You are on page 1of 1

NOTE: DESIGNATION NAME REVISION REVISION PROJECT NAME DRAWING TITLE ISSUED BY:

-THIS DRAWING IS COPYRIGHT. CONTRACTORS / SUBCONTRACTORS MUST CHECK ALL APPROVED BY: CKC REV. DESCRIPTION DATE REV. DESCRIPTION DATE ENGINEERING TEAM
DIMENSIONS ON SITE
-ONLY FIGURED DIMENSION ARE TO BE WORKED FROM. DISCREPANCIES MUST BE CHECKED BY: CKC 01 RELEASED FOR CONSTRUCTION03.05.23 RELEASED FOR:
IMPERIAL VILLA 2ND FLOOR
REPORTED IMMEDIATELY TO THE ENGINEER FOR CLARIFICATION BEFORE PROCEEDING. DESIGNED BY: CKC 02 RELEASED FOR CONSTRUCTION15.05.23 CONSTRUCTION
BEAM DETAIL-01
-ALL CONTRACTORS / SUBCONTRACTORS ARE TO SUBMIT ALL METHOD STATEMENTS AND
OVERALL CLEAR DESCRIPTION OF MATERIALS FOR APPROVAL. MATERIAL SAMPLES ARE TO
DRAWN BY: CKC DRAWING NUMBER:
BE SUBMITTED FOR APPROVAL SEPARATELY. LOCATION: PHNOM PENH, CAMBODIA SCALE: 1/25 & 1/10 DATE: 15.05.23 RHT.CS.VMP.L2BD.01

You might also like