CR1-0723 Concave & Mantle Shutdown CR1-0723 Final Gantt Rev1

Start 26/08/23 8:00 PM _ Finish 2/09/23 7:00 PM


ID % WO Equipment Task Name Duration Start Finish Resource Names Team Sub Team
Complete Thu 24 Aug
Fri 25 AugSat 26 Aug
Sun 27 Aug
Mon 28 Aug
Tue 29 Aug
Wed 30 Aug
Thu 31 AugFri 1 SepSat 2 SepSun 3 SepMon 4 SepTue 5 SepW ed 6 SepThu 7 SepFri 8 SepSat 9 SepSun 10 S
12 6
PM12
PM6AM12
AM6PM
12
PM6AM12
AM6PM12
PM6AM
12
AM6PM12
PM6AM
12
AM6PM12
PM6AM
12
AM6PM12
PM6AM
12
AM6PM
12
PM6AM
12
AM6PM12
PM6AM12
AM6PM12
PM6AM
12
AM6PM
12
PM6AM
12
AM6 PM
12
PM6AM
12
AM6PM12
PM6AM
12
AM6 PM
12
PM6AM12
AM6PM12
PM6AM
12
AM6PM
12
PM6AM12
AM6PM12
PM6AM
12
AM6PM
12
PMAM
1 0% PRE-SHUTDOWN WORKS 36 hrs 25/08/23 8:00 AM 26/08/23 8:00 PM
2 0% 40210927 1301-CR001 PRIMARY OUTAGE PREP/POST WORKS 16 hrs 25/08/23 8:00 PM 26/08/23 12:00 PM
3 0% 40210927 1301-CR001 PRIMARY PRE SHUTDOWN SET UP & EQUIP PREP 12 hrs 25/08/23 8:00 PM 26/08/23 8:00 AM 13MBCFIT,13MBCBOI ENGYTECH MECH 01 8:00 PM PRIMARY PRE SHUTDOWN SET UP & EQUIP PREP
4 0% 40210927 1301-CR001 PRIMARY PRE SHUTDOWN SET UP & EQUIP PREP 12 hrs 25/08/23 8:00 PM 26/08/23 8:00 AM 13MCCFIT,13MCCRIG,13MCCBOI[2] KG MECH 02 8:00 PM PRIMARY PRE SHUTDOWN SET UP & EQUIP PREP
5 0% 40210927 1301-CR001 PRIMARY PRE SHUTDOWN SET UP & EQUIP PREP 12 hrs 25/08/23 8:00 PM 26/08/23 8:00 AM 13MCCBOI 8:00 PM PRIMARY PRE SHUTDOWN SET UP & EQUIP PREP
6 0% 40210927 1301-CR001 PRIMARY PRE SHUTDOWN SET UP & EQUIP PREP 12 hrs 26/08/23 12:00 AM 26/08/23 12:00 PM 13MCCSCF[2] KG SCAFFOLD 01 KG SCAFFOLD 01 12:00 AM PRIMARY PRE SHUTDOWN SET UP & EQUIP PREP
7 0% 40210927 1301-CR001 PRIMARY PRE SHUTDOWN SET UP & EQUIP PREP 12 hrs 25/08/23 8:00 PM 26/08/23 8:00 AM 13MECCND[2] 8:00 PM PRIMARY PRE SHUTDOWN SET UP & EQUIP PREP
8 0% 40210945 1301-CR001 09W OF EL PREP HV PROGRAMS CR1 OUTAGE 3 hrs 25/08/23 8:00 PM 25/08/23 11:00 PM
9 0% 40210945 1301-CR001 09W OF EL PREP HV PROGRAMS CR1 OUTAGE 3 hrs 25/08/23 8:00 PM 25/08/23 11:00 PM 13ELTELE[2] KML ELECTRICAL 01 8:00 PM 09W OF EL PREP HV PROGRAMS CR1 OUTAGE
10 0% 40192596 1301-BN001 BN001 REPLACE REAR WALL 12 hrs 25/08/23 8:00 PM 26/08/23 8:00 AM
11 0% 40192596 1301-BN001 PREP-REPLACE REAR WALL 12 hrs 25/08/23 8:00 PM 26/08/23 8:00 AM 13MECFIT[2],13MECBOI[2],13MECRIG KG BN001 8:00 PM PREP-REPLACE REAR WALL
12 0% 40213575 1301-CV001-CO013 CV001 REPL HARD SKIRTS 3 hrs 25/08/23 8:00 PM 25/08/23 11:00 PM
13 0% 40213575 1301-CV001-CO013 PRE SHUT HOSE OFF BOTH SIDES OF BELT 3 hrs 25/08/23 8:00 PM 25/08/23 11:00 PM 13OPTOPE KML OPERATIONS 8:00 PM PRE SHUT HOSE OFF BOTH SIDES OF BELT
14 0% 40178895 1301-CV003 CV003 VSD POWERCELL REFURB SIEMENS 5 hrs 26/08/23 6:00 AM 26/08/23 11:00 AM
15 0% 40178895 1301-CV003 PRE-MOBILISE POWERCELLS TO SWITCHROOM 3 hrs 26/08/23 6:00 AM 26/08/23 9:00 AM 13CR25T KML ELECTRICAL 01 6:00 AM PRE-MOBILISE POWERCELLS TO SWITCHROOM
16 0% 40178895 1301-CV003 PRE-MOBILISE POWERCELLS TO SWITCHROOM 1.5 hrs 26/08/23 9:00 AM 26/08/23 10:30 AM 13ELTELE[2] KML ELECTRICAL 01 9:00 AM PRE-MOBILISE POWERCELLS TO SWITCHROOM
17 0% 40178895 1301-CV003 PRE EXTRACT POWER CELLS CRATES CAREFULLY 0.5 hrs 26/08/23 10:30 AM 26/08/23 11:00 AM 13ELTELE[2] KML ELECTRICAL 01 10:30 AM PRE EXTRACT POWER CELLS CRATES CAREFULLY
18 0% 40212855 1301-SR105-CO013 CV007 ROBICON VSD POWER CELL REFURB 5 hrs 26/08/23 11:00 AM 26/08/23 4:00 PM
19 0% 40212855 1301-SR105-CO013 PRE-MOBILISE POWERCELLS TO SWITCHROOM 3 hrs 26/08/23 11:00 AM 26/08/23 2:00 PM 13CR25T KML ELECTRICAL 01 11:00 AM PRE-MOBILISE POWERCELLS TO SWITCHROOM
20 0% 40212855 1301-SR105-CO013 PRE-MOBILISE POWERCELLS TO SWITCHROOM 1.5 hrs 26/08/23 2:00 PM 26/08/23 3:30 PM 13ELTELE[2] KML ELECTRICAL 01 2:00 PM PRE-MOBILISE POWERCELLS TO SWITCHROOM
21 0% 40212855 1301-SR105-CO013 PRE EXTRACT POWER CELLS CRATES CAREFULLY 0.5 hrs 26/08/23 3:30 PM 26/08/23 4:00 PM 13ELTELE[2] KML ELECTRICAL 01 3:30 PM PRE EXTRACT POWER CELLS CRATES CAREFULLY
22 0% 40215032 1302-FE005 FE005 REPL HAGGLUND DRIVE 16 hrs 25/08/23 8:00 AM 26/08/23 12:00 AM
23 0% 40215032 1302-FE005 PRESHUT- MODIFY SCAFFOLD 4 hrs 25/08/23 8:00 AM 25/08/23 12:00 PM 13MCCSCF[3] KG SCAFFOLD 01 KG SCAFFOLD 01 8:00 AM PRESHUT- MODIFY SCAFFOLD
24 0% 40215032 1302-FE005 PRESHUT- MOBILISE EQUIP, INSP DRIVE UNIT 6 hrs 25/08/23 12:00 PM 25/08/23 6:00 PM 13MCCFIT,13MCCRIG,13MCCBOI[2] KG MECH 01 12:00 PM PRESHUT- MOBILISE EQUIP, INSP DRIVE UNIT
25 0% 40215032 1302-FE005 PRESHUT- INSTALL MONORAIL 6 hrs 25/08/23 6:00 PM 26/08/23 12:00 AM 13MCCFIT,13MCCRIG,13MCCBOI[2] KG MECH 01 6:00 PM PRESHUT- INSTALL MONORAIL
26 0% 40213590 1303-BD003 BD003 REPLACE 1" BALL VALVES SECONDARY C 3 hrs 25/08/23 8:00 PM 25/08/23 11:00 PM
27 0% 40213590 1303-BD003 PREP WORK AND JHA’S / MOBILISE TOOLING 3 hrs 25/08/23 8:00 PM 25/08/23 11:00 PM 13MBCFIT,13MBCBOI ENGYTECH MECH 01 8:00 PM PREP WORK AND JHA’S / MOBILISE TOOLING
28 0% 40213577 1303-CV002-CO015 CV002 HARD SKIRT MAINTENANCE 3 hrs 25/08/23 8:00 PM 25/08/23 11:00 PM
29 0% 40213577 1303-CV002-CO015 PRE SHUT HOSE OFF BOTH SIDES OF BELT 3 hrs 25/08/23 8:00 PM 25/08/23 11:00 PM 13OPTOPE KML OPERATIONS 8:00 PM PRE SHUT HOSE OFF BOTH SIDES OF BELT
30 0% 40213579 1303-CV005-CO018 CV005 HARD SKIRT MAINTENANCE 3 hrs 25/08/23 11:00 PM 26/08/23 2:00 AM
31 0% 40213579 1303-CV005-CO018 PRE SHUT HOSE OFF BOTH SIDES OF BELT 3 hrs 25/08/23 11:00 PM 26/08/23 2:00 AM 13OPTOPE KML OPERATIONS 11:00 PM PRE SHUT HOSE OFF BOTH SIDES OF BELT
32 0% 40218402 1303-HP010-GA020 GA020 CHANGE OUT DISCHARGE GATE 6 hrs 25/08/23 8:00 PM 26/08/23 2:00 AM
33 0% 40218402 1303-HP010-GA020 PRE SHUT CUT LINERS AND PRE ASSEMBLE 6 hrs 25/08/23 8:00 PM 26/08/23 2:00 AM 13MCCFIT,13MCCRIG,13MCCBOI[2] KG EMERGENT 8:00 PM PRE SHUT CUT LINERS AND PRE ASSEMBLE
34 0% 1301-CR001 RUNDOWN PREPERATION 12 hrs 25/08/23 12:00 PM 26/08/23 12:00 AM
35 0% 1301-CR001 MOBILISE LONGREACH & SKID STEER TO DUMP POCKET 2 hrs 25/08/23 8:00 PM 25/08/23 10:00 PM 13OPTOPE[2] KML OPERATIONS 8:00 PM MOBILISE LONGREACH & SKID STEER TO DUMP POCKET
36 0% 1301-CR001 MOBILISE ROCK BREAKER TO DUMP POCKET 2 hrs 25/08/23 10:00 PM 26/08/23 12:00 AM 13OPTOPE[2] KML OPERATIONS 10:00 PM MOBILISE ROCK BREAKER TO DUMP POCKET
37 0% 1303-FE013 SCAFFOLD BARRICADE GROUND LEVEL BELOW FE013 4 hrs 25/08/23 8:00 PM 26/08/23 12:00 AM 13OPTOPE[2] KML OPERATIONS KG SCAFFOLD 01 8:00 PM SCAFFOLD BARRICADE GROUND LEVEL BELOW FE013
38 0% 1303-CH018 SCAFFOLD DECK AT CH018 6 hrs 25/08/23 12:00 PM 25/08/23 6:00 PM 13MCCSCF[3] KG SCAFFOLD 01 KG SCAFFOLD 01 12:00 PM SCAFFOLD DECK AT CH018
39 0% MISCELLANEOUS 14 hrs 25/08/23 6:00 PM 26/08/23 8:00 AM
40 0% 1301-CR001 POTABLE WATER POLY LINE TIE IN 12 hrs 25/08/23 8:00 PM 26/08/23 8:00 AM 13METFIT[2] KML SITE SERVICES 8:00 PM POTABLE WATER POLY LINE TIE IN
41 0% 1303-CH010 PREBUILD SCAFFOLD AT CH010 & CH011 6 hrs 25/08/23 6:00 PM 26/08/23 12:00 AM 13MCCSCF[3] KG SCAFFOLD 01 KG SCAFFOLD 01 6:00 PM PREBUILD SCAFFOLD AT CH010 & CH011
42 0% 1302-FE005 FE005 2 hrs 26/08/23 4:00 PM 26/08/23 6:00 PM
43 0% 1302-FE005 INSTALL FE005 PERMIT 0.5 hrs 26/08/23 4:00 PM 26/08/23 4:30 PM 13OPTOPE[2] KML OPERATIONS 4:00 PM INSTALL FE005 PERMIT
44 0% 1302-FE005 CLOSE FE005 GATES AND COMPLETELY RUN OFF 1.5 hrs 26/08/23 4:30 PM 26/08/23 6:00 PM 13OPTOPE[2] KML OPERATIONS 4:30 PM CLOSE FE005 GATES AND COMPLETELY RUN OFF
45 0% ALL PRESHUTDOWN WORKS COMPLETE 0 hrs 26/08/23 8:00 PM 26/08/23 8:00 PM 8:00 PM ALL PRESHUTDOWN WORKS COMPLETE
46 0% CR1-0723 CONCAVE & STANDARD MANTLE 167 hrs 26/08/23 8:00 PM 2/09/23 7:00 PM
47 0% RUNDOWN AND ISOLATIONS 19.25 hrs 26/08/23 8:00 PM 27/08/23 3:15 PM
48 0% COMMENCE RUNDOWN & ISOLATIONS 0 hrs 26/08/23 8:00 PM 26/08/23 8:00 PM 8:00 PM COMMENCE RUNDOWN & ISOLATIONS
49 0% 1301-CR001 FEED OFF CR001 0 hrs 26/08/23 8:00 PM 26/08/23 8:00 PM 13OPTOPE[2] KML OPERATIONS 8:00 PM FEED OFF CR001
50 0% 1303-CR002 RUN CR002 BIN TO EMPTY 1 hr 26/08/23 8:00 PM 26/08/23 9:00 PM 13OPTOPE[2] KML OPERATIONS 8:00 PM RUN CR002 BIN TO EMPTY
51 0% 1303-FE006 CLOSE FE006 GATES 0.25 hrs 26/08/23 8:00 PM 26/08/23 8:15 PM 13OPTOPE[2] KML OPERATIONS 8:00 PM CLOSE FE006 GATES
52 0% 1301-RB001 RB001 TO BE PLACED IN MAINTENANCE POSITION 0.25 hrs 26/08/23 8:15 PM 26/08/23 8:30 PM 13OPTOPE[2] KML OPERATIONS 8:15 PM RB001 TO BE PLACED IN MAINTENANCE POSITION
53 0% 1301-RB001 ISOLATE RB001 AND SPRAY WATERS 0.25 hrs 26/08/23 8:30 PM 26/08/23 8:45 PM 13OPTOPE[2] KML OPERATIONS 8:30 PM ISOLATE RB001 AND SPRAY WATERS
54 0% 1301-CR001 MOVE TYRES INTO BARRICADE POSITION 0.25 hrs 26/08/23 8:45 PM 26/08/23 9:00 PM 13OPTOPE[2] KML OPERATIONS 8:45 PM MOVE TYRES INTO BARRICADE POSITION
55 0% 1303-CR004 RUN CR004 DOWN TO LOW LEVEL & CLOSE FEED GATES ONLY 0.25 hrs 26/08/23 9:00 PM 26/08/23 9:15 PM 13OPTOPE[2] KML OPERATIONS 9:00 PM RUN CR004 DOWN TO LOW LEVEL & CLOSE FEED GATES ONLY
56 0% 1303-FE013 ISOLATE FE013 & CH029 KNIFE GATE 0.25 hrs 26/08/23 9:00 PM 26/08/23 9:15 PM 13OPTOPE[2] KML OPERATIONS 9:00 PM ISOLATE FE013 & CH029 KNIFE GATE
57 0% 1303-CR002 SHUTDOWN CR002 DISCHARGE GATES IN CLOSED POSITION 0.5 hrs 26/08/23 9:00 PM 26/08/23 9:30 PM 13OPTOPE[2] KML OPERATIONS 9:00 PM SHUTDOWN CR002 DISCHARGE GATES IN CLOSED POSITION
58 0% 1301-CR001 CLEAN UP DUMP POCKET ACCESS WITH LOADER 0.5 hrs 26/08/23 9:30 PM 26/08/23 10:00 PM 13OPTOPE[2] KML OPERATIONS 9:30 PM CLEAN UP DUMP POCKET ACCESS WITH LOADER
59 0% 1301-CR001 COMMENCE CLEAN OUT DUMP POCKET WITH LONG REACH 3 hrs 26/08/23 10:00 PM 27/08/23 1:00 AM 13OPTOPE[2] KML OPERATIONS 10:00 PM COMMENCE CLEAN OUT DUMP POCKET WITH LONG REACH
60 0% 1303-FE013 LIFT FE013 GATES & SWING GA001 TO DIVERT POSITION 0.5 hrs 26/08/23 11:45 PM 27/08/23 12:15 AM 13OPTOPE[2] KML OPERATIONS KG MECH 01 11:45 PM LIFT FE013 GATES & SWING GA001 TO DIVERT POSITION
61 0% 1303-FE013 RUN FE013 IN REVERSE, POSITION CS001 OVER CR004 AND RUN 10 hrs 27/08/23 12:15 AM 27/08/23 10:15 AM 13OPTOPE[2] KML OPERATIONS 12:15 AM RUN FE013 IN REVERSE, POSITION CS001 OVER CR004 AND RUN OUT
OUT
62 0% 1303-CV002 CV002 SIMPLE ISOLATION 0.25 hrs 27/08/23 12:15 AM 27/08/23 12:30 AM 13OPTOPE[2] KML OPERATIONS 12:15 AM CV002 SIMPLE ISOLATION
63 0% 1303-CV002 CV002 INSTALL BELT CLAMPS 1 hr 27/08/23 12:30 AM 27/08/23 1:30 AM 13MBCBTE KML OPERATIONS ENGYTECH BELTS 12:30 AM CV002 INSTALL BELT CLAMPS
64 0% 1303-CH010 INSTALL CHUTE HOSE OUT PERMIT 0.75 hrs 27/08/23 12:30 AM 27/08/23 1:15 AM 13OPTOPE[2] KML OPERATIONS 12:30 AM INSTALL CHUTE HOSE OUT PERMIT
65 0% 1301-CR001 LONGREACH DIG OUT COMPLETE 0 hrs 27/08/23 1:00 AM 27/08/23 1:00 AM 13OPTOPE[2] KML OPERATIONS 1:00 AM LONGREACH DIG OUT COMPLETE
66 0% 1303-CH018 ERECT SCAFFOLD PLATFROM FOR CH018 HOSE OUT 0.5 hrs 27/08/23 1:30 AM 27/08/23 2:00 AM 13MCCSCF[3] KML OPERATIONS 1:30 AM ERECT SCAFFOLD PLATFROM FOR CH018 HOSE OUT
67 0% 1303-CH018 COMMENCE CH018 / CH010 / CH011 HOSE OUT 6 hrs 27/08/23 2:00 AM 27/08/23 8:00 AM 13OPTOPE[2] KML OPERATIONS 2:00 AM COMMENCE CH018 / CH010 / CH011 HOSE OUT
68 0% 1301-BN001 INSTALL BN001 DIG OUT PERMIT 1 hr 27/08/23 1:30 AM 27/08/23 2:30 AM 13OPTOPE[2] KML OPERATIONS 1:30 AM INSTALL BN001 DIG OUT PERMIT
69 0% 1303-CV002 INSTALL CV002 GTU PERMIT 0.5 hrs 27/08/23 2:00 AM 27/08/23 2:30 AM 13OPTOPE[2] KML OPERATIONS 2:00 AM INSTALL CV002 GTU PERMIT
70 0% 1301-CR001 LOWER BOBCAT INTO DUMP POCKET 0.5 hrs 27/08/23 3:00 AM 27/08/23 3:30 AM 13OPTOPE[2] KML OPERATIONS 3:00 AM LOWER BOBCAT INTO DUMP POCKET
71 0% 1303-CH042 MECHANICAL TO OPEN CH042 / CH043 / CH054 / CH055 HATCHES 3 hrs 27/08/23 3:00 AM 27/08/23 6:00 AM 13MCCSUP KML OPERATIONS 3:00 AM MECHANICAL TO OPEN CH042 / CH043 / CH054 / CH055 HATCHES
72 0% 1303-CH042 INSTALL SCAFF BARS ON CH042 / CH043 / CH054 / CH055 0.5 hrs 27/08/23 6:00 AM 27/08/23 6:30 AM 13OPTOPE[2] KML OPERATIONS 6:00 AM INSTALL SCAFF BARS ON CH042 / CH043 / CH054 / CH055
73 0% 1301-CR001 CLEAN OUT DUMP POCKET WITH BOBCAT 2 hrs 27/08/23 3:30 AM 27/08/23 5:30 AM 13OPTOPE[2] KML OPERATIONS 3:30 AM CLEAN OUT DUMP POCKET WITH BOBCAT
74 0% 40214774 1301-FE001 FE001 ONLINE TEST/FAULT FINDING 2 hrs 27/08/23 5:30 AM 27/08/23 7:30 AM
75 0% 40214774 1301-FE001 ONLINE TEST/FAULT FIND - DURING DIG OUT 2 hrs 27/08/23 5:30 AM 27/08/23 7:30 AM 13ELTELE[2],13METHYD KML OPERATIONS KML ELECTRICAL 01 5:30 AM ONLINE TEST/FAULT FIND - DURING DIG OUT
76 0% 1301-CH006 COMPLETELY CLEAN CH008 ONTO CV003 & SWING GA001 BACK TO 6.5 hrs 27/08/23 4:00 AM 27/08/23 10:30 AM 13OPTOPE[2] KML OPERATIONS 4:00 AM COMPLETELY CLEAN CH008 ONTO CV003 & SWING GA001 BACK TO TRAMP POSITION
TRAMP POSITION
77 0% 1301-CR001 REMOVE OPERATOR FROM DUMP POCKET 0.25 hrs 27/08/23 5:30 AM 27/08/23 5:45 AM 13OPTOPE[2] KML OPERATIONS 5:30 AM REMOVE OPERATOR FROM DUMP POCKET
78 0% 1301-CR001 DE-ISOLATE CR001 0.25 hrs 27/08/23 5:45 AM 27/08/23 6:00 AM 13OPTOPE[2] KML OPERATIONS 5:45 AM DE-ISOLATE CR001
79 0% 1301-CR001 RUN OUT CRUSHER 0.5 hrs 27/08/23 6:00 AM 27/08/23 6:30 AM KML OPERATIONS 6:00 AM RUN OUT CRUSHER
80 0% 1301-CR001 CRUSHING SUPERVISOR TO CONFIRM CLENA OUT OF CR001 0.25 hrs 27/08/23 6:30 AM 27/08/23 6:45 AM 13MCCSUP KML OPERATIONS 6:30 AM CRUSHING SUPERVISOR TO CONFIRM CLENA OUT OF CR001 COMPLETE
COMPLETE
81 0% 1303-CR018 MECHANICAL SUPERVISOR TO CONFIRM CH018 / CH010 / CH011 0.25 hrs 27/08/23 8:00 AM 27/08/23 8:15 AM 13MCCSUP KML OPERATIONS 8:00 AM MECHANICAL SUPERVISOR TO CONFIRM CH018 / CH010 / CH011 HOSE OUT COMPLETE
HOSE OUT COMPLETE
82 0% 1303-CH042 COMMENCE HOSE OUT OF CH042 / CH042 / CH054 / CH055 3.5 hrs 27/08/23 7:00 AM 27/08/23 10:30 AM 13OPTOPE[2] KML OPERATIONS 7:00 AM COMMENCE HOSE OUT OF CH042 / CH042 / CH054 / CH055
83 0% 1303-CH042 REMOVE CHUTE HOSE OUT PERMIT 0.75 hrs 27/08/23 7:00 AM 27/08/23 7:45 AM 13OPTOPE[2] KML OPERATIONS 7:00 AM REMOVE CHUTE HOSE OUT PERMIT
84 0% 1301-CR001 COMMENCE INSTALL OF CR001 / LU023 / RB001 / DS001 PERMIT 1.5 hrs 27/08/23 7:00 AM 27/08/23 8:30 AM 13OPTOPE[2] KML OPERATIONS 7:00 AM COMMENCE INSTALL OF CR001 / LU023 / RB001 / DS001 PERMIT
85 0% 1301-BN010 COMMENCE INSTALL OF BN010 PERMIT 1.5 hrs 27/08/23 7:00 AM 27/08/23 8:30 AM 13OPTOPE[2] KML OPERATIONS 7:00 AM COMMENCE INSTALL OF BN010 PERMIT
86 0% 1303-CV002 COMMENCE INSTALL OF CV002 / CH010 / CH011 / CH018 PERMIT 0.75 hrs 27/08/23 8:30 AM 27/08/23 9:15 AM 13OPTOPE[2] KML OPERATIONS 8:30 AM COMMENCE INSTALL OF CV002 / CH010 / CH011 / CH018 PERMIT
87 0% 1301-BN010 TEST & JOB ON BN010 PERMIT TO OPEN DOORS 1 hr 27/08/23 9:30 AM 27/08/23 10:30 AM 13OPTOPE[2] KML OPERATIONS 9:30 AM TEST & JOB ON BN010 PERMIT TO OPEN DOORS
88 0% 1301-BN010 HOSE OUT BN010 1 hr 27/08/23 10:30 AM 27/08/23 11:30 AM 13OPTOPE[2] KML OPERATIONS 10:30 AM HOSE OUT BN010

