You are on page 1of 2

PMC TO C-RH

1 No SDL to be considered ?

155kg/m2 155kg/m2
(Equipment weight) (Equipment weight)

2 Equipment weight ~155kg/m2


Plinth 200mm thickness~500kg/m2
PMC TO C-RH

*Design Load
155kg/m2 ~82kg/m2 ~82kg/m2 ~82kg/m2 ~82kg/m2
~82kg/m2
(Equipment weight) (Equipment weight) (Equipment weight) (Equipment weight) (Equipment weight) (Equipment weight)

~82kg/m2 ~82kg/m2 ~82kg/m2 ~82kg/m2


SDL=not considered?
~82kg/m2

(Plinth 100mm t150kg/m2.


(Equipment weight) (Equipment weight) (Equipment weight) (Equipment weight)
(Equipment weight)
155kg/m2
(Equipment weight)

MEP Plinth seems hk ~250kg/m2)


*MEP Contractor proposed 200mm thk
--------------
LL design load is okay. However, PMC
concern SDL design load and actual load.