GIRDERS WEIGHTAGE RATIO

10% Increased Live Load 10% Increased Live Load


9 Girders Deck - Moment Sharing Ratio
Moment for Single Track Moment for Double Track
Under RU Loading
SLS ULS SLS ULS
Weightage
Name Standard Position KNm KNm KNm KNm
K"g
G-1 -5 0.41 459.1 584.2 918.2 1168.4
G-2 -3.75 0.85 953.1 1212.9 1906.1 2425.7
G-3 -2.5 1.16 1305.9 1661.9 2611.8 3323.8
G-4 -1.25 1.35 1517.6 1931.3 3035.2 3862.7
G-5 0 1.41 1588.2 2021.1 3176.4 4042.3
G-6 1.25 1.35 1517.6 1931.3 3035.2 3862.7
G-7 2.5 1.16 1305.9 1661.9 2611.8 3323.8
G-8 3.75 0.85 953.1 1212.9 1906.1 2425.7
G-9 5 0.41 459.1 584.2 918.2 1168.4
Total 8.93 10059.5 12801.8 20119.0 25603.6