Scheduler:-Scott Everard Page 1 Printed:- 25/08/23 4:53 PM


Coordinator:-Doug Wolfendon
CR1-0723 Concave & Mantle Shutdown CR1-0723 Final Gantt Rev1
Start 26/08/23 8:00 PM _ Finish 2/09/23 7:00 PM
ID % WO Equipment Task Name Duration Start Finish Resource Names Team Sub Team
Complete Thu 24 Aug
Fri 25 AugSat 26 Aug
Sun 27 Aug
Mon 28 Aug
Tue 29 Aug
Wed 30 Aug
Thu 31 AugFri 1 SepSat 2 SepSun 3 SepMon 4 SepTue 5 SepW ed 6 SepThu 7 SepFri 8 SepSat 9 SepSun 10 S
12 6
PM12
PM6AM12
AM6PM
12
PM6AM12
AM6 PM
12
PM6AM
12
AM6PM12
PM6AM
12
AM6PM12
PM6AM
12
AM6PM12
PM6AM
12
AM6PM
12
PM6AM
12
AM6PM12
PM6AM12
AM6PM12
PM6AM
12
AM6PM
12
PM6AM
12
AM6 PM
12
PM6AM
12
AM6PM12
PM6AM
12
AM6 PM
12
PM6AM12
AM6PM12
PM6AM
12
AM6PM
12
PM6AM12
AM6PM12
PM6AM
12
AM6PM
12
PMAM
89 0% 1303-CH042 MECHANICAL TO INSPECT CH042 / CH043 / CH055 HOSE OUT 0.25 hrs 27/08/23 10:30 AM 27/08/23 10:45 AM 13MCCSUP KML OPERATIONS 10:30 AM MECHANICAL TO INSPECT CH042 / CH043 / CH055 HOSE OUT COMPLETE
COMPLETE
90 0% 1303-FE013 FE013 REVERSE RUN TO BE STOPPED & FEED GATE CLOSED 0.25 hrs 27/08/23 10:15 AM 27/08/23 10:30 AM 13OPTOPE[2] KML OPERATIONS 10:15 AM FE013 REVERSE RUN TO BE STOPPED & FEED GATE CLOSED
91 0% 1302-CH040 COMMENCE HOSE OUT ON CH040/109 0.5 hrs 27/08/23 10:30 AM 27/08/23 11:00 AM 13OPTOPE[2] KML OPERATIONS 10:30 AM COMMENCE HOSE OUT ON CH040/109
92 0% 1303-SN005 COMMENCE INSTALL OF SN005 / SN006 / FE002 / FE003 / CH042 / 2 hrs 27/08/23 11:00 AM 27/08/23 1:00 PM 13OPTOPE[2] KML OPERATIONS 11:00 AM COMMENCE INSTALL OF SN005 / SN006 / FE002 / FE003 / CH042 / CH043 / CH054 / CH055 / CH040/109 PERMIT
CH043 / CH054 / CH055 / CH040/109 PERMIT
93 0% 1301-BN010 COMMENCE INSTALL OF MODIFICATION TO BN010 PERMIT TO 0.5 hrs 27/08/23 11:00 AM 27/08/23 11:30 AM 13OPTOPE[2] KML OPERATIONS 11:00 AM COMMENCE INSTALL OF MODIFICATION TO BN010 PERMIT TO INCLUDE FE001 & CV001
INCLUDE FE001 & CV001
94 0% 1301-CV003 ENGYTECH TO POSITION CV003 BELT FOR REPAIR 0.25 hrs 27/08/23 11:30 AM 27/08/23 11:45 AM 13MBCBTE KML OPERATIONS ENGYTECH BELTS 11:30 AM ENGYTECH TO POSITION CV003 BELT FOR REPAIR
95 0% 1301-CV003 SIMPLE ISOLATION CV003 0.25 hrs 27/08/23 11:45 AM 27/08/23 12:00 PM 13OPTOPE[2] KML OPERATIONS 11:45 AM SIMPLE ISOLATION CV003
96 0% 1301-CV003 CV003 REMOVE BUMP STOPS & INSTALL BELT CLAMP 1 hr 27/08/23 12:00 PM 27/08/23 1:00 PM 13MBCBTE KML OPERATIONS ENGYTECH BELTS 12:00 PM CV003 REMOVE BUMP STOPS & INSTALL BELT CLAMP
97 0% 1303-BN007 COMMENCE INSTALL OF BN007 / CH019 / CH020 / CH021 / FE006 / 1.25 hrs 27/08/23 1:00 PM 27/08/23 2:15 PM 13OPTOPE[2] KML OPERATIONS 1:00 PM COMMENCE INSTALL OF BN007 / CH019 / CH020 / CH021 / FE006 / FE007 / FE013 PERMIT
FE007 / FE013 PERMIT
98 0% 1301-CV003-CS001 DRIVE CS001 INTO MAINTENANCE BAY 0.5 hrs 27/08/23 1:00 PM 27/08/23 1:30 PM 13OPTOPE[2] KML OPERATIONS 1:00 PM DRIVE CS001 INTO MAINTENANCE BAY
99 0% 1301-CV001 COMMENCE INSTALL OF CV001 / CV003 / CS001 / CH006/008 1.25 hrs 27/08/23 1:30 PM 27/08/23 2:45 PM 13OPTOPE[2] KML OPERATIONS 1:30 PM COMMENCE INSTALL OF CV001 / CV003 / CS001 / CH006/008 PERMIT
PERMIT
100 0% 1302-CV007 COMMENCE INSTALL OF CV007 / CV007 PERMIT 0.75 hrs 27/08/23 2:30 PM 27/08/23 3:15 PM 13OPTOPE[2] KML OPERATIONS 2:30 PM COMMENCE INSTALL OF CV007 / CV007 PERMIT
101 0% 1303-CV007 COMMENCE INSTALL OF COS PUSH IN PERMIT 0.5 hrs 27/08/23 2:45 PM 27/08/23 3:15 PM 13OPTOPE[2] KML OPERATIONS 2:45 PM COMMENCE INSTALL OF COS PUSH IN PERMIT
102 0% 1303-CV005 COMMENCE INSTALL OF CV005 GTU PERMIT 0.5 hrs 27/08/23 2:45 PM 27/08/23 3:15 PM 13OPTOPE[2] KML OPERATIONS 2:45 PM COMMENCE INSTALL OF CV005 GTU PERMIT
103 0% 1301-CR001 INSTALL OF CR001 / LU023 / RB001 / DS001 PERMIT COMPLETE 0 hrs 27/08/23 8:30 AM 27/08/23 8:30 AM 13OPTOPE[2] KML OPERATIONS 8:30 AM INSTALL OF CR001 / LU023 / RB001 / DS001 PERMIT COMPLETE
104 0% 1301-BN010 INSTALL OF BN010 PERMIT COMPLETE 0 hrs 27/08/23 8:30 AM 27/08/23 8:30 AM 13OPTOPE[2] KML OPERATIONS 8:30 AM INSTALL OF BN010 PERMIT COMPLETE
105 0% 1303-CV002 INSTALL OF CV002 / CH010 / CH011 / CH018 PERMIT COMPLETE 0 hrs 27/08/23 9:15 AM 27/08/23 9:15 AM 13OPTOPE[2] KML OPERATIONS 9:15 AM INSTALL OF CV002 / CH010 / CH011 / CH018 PERMIT COMPLETE
106 0% 1301-BN010 INSTALL OF MODIFICATION TO BN010 PERMIT TO INCLUDE FE001 & 0 hrs 27/08/23 11:30 AM 27/08/23 11:30 AM 13OPTOPE[2] KML OPERATIONS 11:30 AM INSTALL OF MODIFICATION TO BN010 PERMIT TO INCLUDE FE001 & CV001 COMPLETE
CV001 COMPLETE
107 0% 1303-SN005 INSTALL OF SN005 / SN006 / FE002 / FE003 / CH042 / CH043 / CH054 / 0 hrs 27/08/23 1:00 PM 27/08/23 1:00 PM 13OPTOPE[2] KML OPERATIONS 1:00 PM INSTALL OF SN005 / SN006 / FE002 / FE003 / CH042 / CH043 / CH054 / CH055 / CH040/109 COMPLETE
CH055 / CH040/109 COMPLETE
108 0% 1303-BN007 INSTALL OF BN007 / CH019 / CH020 / CH021 / FE006 / FE007 / FE013 0 hrs 27/08/23 2:15 PM 27/08/23 2:15 PM 13OPTOPE[2] KML OPERATIONS 2:15 PM INSTALL OF BN007 / CH019 / CH020 / CH021 / FE006 / FE007 / FE013 PERMIT COMPLETE
PERMIT COMPLETE
109 0% 1301-CV001 INSTALL OF CV001 / CV003 / CS001 / CH006/008 PERMIT COMPLETE 0 hrs 27/08/23 2:45 PM 27/08/23 2:45 PM 13OPTOPE[2] KML OPERATIONS 2:45 PM INSTALL OF CV001 / CV003 / CS001 / CH006/008 PERMIT COMPLETE

110 0% 1302-CV007 INSTALL OF COS PUSH IN PERMIT COMPLETE 0 hrs 27/08/23 3:15 PM 27/08/23 3:15 PM 13OPTOPE[2] KML OPERATIONS 3:15 PM INSTALL OF COS PUSH IN PERMIT COMPLETE
111 0% 1303-CV005 INSTALL OF CV005 GTU PERMIT COMPLETE 0 hrs 27/08/23 3:15 PM 27/08/23 3:15 PM 13OPTOPE[2] KML OPERATIONS 3:15 PM INSTALL OF CV005 GTU PERMIT COMPLETE
112 0% 1303-CV005 INSTALL OF CV005 / CV007 PERMIT COMPLETE 0 hrs 27/08/23 3:15 PM 27/08/23 3:15 PM 13OPTOPE[2] KML OPERATIONS 3:15 PM INSTALL OF CV005 / CV007 PERMIT COMPLETE
113 0% RUNDOWN & ISOLATIONS COMPLETE 0 hrs 27/08/23 3:15 PM 27/08/23 3:15 PM 3:15 PM RUNDOWN & ISOLATIONS COMPLETE
114 0% SHUTDOWN TOOL TIME 165 hrs 26/08/23 8:00 PM 2/09/23 5:00 PM
115 0% 1301 AREA PRIMARY 147.5 hrs 27/08/23 8:30 AM 2/09/23 12:00 PM
116 0% 1301-RB001 RB001 127.5 hrs 28/08/23 12:30 AM 2/09/23 8:00 AM
117 0% 40208622 1301-RB001 09W OF ME ROCK BREAKER INSP 2 hrs 2/09/23 6:00 AM 2/09/23 8:00 AM
118 0% 40208622 1301-RB001 09W OF ME ROCK BREAKER INSP 2 hrs 2/09/23 6:00 AM 2/09/23 8:00 AM 13MCCFIT KG CRUSHING 6:00 AM 09W OF ME ROCK BREAKER INSP
119 0% 40208539 1301-RB001 09W OF EL ROCK BREAKER SERV 2.5 hrs 28/08/23 12:30 AM 28/08/23 3:00 AM
120 0% 40208539 1301-RB001 09W OF EL ROCK BREAKER SERVICE 2.5 hrs 28/08/23 12:30 AM 28/08/23 3:00 AM 13ELTELE KML ELECTRICAL 01 12:30 AM 09W OF EL ROCK BREAKER SERVICE
121 0% 1301-DS001 DS001 4 hrs 2/09/23 8:00 AM 2/09/23 12:00 PM
122 0% 40208436 1301-DS001 09W OF ME DUST SUPPRESSION INSP 4 hrs 2/09/23 8:00 AM 2/09/23 12:00 PM
123 0% 40208436 1301-DS001 09W OF ME DUST SUPPRESSION INSP 4 hrs 2/09/23 8:00 AM 2/09/23 12:00 PM 13MCCFIT[2] KG CRUSHING 8:00 AM 09W OF ME DUST SUPPRESSION INSP
124 0% BN001 140 hrs 27/08/23 8:30 AM 2/09/23 4:30 AM
125 0% 40192596 1301-BN001 BN001 REPLACE REAR WALL 140 hrs 27/08/23 8:30 AM 2/09/23 4:30 AM
126 0% 40192596 1301-BN001 ERECT SCAFFOLD 6 hrs 27/08/23 8:30 AM 27/08/23 2:30 PM 13MCCSCF[3] KG BN001 ALTRAD SCAFFOLD 8:30 AM ERECT SCAFFOLD
127 0% 40192596 1301-BN001 ELECTRICAL DISCONNECT 10 hrs 27/08/23 2:30 PM 28/08/23 12:30 AM 13ELTELE[2] KG BN001 KML ELECTRICAL 01 2:30 PM ELECTRICAL DISCONNECT
128 0% 40192596 1301-BN001 BN001 REPLACE REAR WALL 96 hrs 28/08/23 12:30 AM 1/09/23 12:30 AM 13MECFIT[2],13MECBOI[2],13MECRIG KG BN001 12:30 AM BN001 REPLACE REAR WALL
129 0% 40192596 1301-BN001 ELEC RECONNECT CABLE LADDER / CABLING 18 hrs 1/09/23 7:30 AM 2/09/23 1:30 AM 13ELTELE[2] KG BN001 KML ELECTRICAL 01 7:30 AM ELEC RECONNECT CABLE LADDER / CABLING
130 0% 40192596 1301-BN001 DISMANTLE SCAFFOLD 3 hrs 2/09/23 1:30 AM 2/09/23 4:30 AM 13MCCSCF[3] KG BN001 ALTRAD SCAFFOLD 1:30 AM DISMANTLE SCAFFOLD
131 0% BD001 2 hrs 28/08/23 3:00 AM 28/08/23 5:00 AM
132 0% 40208653 1301-BD001-DB006 27W OF EL ST LV RCD INJ TEST 2 hrs 28/08/23 3:00 AM 28/08/23 5:00 AM
133 0% 40208653 1301-BD001-DB006 27W OF EL ST LV RCD INJ TEST 2 hrs 28/08/23 3:00 AM 28/08/23 5:00 AM 13ELTELE[2] KML ELECTRICAL 01 3:00 AM 27W OF EL ST LV RCD INJ TEST
134 0% 1301-CR001 CR001 129.5 hrs 27/08/23 8:30 AM 1/09/23 6:00 PM
135 0% 40208533 1301-CR001 09W OF ME MANTLE HEIGHT CALIBRATE 1 hr 1/09/23 10:30 AM 1/09/23 11:30 AM
136 0% 40208533 1301-CR001 09W OF ME MANTLE HEIGHT CALIBRATE 1 hr 1/09/23 10:30 AM 1/09/23 11:30 AM 13MCCFIT[2] KG CRUSHING 10:30 AM 09W OF ME MANTLE HEIGHT CALIBRATE
137 0% 40208132 1301-CR001-CO001 09W OF CM SPIDER VISUAL WEAR INSPECTION 1 hr 27/08/23 10:30 PM 27/08/23 11:30 PM
138 0% 40208132 1301-CR001-CO001 09W OF CM SPIDER VISUAL WEAR INSPECTION 1 hr 27/08/23 10:30 PM 27/08/23 11:30 PM 13MCCWEA KG CRUSHING 10:30 PM 09W OF CM SPIDER VISUAL WEAR INSPECTION
139 0% 40214522 1301-CR001 CON OF ME CONCAVE & MANTLE CHANGE OUT 129.5 hrs 27/08/23 8:30 AM 1/09/23 6:00 PM
140 0% 40214522 1301-CR001 DISASSEMBLE PRIMARY CR001 17.5 hrs 27/08/23 8:30 AM 28/08/23 2:00 AM
141 0% 40214522 1301-CR001 INSTALL SIMPLES FOR PERMIT HUT AND ACCESS 0.5 hrs 27/08/23 8:30 AM 27/08/23 9:00 AM 13OPTOPE KG CRUSHING KML OPERATIONS 8:30 AM INSTALL SIMPLES FOR PERMIT HUT AND ACCESS STAIRS DROP IN
STAIRS DROP IN
142 0% 40214522 1301-CR001 BUILD 450T CRANE 4 hrs 27/08/23 9:00 AM 27/08/23 1:00 PM 13MECCND,13MCCFIT[2],13MCCRIG,13CR145T KG CRUSHING 9:00 AM BUILD 450T CRANE
143 0% 40214522 1301-CR001 INSTALL PERMIT HUT 0.5 hrs 27/08/23 1:00 PM 27/08/23 1:30 PM 13MECCND,13MCCFIT[2],13MCCRIG KG CRUSHING FREO 450T 1:00 PM INSTALL PERMIT HUT
144 0% 40214522 1301-CR001 SCAFFOLD HANDRAIL ALONG DUMP POCKET BUMP 0.5 hrs 27/08/23 1:30 PM 27/08/23 2:00 PM 13MCCSCF[3] KG CRUSHING KG SCAFFOLD 01 1:30 PM SCAFFOLD HANDRAIL ALONG DUMP POCKET BUMP STOP
STOP
145 0% 40214522 1301-CR001 INSTALL DROP IN ACCESS STAIRS 0.5 hrs 27/08/23 2:00 PM 27/08/23 2:30 PM 13MECCND,13MCCFIT[2],13MCCRIG,13CR145T KG CRUSHING FREO 450T 2:00 PM INSTALL DROP IN ACCESS STAIRS
146 0% 40214522 1301-CR001 INSTALL HAND RAIL RING INSIDE BN001 0.5 hrs 27/08/23 2:30 PM 27/08/23 3:00 PM 13MCCSCF[3] KG CRUSHING KG SCAFFOLD 01 2:30 PM INSTALL HAND RAIL RING INSIDE BN001
147 0% 40214522 1301-CR001 SET UP SKYHOOK'S 0.5 hrs 27/08/23 3:00 PM 27/08/23 3:30 PM 13MECCND,13MCCFIT[2],13MCCRIG KG CRUSHING FREO 450T 3:00 PM SET UP SKYHOOK'S
148 0% 40214522 1301-CR001 REMOVE PRODUCT FROM SPIDER ARM GUARDS AND 3 hrs 27/08/23 3:30 PM 27/08/23 6:30 PM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN KG CRUSHING FREO 450T 3:30 PM REMOVE PRODUCT FROM SPIDER ARM GUARDS AND REMOVE SUPER BOLTS
REMOVE SUPER BOLTS
149 0% 40214522 1301-CR001 RIG SPIDER FOR REMOVAL 1 hr 27/08/23 6:30 PM 27/08/23 7:30 PM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN KG CRUSHING FREO 450T 6:30 PM RIG SPIDER FOR REMOVAL
150 0% 40214522 1301-CR001 REMOVE SPIDER 3 hrs 27/08/23 7:30 PM 27/08/23 10:30 PM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN KG CRUSHING FREO 450T 7:30 PM REMOVE SPIDER
151 0% 40214522 1301-CR001 CLEAN AND MEASURE SPIDER BUSH 1 hr 27/08/23 10:30 PM 27/08/23 11:30 PM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN KG CRUSHING FREO 450T 10:30 PM CLEAN AND MEASURE SPIDER BUSH
152 0% 40214522 1301-CR001 INSPECT SPIDER COMPONENTS 1 hr 27/08/23 10:30 PM 27/08/23 11:30 PM 13ENTENG KG CRUSHING KML MECH ENGINEER 10:30 PM INSPECT SPIDER COMPONENTS
153 0% 40214522 1301-CR001 INSTALL PLATFORM FOR MAIN SHAFT ACCESS AND 0.5 hrs 27/08/23 10:30 PM 27/08/23 11:00 PM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN KG CRUSHING FREO 450T 10:30 PM INSTALL PLATFORM FOR MAIN SHAFT ACCESS AND LOWER LIFTING EYE
LOWER LIFTING EYE
154 0% 40214522 1301-CR001 RIG MAIN SHAFT AND REMOVE ACCESS PLATFORM 0.5 hrs 27/08/23 11:00 PM 27/08/23 11:30 PM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN KG CRUSHING FREO 450T 11:00 PM RIG MAIN SHAFT AND REMOVE ACCESS PLATFORM
155 0% 40214522 1301-CR001 REMOVE MAIN SHAFT AND LOWER DOWN TO RE-BUILD 1 hr 27/08/23 11:30 PM 28/08/23 12:30 AM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN KG CRUSHING FREO 450T 11:30 PM REMOVE MAIN SHAFT AND LOWER DOWN TO RE-BUILD STAND
STAND
156 0% 40214522 1301-CR001 INSTALL ACCESS LADDER TO MEASURE ECCENTRIC 0.5 hrs 28/08/23 12:30 AM 28/08/23 1:00 AM 13MCCSCF[3] KG CRUSHING KG SCAFFOLD 01 12:30 AM INSTALL ACCESS LADDER TO MEASURE ECCENTRIC BUSH
BUSH
157 0% 40214522 1301-CR001 CLEAN AND MEASURE ECCENTRIC BUSH 1 hr 28/08/23 12:30 AM 28/08/23 1:30 AM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN KG CRUSHING FREO 450T 12:30 AM CLEAN AND MEASURE ECCENTRIC BUSH
158 0% 40214522 1301-CR001 LOWER IN AND INSTALL ECCENTRIC BUSH DUST 0.5 hrs 28/08/23 1:30 AM 28/08/23 2:00 AM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN KG CRUSHING FREO 450T 1:30 AM LOWER IN AND INSTALL ECCENTRIC BUSH DUST COVER
COVER
159 0% 40214522 1301-CR001 CONCAVE REPLACEMENT 47 hrs 28/08/23 2:00 AM 30/08/23 1:00 AM
160 0% 40214522 1301-CR001 REMOVE INNER LIP LINERS 2 hrs 28/08/23 2:00 AM 28/08/23 4:00 AM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 2:00 AM REMOVE INNER LIP LINERS
161 0% 40214522 1301-CR001 INSTALL ALL 3X TUBS 1 hr 28/08/23 4:00 AM 28/08/23 5:00 AM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 4:00 AM INSTALL ALL 3X TUBS
162 0% 40214522 1301-CR001 GOUGE TOP ROW CONCAVE LINER 1 hr 28/08/23 5:00 AM 28/08/23 6:00 AM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 5:00 AM GOUGE TOP ROW CONCAVE LINER
163 0% 40214522 1301-CR001 LOWER MINI EX INTO DUMP POCKET AND SET UP 1 hr 28/08/23 6:00 AM 28/08/23 7:00 AM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 6:00 AM LOWER MINI EX INTO DUMP POCKET AND SET UP MACHINE
MACHINE
164 0% 40214522 1301-CR001 KNOCK OUT&REMOVE TOP ROW OF CONCAVES USING 3 hrs 28/08/23 7:00 AM 28/08/23 10:00 AM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 7:00 AM KNOCK OUT&REMOVE TOP ROW OF CONCAVES USING THE MINI EX AND FRANNA CRANE
THE MINI EX AND FRANNA CRANE
165 0% 40214522 1301-CR001 REMOVE TOP TUB 1 hr 28/08/23 10:00 AM 28/08/23 11:00 AM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 10:00 AM REMOVE TOP TUB
166 0% 40214522 1301-CR001 GOUGE MIDDLE ROW CONCAVE LINER 1.5 hrs 28/08/23 11:00 AM 28/08/23 12:30 PM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 11:00 AM GOUGE MIDDLE ROW CONCAVE LINER

