You are on page 1of 8

Check Schedule

Item Date Checker Contact Email Comments


Pilegroup analysis 10-May-07 Tayeb Kazemi Tayeb.kazemi@stskconsulting.co.uk first issue
Disclaimer
The originator does not guarantee the accuracy of the output
or any other information on this spreadsheet. The users
take all responsiblity for the use of this spreadsheet,
modifications and output. Should you experience any
problems or like to see more features added to this
spreadsheet please contact:
tayeb.kazemi@stskconsulting.co.uk

This spreadsheet is free and you may print or download this


spreadsheet to a local hard disk for your personal and non-
commercial use only. You may transfer the spreadsheet to
individual third parties for their personal use, but only if you
acknowledge STSK Consulting Ltd or the website as the
source of the material.
DOCUMENT No.(Project / Doc) SHEET No.
10307

© STSK Consulting Ltd DATE: 17


SUBJECT 17
PREPARED BY:
-17
REF CALCULATIONS OUTPUT -17
Q/N + Mx 16.5
y/y^2 +My
Pile Group Analysis Load input Load
Load due to x/x^2
due to
X Y Xi^2 yi^2 Applied Load kN V 1E+05 kN My Total load
Mx
1 -15 -3 225 9 3702.02 Mx 5000 kNm 75.76 -10.101 3702.02
2 -12 -3 144 9 3704.04 My 2000 kNm 75.76 -8.081 3704.04
3 -9 -3 81 9 3706.06 N 33 75.76 -6.061 3706.06
4 -6 -3 36 9 3708.08 75.76 -4.040 3708.08
5 -3 -3 9 9 3710.10 V is the total vertical load on pile cap 75.76 -2.020 3710.10
6 0 -3 0 9 3712.12 Mx Moment about x axis 75.76 0.000 3712.12
7 3 -3 9 9 3714.14 My Moment about y axis 75.76 2.020 3714.14
8 6 -3 36 9 3716.16 N Number of piles 75.76 4.040 3716.16
9 9 -3 81 9 3718.18 20 75.76 6.061 3718.18
10 12 -3 144 9 3720.20 75.76 8.081 3720.20
11 15 -3 225 9 3722.22 75.76 10.101 3722.22
15
12 -15 0 225 0 3626.26 0.00 -10.101 3626.26
13 -12 0 144 0 3628.28 0.00 -8.081 3628.28
14 -9 0 81 0 3630.30 10 0.00 -6.061 3630.30
15 -6 0 36 0 3632.32 0.00 -4.040 3632.32
16 -3 0 9 0 3634.34 5 0.00 -2.020 3634.34
17 0 0 0 0 3636.36 0.00 0.000 3636.36
18 3 0 9 0 3638.38 0.00 2.020 3638.38
0
19 6 0 36 0 3640.40 -4 -3 -2 -1 0 1 2 3 4 0.00 4.040 3640.40
20 9 0 81 0 3642.42 0.00 6.061 3642.42
-5
21 12 0 144 0 3644.44 0.00 8.081 3644.44
22 15 0 225 0 3646.46 0.00 10.101 3646.46
23 -15 3 225 9 3550.51 -10 -75.76 -10.101 3550.51
24 -12 3 144 9 3552.53 -75.76 -8.081 3552.53
-15

-20
-10

25 -9 3 81 9 3554.55 -15 -75.76 -6.061 3554.55


26 -6 3 36 9 3556.57 -75.76 -4.040 3556.57
27 -3 3 9 9 3558.59 -75.76 -2.020 3558.59
-20
28 0 3 0 9 3560.61 -75.76 0.000 3560.61
29 3 3 9 9 3562.63 -75.76 2.020 3562.63
30 6 3 36 9 3564.65 -75.76 4.040 3564.65
31 9 3 81 9 3566.67 -75.76 6.061 3566.67
32 12 3 144 9 3568.69 -75.76 8.081 3568.69
33 15 3 225 9 3570.71 -75.76 10.101 3570.71
34 0 0 3636.36 0.00 0.000 3636.36
35 0 0 3636.36 0.00 0.000 3636.36
36 0 0 3636.36 Sign convention: above diagram shows the positive direction 0.00 0.000 3636.36
37 0 0 3636.36 0.00 0.000 3636.36
38 0 0 3636.36 0.00 0.000 3636.36
39 0 0 3636.36 0.00 0.000 3636.36
40 0 0 3636.36 0.00 0.000 3636.36
Total 2970 198
4.5
-4.5
-4.5
4.5
4.5
Operating Instructions

Enter the Data in Blue Cells Only, pile coordinates


Loads on each pile is calculated in the last column
-20 -15
20
15
10
5
0
-20 -15 -10 -5 -5 0 5 10 15 20
-10
-15
-20
20