Professional Documents
Culture Documents
L (44) 18-23 - Staircase 4 Details
L (44) 18-23 - Staircase 4 Details
L[44]23
Paking slot
91
Door to opening schedule
Change in level
Stair 4
1000
2400
Level transition ramp
FHR
1450 200 1450
20
1
17
4
Railing to detail A[44]series 16
5
8100
15
6
14
7
13
8
12
9
11
10
Paking slot
2550
2550 7
200
200 3100 200
L(44)18 Typical Staircase Basement 3 and 2 -Staircase 4(Fire Escape)
L[44]23
1
1 : 50
L[44]20
200
200
6
Change in level
1000
Stair 4
Level transition ramp
3340
3100
FHR
1450 200 1450
17
4
Railing to detail A[44]series 16
5
1800
8100
8100
15
6
14
7
13
8
12
9
11
Paking slot
10
3360
to detail A[43]series
2550
2550
7
200
200
L[44]23
L(44)19 Basement 1 Floor Plan-Staircase 4(Fire Escape) 200 3100 200
1
1 : 50
L[44]23
200 2500 200 3100 200
200
200
0D44 6
630
1000
Door to opening schedule
Stair 4
2300
3340
870
FHR
1037 1200 263 1450 200 1450
28
200
1
300 300 300 300 300 300 300 300 300 300 300 300 300
300 300 300 300 300 300 300 300 300 300 300 300 300
27
150mm high concrete upstand to SE's details
2
3100
26
3
25
4
2100
24
Railing to detail A[44]series 5
23
796 1000 224
1800
6
8100
22
7
21
8
200
20
0D39 9
19
1000 10
18
226 1000 474 11
17
12
200
16
0D40 13
15
14
3360
1800
1800
Railing to detail A[44]series
2500
200
200
L[44]23
487 800 614
L(44)20 Ground Floor Plan-Staircase 4(Fire Escape) 200 1500 200 3100 200
1
1 : 50
L[44]23
200
6
1000
Door to opening schedule
Stair 4
3340
3100
FHR
1450 200 1450
24
150mm high concrete upstand to SE's details 1
350 350 350 350 350 350 350 350 350 350 350
350 350 350 350 350 350 350 350 350 350 350
23
2
22
3
21
Railing to detail A[44]series 4
20
5
1800
8100
19
6
18
7
17
8
16
9
15
10
14
11
13
12
3360
1850
1850
Railing to detail A[44]series
200
L[44]23
200 3100 200
L[44]23
200
6
1000
Door to opening schedule
Stair 4
3340
3100
FHR
24
350 350 350 350 350 350 350 350 350 350 350
350 350 350 350 350 350 350 350 350 350 350
23
2
22
3
21
Railing to detail A[44]series 4
20
5
1800
8100
19
6
18
7
17
8
16
9
15
10
14
11
13
12
3360
1850
1850
Railing to detail A[44]series
200
L(44)22 Third Floor Plan-Staircase 4(Fire Escape) L[44]23
200 3100 200
1
1 : 50
Riser Height=150mm
Riser Height=150mm
Riser Height=150mm
Riser Height=150mm
Riser Height=150mm
Window to openong schedule
Tread=350mm
Tread=300mm
Tread=350mm
Tread=350mm
Tread=350mm
To detail A[27]series
Riser No: 24
Riser No: 24
Riser No: 28
Riser No: 19
Riser No: 20
Riser No: 20
STAIR:
STAIR:
STAIR:
STAIR:
STAIR:
STAIR:
6
2400
19
24
20
20
28
24
1
1
2
27
2
2
23
23
19
19
26
3
22
22
18
18
18
3
3
3
25
17
17
17
21
21
4
4
24
16
16
16
20
20
5
23
5
6
19
19
22
15
15
15
6
6
6
7
21
14
14
14
18
18
7
7
3150
20
13
13
13
17
17
8
8
19
10
12
12
12
16
16
9
9
11
11
11
18
11
15
15
10
10
17
12
14
14
11
11
16
13
13
13
10
10
10
15
2550
2550
14
12
12
7
Basement 1
Basement 2
Basement 3
+15,000
+11.400
+7.800
+4.200
±0.000
-3,000
-6,000
-9,000
1 : 50
1
NOTES Revisions: Client: Project title: Architect: Drawn: Checked:
1. This drawing is copyright. 10. A single layer of 3-ply bituminous felt to be provided between rev date description ENTERPRISE UGANDA LIMITED PROPOSED OFFICE BUILDING JULIUS CGO R.R
6. This drawing is to be read in conjunction with specifications and all DDAMULIRA
2. Do not scale off this drawing. other relevant drawings. masonry and r.c. work. REG.NO. 196 Date: Scale:
11. Drain pipes passing under tarmac, driveways, and buildings to be
3. All levels and dimensions to be checked on site before any 7. Walls below 200mm thick to be reinforced with hoop iron at every encased in 150mm thick concrete sorround.
PRAC.NO. 3101 MARCH 2020
alternate course. Location: Drawing title:
building work commences. Published: 9/10/2021 14:30:43 1 : 50 @ A1
12. All reinforced concrete work to Structural Engineer's drawings. PLOT 2A,&2-4,BUTABIKA ROAD
4. Any discrepancies to be reported to the office of the consultant. 8. Depth of foundations to be decided on site.
13. All sanitary works to the entire satisfaction of MoH. BUTABIKA,KAMPALA DISTRICT Staircase 4 Section Job no. Drawing no.
5. All work to be strictly in accordance to with the standard 9. pv denotes permanent air vents over doors and windows as
specifications and notes. 14. All roads, storm water drainage and foul sewerage to L(44)23
shown on drawings. Civil Engineer's drawings.
Tel:+256 701-650587