Scheduler:-Scott Everard Page 2 Printed:- 25/08/23 4:53 PM


Coordinator:-Doug Wolfendon
CR1-0723 Concave & Mantle Shutdown CR1-0723 Final Gantt Rev1
Start 26/08/23 8:00 PM _ Finish 2/09/23 7:00 PM
ID % WO Equipment Task Name Duration Start Finish Resource Names Team Sub Team
Complete Thu 24 Aug
Fri 25 AugSat 26 Aug
Sun 27 Aug
Mon 28 Aug
Tue 29 Aug
Wed 30 Aug
Thu 31 AugFri 1 SepSat 2 SepSun 3 SepMon 4 SepTue 5 SepW ed 6 SepThu 7 SepFri 8 SepSat 9 SepSun 10 S
12 6
PM12
PM6AM12
AM6PM
12
PM6AM12
AM6PM12
PM6AM
12
AM6PM12
PM6AM
12
AM6PM12
PM6AM
12
AM6PM12
PM6AM
12
AM6PM
12
PM6AM
12
AM6PM12
PM6AM12
AM6PM12
PM6AM
12
AM6PM
12
PM6AM
12
AM6 PM
12
PM6AM
12
AM6PM12
PM6AM
12
AM6 PM
12
PM6AM12
AM6PM12
PM6AM
12
AM6PM
12
PM6AM12
AM6PM12
PM6AM
12
AM6PM
12
PMAM
167 0% 40214522 1301-CR001 KNOCK OUT&REMOVE MIDDLE ROW OF CONCAVES 3 hrs 28/08/23 12:30 PM 28/08/23 3:30 PM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 12:30 PM KNOCK OUT&REMOVE MIDDLE ROW OF CONCAVES USING THE MINI EX AND FRANNA CRANE
USING THE MINI EX AND FRANNA CRANE
168 0% 40214522 1301-CR001 REMOVE MIDDLE TUB 1 hr 28/08/23 3:30 PM 28/08/23 4:30 PM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 3:30 PM REMOVE MIDDLE TUB
169 0% 40214522 1301-CR001 GOUGE BOTTOM ROW CONCAVE LINER 2 hrs 28/08/23 4:30 PM 28/08/23 6:30 PM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 4:30 PM GOUGE BOTTOM ROW CONCAVE LINER
170 0% 40214522 1301-CR001 KNOCK OUT&REMOVE BOTTOM ROW OF CONCAVES 4 hrs 28/08/23 6:30 PM 28/08/23 10:30 PM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 6:30 PM KNOCK OUT&REMOVE BOTTOM ROW OF CONCAVES USING THE MINI EX AND FRANNA CRANE
USING THE MINI EX AND FRANNA CRANE
171 0% 40214522 1301-CR001 SANDBLAST CRUSHER BOWL - TO BE ASSESSED ON 8 hrs 28/08/23 10:30 PM 29/08/23 6:30 AM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 10:30 PM SANDBLAST CRUSHER BOWL - TO BE ASSESSED ON THE DAY
THE DAY
172 0% 40214522 1301-CR001 PREP AND DRESS CONCAVE SUPPORT RING 2.5 hrs 29/08/23 6:30 AM 29/08/23 9:00 AM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 6:30 AM PREP AND DRESS CONCAVE SUPPORT RING
173 0% 40214522 1301-CR001 REMOVE BOTTOM TUB 0.5 hrs 29/08/23 9:00 AM 29/08/23 9:30 AM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 9:00 AM REMOVE BOTTOM TUB
174 0% 40214522 1301-CR001 INSTALL BOTTOM ROW OF CONCAVES 1 hr 29/08/23 9:30 AM 29/08/23 10:30 AM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 9:30 AM INSTALL BOTTOM ROW OF CONCAVES
175 0% 40214522 1301-CR001 SEAL BOTTOM ROW OF CONCAVES 1 hr 29/08/23 10:30 AM 29/08/23 11:30 AM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 10:30 AM SEAL BOTTOM ROW OF CONCAVES
176 0% 40214522 1301-CR001 POUR BACKING COMPOUND 2.5 hrs 29/08/23 11:30 AM 29/08/23 2:00 PM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 11:30 AM POUR BACKING COMPOUND
177 0% 40214522 1301-CR001 CUT CARROTS AND GRIND FLUSH ON BOTTOM ROW 0.5 hrs 29/08/23 2:00 PM 29/08/23 2:30 PM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 2:00 PM CUT CARROTS AND GRIND FLUSH ON BOTTOM ROW
178 0% 40214522 1301-CR001 INSTALL MIDDLE ROW OF CONCAVES AND SEAL 1.5 hrs 29/08/23 2:30 PM 29/08/23 4:00 PM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 2:30 PM INSTALL MIDDLE ROW OF CONCAVES AND SEAL
179 0% 40214522 1301-CR001 POUR BACKING COMPOUND 2.5 hrs 29/08/23 4:00 PM 29/08/23 6:30 PM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 4:00 PM POUR BACKING COMPOUND
180 0% 40214522 1301-CR001 CUT CARROTS AND GRIND FLUSH ON MIDDLE ROW 0.5 hrs 29/08/23 6:30 PM 29/08/23 7:00 PM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 6:30 PM CUT CARROTS AND GRIND FLUSH ON MIDDLE ROW
181 0% 40214522 1301-CR001 INSTALL LOWER TUB 0.5 hrs 29/08/23 7:00 PM 29/08/23 7:30 PM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 7:00 PM INSTALL LOWER TUB
182 0% 40214522 1301-CR001 INSTALL TOP ROW OF CONCAVES AND SEAL 1.5 hrs 29/08/23 7:30 PM 29/08/23 9:00 PM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 7:30 PM INSTALL TOP ROW OF CONCAVES AND SEAL
183 0% 40214522 1301-CR001 INSTALL TOP TUB AND POUR BACKING 2.5 hrs 29/08/23 9:00 PM 29/08/23 11:30 PM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 9:00 PM INSTALL TOP TUB AND POUR BACKING
184 0% 40214522 1301-CR001 CUT CARROTS AND GRIND ON TOP ROW 0.5 hrs 29/08/23 11:30 PM 30/08/23 12:00 AM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 11:30 PM CUT CARROTS AND GRIND ON TOP ROW
185 0% 40214522 1301-CR001 CLEAN UP 1 hr 30/08/23 12:00 AM 30/08/23 1:00 AM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 12:00 AM CLEAN UP
186 0% 40214522 1301-CR001 ASSEMBLE PRIMARY CR001 18.5 hrs 31/08/23 11:30 PM 1/09/23 6:00 PM
187 0% 40214522 1301-CR001 REMOVE BOTTOM TUB 0.5 hrs 31/08/23 11:30 PM 1/09/23 12:00 AM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 11:30 PM REMOVE BOTTOM TUB
188 0% 40214522 1301-CR001 REMOVE ECCENTRIC BUSH DUST COVER 0.5 hrs 1/09/23 12:00 AM 1/09/23 12:30 AM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 12:00 AM REMOVE ECCENTRIC BUSH DUST COVER
189 0% 40214522 1301-CR001 RIG AND INSTALL MAIN SHAFT 1 hr 1/09/23 12:30 AM 1/09/23 1:30 AM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 12:30 AM RIG AND INSTALL MAIN SHAFT
190 0% 40214522 1301-CR001 INSTALL MAIN SHAFT ACCESS PLATFORM 0.5 hrs 1/09/23 1:30 AM 1/09/23 2:00 AM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 1:30 AM INSTALL MAIN SHAFT ACCESS PLATFORM
191 0% 40214522 1301-CR001 DE-RIG MAIN SHAFT 0.5 hrs 1/09/23 2:00 AM 1/09/23 2:30 AM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 2:00 AM DE-RIG MAIN SHAFT
192 0% 40214522 1301-CR001 REMOVE MAIN SHAFT ACCESS PLATFORM 0.5 hrs 1/09/23 2:30 AM 1/09/23 3:00 AM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 2:30 AM REMOVE MAIN SHAFT ACCESS PLATFORM
193 0% 40214522 1301-CR001 INSTALL LIP LINERS 2 hrs 1/09/23 3:00 AM 1/09/23 5:00 AM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING 3:00 AM INSTALL LIP LINERS
194 0% 40214522 1301-CR001 REMOVE VAULT HARD BARRICADING 0.5 hrs 1/09/23 3:00 AM 1/09/23 3:30 AM 13MCCSCF[3] KG CRUSHING KG SCAFFOLD 01 3:00 AM REMOVE VAULT HARD BARRICADING
195 0% 40214522 1301-CR001 REMOVE ECCENTRIC CART 0.5 hrs 1/09/23 3:00 AM 1/09/23 3:30 AM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 3:00 AM REMOVE ECCENTRIC CART
196 0% 40214522 1301-CR001 CLOSE VAULT DOORS 1 hr 1/09/23 3:30 AM 1/09/23 4:30 AM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 3:30 AM CLOSE VAULT DOORS
197 0% 40214522 1301-CR001 CHECK LUBE OIL TANK LEVEL 0.5 hrs 1/09/23 3:30 AM 1/09/23 4:00 AM 13MCCFIT[2] KG CRUSHING 3:30 AM CHECK LUBE OIL TANK LEVEL
198 0% 40214522 1301-CR001 CHECK HYDRAULIC OIL LEVEL 0.5 hrs 1/09/23 4:00 AM 1/09/23 4:30 AM 13MCCFIT[2] KG CRUSHING 4:00 AM CHECK HYDRAULIC OIL LEVEL
199 0% 40214522 1301-CR001 ENSURE LUBE OIL TEMP IS AT MINIMUM SET POINT OR 0.5 hrs 1/09/23 4:30 AM 1/09/23 5:00 AM 13MCCFIT[2] KG CRUSHING 4:30 AM ENSURE LUBE OIL TEMP IS AT MINIMUM SET POINT OR HIGHER 38*C
HIGHER 38*C
200 0% 40214522 1301-CR001 RIG UP AND INSTALL SPIDER 3 hrs 1/09/23 4:00 AM 1/09/23 7:00 AM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 4:00 AM RIG UP AND INSTALL SPIDER
201 0% 40214522 1301-CR001 INSTALL SPIDER SUPER BOLTS AND WELD TABS 1 hr 1/09/23 7:00 AM 1/09/23 8:00 AM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 7:00 AM INSTALL SPIDER SUPER BOLTS AND WELD TABS
202 0% 40214522 1301-CR001 TORQUE UP SPIDER TO CORRECT SETTING 1.5 hrs 1/09/23 8:00 AM 1/09/23 9:30 AM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 8:00 AM TORQUE UP SPIDER TO CORRECT SETTING
203 0% 40214522 1301-CR001 CR001 PERMIT MOD FOR MANTLE H/H 1 hr 1/09/23 9:30 AM 1/09/23 10:30 AM 13OPTOPE[2],13COTPRE KG CRUSHING KML OPERATIONS 9:30 AM CR001 PERMIT MOD FOR MANTLE H/H
204 0% 40214522 1301-CR001 CR001 MANTLE H/H CALIBRATION/SETTING 1 hr 1/09/23 10:30 AM 1/09/23 11:30 AM 13OPTOPE[2],13COTPRE,13MCCSUP KG CRUSHING KML OPERATIONS 10:30 AM CR001 MANTLE H/H CALIBRATION/SETTING
205 0% 40214522 1301-CR001 REMOVE HANDRAIL ALONG DUMP POCKET BUMP STOP 0.5 hrs 1/09/23 11:30 AM 1/09/23 12:00 PM 13MCCSCF[3] KG CRUSHING KG SCAFFOLD 01 11:30 AM REMOVE HANDRAIL ALONG DUMP POCKET BUMP STOP

206 0% 40214522 1301-CR001 REINSTALL PORTHOLE COVERS 0.5 hrs 1/09/23 11:30 AM 1/09/23 12:00 PM 13MCCFIT[2] KG CRUSHING 11:30 AM REINSTALL PORTHOLE COVERS
207 0% 40214522 1301-CR001 REMOVE SKY HOOK FROM BN001 0.5 hrs 1/09/23 11:30 AM 1/09/23 12:00 PM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 11:30 AM REMOVE SKY HOOK FROM BN001
208 0% 40214522 1301-CR001 REMOVE HAND RAIL RING FROM BN001 0.5 hrs 1/09/23 12:00 PM 1/09/23 12:30 PM 13MCCSCF[3] KG CRUSHING KG SCAFFOLD 01 12:00 PM REMOVE HAND RAIL RING FROM BN001
209 0% 40214522 1301-CR001 REMOVE PERMIT HUT 1 hr 1/09/23 12:00 PM 1/09/23 1:00 PM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 12:00 PM REMOVE PERMIT HUT
210 0% 40214522 1301-CR001 REMOVE DROP IN ACCESS STAIRS 1 hr 1/09/23 1:00 PM 1/09/23 2:00 PM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2]
KG CRUSHING FREO 450T 1:00 PM REMOVE DROP IN ACCESS STAIRS
211 0% 40214522 1301-CR001 PACK UP 450T CRANE 4 hrs 1/09/23 2:00 PM 1/09/23 6:00 PM 13MECCND,13MCCFIT[2],13MCCRIG,13MCCSEN,13MCCBOI[2] FREO 450T 2:00 PM PACK UP 450T CRANE
212 0% 40214522 1301-CR001 PRE-START UP CHECKS 1 hr 1/09/23 1:30 AM 1/09/23 2:30 AM
213 0% 40214522 1301-CR001 ENSURE YELLOW AFP MOBILE OIL FILTRATION UNIT IS 0.25 hrs 1/09/23 1:30 AM 1/09/23 1:45 AM 13MCCFIT[2] KG CRUSHING 1:30 AM ENSURE YELLOW AFP MOBILE OIL FILTRATION UNIT IS RUNNING
RUNNING
214 0% 40214522 1301-CR001 CHECK DUST BONNET AIR SUPPLY AIR PRESSURE 0.25 hrs 1/09/23 1:45 AM 1/09/23 2:00 AM 13MCCFIT[2] KG CRUSHING 1:45 AM CHECK DUST BONNET AIR SUPPLY AIR PRESSURE
215 0% 40214522 1301-CR001 ENSURE PORT HOLE INSPECTIONS COVERS / CAPS 0.25 hrs 1/09/23 2:00 AM 1/09/23 2:15 AM 13MCCFIT[2] KG CRUSHING 2:00 AM ENSURE PORT HOLE INSPECTIONS COVERS / CAPS ARE ON
ARE ON
216 0% 40214522 1301-CR001 CHECK COUNTER SHAFT BOX GUARD IS IN PLACE AND 0.25 hrs 1/09/23 2:15 AM 1/09/23 2:30 AM 13MCCFIT[2] KG CRUSHING 2:15 AM CHECK COUNTER SHAFT BOX GUARD IS IN PLACE AND FREE FROM SHAFT
FREE FROM SHAFT
217 0% 40210871 1301-CR001 09W OF EL CRUSHER AND LRS INSP 5 hrs 28/08/23 5:00 AM 28/08/23 10:00 AM
218 0% 40210871 1301-CR001 09W OF EL CRUSHER AND LRS INSP 4 hrs 28/08/23 5:00 AM 28/08/23 9:00 AM 13ELTELE[2] KML ELECTRICAL 01 5:00 AM 09W OF EL CRUSHER AND LRS INSP
219 0% 40210871 1301-CR001 09W OF EL CRUSHER AND LRS INSP 1 hr 28/08/23 9:00 AM 28/08/23 10:00 AM 13EETENG KML ELECTRICAL 01 KML ELECTRICAL ENG 9:00 AM 09W OF EL CRUSHER AND LRS INSP
220 0% 40210926 1301-CR001 09W OF EL PRI CR EQUIP INSP 4 hrs 28/08/23 9:00 AM 28/08/23 1:00 PM
221 0% 40210926 1301-CR001 09W OF EL PRI CR EQUIP INSP 4 hrs 28/08/23 9:00 AM 28/08/23 1:00 PM 13ELTELE KML ELECTRICAL 01 9:00 AM 09W OF EL PRI CR EQUIP INSP
222 0% 40210872 1301-CR001 09W OF IN PRIMARY CRUSHR LEVL TRANS INSP 4 hrs 28/08/23 1:00 PM 28/08/23 5:00 PM
223 0% 40210872 1301-CR001 09W OF IN PRIMARY CRUSHR LEVL TRANS INSP 4 hrs 28/08/23 1:00 PM 28/08/23 5:00 PM 13ELTELE KML ELECTRICAL 01 1:00 PM 09W OF IN PRIMARY CRUSHR LEVL TRANS INSP
224 0% 1301-CR001-CO024 VAULT 52 hrs 29/08/23 7:30 PM 31/08/23 11:30 PM
225 0% 40217843 1301-CR001-CO011 CR001 REPL GEAR CASE LINERS 50 hrs 29/08/23 7:30 PM 31/08/23 9:30 PM
226 0% 40217843 1301-CR001-CO011 INSPECT AND MARK UP LINERS 1 hr 29/08/23 7:30 PM 29/08/23 8:30 PM 13MCCWEA,13MCCSEN KG CRUSHING 7:30 PM INSPECT AND MARK UP LINERS
227 0% 40217843 1301-CR001-CO011 REMOVE MARKED UP LINERS 6 hrs 30/08/23 5:30 PM 30/08/23 11:30 PM 13MCCBOI,13MCCFIT,13MCCSEN KG CRUSHING 5:30 PM REMOVE MARKED UP LINERS
228 0% 40217843 1301-CR001-CO011 INSTALL NEW LINERS 4 hrs 31/08/23 5:30 PM 31/08/23 9:30 PM 13MCCBOI,13MCCFIT,13MCCSEN KG CRUSHING 5:30 PM INSTALL NEW LINERS
229 0% 40217844 1301-CR001-CO024 CR001 REPL VAULT & ARM GUARD LINERS 52 hrs 29/08/23 7:30 PM 31/08/23 11:30 PM
230 0% 40217844 1301-CR001-CO024 INSPECT AND MARK UP LINERS 4 hrs 29/08/23 7:30 PM 29/08/23 11:30 PM 13MCCWEA,13MCCSEN KG CRUSHING 7:30 PM INSPECT AND MARK UP LINERS
231 0% 40217844 1301-CR001-CO024 REMOVE MARKED UP LINERS 18 hrs 29/08/23 11:30 PM 30/08/23 5:30 PM 13MCCBOI[3],13MCCFIT,13MCCSEN KG CRUSHING 11:30 PM REMOVE MARKED UP LINERS
232 0% 40217844 1301-CR001-CO024 INSTALL NEW LINERS 18 hrs 30/08/23 11:30 PM 31/08/23 5:30 PM 13MCCBOI[3],13MCCFIT,13MCCSEN KG CRUSHING 11:30 PM INSTALL NEW LINERS
233 0% 40217844 1301-CR001-CO024 FINAL INSPECTION 2 hrs 31/08/23 9:30 PM 31/08/23 11:30 PM 13MCCWEA,13MCCSEN KG CRUSHING 9:30 PM FINAL INSPECTION
234 0% 1301-CR001-AM001 ACCUMULATOR 3 hrs 1/09/23 2:00 PM 1/09/23 5:00 PM
235 0% 40210939 1301-CR001-AM001 09W OF ME ACCUMULATOR INSP 3 hrs 1/09/23 2:00 PM 1/09/23 5:00 PM
236 0% 40210939 1301-CR001-AM001 09W OF ME ACCUMULATOR INSP 3 hrs 1/09/23 2:00 PM 1/09/23 5:00 PM 13MCCFIT KG CRUSHING 2:00 PM 09W OF ME ACCUMULATOR INSP
237 0% 1301-LU023 LU023 129.5 hrs 27/08/23 8:30 AM 1/09/23 6:00 PM
238 0% 40210910 1301-LU023 09W OF LU PRIM CRUSHER LUBE/HYDR INSP 4 hrs 27/08/23 8:30 AM 27/08/23 12:30 PM
239 0% 40210910 1301-LU023 09W OF LU PRIM CRUSHER LUBE/HYDR INSP 4 hrs 27/08/23 8:30 AM 27/08/23 12:30 PM 13MCCLUB KG LUBE 8:30 AM 09W OF LU PRIM CRUSHER LUBE/HYDR INSP
240 0% 40210916 1301-LU023 09W OF LU DUPLEX FILTER ELEMENT CHANGE 1 hr 1/09/23 5:00 PM 1/09/23 6:00 PM
241 0% 40210916 1301-LU023 09W OF LU DUPLEX FILTER ELEMENT CHANGE 1 hr 1/09/23 5:00 PM 1/09/23 6:00 PM 13MCCFIT KG CRUSHING 5:00 PM 09W OF LU DUPLEX FILTER ELEMENT CHANGE
242 0% 1301-FE001 FE001 141.5 hrs 27/08/23 8:30 AM 2/09/23 6:00 AM
243 0% 40210831 1301-FE001 18W OF ME FEEDER INSPECTION FE001 12 hrs 1/09/23 6:00 PM 2/09/23 6:00 AM
244 0% 40210831 1301-FE001 18W OF ME FEEDER INSPECTION FE001 12 hrs 1/09/23 6:00 PM 2/09/23 6:00 AM 13MCCFIT[2] KG CRUSHING 6:00 PM 18W OF ME FEEDER INSPECTION FE001
245 0% 40215040 1301-FE001-HP013 FE001 REPL 2 X FILTER HOUSING HPU 8 hrs 27/08/23 8:30 AM 27/08/23 4:30 PM
246 0% 40215040 1301-FE001-HP013 FE001 REPL 2 X FILTER HOUSING 8 hrs 27/08/23 8:30 AM 27/08/23 4:30 PM 13METHYD KML HYDRAULIC 8:30 AM FE001 REPL 2 X FILTER HOUSING
247 0% 40214449 1301-FE001 27W OF EL ELECT & INST INSP 2 hrs 28/08/23 5:00 PM 28/08/23 7:00 PM
248 0% 40214449 1301-FE001 27W OF EL ELECT & INST INSP 2 hrs 28/08/23 5:00 PM 28/08/23 7:00 PM 13ELTELE[2] KML ELECTRICAL 01 5:00 PM 27W OF EL ELECT & INST INSP
249 0% 40214512 1301-FE001-HP013 27W OF EL ELECT & INST INSP HP013 2 hrs 28/08/23 7:00 PM 28/08/23 9:00 PM
250 0% 40214512 1301-FE001-HP013 27W OF EL ELECT & INST INSP HP013 2 hrs 28/08/23 7:00 PM 28/08/23 9:00 PM 13ELTELE[2] KML ELECTRICAL 01 7:00 PM 27W OF EL ELECT & INST INSP HP013
251 0% 1301-CV001 CV001 68.25 hrs 27/08/23 2:45 PM 30/08/23 11:00 AM

