c ≥ 47dB
Dance Studio
8.4.1 Drama Room
7.1.1.5
97.2 m² INTERNATIONAL
8400

184.3 m² 7.1.4.1
DOOR
SCHOOL
92.6 m²

UP MECH. STAIR
10 Door Rw+c ≥ 30dB
17.8 m² B-1

700 7200 600


Door Rw+c ≥ 34dB HANOI, VIETNAM
-0.1
B-0.1

UP UP UP Door Rw+c ≥ 40dB


Music Rooms
Double door Rw+c ≥ 45dB PROJECT No: 82630
8500 8500
Floor : Floating slab
8500 8500 8000 8000 8000 3200 7750 7750 4000 8000 8000 8000
DRAWING TITLE:

B-A B-B B-C


Ceiling : Suspended,
B-E B-F B-G B-H B-H1 B-J B-K B-L B-M B-N B-P B-Q B-R
LEVEL 1 ZONE C
100mm cavity, 2 layers of
82630_ARCH_2020_detached.rvt

12mm gypsum board


SCALE: 1 : 200
A-231

A-113
02
11/6/2020 7:49:22 PM

1
L1 - ZONE C AS-301
1
A-231

SCHEMATIC DESIGN
01

1 : 200

2020.11.06
B-A0