You are on page 1of 1

A1

Review Status: Approve


Refer to Ramps & LEGEND: Date: 08 Aug 2022
Stairs Drawings A 27 B B-1 27 B-2 27 C C-1 27 D 27 1-1 SHOP DRAWING
26 27a 27a 1-6 FOUNDATION BEAM

FB-1-001
300 1300 1150 350 250 3975 1375 1950 1375 1842 2000 2000 1433 300 1983 1450 1450 350 300 3617 1450 1450 1100 Refer to Ramps &
TOC 80.25 TOC 80.25 TOC 80.25 TOC 80.25 Stairs Drawings TOC 80.25 ADMIN = 0
TOC 80.25
TOC 79.70 TOC 79.70 COLO 1 = 1

570 230

570 230
COLO 2 = 2

600

600

600

600
JKT02

700 150 200


TOC 79.35 BOC 79.65 BOC 79.65

800

800
COLO 2 = 3
FB-1-125 FB-1-126 FB-1-127 BOC 79.65 FB-1-128 BOC 79.65 FB-0-128' 200 200
MECH PLANT= 4
GENSET = 5
Datacenter Indonesia
BOC 78.65 BOC 79.65 300Wx600D 300Wx600D 300Wx600D 300Wx600D 300Wx600D BOC 79.45 Karawang International Industrial City (KIIC)
400 COOLING TOWER = 6 West Java, Indonesia
TOFB:80.250 m TOFB:80.250 m TOFB:80.250 m TOFB:80.250 m TOFB:80.250 m
CONSUMER = 7
FB-1-124 BOC 78.65 250 150 MAKE UP WATER TANK AREA = 8
700Dx400W
FB-1-124--128'
Engineer
400 WATER PROCESS TREATMENT (INDUSTIAL) = 9
TOFB:79.350 m DOMESTIC WATER PLANT = 10
1 : 75
Section 26 Section 30 FIRE PUMP ROOM = 11
GUARD HOUSE = 12

28
A 27
B B-1 27
B-2 27
C C-1 27 27
D 27
E 1-1
1 : 75 1 : 75 SWITCH ROOM = 13
PLN SUBSTATION = 14
152 Beach Rd, #16-00 Gateway East, Singapore 189721
Note :

RAMPS & STAIRS = 15


600 1-6 REFUSE CHAMBER = 16
BRIDGES = 17
350 250 4800 550 550 4275 1100 4275 1000 100 4433 1100 4117 550 550 2900 550
NUMBERING
TOC 80.25 TOC 80.25 Status
TOC 80.25 TOC 80.25 TOC 80.25 TOC 80.25 TOC 80.25 TOC 80.25

400 200

370 230

370 230
150 mm THICK. CAST IN SITU RC Approved Revise and resubmit

TOC 79.70 WALLS Approved with comment Rejected


600

600

600

600

600

600

600

600

600
Signature : Date :

FB-1-135 FB-1-136 FB-1-137 FB-1-138 FB-1-139 FB-1-140 STEEL COLUMN


1050

Security
BOC 79.65 BOC 79.65 BOC 79.65 BOC 79.65 BOC 79.65 BOC 79.65 BOC 79.65 150 150
BOC 78.65 TOC 78.65 300Wx600D 300Wx600D 300Wx600D 300Wx600D 300Wx600D 300Wx600D 150 150 TOC 79.65
300
TOFB:80.250 m 1100 TOFB:80.250 m TOFB:80.250 m 1100 TOFB:80.250 m TOFB:80.250 m 1100 TOFB:80.250 m 300
NOTE:
FB-1-134
STEEL STRUCTURE ELEMENTS ARE SHOWN
400Wx1050D
TOFB:79.700 m
Section 27 Section 31 SCHEMATICALLY.
111 Somerset Road, Unit #07-10 TripleOne Somerset
Singapore 238164

REFER TO STEEL STRUCTURE DETAILS FOR Note :

1 : 75 1 : 75
FB-1-134--140 EXACT LOCATIONS AND DIMENSIONS.

1 : 75 D E
A 27
B B-1 27
B-2 27
C 27
C-1 27 27
1-1 Status
600 Approved Revise and resubmit

350 250 4800 550 550 4275 1100 4275 1000 100 4433 1100 4117 550 550 2900 550 550 Approved with comment Rejected

Signature : Date :

TOC 80.25 TOC 80.25 TOC 80.25 TOC 80.25 TOC 80.25 TOC 80.25 TOC 80.25 Architect

400 200

600
600

600

600

600

600

600
BOC 79.65
1600

FB-1-147 BOC 79.65 FB-1-148 FB-1-149 FB-1-150 FB-1-151 FB-1-152


BOC 79.65 BOC 79.65 BOC 79.65 BOC 79.65 150 150
TOC 78.65 300Wx600D 300Wx600D 300Wx600D 300Wx600D 300Wx600D 300Wx600D BOC 79.65
143 Cecil Street, GB Building, #12-00, Singapore 069542
TOFB:80.250 m TOFB:80.250 m TOFB:80.250 m TOFB:80.250 m TOFB:80.250 m TOFB:80.250 m 300 Note :
1200