Scheduler:-Scott Everard Page 3 Printed:- 25/08/23 4:53 PM


Coordinator:-Doug Wolfendon
CR1-0723 Concave & Mantle Shutdown CR1-0723 Final Gantt Rev1
Start 26/08/23 8:00 PM _ Finish 2/09/23 7:00 PM
ID % WO Equipment Task Name Duration Start Finish Resource Names Team Sub Team
Complete Thu 24 Aug
Fri 25 AugSat 26 Aug
Sun 27 Aug
Mon 28 Aug
Tue 29 Aug
Wed 30 Aug
Thu 31 AugFri 1 SepSat 2 SepSun 3 SepMon 4 SepTue 5 SepW ed 6 SepThu 7 SepFri 8 SepSat 9 SepSun 10 S
12 6
PM12
PM6AM12
AM6PM
12
PM6AM12
AM6PM12
PM6AM
12
AM6PM12
PM6AM
12
AM6PM12
PM6AM
12
AM6PM12
PM6AM
12
AM6PM
12
PM6AM
12
AM6PM12
PM6AM12
AM6PM12
PM6AM
12
AM6PM
12
PM6AM
12
AM6 PM
12
PM6AM
12
AM6PM12
PM6AM
12
AM6 PM
12
PM6AM12
AM6PM12
PM6AM
12
AM6PM
12
PM6AM12
AM6PM12
PM6AM
12
AM6PM
12
PMAM
252 0% 40208137 1301-CV001 09W OF ME BELT THICKNESS INSPECTION 1 hr 27/08/23 2:45 PM 27/08/23 3:45 PM
253 0% 40208137 1301-CV001 09W OF ME BELT THICKNESS INSPECTION 1 hr 27/08/23 2:45 PM 27/08/23 3:45 PM 13MBCBTE[2] ENGYTECH BELTS 2:45 PM 09W OF ME BELT THICKNESS INSPECTION
254 0% 40210891 1301-CV001 09W OF ME SOFT SKIRT INSPECTION/REPLACE 6 hrs 29/08/23 1:30 AM 29/08/23 7:30 AM
255 0% 40210891 1301-CV001 09W OF ME SOFT SKIRT INSPECTION 6 hrs 29/08/23 1:30 AM 29/08/23 7:30 AM 13MBCBTE ENGYTECH BELTS 1:30 AM 09W OF ME SOFT SKIRT INSPECTION
256 0% 40210921 1301-CV001 09W OF ME CONVEYOR SCRAPER MAINT 4 hrs 28/08/23 6:45 AM 28/08/23 10:45 AM
257 0% 40210921 1301-CV001 09W OF ME CONVEYOR SCRAPER MAINT 4 hrs 28/08/23 6:45 AM 28/08/23 10:45 AM 13MBCFIT[2] ENGYTECH SCRAPERS 6:45 AM 09W OF ME CONVEYOR SCRAPER MAINT
258 0% 40210944 1301-CV001 09W OF ME ROLLER REPLACEMENT 19 hrs 29/08/23 4:00 PM 30/08/23 11:00 AM
259 0% 40210944 1301-CV001 09W OF ME CONVEYOR ROLLER REPLACEMENT 7 hrs 29/08/23 4:00 PM 30/08/23 11:00 AM 13MECBOI,13MECFIT,13MECTRA TMS ROLLERS 4:00 PM 09W OF ME CONVEYOR ROLLER REPLACEMENT
260 0% 40213575 1301-CV001-CO013 CV001 REPL HARD SKIRTS 23 hrs 27/08/23 2:45 PM 28/08/23 1:45 PM
261 0% 40213575 1301-CV001-CO013 REMOVE GUARDING AND SOFT SKIRTS 3 hrs 27/08/23 2:45 PM 27/08/23 5:45 PM 13MBCSEN,13MECBOI[2],13MECFIT[2],13MECTRA[2]
KML SKIRTS 2:45 PM REMOVE GUARDING AND SOFT SKIRTS
262 0% 40213575 1301-CV001-CO013 ERECT BELT ACCESS SCAFFOLD 2 hrs 27/08/23 5:45 PM 27/08/23 7:45 PM 13MBCSCF[3] KML SKIRTS KML SCAFFOLD 01 5:45 PM ERECT BELT ACCESS SCAFFOLD
263 0% 40213575 1301-CV001-CO013 DRAIN WATER FROM BELT 2 hrs 27/08/23 7:45 PM 27/08/23 9:45 PM 13MBCSEN,13MECBOI[2],13MECFIT[2],13MECTRA[2]
KML SKIRTS 7:45 PM DRAIN WATER FROM BELT
264 0% 40213575 1301-CV001-CO013 INSPECT AND MARK UP HARD SKIRT LINERS 1 hr 27/08/23 9:45 PM 27/08/23 10:45 PM 13MBCSEN,13MECBOI[2],13MECFIT[2],13MECTRA[2]
KML SKIRTS 9:45 PM INSPECT AND MARK UP HARD SKIRT LINERS
265 0% 40213575 1301-CV001-CO013 ROTATE MARKED UP HARD SKIRT LINERS 10 hrs 27/08/23 10:45 PM 28/08/23 8:45 AM 13MBCSEN,13MECBOI[2],13MECFIT[2],13MECTRA[2]
KML SKIRTS 10:45 PM ROTATE MARKED UP HARD SKIRT LINERS
266 0% 40213575 1301-CV001-CO013 ADJUST ROTATED HARD SKIRT LINERS AND SET 6 hrs 28/08/23 2:45 AM 28/08/23 8:45 AM 13MBCSEN,13MECBOI[2],13MECFIT[2],13MECTRA[2]
KML SKIRTS 2:45 AM ADJUST ROTATED HARD SKIRT LINERS AND SET
267 0% 40213575 1301-CV001-CO013 FINAL INSPECTION 1 hr 28/08/23 8:45 AM 28/08/23 9:45 AM 13MBCSEN,13MECBOI[2],13MECFIT[2],13MECTRA[2]
KML SKIRTS 8:45 AM FINAL INSPECTION
268 0% 40213575 1301-CV001-CO013 DISMANTLE SCAFFOLD ACESS 1 hr 28/08/23 9:45 AM 28/08/23 10:45 AM 13MBCSCF[3] KML SKIRTS KML SCAFFOLD 01 9:45 AM DISMANTLE SCAFFOLD ACESS
269 0% 40213575 1301-CV001-CO013 REINSTATE SOFT SKIRTS AND GUARDS 3 hrs 28/08/23 10:45 AM 28/08/23 1:45 PM 13MBCSEN,13MECBOI[2],13MECFIT[2],13MECTRA[2]
KML SKIRTS 10:45 AM REINSTATE SOFT SKIRTS AND GUARDS
270 0% 40210946 1301-CV001 09W OF EL 1301-CV001 INSP 1 hr 28/08/23 9:00 PM 28/08/23 10:00 PM
271 0% 40210946 1301-CV001 09W OF EL 1301-CV001 INSP 1 hr 28/08/23 9:00 PM 28/08/23 10:00 PM 13ELTELE[2] 9:00 PM 09W OF EL 1301-CV001 INSP
272 0% 1301-CV001-CH006 CH006 68.75 hrs 27/08/23 2:45 PM 30/08/23 11:30 AM
273 0% 40215908 1301-CV001-CH006 CH006 AND CH008 REPLACE LINERS 68.75 hrs 27/08/23 2:45 PM 30/08/23 11:30 AM
274 0% 40215908 1301-CV001-CH006 BUILD SCAFFOLD ACCESS 4 hrs 27/08/23 2:45 PM 27/08/23 6:45 PM 13MCCSCF[3] KG CHUTES T001 KG SCAFFOLD 01 2:45 PM BUILD SCAFFOLD ACCESS
275 0% 40215908 1301-CV001-CH006 REMOVE OLD LINERS 6 hrs 29/08/23 10:30 AM 29/08/23 4:30 PM 13MBCSEN,13MCCBOI[2] KG CHUTES T001 10:30 AM REMOVE OLD LINERS
276 0% 40215908 1301-CV001-CH006 INSTALL NEW LINERS 4 hrs 29/08/23 4:30 PM 29/08/23 8:30 PM 13MBCSEN,13MCCBOI[2] KG CHUTES T001 4:30 PM INSTALL NEW LINERS
277 0% 40215908 1301-CV001-CH006 MODIFY INTERNAL SCAFFOLD FOR ACCESS 2 hrs 29/08/23 8:30 PM 29/08/23 10:30 PM 13MCCSCF[3] KG CHUTES T001 KG SCAFFOLD 01 8:30 PM MODIFY INTERNAL SCAFFOLD FOR ACCESS
278 0% 40215908 1301-CV001-CH006 REMOVE LOWER LINER SECTIONS 6 hrs 29/08/23 10:30 PM 30/08/23 4:30 AM 13MBCSEN,13MCCBOI[2] KG CHUTES T001 10:30 PM REMOVE LOWER LINER SECTIONS
279 0% 40215908 1301-CV001-CH006 INSTALL NEW LINERS 4 hrs 30/08/23 4:30 AM 30/08/23 8:30 AM 13MBCSEN,13MCCBOI[2] KG CHUTES T001 4:30 AM INSTALL NEW LINERS
280 0% 40215908 1301-CV001-CH006 FINAL INSPECTION 1 hr 30/08/23 8:30 AM 30/08/23 9:30 AM 13MBCWEA,13MBCSEN KG CHUTES T001 ENGY WEAR TECH 8:30 AM FINAL INSPECTION
281 0% 40215908 1301-CV001-CH006 DISMANTLE SCAFFOLD 2 hrs 30/08/23 9:30 AM 30/08/23 11:30 AM 13MCCSCF[3] KG CHUTES T001 KG SCAFFOLD 01 9:30 AM DISMANTLE SCAFFOLD
282 0% 40210941 1301-CV001-CH006-2 09W OF EL INSPECT DIVERTER GATE 43.5 hrs 27/08/23 3:00 PM 29/08/23 10:30 AM
283 0% 40210941 1301-CV001-CH006-2 INSTALL ACCESS SCAFFOLD 2 hrs 27/08/23 3:00 PM 27/08/23 5:00 PM 13MCCSCF[3] KML ELECTRICAL 01 KG SCAFFOLD 01 3:00 PM INSTALL ACCESS SCAFFOLD
284 0% 40210941 1301-CV001-CH006-2 09W OF EL INSPECT DIVERTER GATE 2 hrs 28/08/23 10:00 PM 29/08/23 12:00 AM 13ELTELE[2] KML ELECTRICAL 01 10:00 PM 09W OF EL INSPECT DIVERTER GATE
285 0% 40210941 1301-CV001-CH006-2 REMOVE ACCESS SCAFFOLD 3 hrs 29/08/23 7:30 AM 29/08/23 10:30 AM 13MCCSCF[3] KML ELECTRICAL 01 KG SCAFFOLD 01 7:30 AM REMOVE ACCESS SCAFFOLD
286 0% 1301-CV003 CV003 112.75 hrs 27/08/23 2:45 PM 1/09/23 7:30 AM
287 0% 40208138 1301-CV003 09W OF ME BELT THICKNESS INSPECTION 1 hr 30/08/23 11:00 AM 30/08/23 12:00 PM
288 0% 40208138 1301-CV003 09W OF ME BELT THICKNESS INSPECTION 1 hr 30/08/23 11:00 AM 30/08/23 12:00 PM 13MBCBTE[2] ENGYTECH BELTS 11:00 AM 09W OF ME BELT THICKNESS INSPECTION
289 0% 40210892 1301-CV003 09W OF ME SOFT SKIRT INSPECTION/REPLACE 5 hrs 30/08/23 5:30 AM 30/08/23 10:30 AM
290 0% 40210892 1301-CV003 09W OF ME SOFT SKIRT INSPECTION 5 hrs 30/08/23 5:30 AM 30/08/23 10:30 AM 13MBCBTE ENGYTECH BELTS 5:30 AM 09W OF ME SOFT SKIRT INSPECTION
291 0% 40210911 1301-CV003 09W OF ME ROLLER REPLACEMENT 22 hrs 30/08/23 12:00 PM 31/08/23 10:00 AM
292 0% 40210911 1301-CV003 09W OF ME CONVEYOR ROLLER REPLACEMENT 10 hrs 30/08/23 12:00 PM 31/08/23 10:00 AM 13MECBOI,13MECFIT,13MECTRA TMS ROLLERS 12:00 PM 09W OF ME CONVEYOR ROLLER REPLACEMENT
293 0% 40210922 1301-CV003 09W OF ME CONVEYOR SCRAPER MAINT 4 hrs 28/08/23 10:45 AM 28/08/23 2:45 PM
294 0% 40210922 1301-CV003 09W OF ME CONVEYOR SCRAPER MAINT 4 hrs 28/08/23 10:45 AM 28/08/23 2:45 PM 13MBCFIT[2] ENGYTECH SCRAPERS 10:45 AM 09W OF ME CONVEYOR SCRAPER MAINT
295 0% 40210951 1301-CV003 09W OF LU CONVEYOR CV003 2 hrs 27/08/23 2:45 PM 27/08/23 4:45 PM
296 0% 40210951 1301-CV003 09W OF LU CONVEYOR 003 2 hrs 27/08/23 2:45 PM 27/08/23 4:45 PM 13MBCLUB ENGYTECH LUBE 2:45 PM 09W OF LU CONVEYOR 003
297 0% 40208917 1301-CV003 45W OF ME CV BRAKE FLUID AND FILTER CHG 2 hrs 28/08/23 1:00 PM 28/08/23 3:00 PM
298 0% 40208917 1301-CV003 45W OF ME CV BRAKE FLUID AND FILTER REPL 2 hrs 28/08/23 1:00 PM 28/08/23 3:00 PM 13METHYD[2] KML HYD TECH 1:00 PM 45W OF ME CV BRAKE FLUID AND FILTER REPL
299 0% 40153789 1301-CV003 12M OF ME GTU CHAIN LUG INSP 32.75 hrs 27/08/23 7:45 PM 29/08/23 4:30 AM
300 0% 40153789 1301-CV003 BUILD SCAFFOLD OUT TO LUGS 2 hrs 27/08/23 7:45 PM 27/08/23 9:45 PM 13MBCSCF[3] ENGYTECH MECH 01 KML SCAFFOLD 01 7:45 PM BUILD SCAFFOLD OUT TO LUGS
301 0% 40153789 1301-CV003 INSP & TAG LUGS CHAINS HAMMERLOCKS SHACK 2 hrs 27/08/23 9:45 PM 27/08/23 11:45 PM 13MBCRIG ENGYTECH MECH 01 9:45 PM INSP & TAG LUGS CHAINS HAMMERLOCKS SHACK
302 0% 40153789 1301-CV003 REMOVE SCAFFOLD 2 hrs 29/08/23 2:30 AM 29/08/23 4:30 AM 13MBCSCF[3] ENGYTECH MECH 01 KML SCAFFOLD 01 2:30 AM REMOVE SCAFFOLD
303 0% 40213576 1301-CV003-CO013 CV003 HARD SKIRT MAINTENANCE 64.75 hrs 27/08/23 5:45 PM 30/08/23 10:30 AM
304 0% 40213576 1301-CV003-CO013 REMOVE GUARDING AND SOFT SKIRTS 6 hrs 27/08/23 5:45 PM 27/08/23 11:45 PM 13MBCSEN,13MECBOI[2],13MECFIT[2],13MECTRA[2]
KML SKIRTS 5:45 PM REMOVE GUARDING AND SOFT SKIRTS
305 0% 40213576 1301-CV003-CO013 ERECT BELT ACCESS SCAFFOLD 2 hrs 27/08/23 11:45 PM 28/08/23 1:45 AM 13MBCSCF[3] KML SKIRTS KML SCAFFOLD 01 11:45 PM ERECT BELT ACCESS SCAFFOLD
306 0% 40213576 1301-CV003-CO013 REMOVE DUST COVERS REQUIRED RESCUE PLAN 6 hrs 28/08/23 8:45 AM 28/08/23 2:45 PM 13MBCSEN,13MECBOI[2],13MECFIT[2],13MECTRA[2]
KML SKIRTS 8:45 AM REMOVE DUST COVERS REQUIRED RESCUE PLAN
307 0% 40213576 1301-CV003-CO013 DRAIN WATER FROM BELT 2 hrs 28/08/23 2:45 PM 28/08/23 4:45 PM 13MBCSEN,13MECBOI[2],13MECFIT[2],13MECTRA[2]
KML SKIRTS 2:45 PM DRAIN WATER FROM BELT
308 0% 40213576 1301-CV003-CO013 INSPECT AND MARK UP HARD SKIRT LINERS 1 hr 28/08/23 4:45 PM 28/08/23 5:45 PM 13MBCSEN,13MECBOI[2],13MECFIT[2],13MECTRA[2]
KML SKIRTS 4:45 PM INSPECT AND MARK UP HARD SKIRT LINERS
309 0% 40213576 1301-CV003-CO013 REMOVE MARKED UP HARD SKIRT LINERS 10 hrs 29/08/23 7:30 AM 29/08/23 5:30 PM 13MBCSEN,13MECBOI[2],13MECFIT[2],13MECTRA[2]
KML SKIRTS 7:30 AM REMOVE MARKED UP HARD SKIRT LINERS
310 0% 40213576 1301-CV003-CO013 REPLACE HARD SKIRT LINERS AND SET 14 hrs 29/08/23 7:30 AM 29/08/23 9:30 PM 13MBCSEN,13MECBOI[2],13MECFIT[2],13MECTRA[2]
KML SKIRTS 7:30 AM REPLACE HARD SKIRT LINERS AND SET
311 0% 40213576 1301-CV003-CO013 FINAL INSPECTION 1 hr 29/08/23 9:30 PM 29/08/23 10:30 PM 13MBCSEN,13MECBOI[2],13MECFIT[2],13MECTRA[2]
KML SKIRTS 9:30 PM FINAL INSPECTION
312 0% 40213576 1301-CV003-CO013 REINSTATE DUST COVERS 6 hrs 29/08/23 10:30 PM 30/08/23 4:30 AM 13MBCSEN,13MECBOI[2],13MECFIT[2],13MECTRA[2]
KML SKIRTS 10:30 PM REINSTATE DUST COVERS
313 0% 40213576 1301-CV003-CO013 DISMANTLE SCAFFOLD ACESS 1 hr 30/08/23 4:30 AM 30/08/23 5:30 AM 13MBCSCF[3] KML SKIRTS KML SCAFFOLD 01 4:30 AM DISMANTLE SCAFFOLD ACESS
314 0% 40213576 1301-CV003-CO013 REINSTATE SOFT SKIRTS AND GUARDS 5 hrs 30/08/23 5:30 AM 30/08/23 10:30 AM 13MBCSEN,13MECBOI[2],13MECFIT[2],13MECTRA[2]
KML SKIRTS 5:30 AM REINSTATE SOFT SKIRTS AND GUARDS
315 0% 40215893 1301-CV003 CV003 INSTALL SCAFFOLD SHEDDER 26.75 hrs 27/08/23 11:45 PM 29/08/23 2:30 AM
316 0% 40215893 1301-CV003 HOUSEKEEP THE AREA FOR SCAFFOLD FOOTINGS 12 hrs 27/08/23 11:45 PM 28/08/23 11:45 AM 13MBCOPR ENGYTECH MECH 01 11:45 PM HOUSEKEEP THE AREA FOR SCAFFOLD FOOTINGS
317 0% 40215893 1301-CV003 ERECT SHEDDER 4 hrs 28/08/23 10:30 PM 29/08/23 2:30 AM 13MBCSCF[3] ENGYTECH MECH 01 KML SCAFFOLD 01 10:30 PM ERECT SHEDDER
318 0% 40218308 1301-CV003 CV003 HOT REPR 8.5 hrs 27/08/23 2:45 PM 27/08/23 11:15 PM
319 0% 40218308 1301-CV003 MOVE ROLLER FRAMES 1 hr 27/08/23 2:45 PM 27/08/23 3:45 PM 13MECFIT[2],13MECRIG KRG 2:45 PM MOVE ROLLER FRAMES
320 0% 40218308 1301-CV003 PREPARE REPAIR 2 hrs 27/08/23 3:45 PM 27/08/23 5:45 PM 13MECBTE[2],13MECFIT KRG 3:45 PM PREPARE REPAIR
321 0% 40218308 1301-CV003 BUILD PRESS 1 hr 27/08/23 5:45 PM 27/08/23 6:45 PM 13MECBTE[2],13MECFIT KRG 5:45 PM BUILD PRESS
322 0% 40218308 1301-CV003 COOK REPAIR 1.5 hrs 27/08/23 6:45 PM 27/08/23 8:15 PM 13MECBTE[2],13MECFIT KRG 6:45 PM COOK REPAIR
323 0% 40218308 1301-CV003 COOL REPAIR 1.5 hrs 27/08/23 8:15 PM 27/08/23 9:45 PM 13MECBTE[2],13MECFIT KRG 8:15 PM COOL REPAIR
324 0% 40218308 1301-CV003 STRIP PRESS 0.5 hrs 27/08/23 9:45 PM 27/08/23 10:15 PM 13MECBTE[2],13MECFIT KRG 9:45 PM STRIP PRESS
325 0% 40218308 1301-CV003 REMOVE BELT CLAMPS 0.5 hrs 27/08/23 10:15 PM 27/08/23 10:45 PM 13MECBTE[2],13MECFIT KRG 10:15 PM REMOVE BELT CLAMPS
326 0% 40218308 1301-CV003 INSTALL TROUGH FRAMES 0.5 hrs 27/08/23 10:45 PM 27/08/23 11:15 PM 13MECFIT[2],13MECRIG KRG 10:45 PM INSTALL TROUGH FRAMES
327 0% 40178895 1301-CV003 CV003 VSD POWERCELL REFURB SIEMENS 37 hrs 29/08/23 12:00 AM 30/08/23 1:00 PM
328 0% 40178895 1301-CV003 HV ISOLATIONS 0.5 hrs 29/08/23 12:00 AM 29/08/23 12:30 AM 13ELTELE[2] KML ELECTRICAL 01 12:00 AM HV ISOLATIONS
329 0% 40178895 1301-CV003 REMOVE AND REINSTALL NEW POWER CELLS 12 hrs 29/08/23 12:30 PM 30/08/23 12:30 PM 13EECENG KML ELECTRICAL 01 SIEMENS 12:30 PM REMOVE AND REINSTALL NEW POWER CELLS
330 0% 40178895 1301-CV003 REMOVE AND REINSTALL NEW POWER CELLS 12 hrs 29/08/23 12:30 PM 30/08/23 12:30 PM 13ELTELE[2] KML ELECTRICAL 01 12:30 PM REMOVE AND REINSTALL NEW POWER CELLS
331 0% 40178895 1301-CV003 DE-ISOLATION 0.5 hrs 30/08/23 12:30 PM 30/08/23 1:00 PM 13ELTELE[2] KML ELECTRICAL 01 12:30 PM DE-ISOLATION
332 0% 40210948 1301-CV003 09W OF EL 1301-CV003 INSP 1 hr 1/09/23 4:30 AM 1/09/23 5:30 AM
333 0% 40210948 1301-CV003 09W OF EL 1301-CV003 INSP 1 hr 1/09/23 4:30 AM 1/09/23 5:30 AM 13ELTELE[2] KML ELECTRICAL 01 4:30 AM 09W OF EL 1301-CV003 INSP
334 0% 40208169 1301-CV003 27W OF EL & IN INSP - CV003 2 hrs 1/09/23 5:30 AM 1/09/23 7:30 AM
335 0% 40208169 1301-CV003 27W OF EL INSP - CV003 2 hrs 1/09/23 5:30 AM 1/09/23 7:30 AM 13ELTELE[2] KML ELECTRICAL 01 5:30 AM 27W OF EL INSP - CV003
336 0% SWITCH ROOM 105 82 hrs 29/08/23 12:30 AM 1/09/23 10:30 AM
337 0% 40208212 1301-SR105-MC025 104W OF EL HV VC & MCC EQUIP TEST 11 hrs 31/08/23 5:30 PM 1/09/23 4:30 AM
338 0% 40208212 1301-SR105-MC025 APPLY PERMITS AND ISOLATIONS 2 hrs 31/08/23 5:30 PM 31/08/23 7:30 PM 13ELTELE[2] KML ELECTRICAL 01 5:30 PM APPLY PERMITS AND ISOLATIONS
339 0% 40208212 1301-SR105-MC025 104W OF EL HV MCC EQUIP TEST 8 hrs 31/08/23 7:30 PM 1/09/23 3:30 AM 13ELTELE[2] KML ELECTRICAL 01 7:30 PM 104W OF EL HV MCC EQUIP TEST
340 0% 40208212 1301-SR105-MC025 REMOVE ISOLATIONS AND SURRENDER PERMIT 1 hr 1/09/23 3:30 AM 1/09/23 4:30 AM 13ELTELE[2] KML ELECTRICAL 01 3:30 AM REMOVE ISOLATIONS AND SURRENDER PERMIT
341 0% 40212855 1301-SR105-CO013 CV007 ROBICON VSD POWER CELL REFURB 82 hrs 29/08/23 12:30 AM 1/09/23 10:30 AM
342 0% 40212855 1301-SR105-CO013 HV ISOLATIONS 0.5 hrs 29/08/23 12:30 AM 29/08/23 1:00 AM 13ELTELE[2] KML ELECTRICAL 01 12:30 AM HV ISOLATIONS

Scheduler:-Scott Everard Page 4 Printed:- 25/08/23 4:53 PM


Coordinator:-Doug Wolfendon
CR1-0723 Concave & Mantle Shutdown CR1-0723 Final Gantt Rev1
Start 26/08/23 8:00 PM _ Finish 2/09/23 7:00 PM
ID % WO Equipment Task Name Duration Start Finish Resource Names Team Sub Team
Complete Thu 24 Aug
Fri 25 AugSat 26 Aug
Sun 27 Aug
Mon 28 Aug
Tue 29 Aug
Wed 30 Aug
Thu 31 AugFri 1 SepSat 2 SepSun 3 SepMon 4 SepTue 5 SepW ed 6 SepThu 7 SepFri 8 SepSat 9 SepSun 10 S
12 6
PM12
PM6AM12
AM6PM
12
PM6AM12
AM6PM12
PM6AM
12
AM6PM12
PM6AM
12
AM6PM12
PM6AM
12
AM6PM12
PM6AM
12
AM6PM12
PM6AM
12
AM6PM12
PM6AM12
AM6PM12
PM6AM
12
AM6PM
12
PM6AM
12
AM6 PM
12
PM6AM
12
AM6PM12
PM6AM
12
AM6 PM
12
PM6AM12
AM6PM12
PM6AM
12
AM6PM
12
PM6AM12
AM6PM12
PM6AM
12
AM6PM
12
PMAM
343 0% 40212855 1301-SR105-CO013 REMOVE AND REINSTALL NEW POWER CELLS 12 hrs 30/08/23 1:00 PM 31/08/23 1:00 PM 13EECENG KML ELECTRICAL 01 SIEMENS 1:00 PM REMOVE AND REINSTALL NEW POWER CELLS
344 0% 40212855 1301-SR105-CO013 REMOVE AND REINSTALL NEW POWER CELLS 12 hrs 30/08/23 1:00 PM 31/08/23 1:00 PM 13ELTELE[2] KML ELECTRICAL 01 1:00 PM REMOVE AND REINSTALL NEW POWER CELLS
345 0% 40212855 1301-SR105-CO013 DE-ISOLATION 0.5 hrs 31/08/23 1:00 PM 31/08/23 1:30 PM 13ELTELE[2] KML ELECTRICAL 01 1:00 PM DE-ISOLATION
346 0% 40212855 1301-SR105-CO013 MOBILISE REPACKED POWERCELL TO WAREHOUSE 3 hrs 1/09/23 7:30 AM 1/09/23 10:30 AM 13CR25T KML ELECTRICAL 01 7:30 AM MOBILISE REPACKED POWERCELL TO WAREHOUSE
347 0% TX025 98.25 hrs 27/08/23 3:15 PM 31/08/23 5:30 PM
348 0% 40208290 1301-TX025 104W OF EL STAT TX/CB/NER TEST 4 hrs 31/08/23 1:30 PM 31/08/23 5:30 PM
349 0% 40208290 1301-TX025 104W OF EL STAT TX/CB/NER TEST 4 hrs 31/08/23 1:30 PM 31/08/23 5:30 PM 13ELTELE[2] KML ELECTRICAL 01 1:30 PM 104W OF EL STAT TX/CB/NER TEST
350 0% 40212852 1301-TX025 TX025 HV CABLE RE-TERMINATION 50.25 hrs 27/08/23 3:15 PM 29/08/23 5:30 PM
351 0% 40212852 1301-TX025 HV ISOLATION 1 hr 27/08/23 3:15 PM 27/08/23 4:15 PM KML ELECTRICAL 02 3:15 PM HV ISOLATION
352 0% 40212852 1301-TX025 TX025 - HV CABLE RE-TERMINATION D1 10.5 hrs 27/08/23 4:15 PM 28/08/23 2:45 PM 13ELTELE STATEWIDE 4:15 PM TX025 - HV CABLE RE-TERMINATION D1
353 0% 40212852 1301-TX025 TX025 - HV CABLE RE-TERMINATION D2 10.5 hrs 29/08/23 6:00 AM 29/08/23 4:30 PM 13ELTELE STATEWIDE 6:00 AM TX025 - HV CABLE RE-TERMINATION D2
354 0% 40212852 1301-TX025 HV DE-ISOLATION 1 hr 29/08/23 4:30 PM 29/08/23 5:30 PM 13ELTELE STATEWIDE KML ELECTRICAL 02 4:30 PM HV DE-ISOLATION
355 0% 1301 AREA PRIMARY - TOOL TIME COMPLETE 0 hrs 2/09/23 12:00 PM 2/09/23 12:00 PM 12:00 PM 1301 AREA PRIMARY - TOOL TIME COMPLETE
356 0% 1302 AREA COS 89.5 hrs 26/08/23 8:00 PM 30/08/23 1:30 PM
357 0% 1302-CV007-CH040 CH040 39 hrs 28/08/23 7:30 PM 30/08/23 10:30 AM
358 0% 40215898 1302-CV007-CH040 CH109/40 LINER REPLACEMENT BOTTOM SECTION 39 hrs 28/08/23 7:30 PM 30/08/23 10:30 AM
359 0% 40215898 1302-CV007-CH040 WEAR TECH INSPECTION 1 hr 28/08/23 7:30 PM 28/08/23 8:30 PM 13MBCWEA,13MBCSEN KRG ENGY WEAR TECH 7:30 PM WEAR TECH INSPECTION
360 0% 40215898 1302-CV007-CH040 INSTALL INTERIOR SCAFFOLD DECK 2 hrs 28/08/23 8:30 PM 28/08/23 10:30 PM 13MBCSCF[3],13MBCSEN KRG KML SCAFFOLD 01 8:30 PM INSTALL INTERIOR SCAFFOLD DECK
361 0% 40215898 1302-CV007-CH040 OXY OFF ALL OLD BOLTS 3 hrs 28/08/23 10:30 PM 29/08/23 1:30 AM 13MBCSEN,13MECBOI[2] KRG 10:30 PM OXY OFF ALL OLD BOLTS
362 0% 40215898 1302-CV007-CH040 DIG & REMOVE OLD LINERS 5 hrs 29/08/23 1:30 AM 29/08/23 6:30 AM 13MBCSEN,13MECBOI[2] KRG 1:30 AM DIG & REMOVE OLD LINERS
363 0% 40215898 1302-CV007-CH040 INSTALL NEW LINERS 4 hrs 29/08/23 6:30 AM 29/08/23 10:30 AM 13MBCSEN,13MECBOI[2] KRG 6:30 AM INSTALL NEW LINERS
364 0% 40215898 1302-CV007-CH040 DISMANTLE INTERIOR SCAFFOLD DECK 1 hr 29/08/23 12:00 PM 29/08/23 1:00 PM 13MBCSCF[3],13MBCSEN KRG KML SCAFFOLD 01 12:00 PM DISMANTLE INTERIOR SCAFFOLD DECK
365 0% 40215898 1302-CV007-CH040 FINAL INSPECTION 1 hr 30/08/23 9:30 AM 30/08/23 10:30 AM 13MBCWEA,13MBCSEN KRG ENGY WEAR TECH 9:30 AM FINAL INSPECTION
366 0% HT035 42.5 hrs 27/08/23 3:15 PM 29/08/23 9:45 AM
367 0% 40214548 1302-HT035 CV007 HT035 REPL TORPEDO TAKE UP WINCH 42.5 hrs 27/08/23 3:15 PM 29/08/23 9:45 AM
368 0% 40214548 1302-HT035 REMOVE GUARDS 1 hr 27/08/23 3:15 PM 27/08/23 4:15 PM 13ELCCTE[2] TOTAL HOIST 3:15 PM REMOVE GUARDS
369 0% 40214548 1302-HT035 LOWER TORPEDO 0.5 hrs 27/08/23 4:15 PM 27/08/23 4:45 PM 13ELCCTE[2] TOTAL HOIST 4:15 PM LOWER TORPEDO
370 0% 40214548 1302-HT035 REPLACE TORPEDO 5 hrs 28/08/23 6:45 AM 28/08/23 11:45 AM 13ELCCTE[2] TOTAL HOIST 6:45 AM REPLACE TORPEDO
371 0% 40214548 1302-HT035 HOLD POINT - CP ENGINEER INSPECT 0.5 hrs 29/08/23 7:45 AM 29/08/23 8:15 AM 13ENTENG TOTAL HOIST KML MECH ENGINEER 7:45 AM HOLD POINT - CP ENGINEER INSPECT
372 0% 40214548 1302-HT035 LIFT TORPEDO 0.5 hrs 29/08/23 8:15 AM 29/08/23 8:45 AM 13ELCCTE[2] TOTAL HOIST 8:15 AM LIFT TORPEDO
373 0% 40214548 1302-HT035 REINSTATE GUARDS 1 hr 29/08/23 8:45 AM 29/08/23 9:45 AM 13ELCCTE[2] TOTAL HOIST 8:45 AM REINSTATE GUARDS
374 0% 1302-CV007 CV007 70.25 hrs 27/08/23 3:15 PM 30/08/23 1:30 PM
375 0% 40210913 1302-CV007 09W OF ME SOFT SKIRT INSPECTION/REPLACE 6 hrs 28/08/23 7:30 PM 29/08/23 1:30 AM
376 0% 40210913 1302-CV007 09W OF ME SOFT SKIRT INSPECTION 6 hrs 28/08/23 7:30 PM 29/08/23 1:30 AM 13MBCBTE ENGYTECH BELTS 7:30 PM 09W OF ME SOFT SKIRT INSPECTION
377 0% 40210917 1302-CV007 09W OF ME ROLLER REPLACEMENT 23.25 hrs 28/08/23 12:45 PM 29/08/23 12:00 PM
378 0% 40210917 1302-CV007 ERECT SCAFFOLD 6 hrs 28/08/23 12:45 PM 28/08/23 6:45 PM 13MBCSCF[3] TMS ROLLERS KML SCAFFOLD 01 12:45 PM ERECT SCAFFOLD
379 0% 40210917 1302-CV007 09W OF ME ROLLER CONVEYOR REPLACEMENT 10 hrs 28/08/23 6:45 PM 29/08/23 4:45 AM 13MECBOI,13MECFIT,13MECTRA TMS ROLLERS 6:45 PM 09W OF ME ROLLER CONVEYOR REPLACEMENT
380 0% 40210917 1302-CV007 DISMANTLE SCAFFOLD 6 hrs 29/08/23 6:00 AM 29/08/23 12:00 PM 13MBCSCF[3] TMS ROLLERS KML SCAFFOLD 01 6:00 AM DISMANTLE SCAFFOLD
381 0% 40210925 1302-CV007 09W OF ME CONVEYOR SCRAPER MAINT 4 hrs 29/08/23 6:00 AM 29/08/23 10:00 AM
382 0% 40210925 1302-CV007 09W OF ME CONVEYOR SCRAPER MAINT 4 hrs 29/08/23 6:00 AM 29/08/23 10:00 AM 13MBCFIT[2] ENGYTECH SCRAPERS 6:00 AM 09W OF ME CONVEYOR SCRAPER MAINT
383 0% 40208463 1302-CV007 09W OF ME HARD SKIRTS INSP 70.25 hrs 27/08/23 3:15 PM 30/08/23 1:30 PM
384 0% 40208463 1302-CV007 INSTALL ACCESS SCAFFOLDING TO BELT 2 hrs 27/08/23 3:15 PM 27/08/23 5:15 PM 13MBCSCF[3] KML SKIRTS KML SCAFFOLD 01 3:15 PM INSTALL ACCESS SCAFFOLDING TO BELT
385 0% 40208463 1302-CV007 09W INSPECT MARK WORN LINERS 1 hr 27/08/23 5:15 PM 27/08/23 6:15 PM 13MBCSEN,13MECBOI[2],13MECFIT[2],13MECTRA[2]
KML SKIRTS 5:15 PM 09W INSPECT MARK WORN LINERS
386 0% 40208463 1302-CV007 09W HARD SKIRT INSPECT/ADJUST 8 hrs 30/08/23 4:30 AM 30/08/23 12:30 PM 13MBCSEN,13MECBOI[2],13MECFIT[2],13MECTRA[2]
KML SKIRTS 4:30 AM 09W HARD SKIRT INSPECT/ADJUST
387 0% 40208463 1302-CV007 REMOVE SCAFFOLD 1 hr 30/08/23 12:30 PM 30/08/23 1:30 PM 13MBCSCF[3] KML SKIRTS KML SCAFFOLD 01 12:30 PM REMOVE SCAFFOLD
388 0% 40208135 1302-CV007 09W OF ME BELT THICKNESS INSPECTION 1 hr 29/08/23 7:30 AM 29/08/23 8:30 AM
389 0% 40208135 1302-CV007 09W OF ME BELT THICKNESS INSPECTION 1 hr 29/08/23 7:30 AM 29/08/23 8:30 AM 13MBCBTE[2] ENGYTECH BELTS 7:30 AM 09W OF ME BELT THICKNESS INSPECTION
390 0% 40208918 1302-CV007 45W OF ME CV BRAKE FLUID AND FILTER CHG 2 hrs 27/08/23 3:15 PM 27/08/23 5:15 PM
391 0% 40208918 1302-CV007 45W OF ME CV BRAKE FLUID AND FILTER REPL 2 hrs 27/08/23 3:15 PM 27/08/23 5:15 PM 13METHYD[2] KML HYD TECH 3:15 PM 45W OF ME CV BRAKE FLUID AND FILTER REPL
392 0% 40210950 1302-CV007 09W OF EL 1302-CV007 INSP 1 hr 29/08/23 5:30 PM 29/08/23 6:30 PM
393 0% 40210950 1302-CV007 09W OF EL 1302-CV007 INSP 1 hr 29/08/23 5:30 PM 29/08/23 6:30 PM 13ELTELE[2] KML ELECTRICAL 02 5:30 PM 09W OF EL 1302-CV007 INSP
394 0% 1302-FE005 FE005 36 hrs 26/08/23 8:00 PM 28/08/23 8:00 AM
395 0% 40215032 1302-FE005 FE005 REPL HAGGLUND DRIVE 36 hrs 26/08/23 8:00 PM 28/08/23 8:00 AM
396 0% 40215032 1302-FE005 REPL HAGGLUND DRIVE 36 hrs 26/08/23 8:00 PM 28/08/23 8:00 AM 13MCCFIT,13MCCRIG,13MCCBOI[2] KG MECH 01 KML HYDRAULIC 8:00 PM REPL HAGGLUND DRIVE
397 0% 1302 AREA COS - TOOL TIME COMPLETE 0 hrs 30/08/23 10:30 AM 30/08/23 10:30 AM 10:30 AM 1302 AREA COS - TOOL TIME COMPLETE
398 0% 1303 AREA SECONDARY CRUSHING & SCREENING 151.75 hrs 27/08/23 9:15 AM 2/09/23 5:00 PM
399 0% 1303-BD002 BD002 2 hrs 28/08/23 12:15 PM 28/08/23 2:15 PM
400 0% 40210730 1303-BD002 09W OF EL SEC CRUSH SCN INST INSP 2 hrs 28/08/23 12:15 PM 28/08/23 2:15 PM
401 0% 40210730 1303-BD002 09W OF EL SEC CRUSH SCRN INST. INSP 2 hrs 28/08/23 12:15 PM 28/08/23 2:15 PM 13ELTELE KML ELECTRICAL 02 12:15 PM 09W OF EL SEC CRUSH SCRN INST. INSP
402 0% 1303-BD003 BD003 13 hrs 27/08/23 3:15 PM 28/08/23 4:15 AM
403 0% 40213590 1303-BD003 BD003 REPLACE 1" BALL VALVES SECONDARY C 13 hrs 27/08/23 3:15 PM 28/08/23 4:15 AM
404 0% 40213590 1303-BD003 ISOLATE AND PURGE AIR & WATER LINES 2 hrs 27/08/23 3:15 PM 27/08/23 5:15 PM 13OPTOPE 3:15 PM ISOLATE AND PURGE AIR & WATER LINES
405 0% 40213590 1303-BD003 REMOVE AND REPLACE BALL VALVES 10 hrs 27/08/23 5:15 PM 28/08/23 3:15 AM 13MBCFIT,13MBCBOI ENGYTECH MECH 01 5:15 PM REMOVE AND REPLACE BALL VALVES
406 0% 40213590 1303-BD003 HSK AREA AND DEMOBILISE TOOLING FROM JOB 1 hr 28/08/23 3:15 AM 28/08/23 4:15 AM 13MBCFIT,13MBCBOI ENGYTECH MECH 01 3:15 AM HSK AREA AND DEMOBILISE TOOLING FROM JOB
407 0% MARSHALLING PANEL 2 hrs 28/08/23 2:15 AM 28/08/23 4:15 AM
408 0% 40211248 1303-MP254 MP254 REPLACE SWITCH 2 hrs 28/08/23 2:15 AM 28/08/23 4:15 AM
409 0% 40211248 1303-MP254 REPLACE SWITCH IN MP254 2 hrs 28/08/23 2:15 AM 28/08/23 4:15 AM 13ELTELE[2] KML ELECTRICAL 02 2:15 AM REPLACE SWITCH IN MP254
410 0% 40211248 1303-MP254 REPLACE SWITCH IN MP254 1 hr 28/08/23 2:15 AM 28/08/23 3:15 AM 13COTPRE KML ELECTRICAL 02 PCS 2:15 AM REPLACE SWITCH IN MP254
411 0% 1303-BN007-CH019 CH019 18 hrs 28/08/23 8:45 AM 29/08/23 2:45 AM
412 0% 40215899 1303-BN007-CH019 CH-19 KNIFE GATE PARENT METAL REPAIRS 18 hrs 28/08/23 8:45 AM 29/08/23 2:45 AM
413 0% 40215899 1303-BN007-CH019 CUTTING & CLEANING METAL STRIPS 5 hrs 28/08/23 8:45 AM 28/08/23 1:45 PM 13MBCBOI,13MBCSEN,13MECTRA TMS BM T001 8:45 AM CUTTING & CLEANING METAL STRIPS
414 0% 40215899 1303-BN007-CH019 WELD-IN METAL STRIPS 12 hrs 28/08/23 1:45 PM 29/08/23 1:45 AM 13MBCBOI,13MBCSEN,13MECTRA TMS BM T001 1:45 PM WELD-IN METAL STRIPS
415 0% 40215899 1303-BN007-CH019 DEMOBE JOB FRONT 1 hr 29/08/23 1:45 AM 29/08/23 2:45 AM 13MBCBOI,13MBCSEN,13MECTRA TMS BM T001 1:45 AM DEMOBE JOB FRONT
416 0% 1303-BN007-CH020 CH020 18 hrs 29/08/23 3:45 AM 29/08/23 9:45 PM
417 0% 40215900 1303-BN007-CH020 CH-02 KNIFE GATE PARENT METAL REPAIRS 18 hrs 29/08/23 3:45 AM 29/08/23 9:45 PM
418 0% 40215900 1303-BN007-CH020 CUTTING AND CLEANING METAL STRIPS 5 hrs 29/08/23 3:45 AM 29/08/23 8:45 AM 13MBCBOI,13MBCSEN,13MECTRA TMS BM T001 3:45 AM CUTTING AND CLEANING METAL STRIPS
419 0% 40215900 1303-BN007-CH020 WELD IN METAL STRIPS 12 hrs 29/08/23 8:45 AM 29/08/23 8:45 PM 13MBCBOI,13MBCSEN,13MECTRA TMS BM T001 8:45 AM WELD IN METAL STRIPS
420 0% 40215900 1303-BN007-CH020 DEMOBE JOB FRONT 1 hr 29/08/23 8:45 PM 29/08/23 9:45 PM 13MBCBOI,13MBCSEN,13MECTRA TMS BM T001 8:45 PM DEMOBE JOB FRONT
421 0% 1303-BN007-CH021 CH021 18 hrs 29/08/23 9:45 PM 30/08/23 3:45 PM
422 0% 40215968 1303-BN007-CH021 CH-021 KNIFE GATE PARENT METAL REPAIR 18 hrs 29/08/23 9:45 PM 30/08/23 3:45 PM
423 0% 40215968 1303-BN007-CH021 CUTTING AND CLEANING METAL STRIPS 5 hrs 29/08/23 9:45 PM 30/08/23 2:45 AM 13MBCBOI,13MBCSEN,13MECTRA TMS BM T001 9:45 PM CUTTING AND CLEANING METAL STRIPS
424 0% 40215968 1303-BN007-CH021 WELD IN METAL STRIPS 12 hrs 30/08/23 2:45 AM 30/08/23 2:45 PM 13MBCBOI,13MBCSEN,13MECTRA TMS BM T001 2:45 AM WELD IN METAL STRIPS
425 0% 40215968 1303-BN007-CH021 DE-MOBE JOB FRONT 1 hr 30/08/23 2:45 PM 30/08/23 3:45 PM 13MBCBOI,13MBCSEN,13MECTRA TMS BM T001 2:45 PM DE-MOBE JOB FRONT
426 0% 1303-FE006 FE006 120.75 hrs 27/08/23 3:45 PM 1/09/23 4:30 PM
427 0% 40208101 1303-FE006 09W OF CM FEED CHUTE & SKIRT WEAR INSP 105.75 hrs 28/08/23 6:45 AM 1/09/23 4:30 PM
428 0% 40208101 1303-FE006 ERECT ACCESS SCAFFOLDING 2 hrs 28/08/23 6:45 AM 28/08/23 8:45 AM 13MBCSCF[3] ENGYTECH CHUTES KML SCAFFOLD 01 6:45 AM ERECT ACCESS SCAFFOLDING
429 0% 40208101 1303-FE006 09W OF CM FEED CHUTE & SKIRT WEAR INSP 3 hrs 29/08/23 10:30 AM 29/08/23 1:30 PM 13MBCWEA,13MBCSEN ENGYTECH CHUTES ENGY WEAR TECH 10:30 AM 09W OF CM FEED CHUTE & SKIRT WEAR INSP
430 0% 40208101 1303-FE006 DISMANTLE ACCESS SCAFFOLDING 1 hr 1/09/23 3:30 PM 1/09/23 4:30 PM 13MBCSCF[3] ENGYTECH CHUTES KML SCAFFOLD 01 3:30 PM DISMANTLE ACCESS SCAFFOLDING
431 0% 40210914 1303-FE006 09W OF ME BELT THICKNESS INSPECTION 1 hr 27/08/23 3:45 PM 27/08/23 4:45 PM
432 0% 40210914 1303-FE006 09W OF ME BELT THICKNESS INSPECTION 1 hr 27/08/23 3:45 PM 27/08/23 4:45 PM 13MBCBTE[2] ENGYTECH BELTS 3:45 PM 09W OF ME BELT THICKNESS INSPECTION
433 0% 1303-FE007 FE007 120.75 hrs 27/08/23 4:45 PM 1/09/23 5:30 PM