Section 27a
1 : 75
FB-1-147--152 Status

1 : 75 Approved Revise and resubmit

A 27
B B-1 27
B-2 27
C C-1 27 27
D 27
E 1-2
Approved with comment

Signature :
Rejected

Date :

Construction Supervision

350250 4800 550 550 4275 1100 4275 1000 100 4433 1100 4117 550 550 2900 550 550

TOC 80.25 TOC 80.25 TOC 80.25 TOC 80.25 TOC 80.25 TOC 80.25 TOC 79.70

850 200
600

600

600

600

600

600
International Financial Centre, Tower 2 Lt. 26,
Jl. Jenderal Sudirman, Kuningan, Kuningan Tim., Kecamatan

1050
Setiabudi, Jakarta, Daerah Khusus Ibukota Jakarta 12920
1600

FB-1-158 BOC 79.65


FB-1-159 BOC 79.65
FB-1-160 BOC 79.65 FB-1-161 BOC 79.65 FB-1-162 BOC 79.65 FB-1-163 BOC 79.65
Note :

300Wx600D 300Wx600D 300Wx600D 300Wx600D 300Wx600D 300Wx600D


BOC 78.65
TOFB:80.250 m TOFB:80.250 m TOFB:80.250 m TOFB:80.250 m TOFB:80.250 m TOFB:80.250 m 100 300
400
1200

FB-1-158--163 Section 28
Status

Approved Revise and resubmit

1 : 75 1 : 75 Approved with comment Rejected

Signature : Date :

General Contractor

A 29
B B-1 29
B-2 27
C 27
C-1 27
D 27
E
1-5 Jl. Pancoran Timur II no 3
Pancoran, Jakarta 12780, Indonesia
350250 4800 550 550 4275 1100 4275 1000 100 4433 1100 4117 550 550 2900 550 550 (021) 7982223 , (021) 7944142

Contractor Design Team


TOC 80.25 TOC 80.25 TOC 80.25 TOC 80.25 TOC 80.25 TOC 80.25 TOC 80.25

370 230
400 200
Drawn By
M.D
600

600

600

600

600

600

600

600
Checked By
M.T
1600

FB-1-169 FB-1-170 BOC 79.65


FB-1-171 FB-1-172 FB-1-173 BOC 79.65
FB-1-174 150 150
BOC 79.65 BOC 79.65 300Wx600D BOC 79.65 BOC 79.65 BOC 79.65 Revisions
300Wx600D 300Wx600D 300Wx600D 300Wx600D 300Wx600D
300 No. Date Description
TOFB:80.250 m TOFB:80.250 m TOFB:80.250 m TOFB:80.250 m TOFB:80.250 m TOFB:80.250 m
A 28 APRIL 2022 FOR APPROVAL
B 28 JULY 2022 FOR APPROVAL
1200

FB-1-169--174 Section 29
1 : 75
1 : 75
A 30
B B-1 31
B-2 27
C 27
C-1 27
D 27
E
30a 1-6 Reference Drawing
No. Dwg. No.
350250 5200 150 150 1600 200 900 1975 1100 4275 1000 100 4433 1100 4117 550 550 2900 550 550
Refer to Ramps & 1. JKT02-S-C-110-1
2. JKT02-S-D-110-1
Stairs Drawings 3. JKT02-S-E-235-1
TOC 80.25 TOC 80.25 TOC 80.25 TOC 80.25 TOC 80.25 TOC 80.25 4. JKT02-S-F-110-1
5. JKT02-S-F-111-1
200

600

600

600

600

600

600

200 600
6. JKT02-A-D-202-1
800

BOC 79.65
1600

FB-1-181 BOC 79.65 FB-1-182 FB-1-183 BOC 79.65 FB-1-184 BOC 79.65 FB-1-185 BOC 79.65
TOC 78.65 FB-1-180 BOC 79.45 300Wx600D 300Wx600D 300Wx600D 300Wx600D 300Wx600D BOC 79.45 200 200
400Wx800D
TOFB:80.250 m TOFB:80.250 m TOFB:80.250 m TOFB:80.250 m TOFB:80.250 m 400
TOFB:80.250 m
1200

Key Plan

FB-1-180--185 Section 30a


1 : 75 1 : 75

0 4 8 12 16 20
m NORTH

Drawing Title
FOUNDATION BEAMS ELEVATIONS
FORMWORK
COLO 1
SHEET 4
Scale at A1
1 : 75
Discipline
STRUCTURE
Suitability
ISSUED FOR CONSTRACTION
Drawing Number Rev

JKT02-JO-SHD-STR-2008 B
A

Do not scale CONFIDENTIAL INFORMATION : This drawing/document and all design, details, inventions or developments covered or derived thereby are confidential and the exclusive property of the owner (or its affiliates), which reserve all rights in the is drawing/document. Copying, reproduction, duplication, or distribution to a third party, in whole or in part, is forbidden unless expressly authorised in writing.