Scheduler:-Scott Everard Page 5 Printed:- 25/08/23 4:53 PM


Coordinator:-Doug Wolfendon
CR1-0723 Concave & Mantle Shutdown CR1-0723 Final Gantt Rev1
Start 26/08/23 8:00 PM _ Finish 2/09/23 7:00 PM
ID % WO Equipment Task Name Duration Start Finish Resource Names Team Sub Team
Complete Thu 24 Aug
Fri 25 AugSat 26 Aug
Sun 27 Aug
Mon 28 Aug
Tue 29 Aug
Wed 30 Aug
Thu 31 AugFri 1 SepSat 2 SepSun 3 SepMon 4 SepTue 5 SepW ed 6 SepThu 7 SepFri 8 SepSat 9 SepSun 10 S
12 6
PM12
PM6AM12
AM6PM
12
PM6AM12
AM6PM12
PM6AM
12
AM6PM12
PM6AM
12
AM6PM12
PM6AM
12
AM6PM12
PM6AM
12
AM6PM
12
PM6AM
12
AM6PM12
PM6AM12
AM6PM12
PM6AM
12
AM6PM
12
PM6AM
12
AM6 PM
12
PM6AM
12
AM6PM12
PM6AM
12
AM6 PM
12
PM6AM12
AM6PM12
PM6AM
12
AM6PM
12
PM6AM12
AM6PM12
PM6AM
12
AM6PM
12
PMAM
434 0% 40208102 1303-FE007 09W OF CM FEED CHUTE & SKIRT WEAR INSP 104.75 hrs 28/08/23 8:45 AM 1/09/23 5:30 PM
435 0% 40208102 1303-FE007 ERECT ACCESS SCAFFOLDING 2 hrs 28/08/23 8:45 AM 28/08/23 10:45 AM 13MBCSCF[3] ENGYTECH CHUTES KML SCAFFOLD 01 8:45 AM ERECT ACCESS SCAFFOLDING
436 0% 40208102 1303-FE007 09W OF CM FEED CHUTE & SKIRT WEAR INSP 3 hrs 29/08/23 1:30 PM 29/08/23 4:30 PM 13MBCWEA,13MBCSEN ENGYTECH CHUTES ENGY WEAR TECH 1:30 PM 09W OF CM FEED CHUTE & SKIRT WEAR INSP
437 0% 40208102 1303-FE007 DISMANTLE ACCESS SCAFFOLDING 1 hr 1/09/23 4:30 PM 1/09/23 5:30 PM 13MBCSCF[3] ENGYTECH CHUTES KML SCAFFOLD 01 4:30 PM DISMANTLE ACCESS SCAFFOLDING
438 0% 40210866 1303-FE007 09W OF ME BELT THICKNESS INSPECTION 1 hr 27/08/23 4:45 PM 27/08/23 5:45 PM
439 0% 40210866 1303-FE007 09W OF ME BELT THICKNESS INSPECTION 1 hr 27/08/23 4:45 PM 27/08/23 5:45 PM 13MBCBTE[2] ENGYTECH BELTS 4:45 PM 09W OF ME BELT THICKNESS INSPECTION
440 0% 1303-FE013 FE013 120.75 hrs 27/08/23 5:45 PM 1/09/23 6:30 PM
441 0% 40208103 1303-FE013 09W OF CM FEED CHUTE & SKIRT WEAR INSP 103.75 hrs 28/08/23 10:45 AM 1/09/23 6:30 PM
442 0% 40208103 1303-FE013 ERECT ACCESS SCAFFOLDING 2 hrs 28/08/23 10:45 AM 28/08/23 12:45 PM 13MBCSCF[3] ENGYTECH CHUTES KML SCAFFOLD 01 10:45 AM ERECT ACCESS SCAFFOLDING
443 0% 40208103 1303-FE013 09W OF CM FEED CHUTE & SKIRT WEAR INSP 3 hrs 29/08/23 4:30 PM 30/08/23 7:30 AM 13MBCWEA,13MBCSEN ENGYTECH CHUTES ENGY WEAR TECH 4:30 PM 09W OF CM FEED CHUTE & SKIRT WEAR INSP
444 0% 40208103 1303-FE013 DISMANTLE ACCESS SCAFFOLDING 1 hr 1/09/23 5:30 PM 1/09/23 6:30 PM 13MBCSCF[3] ENGYTECH CHUTES KML SCAFFOLD 01 5:30 PM DISMANTLE ACCESS SCAFFOLDING
445 0% 40210915 1303-FE013 09W OF ME BELT THICKNESS INSPECTION 13 hrs 27/08/23 5:45 PM 28/08/23 6:45 AM
446 0% 40210915 1303-FE013 09W OF ME BELT THICKNESS INSPECTION 1 hr 27/08/23 5:45 PM 28/08/23 6:45 AM 13MBCBTE[2] ENGYTECH BELTS 5:45 PM 09W OF ME BELT THICKNESS INSPECTION
447 0% 1303-CV002 CV002 123.75 hrs 27/08/23 9:15 AM 1/09/23 1:00 PM
448 0% 40208136 1303-CV002 09W OF ME BELT THICKNESS INSPECTION 1 hr 28/08/23 6:45 AM 28/08/23 7:45 AM
449 0% 40208136 1303-CV002 09W OF ME BELT THICKNESS INSPECTION 1 hr 28/08/23 6:45 AM 28/08/23 7:45 AM 13MBCBTE[2] ENGYTECH BELTS 6:45 AM 09W OF ME BELT THICKNESS INSPECTION
450 0% 40208157 1303-CV002 18W OF ME CONVEYOR BRAKE SYSTEM INSP 3 hrs 28/08/23 6:00 AM 28/08/23 9:00 AM
451 0% 40208157 1303-CV002 18W OF ME CONVEYOR BRAKE SYSTEM INSP 3 hrs 28/08/23 6:00 AM 28/08/23 9:00 AM 13METHYD[2] KML HYD TECH 6:00 AM 18W OF ME CONVEYOR BRAKE SYSTEM INSP
452 0% 40208916 1303-CV002 45W OF ME CV BRAKE FLUID AND FILTER CHG 2 hrs 28/08/23 9:00 AM 28/08/23 11:00 AM
453 0% 40208916 1303-CV002 45W OF ME CV BRAKE FLUID AND FILTER REPL 2 hrs 28/08/23 9:00 AM 28/08/23 11:00 AM 13METHYD[2] KML HYD TECH 9:00 AM 45W OF ME CV BRAKE FLUID AND FILTER REPL
454 0% 40210869 1303-CV002 09W OF ME CONVEYOR SCRAPER MAINT 4 hrs 1/09/23 9:00 AM 1/09/23 1:00 PM
455 0% 40210869 1303-CV002 09W OF ME CONVEYOR SCRAPER MAINT 4 hrs 1/09/23 9:00 AM 1/09/23 1:00 PM 13MBCFIT[2] ENGYTECH SCRAPERS 9:00 AM 09W OF ME CONVEYOR SCRAPER MAINT
456 0% 40210890 1303-CV002 09W OF ME SOFT SKIRT INSPECTION/REPLACE 6 hrs 31/08/23 9:30 AM 31/08/23 3:30 PM
457 0% 40210890 1303-CV002 09W OF ME SOFT SKIRT INSPECTION 6 hrs 31/08/23 9:30 AM 31/08/23 3:30 PM 13MBCBTE ENGYTECH BELTS 9:30 AM 09W OF ME SOFT SKIRT INSPECTION
458 0% 40210942 1303-CV002 09W OF ME ROLLER REPLACEMENT 10 hrs 29/08/23 6:00 AM 29/08/23 4:00 PM
459 0% 40210942 1303-CV002 09W OF ME CONVEYOR ROLLER REPLACEMENT 10 hrs 29/08/23 6:00 AM 29/08/23 4:00 PM 13MECBOI,13MECFIT,13MECTRA TMS ROLLERS 6:00 AM 09W OF ME CONVEYOR ROLLER REPLACEMENT
460 0% 40165179 1303-CV002 CV002 GTU REPLACE SHEDDER BLADES 15.5 hrs 30/08/23 8:00 PM 31/08/23 11:30 AM
461 0% 40165179 1303-CV002 SET UP LADDER AND WAH GEAR 1 hr 30/08/23 8:00 PM 30/08/23 9:00 PM 13MBCFIT,13MBCBTE ENGYTECH SCRAPERS 8:00 PM SET UP LADDER AND WAH GEAR
462 0% 40165179 1303-CV002 UNBOLT OLD BLADES AND MEASURE FOR NEW 2.5 hrs 30/08/23 9:00 PM 30/08/23 11:30 PM 13MBCFIT,13MBCBTE ENGYTECH SCRAPERS 9:00 PM UNBOLT OLD BLADES AND MEASURE FOR NEW
463 0% 40165179 1303-CV002 FABRICATE NEW BLADES 4 hrs 30/08/23 11:30 PM 31/08/23 3:30 AM 13MBCFIT,13MBCBTE ENGYTECH SCRAPERS 11:30 PM FABRICATE NEW BLADES
464 0% 40165179 1303-CV002 REPLACE OLD BOLTS AND WELD IN STUDS 5 hrs 31/08/23 3:30 AM 31/08/23 8:30 AM 13MBCFIT,13MBCBTE ENGYTECH SCRAPERS 3:30 AM REPLACE OLD BOLTS AND WELD IN STUDS
465 0% 40165179 1303-CV002 FIT NEW BLADES AND DENSO TAPE NUTS 2.5 hrs 31/08/23 8:30 AM 31/08/23 11:00 AM 13MBCFIT,13MBCBTE ENGYTECH SCRAPERS 8:30 AM FIT NEW BLADES AND DENSO TAPE NUTS
466 0% 40165179 1303-CV002 CLEAN AREA TO ORIGIANL STATE 0.5 hrs 31/08/23 11:00 AM 31/08/23 11:30 AM 13MBCFIT,13MBCBTE ENGYTECH SCRAPERS 11:00 AM CLEAN AREA TO ORIGIANL STATE
467 0% 40217305 1303-CV002-CH018-3 CV002 REPLACE DESSICANT BREATHER 2 hrs 28/08/23 11:00 AM 28/08/23 1:00 PM
468 0% 40217305 1303-CV002-CH018-3 CV002 - REPLACE DESSICANT BREATHER 2 hrs 28/08/23 11:00 AM 28/08/23 1:00 PM 13METHYD[2] KML HYD TECH 11:00 AM CV002 - REPLACE DESSICANT BREATHER
469 0% 40209200 1303-CV002-CO011-1 CV002 CHANGE OUT DRIVE PULLEY 49 hrs 27/08/23 9:15 AM 29/08/23 10:15 AM
470 0% 40209200 1303-CV002-CO011-1 LIFT GTU 4 hrs 27/08/23 9:15 AM 27/08/23 1:15 PM 13CR145T,13MECFIT[2],13MECRIG TMS MECH T001 FREO 145T 9:15 AM LIFT GTU
471 0% 40209200 1303-CV002-CO011-1 CV002 - CHANGE OUT DRIVE PULLEY 42 hrs 27/08/23 1:15 PM 29/08/23 7:15 AM 13MECFIT[2],13MECRIG,13CR25T TMS MECH T001 FREO 25T 1:15 PM CV002 - CHANGE OUT DRIVE PULLEY
472 0% 40209200 1303-CV002-CO011-1 LOWER GTU 3 hrs 29/08/23 7:15 AM 29/08/23 10:15 AM 13CR145T,13MECFIT[2],13MECRIG TMS MECH T001 FREO 145T 7:15 AM LOWER GTU
473 0% 40213577 1303-CV002-CO015 CV002 HARD SKIRT MAINTENANCE 85.75 hrs 27/08/23 11:45 PM 31/08/23 1:30 PM
474 0% 40213577 1303-CV002-CO015 REMOVE GUARDING AND SOFT SKIRTS 5 hrs 27/08/23 11:45 PM 28/08/23 4:45 AM 13MBCSEN,13MECBOI[2],13MECFIT[2],13MECTRA[2]
KML SKIRTS 11:45 PM REMOVE GUARDING AND SOFT SKIRTS
475 0% 40213577 1303-CV002-CO015 ERECT BELT ACCESS SCAFFOLD 2 hrs 28/08/23 4:45 AM 28/08/23 6:45 AM 13MBCSCF[3] KML SKIRTS KML SCAFFOLD 01 4:45 AM ERECT BELT ACCESS SCAFFOLD
476 0% 40213577 1303-CV002-CO015 DRAIN WATER FROM BELT 2 hrs 28/08/23 6:45 AM 28/08/23 8:45 AM 13MBCSEN,13MECBOI[2],13MECFIT[2],13MECTRA[2]
KML SKIRTS 6:45 AM DRAIN WATER FROM BELT
477 0% 40213577 1303-CV002-CO015 INSPECT AND MARK UP HARD SKIRT LINERS 1 hr 30/08/23 12:30 PM 30/08/23 1:30 PM 13MBCSEN,13MECBOI[2],13MECFIT[2],13MECTRA[2]
KML SKIRTS 12:30 PM INSPECT AND MARK UP HARD SKIRT LINERS
478 0% 40213577 1303-CV002-CO015 REMOVE MARKED UP HARD SKIRT LINERS 5 hrs 30/08/23 1:30 PM 30/08/23 6:30 PM 13MBCSEN,13MECBOI[2],13MECFIT[2],13MECTRA[2]
KML SKIRTS 1:30 PM REMOVE MARKED UP HARD SKIRT LINERS
479 0% 40213577 1303-CV002-CO015 REPLACE HARD SKIRT LINERS AND SET 6 hrs 30/08/23 1:30 PM 30/08/23 7:30 PM 13MBCSEN,13MECBOI[2],13MECFIT[2],13MECTRA[2]
KML SKIRTS 1:30 PM REPLACE HARD SKIRT LINERS AND SET
480 0% 40213577 1303-CV002-CO015 ROTATE ALL OTHER LINERS AND SET 12 hrs 30/08/23 7:30 PM 31/08/23 7:30 AM 13MBCSEN,13MECBOI[2],13MECFIT[2],13MECTRA[2]
KML SKIRTS 7:30 PM ROTATE ALL OTHER LINERS AND SET
481 0% 40213577 1303-CV002-CO015 FINAL INSPECTION 1 hr 31/08/23 7:30 AM 31/08/23 8:30 AM 13MBCSEN,13MECBOI[2],13MECFIT[2],13MECTRA[2]
KML SKIRTS 7:30 AM FINAL INSPECTION
482 0% 40213577 1303-CV002-CO015 DISMANTLE SCAFFOLD ACESS 1 hr 31/08/23 8:30 AM 31/08/23 9:30 AM 13MBCSCF[3] KML SKIRTS KML SCAFFOLD 01 8:30 AM DISMANTLE SCAFFOLD ACESS
483 0% 40213577 1303-CV002-CO015 REINSTATE SOFT SKIRTS AND GUARDS 4 hrs 31/08/23 9:30 AM 31/08/23 1:30 PM 13MBCSEN,13MECBOI[2],13MECFIT[2],13MECTRA[2]
KML SKIRTS 9:30 AM REINSTATE SOFT SKIRTS AND GUARDS
484 0% 40217855 1303-CV002 CV002 INST TERTIARY PROMET SCRAPERS 48 hrs 27/08/23 1:15 PM 29/08/23 1:15 PM
485 0% 40217855 1303-CV002 REMOVE TERTIARY SCRAPER 1 hr 27/08/23 1:15 PM 27/08/23 2:15 PM 13MECFIT,13MECBOI PROMET 1:15 PM REMOVE TERTIARY SCRAPER
486 0% 40217855 1303-CV002 MEASURE NEW TERTIARY SCRAPER LOCATION 2 hrs 27/08/23 2:15 PM 27/08/23 4:15 PM 13MECFIT,13MECBOI PROMET 2:15 PM MEASURE NEW TERTIARY SCRAPER LOCATION
487 0% 40217855 1303-CV002 WELD NEW TERTIARY SCRAP SUPPORT BRACKETS 2 hrs 27/08/23 4:15 PM 28/08/23 6:15 AM 13MECBOI PROMET 4:15 PM WELD NEW TERTIARY SCRAP SUPPORT BRACKETS
488 0% 40217855 1303-CV002 INSTALL NEW TERTIARY SCRAPER 2 hrs 28/08/23 6:15 AM 28/08/23 8:15 AM 13MECFIT,13MECBOI PROMET 6:15 AM INSTALL NEW TERTIARY SCRAPER
489 0% 40217855 1303-CV002 TENSION TERTIARY SCRAPER ***COMPLETE AFTER GTU LOWERED1 hr BY ENGYTECH**
29/08/23 10:15 AM 29/08/23 11:15 AM 13MECFIT,13MECBOI PROMET 10:15 AM TENSION TERTIARY SCRAPER ***COMPLETE AFTER GTU LOWERED BY ENGYTECH**
490 0% 40217855 1303-CV002 MECHANICAL ENGINEER SIGN OFF 2 hrs 29/08/23 11:15 AM 29/08/23 1:15 PM 13ENTENG PROMET KML MECH ENGINEER 11:15 AM MECHANICAL ENGINEER SIGN OFF
491 0% 40210947 1303-CV002 09W OF EL 1303-CV002 INSP 1 hr 27/08/23 5:15 PM 27/08/23 6:15 PM
492 0% 40210947 1303-CV002 09W OF EL 1303-CV002 INSP 1 hr 27/08/23 5:15 PM 27/08/23 6:15 PM 13ELTELE[2] KML ELECTRICAL 02 5:15 PM 09W OF EL 1303-CV002 INSP
493 0% 1303-CV002-CH018 CH018 30 hrs 30/08/23 9:30 AM 31/08/23 3:30 PM
494 0% 40215932 1303-CV002-CH018 CH018 LINER REPLACEMENT 30 hrs 30/08/23 9:30 AM 31/08/23 3:30 PM
495 0% 40215932 1303-CV002-CH018 INSPECT LEDGE LINERS 1 hr 30/08/23 9:30 AM 30/08/23 10:30 AM 13MBCWEA,13MBCSEN KG CHUTES T001 ENGY WEAR TECH 9:30 AM INSPECT LEDGE LINERS
496 0% 40215932 1303-CV002-CH018 DIG OUT BOLTS AND CUT WITH OXY 10 hrs 30/08/23 10:30 AM 30/08/23 8:30 PM 13MBCSEN,13MCCBOI[2] KG CHUTES T001 10:30 AM DIG OUT BOLTS AND CUT WITH OXY
497 0% 40215932 1303-CV002-CH018 DIG OUT & REMOVE LINERS TO BE CHANGED 8 hrs 30/08/23 8:30 PM 31/08/23 4:30 AM 13MBCSEN,13MCCBOI[2] KG CHUTES T001 8:30 PM DIG OUT & REMOVE LINERS TO BE CHANGED
498 0% 40215932 1303-CV002-CH018 INSTALL NEW LINERS 8 hrs 31/08/23 4:30 AM 31/08/23 12:30 PM 13MBCSEN,13MCCBOI[2] KG CHUTES T001 4:30 AM INSTALL NEW LINERS
499 0% 40215932 1303-CV002-CH018 FINAL INSPECTION 1 hr 31/08/23 12:30 PM 31/08/23 1:30 PM 13MBCWEA,13MBCSEN KG CHUTES T001 12:30 PM FINAL INSPECTION
500 0% 40215932 1303-CV002-CH018 STRIP SCAFF DECK 2 hrs 31/08/23 1:30 PM 31/08/23 3:30 PM 13MCCSCF[3] KG CHUTES T001 KG SCAFFOLD 01 1:30 PM STRIP SCAFF DECK
501 0% 1303-CV002-CH010 CH010 44 hrs 27/08/23 9:00 PM 29/08/23 5:00 PM
502 0% 40208075 1303-CV002-CH010 09W OF ME CHUTE INT USTT & WEAR PATTERN 44 hrs 27/08/23 9:00 PM 29/08/23 5:00 PM
503 0% 40208075 1303-CV002-CH010 ERECT ACCESS SCAFFOLD 1 hr 27/08/23 9:00 PM 27/08/23 10:00 PM 13MCCSCF[3] KG MECH 02 KG SCAFFOLD 01 9:00 PM ERECT ACCESS SCAFFOLD
504 0% 40208075 1303-CV002-CH010 09W OF ME CHUTE INT USTT & WEAR PATTERN 4 hrs 28/08/23 3:00 PM 28/08/23 7:00 PM 13MCCWEA,13MCCSEN KG MECH 02 3:00 PM 09W OF ME CHUTE INT USTT & WEAR PATTERN
505 0% 40208075 1303-CV002-CH010 DISMANTLE ACCESS SCAFFOLD 1 hr 29/08/23 4:00 PM 29/08/23 5:00 PM 13MCCSCF[3] KG MECH 02 KG SCAFFOLD 01 4:00 PM DISMANTLE ACCESS SCAFFOLD
506 0% 40216006 1303-CV002-CH010-2 CH010 REPLACE LINERS 21 hrs 28/08/23 7:00 PM 29/08/23 4:00 PM
507 0% 40216006 1303-CV002-CH010-2 WEAR TECH TO MARK-UP CHUTE 2 hrs 28/08/23 7:00 PM 28/08/23 9:00 PM 13MCCWEA,13MCCSEN KG MECH 02 7:00 PM WEAR TECH TO MARK-UP CHUTE
508 0% 40216006 1303-CV002-CH010-2 REMOVE MARKED UP LINERS 10 hrs 28/08/23 9:00 PM 29/08/23 7:00 AM 13MCCBOI[2],13MCCFIT,13MCCRIG KG MECH 02 9:00 PM REMOVE MARKED UP LINERS
509 0% 40216006 1303-CV002-CH010-2 REPLAVE MARKED UP LINERS 8 hrs 29/08/23 7:00 AM 29/08/23 3:00 PM 13MCCBOI[2],13MCCFIT,13MCCRIG KG MECH 02 7:00 AM REPLAVE MARKED UP LINERS
510 0% 40216006 1303-CV002-CH010-2 WEAR TECH TO COMPLETE FINAL INSPECTION 1 hr 29/08/23 3:00 PM 29/08/23 4:00 PM 13MCCWEA,13MCCSEN KG MECH 02 3:00 PM WEAR TECH TO COMPLETE FINAL INSPECTION
511 0% 1303-CV002-CH011 CH011 61 hrs 27/08/23 10:00 PM 30/08/23 11:00 AM
512 0% 40208090 1303-CV002-CH011 09W OF ME CHUTE INT USTT & WEAR PATTERN 61 hrs 27/08/23 10:00 PM 30/08/23 11:00 AM
513 0% 40208090 1303-CV002-CH011 ERECT ACCESS SCAFFOLD 1 hr 27/08/23 10:00 PM 27/08/23 11:00 PM 13MCCSCF[3] KG MECH 02 KG SCAFFOLD 01 10:00 PM ERECT ACCESS SCAFFOLD
514 0% 40208090 1303-CV002-CH011 09W OF ME CHUTE INT USTT & WEAR PATTERN 4 hrs 28/08/23 9:00 AM 28/08/23 1:00 PM 13MCCWEA,13MCCSEN KG MECH 02 9:00 AM 09W OF ME CHUTE INT USTT & WEAR PATTERN
515 0% 40208090 1303-CV002-CH011 DISMANTLE ACCESS SCAFFOLD 1 hr 30/08/23 10:00 AM 30/08/23 11:00 AM 13MCCSCF[3] KG MECH 02 KG SCAFFOLD 01 10:00 AM DISMANTLE ACCESS SCAFFOLD
516 0% 40216007 1303-CV002-CH011-2 CH-011 REPLACE LINERS 45 hrs 28/08/23 1:00 PM 30/08/23 10:00 AM
517 0% 40216007 1303-CV002-CH011-2 WEAR TECH TO MARK-UP CHUTE 2 hrs 28/08/23 1:00 PM 28/08/23 3:00 PM 13MCCWEA,13MCCSEN KG MECH 02 1:00 PM WEAR TECH TO MARK-UP CHUTE
518 0% 40216007 1303-CV002-CH011-2 REMOVE MARKED UP LINERS 10 hrs 29/08/23 3:00 PM 30/08/23 1:00 AM 13MCCBOI[2],13MCCFIT,13MCCRIG KG MECH 02 3:00 PM REMOVE MARKED UP LINERS
519 0% 40216007 1303-CV002-CH011-2 REPLACE MARKED UP LINERS 8 hrs 30/08/23 1:00 AM 30/08/23 9:00 AM 13MCCBOI[2],13MCCFIT,13MCCRIG KG MECH 02 1:00 AM REPLACE MARKED UP LINERS
520 0% 40216007 1303-CV002-CH011-2 WEAR TECH TO COMPLETE FINAL INSPECTION 1 hr 30/08/23 9:00 AM 30/08/23 10:00 AM 13MCCWEA,13MCCSEN KG MECH 02 9:00 AM WEAR TECH TO COMPLETE FINAL INSPECTION
521 0% 1303-FE002 FE002 64.5 hrs 27/08/23 1:30 PM 30/08/23 6:00 AM
522 0% 40210918 1303-FE002 09W OF ME VIB FEEDER LINER WEAR INSPECT 64.5 hrs 27/08/23 1:30 PM 30/08/23 6:00 AM
523 0% 40210918 1303-FE002 DISCONNECT FEEDER 0.5 hrs 27/08/23 1:30 PM 27/08/23 2:00 PM 13ELTELE[2] KG MECH 02 KML ELECTRICAL 02 1:30 PM DISCONNECT FEEDER
524 0% 40210918 1303-FE002 TRACK FEEDER OUT MANUALLY 3 hrs 27/08/23 2:00 PM 27/08/23 5:00 PM 13MCCSEN,13MCCBOI[2] KG MECH 02 2:00 PM TRACK FEEDER OUT MANUALLY

Scheduler:-Scott Everard Page 6 Printed:- 25/08/23 4:53 PM


Coordinator:-Doug Wolfendon
CR1-0723 Concave & Mantle Shutdown CR1-0723 Final Gantt Rev1
Start 26/08/23 8:00 PM _ Finish 2/09/23 7:00 PM
ID % WO Equipment Task Name Duration Start Finish Resource Names Team Sub Team
Complete Thu 24 Aug
Fri 25 AugSat 26 Aug
Sun 27 Aug
Mon 28 AugTue 29 AugWed 30 Aug
Thu 31 AugFri 1 SepSat 2 SepSun 3 SepMon 4 SepTue 5 SepW ed 6 SepThu 7 SepFri 8 SepSat 9 SepSun 10 S
12 6
PM12
PM6AM12
AM6PM
12
PM6AM12
AM6PM12
PM6AM12
AM6PM
12
PM6AM12
AM6PM12
PM6AM12
AM6PM12
PM6AM
12
AM6PM
12
PM6AM
12
AM6PM12
PM6AM12
AM6PM12
PM6AM
12
AM6PM
12
PM6AM
12
AM6 PM
12
PM6AM
12
AM6PM12
PM6AM
12
AM6 PM
12
PM6AM12
AM6PM12
PM6AM
12
AM6PM
12
PM6AM12
AM6PM12
PM6AM
12
AM6PM
12
PMAM
525 0% 40210918 1303-FE002 INSTALL SCAFFOLD BARRIERS 1 hr 27/08/23 5:00 PM 27/08/23 6:00 PM 13MCCSCF[3] KG MECH 02 KG SCAFFOLD 01 5:00 PM INSTALL SCAFFOLD BARRIERS
526 0% 40210918 1303-FE002 09W INSPECTION & REPLACE LINERS 3 hrs 27/08/23 6:00 PM 27/08/23 9:00 PM 13MCCSEN,13MCCBOI[2] KG MECH 02 6:00 PM 09W INSPECTION & REPLACE LINERS
527 0% 40210918 1303-FE002 DISMANTLE SCAFFOLD 1 hr 28/08/23 1:00 AM 28/08/23 2:00 AM 13MCCSCF[3] KG MECH 02 KG SCAFFOLD 01 1:00 AM DISMANTLE SCAFFOLD
528 0% 40210918 1303-FE002 TRACK FEEDER IN MANUALLY 3 hrs 28/08/23 6:00 AM 28/08/23 9:00 AM 13MCCFIT KG MECH 02 6:00 AM TRACK FEEDER IN MANUALLY
529 0% 40210918 1303-FE002 CONNECT FEEDER 0.5 hrs 30/08/23 5:30 AM 30/08/23 6:00 AM 13ELTELE[2] KG MECH 02 KML ELECTRICAL 02 5:30 AM CONNECT FEEDER
530 0% 40210923 1303-FE002 09W OF ME SEC FEEDER INSPECTION 2 hrs 27/08/23 9:00 PM 27/08/23 11:00 PM
531 0% 40210923 1303-FE002 09W OF ME SEC FEEDER INSPECTION 2 hrs 27/08/23 9:00 PM 27/08/23 11:00 PM 13MCCSEN,13MCCBOI[2] KG MECH 02 9:00 PM 09W OF ME SEC FEEDER INSPECTION
532 0% 40216008 1303-FE002-CO002 FE002 REPLACE MARKED UP LINERS 8 hrs 27/08/23 11:00 PM 28/08/23 7:00 AM
533 0% 40216008 1303-FE002-CO002 WEAR TECH TO MARK-UP CHUTE 1 hr 27/08/23 11:00 PM 28/08/23 12:00 AM 13MGCWEA KG MECH 02 11:00 PM WEAR TECH TO MARK-UP CHUTE
534 0% 40216008 1303-FE002-CO002 REMOVE MARKED UP LINERS 4 hrs 28/08/23 12:00 AM 28/08/23 4:00 AM 13MCCBOI[2],13MCCFIT,13MCCRIG KG MECH 02 12:00 AM REMOVE MARKED UP LINERS
535 0% 40216008 1303-FE002-CO002 REPLACE MARKED UP LINERS 2 hrs 28/08/23 4:00 AM 28/08/23 6:00 AM 13MCCBOI[2],13MCCFIT,13MCCRIG KG MECH 02 4:00 AM REPLACE MARKED UP LINERS
536 0% 40216008 1303-FE002-CO002 WEAR TECH TO COMPLETE FINAL INSPECTION 1 hr 28/08/23 6:00 AM 28/08/23 7:00 AM 13MGCWEA KG MECH 02 6:00 AM WEAR TECH TO COMPLETE FINAL INSPECTION
537 0% 40210867 1303-FE002 09W OF EL MOTOR-CABLES & TERMINALS INSP 4 hrs 29/08/23 6:30 PM 29/08/23 10:30 PM
538 0% 40210867 1303-FE002 09W OF EL MOTOR-CABLES & TERMINALS INSP 4 hrs 29/08/23 6:30 PM 29/08/23 10:30 PM 13ELTELE[2] KML ELECTRICAL 02 6:30 PM 09W OF EL MOTOR-CABLES & TERMINALS INSP
539 0% 1303-FE003 FE003 38.5 hrs 28/08/23 9:00 AM 29/08/23 11:30 PM
540 0% 40210924 1303-FE003 09W OF ME SEC FEEDER INSPECTION 2 hrs 28/08/23 11:00 AM 28/08/23 1:00 PM
541 0% 40210924 1303-FE003 09W OF ME SEC FEEDER INSPECTION 2 hrs 28/08/23 11:00 AM 28/08/23 1:00 PM 13MCCSEN,13MCCBOI[2],13MCCFIT,13MCCRIG KG MECH 02 11:00 AM 09W OF ME SEC FEEDER INSPECTION
542 0% 40216009 1303-FE003 FE003 CHANGE OUT WITH ROTABLE 3 hrs 28/08/23 9:00 AM 28/08/23 12:00 PM
543 0% 40216009 1303-FE003 REMOVE FEEDER 1 hr 28/08/23 9:00 AM 28/08/23 10:00 AM 13CR80T,13MCCBOI[2],13MCCFIT,13MCCRIG KG MECH 02 FREO 80T 9:00 AM REMOVE FEEDER
544 0% 40216009 1303-FE003 INSTALL ROTABLE FEEDER 1 hr 28/08/23 10:00 AM 28/08/23 11:00 AM 13CR80T,13MCCBOI[2],13MCCFIT,13MCCRIG KG MECH 02 FREO 80T 10:00 AM INSTALL ROTABLE FEEDER
545 0% 40216009 1303-FE003 DIRECTION TEST 1 hr 28/08/23 11:00 AM 28/08/23 12:00 PM 13ELTELE[2] KML ELECTRICAL 02 11:00 AM DIRECTION TEST
546 0% 40210868 1303-FE003 09W OF EL MOTOR-CABLES & TERMINALS INSP 1 hr 29/08/23 10:30 PM 29/08/23 11:30 PM
547 0% 40210868 1303-FE003 09W OF EL MOTOR-CABLES & TERMINALS INSP 1 hr 29/08/23 10:30 PM 29/08/23 11:30 PM 13ELTELE[2] KML ELECTRICAL 02 10:30 PM 09W OF EL MOTOR-CABLES & TERMINALS INSP
548 0% 1303-SN005 SN005 29.5 hrs 28/08/23 11:00 PM 30/08/23 4:30 AM
549 0% 40208557 1303-SN005 09W OF ME CARDAN SHAFT INSP 1 hr 30/08/23 2:30 AM 30/08/23 3:30 AM
550 0% 40208557 1303-SN005 09W OF ME CARDAN SHAFT INSP 1 hr 30/08/23 2:30 AM 30/08/23 3:30 AM 13MCCFIT[2] KG MECH 03 2:30 AM 09W OF ME CARDAN SHAFT INSP
551 0% 40210940 1303-SN005 09W OF ME SEC SCREEN INSPECTION 29.5 hrs 28/08/23 11:00 PM 30/08/23 4:30 AM
552 0% 40210940 1303-SN005 REMOVE DUST COVERS FROM SCREEN 0.5 hrs 28/08/23 11:00 PM 28/08/23 11:30 PM 13MCCFIT[2],13MCCSEN KG MECH 03 11:00 PM REMOVE DUST COVERS FROM SCREEN
553 0% 40210940 1303-SN005 ERECT SCAFFOLD ACCESS AND END STOP TO SCREEN 3 hrs 29/08/23 4:30 AM 29/08/23 7:30 AM 13MCCSCF[3],13MCCSEN KG MECH 03 KG SCAFFOLD 01 4:30 AM ERECT SCAFFOLD ACCESS AND END STOP TO SCREEN
554 0% 40210940 1303-SN005 09W OF MET INSP SCREEN PANELS 1 hr 29/08/23 3:30 PM 29/08/23 4:30 PM 13MTTMET,13MCCSEN KG MECH 03 KML METS 3:30 PM 09W OF MET INSP SCREEN PANELS
555 0% 40210940 1303-SN005 09W SCREEN PANEL CHANGE 6 hrs 29/08/23 4:30 PM 29/08/23 10:30 PM 13MCCFIT[2],13MCCSEN KG MECH 03 4:30 PM 09W SCREEN PANEL CHANGE
556 0% 40210940 1303-SN005 09W OF ME SEC SCREEN INSPECTION 4 hrs 29/08/23 10:30 PM 30/08/23 2:30 AM 13MCCFIT[2],13MCCSEN KG MECH 03 10:30 PM 09W OF ME SEC SCREEN INSPECTION
557 0% 40210940 1303-SN005 REMOVE SCAFF ACCESS FROM SCREEN 1.5 hrs 30/08/23 2:30 AM 30/08/23 4:00 AM 13MCCSCF[3],13MCCSEN KG MECH 03 KG SCAFFOLD 01 2:30 AM REMOVE SCAFF ACCESS FROM SCREEN
558 0% 40210940 1303-SN005 REFIT DUST COVERS TO SCREEN 0.5 hrs 30/08/23 4:00 AM 30/08/23 4:30 AM 13MCCFIT[2] KG MECH 03 4:00 AM REFIT DUST COVERS TO SCREEN
559 0% 1303-SN006 SN006 148 hrs 27/08/23 1:00 PM 2/09/23 5:00 PM
560 0% 40208571 1303-SN006 09W OF ME CARDAN SHAFT INSP 1 hr 28/08/23 10:00 PM 28/08/23 11:00 PM
561 0% 40208571 1303-SN006 09W OF ME CARDAN SHAFT INSP 1 hr 28/08/23 10:00 PM 28/08/23 11:00 PM 13MCCFIT[2],13MCCRIG KG MECH 03 10:00 PM 09W OF ME CARDAN SHAFT INSP
562 0% 40210920 1303-SN006 09W OF ME SEC SCREEN INSPECTION 4 hrs 28/08/23 6:00 PM 28/08/23 10:00 PM
563 0% 40210920 1303-SN006 09W OF ME SEC SCREEN INSPECTION 4 hrs 28/08/23 6:00 PM 28/08/23 10:00 PM 13MCCFIT[2],13MCCRIG KG MECH 03 6:00 PM 09W OF ME SEC SCREEN INSPECTION
564 0% 40213519 1303-SN006 18W OF MC SECONDARY SCREEN ROTABLE CHANGE 148 hrs 27/08/23 1:00 PM 2/09/23 5:00 PM
565 0% 40213519 1303-SN006 ELECTRICAL DISCONNECT OF FEEDER 0.5 hrs 27/08/23 1:00 PM 27/08/23 1:30 PM 13ELTELE KG MECH 03 KML ELECTRICAL 02 1:00 PM ELECTRICAL DISCONNECT OF FEEDER
566 0% 40213519 1303-SN006 JACK UP AND INSTALL SHIMS 0.5 hrs 27/08/23 1:30 PM 27/08/23 2:00 PM 13MCCFIT[2],13MCCRIG KG MECH 03 1:30 PM JACK UP AND INSTALL SHIMS
567 0% 40213519 1303-SN006 DRIVE FEEDER BACK 3 hrs 27/08/23 2:00 PM 27/08/23 5:00 PM 13MCCFIT[2],13MCCRIG KG MECH 03 KML ELECTRICAL 02 2:00 PM DRIVE FEEDER BACK
568 0% 40213519 1303-SN006 REMOVE SIDE GUARDING AND DUST COVERS 2 hrs 27/08/23 5:00 PM 27/08/23 7:00 PM 13MCCFIT[2],13MCCRIG KG MECH 03 5:00 PM REMOVE SIDE GUARDING AND DUST COVERS
569 0% 40213519 1303-SN006 INSTALL SCAFFOLD BARRIER 1 hr 27/08/23 7:00 PM 27/08/23 8:00 PM 13MCCSCF[3] KG MECH 03 KG SCAFFOLD 01 7:00 PM INSTALL SCAFFOLD BARRIER
570 0% 40213519 1303-SN006 JACKHAMMER AND CLEAN OFF ANY EXCESS PRODUCT 1.5 hrs 27/08/23 8:00 PM 27/08/23 9:30 PM 13MCCFIT[2],13MCCRIG KG MECH 03 8:00 PM JACKHAMMER AND CLEAN OFF ANY EXCESS PRODUCT
571 0% 40213519 1303-SN006 REMOVE FEED CGUTE 1 hr 27/08/23 9:30 PM 27/08/23 10:30 PM 13MCCFIT[2],13MCCRIG KG MECH 03 FREO 145T 9:30 PM REMOVE FEED CGUTE
572 0% 40213519 1303-SN006 REMOVE HEAD CHUTE 1 hr 27/08/23 10:30 PM 27/08/23 11:30 PM 13MCCFIT[2],13MCCRIG KG MECH 03 FREO 145T 10:30 PM REMOVE HEAD CHUTE
573 0% 40213519 1303-SN006 DISCONNECT CARDEN SHAFT 1 hr 27/08/23 11:30 PM 28/08/23 12:30 AM 13MCCFIT[2],13MCCRIG KG MECH 03 11:30 PM DISCONNECT CARDEN SHAFT
574 0% 40213519 1303-SN006 ENSURE SPRINGS W COME FREE & ARE SECURE 1 hr 28/08/23 12:30 AM 28/08/23 1:30 AM 13MCCFIT[2],13MCCRIG KG MECH 03 12:30 AM ENSURE SPRINGS W COME FREE & ARE SECURE
575 0% 40213519 1303-SN006 CHECK IF NEW RUB SPILL CURTAIN INSTALLED 0.5 hrs 28/08/23 1:30 AM 28/08/23 2:00 AM 13MCCFIT[2],13MCCRIG KG MECH 03 1:30 AM CHECK IF NEW RUB SPILL CURTAIN INSTALLED
576 0% 40213519 1303-SN006 RIG UP SCREEN & REMOVE TO LAY DOWN AREA 1 hr 28/08/23 2:00 AM 28/08/23 3:00 AM 13MCCFIT[2],13MCCRIG KG MECH 03 FREO 145T 2:00 AM RIG UP SCREEN & REMOVE TO LAY DOWN AREA
577 0% 40213519 1303-SN006 CHANGE OUT TAPER LOCK COUPLING 2 hrs 28/08/23 3:00 AM 28/08/23 5:00 AM 13MCCFIT[2],13MCCRIG KG MECH 03 3:00 AM CHANGE OUT TAPER LOCK COUPLING
578 0% 40213519 1303-SN006 RIG UP AND INSTALL REPLACEMENT SCREEN 2 hrs 1/09/23 9:30 PM 1/09/23 11:30 PM 13MCCFIT[2],13MCCRIG KG MECH 03 FREO 145T 9:30 PM RIG UP AND INSTALL REPLACEMENT SCREEN
579 0% 40213519 1303-SN006 INSTALL DISCHARGE CHUTE 2 hrs 1/09/23 11:30 PM 2/09/23 1:30 AM 13MCCFIT[2],13MCCRIG KG MECH 03 FREO 145T 11:30 PM INSTALL DISCHARGE CHUTE
580 0% 40213519 1303-SN006 RECONNECT CARDEN SHAFT 2 hrs 2/09/23 1:30 AM 2/09/23 3:30 AM 13MCCFIT KG MECH 03 1:30 AM RECONNECT CARDEN SHAFT
581 0% 40213519 1303-SN006 INSTALL FEED CHUTE - NEW ROTABLE 2 hrs 2/09/23 3:30 AM 2/09/23 5:30 AM 13MCCFIT[2],13MCCRIG KG MECH 03 FREO 145T 3:30 AM INSTALL FEED CHUTE - NEW ROTABLE
582 0% 40213519 1303-SN006 REPLACE DUST COVERS AND SIDE COVERS 1 hr 2/09/23 5:30 AM 2/09/23 6:30 AM 13MCCFIT[2],13MCCRIG KG MECH 03 5:30 AM REPLACE DUST COVERS AND SIDE COVERS
583 0% 40213519 1303-SN006 CHECK BELTS PULLEYS AND GUARDS 2 hrs 2/09/23 6:30 AM 2/09/23 8:30 AM 13MCCFIT[2],13MCCRIG KG MECH 03 6:30 AM CHECK BELTS PULLEYS AND GUARDS
584 0% 40213519 1303-SN006 ENGINEERING INSPECTIONS 2 hrs 2/09/23 8:30 AM 2/09/23 10:30 AM 13ENTENG KG MECH 03 KML MECH ENGINEER 8:30 AM ENGINEERING INSPECTIONS
585 0% 40213519 1303-SN006 FILL EXCITERS WITH OIL 1 hr 2/09/23 10:30 AM 2/09/23 11:30 AM 13MCCLUB KG MECH 03 KG LUBE 10:30 AM FILL EXCITERS WITH OIL
586 0% 40213519 1303-SN006 REMOVE SCAFFOLDING AND HARD BARRICADE 1.5 hrs 2/09/23 11:30 AM 2/09/23 1:00 PM 13MCCSCF[3] KG MECH 03 KG SCAFFOLD 01 11:30 AM REMOVE SCAFFOLDING AND HARD BARRICADE
587 0% 40213519 1303-SN006 DRIVE FEEDER FORWARD 3 hrs 2/09/23 1:00 PM 2/09/23 4:00 PM 13MCCFIT[2],13MCCRIG KG MECH 03 KML ELECTRICAL 02 1:00 PM DRIVE FEEDER FORWARD
588 0% 40213519 1303-SN006 REINSTALL SHIMS AND FIXINGS 0.5 hrs 2/09/23 4:00 PM 2/09/23 4:30 PM 13MCCFIT[2],13MCCRIG KG MECH 03 4:00 PM REINSTALL SHIMS AND FIXINGS
589 0% 40213519 1303-SN006 ELECTRICAL CONNECTIONS 0.5 hrs 2/09/23 4:30 PM 2/09/23 5:00 PM 13ELTELE KG MECH 03 KML ELECTRICAL 02 4:30 PM ELECTRICAL CONNECTIONS
590 0% 1303-SN006-CH042 CH042 104.5 hrs 27/08/23 8:00 PM 1/09/23 4:30 AM
591 0% 40208074 1303-SN006-CH042 09W OF ME CHUTE INT USTT & WEAR PATTERN 104.5 hrs 27/08/23 8:00 PM 1/09/23 4:30 AM
592 0% 40208074 1303-SN006-CH042 ERECT ACCESS SCAFFOLDING 1 hr 27/08/23 8:00 PM 27/08/23 9:00 PM 13MCCSCF[3] KG MECH 03 KG SCAFFOLD 01 8:00 PM ERECT ACCESS SCAFFOLDING
593 0% 40208074 1303-SN006-CH042 09W OF ME CHUTE INT USTT & WEAR PATTERN 4 hrs 30/08/23 3:30 AM 30/08/23 7:30 AM 13MCCWEA,13MCCSEN KG MECH 03 3:30 AM 09W OF ME CHUTE INT USTT & WEAR PATTERN
594 0% 40208074 1303-SN006-CH042 DISMANTLE ACCESS SCAFFOLDING 1 hr 1/09/23 3:30 AM 1/09/23 4:30 AM 13MCCSCF[3] KG MECH 03 KG SCAFFOLD 01 3:30 AM DISMANTLE ACCESS SCAFFOLDING
595 0% 1303-SN005-CH043 CH043 100.5 hrs 28/08/23 1:00 AM 1/09/23 5:30 AM
596 0% 40208089 1303-SN005-CH043 09W OF ME CHUTE INT USTT & WEAR PATTERN 100.5 hrs 28/08/23 1:00 AM 1/09/23 5:30 AM
597 0% 40208089 1303-SN005-CH043 ERECT ACCESS SCAFFOLDING 1 hr 28/08/23 1:00 AM 28/08/23 2:00 AM 13MCCSCF[3] KG MECH 03 KG SCAFFOLD 01 1:00 AM ERECT ACCESS SCAFFOLDING
598 0% 40208089 1303-SN005-CH043 09W OF ME CHUTE INT USTT & WEAR PATTERN 4 hrs 30/08/23 7:30 AM 30/08/23 11:30 AM 13MCCWEA,13MCCSEN KG MECH 03 7:30 AM 09W OF ME CHUTE INT USTT & WEAR PATTERN
599 0% 40208089 1303-SN005-CH043 DISMANTLE ACCESS SCAFFOLDING 1 hr 1/09/23 4:30 AM 1/09/23 5:30 AM 13MCCSCF[3] KG MECH 03 KG SCAFFOLD 01 4:30 AM DISMANTLE ACCESS SCAFFOLDING
600 0% 1303-SN006-CH055 CH055 114.5 hrs 28/08/23 5:00 AM 1/09/23 11:30 PM
601 0% 40214519 1303-SN006-CH055 18W OF MC ROTABLE INSERT CHANGE OUT 114.5 hrs 28/08/23 5:00 AM 1/09/23 11:30 PM
602 0% 40214519 1303-SN006-CH055 REMOVE COVERS FOR UPPER SECTION 3 hrs 28/08/23 5:00 AM 28/08/23 8:00 AM 13MCCFIT[2],13MCCRIG KG MECH 03 FREO 145T 5:00 AM REMOVE COVERS FOR UPPER SECTION
603 0% 40214519 1303-SN006-CH055 CLEANING 2 hrs 28/08/23 8:00 AM 28/08/23 10:00 AM 13MCCFIT[2],13MCCRIG KG MECH 03 8:00 AM CLEANING
604 0% 40214519 1303-SN006-CH055 RIG UP UPPER SECTION AND LOWER TO GROUND 2 hrs 28/08/23 10:00 AM 28/08/23 12:00 PM 13MCCCND KG MECH 03 FREO 145T 10:00 AM RIG UP UPPER SECTION AND LOWER TO GROUND
605 0% 40214519 1303-SN006-CH055 RIG UP LOWER SECTION AND LOWER TO GROUND 4 hrs 28/08/23 12:00 PM 28/08/23 4:00 PM 13MCCCND KG MECH 03 FREO 145T 12:00 PM RIG UP LOWER SECTION AND LOWER TO GROUND
606 0% 40214519 1303-SN006-CH055 INSTALL SCAFFOLD LADDER TO BOTTOM SECTIO 1 hr 28/08/23 4:00 PM 28/08/23 5:00 PM 13MCCSCF[3] KG MECH 03 KG SCAFFOLD 01 4:00 PM INSTALL SCAFFOLD LADDER TO BOTTOM SECTIO
607 0% 40214519 1303-SN006-CH055 INSPECT CV005 HARD SKIRTS 1 hr 28/08/23 5:00 PM 28/08/23 6:00 PM 13MCCFIT,13MCCSEN KG MECH 03 5:00 PM INSPECT CV005 HARD SKIRTS
608 0% 40214519 1303-SN006-CH055 REMOVE SCAFFOLD ONCE WORKS COMPLETED 1 hr 28/08/23 6:00 PM 28/08/23 7:00 PM 13MCCSCF[3] KG MECH 03 KG SCAFFOLD 01 6:00 PM REMOVE SCAFFOLD ONCE WORKS COMPLETED
609 0% 40214519 1303-SN006-CH055 RIG UP AND INSTALL LOWER INSERT SECTION 3 hrs 1/09/23 11:00 AM 1/09/23 2:00 PM 13MCCFIT[2],13MCCRIG KG MECH 03 FREO 145T 11:00 AM RIG UP AND INSTALL LOWER INSERT SECTION
610 0% 40214519 1303-SN006-CH055 RIG UP AND INSTALL UPPER INSERT SECTION 3 hrs 1/09/23 2:00 PM 1/09/23 5:00 PM 13MCCFIT[2],13MCCRIG KG MECH 03 FREO 145T 2:00 PM RIG UP AND INSTALL UPPER INSERT SECTION
611 0% 40214519 1303-SN006-CH055 CONFIRM THE INSERTS ARE SEATED CORRECTLY 0.5 hrs 1/09/23 5:00 PM 1/09/23 5:30 PM 13MCCFIT[2],13MCCRIG KG MECH 03 5:00 PM CONFIRM THE INSERTS ARE SEATED CORRECTLY
612 0% 40214519 1303-SN006-CH055 INSTALL THE COVERS FOR UPPER SECTION 3 hrs 1/09/23 5:30 PM 1/09/23 8:30 PM 13MCCFIT[2],13MCCRIG KG MECH 03 FREO 145T 5:30 PM INSTALL THE COVERS FOR UPPER SECTION
613 0% 40214519 1303-SN006-CH055 ENGINEERING INSPECTION 1 hr 1/09/23 8:30 PM 1/09/23 9:30 PM 13ENTENG KG MECH 03 8:30 PM ENGINEERING INSPECTION
614 0% 40214519 1303-SN006-CH055 REMOVE THE SCAFFOLD BARRIER TO THE DOORS 2 hrs 1/09/23 9:30 PM 1/09/23 11:30 PM 13MCCSCF[3] KG MECH 03 KG SCAFFOLD 01 9:30 PM REMOVE THE SCAFFOLD BARRIER TO THE DOORS
615 0% 1303-CV005 CV005 121.75 hrs 27/08/23 3:15 PM 1/09/23 5:00 PM

Scheduler:-Scott Everard Page 7 Printed:- 25/08/23 4:53 PM


Coordinator:-Doug Wolfendon
CR1-0723 Concave & Mantle Shutdown CR1-0723 Final Gantt Rev1
Start 26/08/23 8:00 PM _ Finish 2/09/23 7:00 PM
ID % WO Equipment Task Name Duration Start Finish Resource Names Team Sub Team
Complete Thu 24 Aug
Fri 25 AugSat 26 Aug
Sun 27 Aug
Mon 28 Aug
Tue 29 Aug
Wed 30 Aug
Thu 31 AugFri 1 SepSat 2 SepSun 3 SepMon 4 SepTue 5 SepW ed 6 SepThu 7 SepFri 8 SepSat 9 SepSun 10 S
12 6
PM12
PM6AM12
AM6PM
12
PM6AM12
AM6PM12
PM6AM
12
AM6PM12
PM6AM
12
AM6PM12
PM6AM
12
AM6PM12
PM6AM
12
AM6PM
12
PM6AM
12
AM6PM12
PM6AM12
AM6PM12
PM6AM
12
AM6PM
12
PM6AM
12
AM6 PM
12
PM6AM
12
AM6PM12
PM6AM
12
AM6 PM
12
PM6AM12
AM6PM12
PM6AM
12
AM6PM
12
PM6AM12
AM6PM12
PM6AM
12
AM6PM
12
PMAM
616 0% 40210870 1303-CV005 09W OF ME ROLLER REPLACEMENT 19 hrs 27/08/23 3:15 PM 28/08/23 10:15 AM
617 0% 40210870 1303-CV005 09W OF ME CONVEYOR ROLLER REPLACEMENT 7 hrs 27/08/23 3:15 PM 28/08/23 10:15 AM 13MECBOI,13MECFIT,13MECTRA TMS ROLLERS 3:15 PM 09W OF ME CONVEYOR ROLLER REPLACEMENT
618 0% 40210912 1303-CV005 09W OF ME SOFT SKIRT INSPECTION/REPLACE 6 hrs 1/09/23 11:00 AM 1/09/23 5:00 PM
619 0% 40210912 1303-CV005 09W OF ME SOFT SKIRT INSPECTION 6 hrs 1/09/23 11:00 AM 1/09/23 5:00 PM 13MBCBTE ENGYTECH BELTS 11:00 AM 09W OF ME SOFT SKIRT INSPECTION
620 0% 40210943 1303-CV005 09W OF ME CONVEYOR SCRAPER MAINT 71 hrs 29/08/23 10:00 AM 1/09/23 9:00 AM
621 0% 40210943 1303-CV005 09W OF ME CONVEYOR SCRAPER MAINT - BACK OFF 2 hrs 29/08/23 10:00 AM 29/08/23 12:00 PM 13MBCBOI,13MBCFIT ENGYTECH SCRAPERS 10:00 AM 09W OF ME CONVEYOR SCRAPER MAINT - BACK OFF SCRAPER FOR BELT PULL
SCRAPER FOR BELT PULL
622 0% 40210943 1303-CV005 09W OF ME CONVEYOR SCRAPER MAINT - RETENSION 3 hrs 1/09/23 6:00 AM 1/09/23 9:00 AM 13MBCBOI,13MBCFIT ENGYTECH SCRAPERS 6:00 AM 09W OF ME CONVEYOR SCRAPER MAINT - RETENSION SCRAPER
SCRAPER
623 0% 40194841 1303-CV005-CO001 CV005 REPL BELT 63.5 hrs 29/08/23 7:30 AM 31/08/23 11:00 PM
624 0% 40194841 1303-CV005-CO001 LIFT GTU WITH SLEW CRANE 4 hrs 29/08/23 7:30 AM 29/08/23 11:30 AM 13CR160T KRG FREO CRANES 160T 7:30 AM LIFT GTU WITH SLEW CRANE
625 0% 40194841 1303-CV005-CO001 SWITCH PERMITS 1 hr 29/08/23 11:30 AM 29/08/23 12:30 PM 13MECBTE[4] KRG FREO CRANES 160T 11:30 AM SWITCH PERMITS
626 0% 40194841 1303-CV005-CO001 REMOVE GUARDING AS REQUIRED 3 hrs 29/08/23 12:30 PM 29/08/23 3:30 PM 13MECBTE[4] KRG FREO CRANES 160T 12:30 PM REMOVE GUARDING AS REQUIRED
627 0% 40194841 1303-CV005-CO001 CLAMP, CUT AND PLATE BELT 4 hrs 29/08/23 3:30 PM 29/08/23 7:30 PM 13MECBTE[4] KRG FREO CRANES 160T 3:30 PM CLAMP, CUT AND PLATE BELT
628 0% 40194841 1303-CV005-CO001 ERECT SPLICE STATION 6 hrs 29/08/23 7:30 PM 30/08/23 1:30 AM 13MECSCF[3] KRG KML SCAFFOLD 01 7:30 PM ERECT SPLICE STATION
629 0% 40194841 1303-CV005-CO001 REMOVE CLAMPS/SWITCH PERMITS 2 hrs 30/08/23 4:30 AM 30/08/23 6:30 AM 13MECBTE[4] KRG FREO CRANES 160T 4:30 AM REMOVE CLAMPS/SWITCH PERMITS
630 0% 40194841 1303-CV005-CO001 PULL ROLL ON AND CLAMP 5 hrs 30/08/23 6:30 AM 30/08/23 11:30 AM 13MECBTE[4] KRG FREO CRANES 160T 6:30 AM PULL ROLL ON AND CLAMP
631 0% 40194841 1303-CV005-CO001 PULL TAIL UP/ADD SLACK 3 hrs 30/08/23 11:30 AM 30/08/23 2:30 PM 13MECBTE[4] KRG FREO CRANES 160T 11:30 AM PULL TAIL UP/ADD SLACK
632 0% 40194841 1303-CV005-CO001 ISOLATE BELT CLAMPS/SWITCH PERMITS 2 hrs 30/08/23 2:30 PM 30/08/23 4:30 PM 13MECBTE[4] KRG FREO CRANES 160T 2:30 PM ISOLATE BELT CLAMPS/SWITCH PERMITS
633 0% 40194841 1303-CV005-CO001 INSTALL BOTTOM PRESS ASSEMBLY 4 hrs 30/08/23 4:30 PM 30/08/23 8:30 PM 13MECBTE[4] KRG FREO CRANES 160T 4:30 PM INSTALL BOTTOM PRESS ASSEMBLY
634 0% 40194841 1303-CV005-CO001 MARK OUT AND CUT OUT SPLICE ENDSALIGN AN 6 hrs 30/08/23 8:30 PM 31/08/23 2:30 AM 13MECBTE[4] KRG FREO CRANES 160T 8:30 PM MARK OUT AND CUT OUT SPLICE ENDSALIGN AN
635 0% 40194841 1303-CV005-CO001 ASSEMLE TOP OF VULCANISER 4 hrs 31/08/23 2:30 AM 31/08/23 6:30 AM 13MECBTE[4] KRG FREO CRANES 160T 2:30 AM ASSEMLE TOP OF VULCANISER
636 0% 40194841 1303-CV005-CO001 COOK AND COOL SPLICE 2 hrs 31/08/23 6:30 AM 31/08/23 8:30 AM 13MECBTE[4] KRG FREO CRANES 160T 6:30 AM COOK AND COOL SPLICE
637 0% 40194841 1303-CV005-CO001 STRIP TOP OF VULCANISER/FINAL QA 2.5 hrs 31/08/23 8:30 AM 31/08/23 11:00 AM 13MECBTE[4] KRG FREO CRANES 160T 8:30 AM STRIP TOP OF VULCANISER/FINAL QA
638 0% 40194841 1303-CV005-CO001 REMOVE BOTTOM OF VULCANISER 3 hrs 31/08/23 11:00 AM 31/08/23 2:00 PM 13MECBTE[4] KRG FREO CRANES 160T 11:00 AM REMOVE BOTTOM OF VULCANISER
639 0% 40194841 1303-CV005-CO001 STRIP SCAFF STATION 2 hrs 31/08/23 2:00 PM 31/08/23 4:00 PM 13MECSCF[3] KRG KML SCAFFOLD 01 2:00 PM STRIP SCAFF STATION
640 0% 40194841 1303-CV005-CO001 REINSTATE GUARDING 2 hrs 31/08/23 4:00 PM 31/08/23 6:00 PM 13MECBTE[4] KRG FREO CRANES 160T 4:00 PM REINSTATE GUARDING
641 0% 40194841 1303-CV005-CO001 DE-ISOLATE BELT CLAMPS/SWITCH PERMITS 2 hrs 31/08/23 6:00 PM 31/08/23 8:00 PM 13MECBTE[4] KRG FREO CRANES 160T 6:00 PM DE-ISOLATE BELT CLAMPS/SWITCH PERMITS
642 0% 40194841 1303-CV005-CO001 DROP GTU 3 hrs 31/08/23 8:00 PM 31/08/23 11:00 PM 13CR160T KRG FREO CRANES 160T 8:00 PM DROP GTU
643 0% 40209135 1303-CV005-CO015-5 CV005 REPLACE TAIL PULLEY 17 hrs 29/08/23 11:30 AM 30/08/23 4:30 AM
644 0% 40209135 1303-CV005-CO015-5 REMOVE ALL GUARDING AROUND PULLEY 0.5 hrs 29/08/23 11:30 AM 29/08/23 12:00 PM 13MECFIT[2],13MECRIG KRG FREO CRANES 160T 11:30 AM REMOVE ALL GUARDING AROUND PULLEY
645 0% 40209135 1303-CV005-CO015-5 DISCONNECT ALL GREASE LINES 0.5 hrs 29/08/23 12:00 PM 29/08/23 12:30 PM 13MECFIT[2],13MECRIG KRG FREO CRANES 160T 12:00 PM DISCONNECT ALL GREASE LINES
646 0% 40209135 1303-CV005-CO015-5 LOOSEN ADJUSTING BOLTS & HD BOLTS 2 hrs 29/08/23 12:30 PM 29/08/23 2:30 PM 13MECFIT[2],13MECRIG KRG FREO CRANES 160T 12:30 PM LOOSEN ADJUSTING BOLTS & HD BOLTS
647 0% 40209135 1303-CV005-CO015-5 RIG AND REMOVE PULLEY 2 hrs 29/08/23 7:30 PM 29/08/23 9:30 PM 13MECFIT[2],13MECRIG KRG FREO CRANES 160T 7:30 PM RIG AND REMOVE PULLEY
648 0% 40209135 1303-CV005-CO015-5 CLEAN ALL SHIMS AND MATING FACE 1 hr 29/08/23 9:30 PM 29/08/23 10:30 PM 13MECFIT[2],13MECRIG KRG FREO CRANES 160T 9:30 PM CLEAN ALL SHIMS AND MATING FACE
649 0% 40209135 1303-CV005-CO015-5 RIG AND INSTALL NEW PULLEY ASSEMBLY 2 hrs 29/08/23 10:30 PM 30/08/23 12:30 AM 13MECFIT[2],13MECRIG KRG FREO CRANES 160T 10:30 PM RIG AND INSTALL NEW PULLEY ASSEMBLY
650 0% 40209135 1303-CV005-CO015-5 CHECK LEVEL AND ALIGNMENT OF PULLEY 2 hrs 30/08/23 12:30 AM 30/08/23 2:30 AM 13MECFIT[2],13MECRIG KRG FREO CRANES 160T 12:30 AM CHECK LEVEL AND ALIGNMENT OF PULLEY
651 0% 40209135 1303-CV005-CO015-5 TIGHTEN BEARING HOLD DOWN BOLTS 1 hr 30/08/23 2:30 AM 30/08/23 3:30 AM 13MECFIT[2],13MECRIG KRG FREO CRANES 160T 2:30 AM TIGHTEN BEARING HOLD DOWN BOLTS
652 0% 40209135 1303-CV005-CO015-5 INSTALL GREASE LINES 0.5 hrs 30/08/23 3:30 AM 30/08/23 4:00 AM 13MECFIT[2],13MECRIG KRG FREO CRANES 160T 3:30 AM INSTALL GREASE LINES
653 0% 40209135 1303-CV005-CO015-5 CHECK AND TIGHTEN LAB SEAL ON BEARING 0.5 hrs 30/08/23 4:00 AM 30/08/23 4:30 AM 13MECFIT[2],13MECRIG KRG FREO CRANES 160T 4:00 AM CHECK AND TIGHTEN LAB SEAL ON BEARING
654 0% 40165174 1303-CV005 CV005 GTU REPLACE SHEDDER BLADES 15.5 hrs 30/08/23 4:30 AM 30/08/23 8:00 PM
655 0% 40165174 1303-CV005 SET UP LADDER AND WAH GEAR 1 hr 30/08/23 4:30 AM 30/08/23 5:30 AM 13MBCFIT,13MBCBTE ENGYTECH SCRAPERS 4:30 AM SET UP LADDER AND WAH GEAR
656 0% 40165174 1303-CV005 UNBOLT OLD BLADES AND MEASURE FOR NEW 2.5 hrs 30/08/23 5:30 AM 30/08/23 8:00 AM 13MBCFIT,13MBCBTE ENGYTECH SCRAPERS 5:30 AM UNBOLT OLD BLADES AND MEASURE FOR NEW
657 0% 40165174 1303-CV005 FABRICATE NEW BLADES 4 hrs 30/08/23 8:00 AM 30/08/23 12:00 PM 13MBCFIT,13MBCBTE ENGYTECH SCRAPERS 8:00 AM FABRICATE NEW BLADES
658 0% 40165174 1303-CV005 REPLACE OLD BOLTS AND WELD IN STUDS 5 hrs 30/08/23 12:00 PM 30/08/23 5:00 PM 13MBCFIT,13MBCBTE ENGYTECH SCRAPERS 12:00 PM REPLACE OLD BOLTS AND WELD IN STUDS
659 0% 40165174 1303-CV005 FIT NEW BLADES AND DENSO TAPE NUTS 2.5 hrs 30/08/23 5:00 PM 30/08/23 7:30 PM 13MBCFIT,13MBCBTE ENGYTECH SCRAPERS 5:00 PM FIT NEW BLADES AND DENSO TAPE NUTS
660 0% 40165174 1303-CV005 PACK UP 0.5 hrs 30/08/23 7:30 PM 30/08/23 8:00 PM 13MBCFIT,13MBCBTE ENGYTECH SCRAPERS 7:30 PM PACK UP
661 0% 40213579 1303-CV005-CO018 CV005 HARD SKIRT MAINTENANCE 93 hrs 28/08/23 7:00 PM 1/09/23 4:00 PM
662 0% 40213579 1303-CV005-CO018 **JOG CV005 & CV007 AFTER TUB OUT** 0.5 hrs 28/08/23 7:00 PM 28/08/23 7:30 PM 13OPTOPE KML OPERATIONS 7:00 PM **JOG CV005 & CV007 AFTER TUB OUT**
663 0% 40213579 1303-CV005-CO018 REMOVE GUARDING AND SOFT SKIRTS 4 hrs 28/08/23 7:30 PM 28/08/23 11:30 PM 13MBCSEN,13MECBOI[2],13MECFIT[2],13MECTRA[2]
KML SKIRTS 7:30 PM REMOVE GUARDING AND SOFT SKIRTS
664 0% 40213579 1303-CV005-CO018 DRAIN WATER FROM BELT 2 hrs 28/08/23 7:30 PM 28/08/23 9:30 PM 13MBCSEN,13MECBOI[2],13MECFIT[2],13MECTRA[2]
KML SKIRTS 7:30 PM DRAIN WATER FROM BELT
665 0% 40213579 1303-CV005-CO018 INSPECT AND MARK UP HARD SKIRT LINERS 1 hr 28/08/23 11:30 PM 29/08/23 12:30 AM 13MBCSEN,13MECBOI[2],13MECFIT[2],13MECTRA[2]
KML SKIRTS 11:30 PM INSPECT AND MARK UP HARD SKIRT LINERS
666 0% 40213579 1303-CV005-CO018 REMOVE MARKED UP HARD SKIRT LINERS & ADJUST 8 hrs 28/08/23 11:30 PM 29/08/23 7:30 AM 13MBCSEN,13MECBOI[2],13MECFIT[2],13MECTRA[2]
KML SKIRTS 11:30 PM REMOVE MARKED UP HARD SKIRT LINERS & ADJUST LINERS UP FOR BELT PULL
LINERS UP FOR BELT PULL
667 0% 40213579 1303-CV005-CO018 REPLACE HARD SKIRT LINERS AND SET 12 hrs 31/08/23 11:00 PM 1/09/23 11:00 AM 13MBCSEN,13MECBOI[2],13MECFIT[2],13MECTRA[2]
KML SKIRTS 11:00 PM REPLACE HARD SKIRT LINERS AND SET
668 0% 40213579 1303-CV005-CO018 FINAL INSPECTION 1 hr 1/09/23 10:00 AM 1/09/23 11:00 AM 13MBCSEN,13MECBOI[2],13MECFIT[2],13MECTRA[2]
KML SKIRTS 10:00 AM FINAL INSPECTION
669 0% 40213579 1303-CV005-CO018 REINSTATE SOFT SKIRTS AND GUARDS 5 hrs 1/09/23 11:00 AM 1/09/23 4:00 PM 13MBCSEN,13MECBOI[2],13MECFIT[2],13MECTRA[2]
KML SKIRTS 11:00 AM REINSTATE SOFT SKIRTS AND GUARDS
670 0% 40210949 1303-CV005 09W OF EL 1303-CV005 INSP 1 hr 27/08/23 4:15 PM 27/08/23 5:15 PM
671 0% 40210949 1303-CV005 09W OF EL 1303-CV005 INSP 1 hr 27/08/23 4:15 PM 27/08/23 5:15 PM 13ELTELE[2] KML ELECTRICAL 02 4:15 PM 09W OF EL 1303-CV005 INSP
672 0% 1303-CV005-CH109 CH109 74.5 hrs 29/08/23 1:00 PM 1/09/23 3:30 PM
673 0% 40215890 1303-CV005-CH109 CH109/40 LINER REPLACEMENT TOP SECTION 74.5 hrs 29/08/23 1:00 PM 1/09/23 3:30 PM
674 0% 40215890 1303-CV005-CH109 INSTALL INERIOR DECK 4 hrs 29/08/23 1:00 PM 29/08/23 5:00 PM 13MBCSCF[3] KRG KML SCAFFOLD 01 1:00 PM INSTALL INERIOR DECK
675 0% 40215890 1303-CV005-CH109 WEAR TECH INSPECTION 1 hr 31/08/23 1:30 PM 31/08/23 2:30 PM 13MBCWEA,13MBCSEN KRG ENGY WEAR TECH 1:30 PM WEAR TECH INSPECTION
676 0% 40215890 1303-CV005-CH109 DIG OUT AND CUT OFF BOLTS WITH OXY 8 hrs 31/08/23 2:30 PM 31/08/23 10:30 PM 13MBCSEN,13MECBOI[2] KRG 2:30 PM DIG OUT AND CUT OFF BOLTS WITH OXY
677 0% 40215890 1303-CV005-CH109 DIG OUT AND REMOVE OLD LINERS 6 hrs 31/08/23 10:30 PM 1/09/23 4:30 AM 13MBCSEN,13MECBOI[2] KRG 10:30 PM DIG OUT AND REMOVE OLD LINERS
678 0% 40215890 1303-CV005-CH109 INSTALL NEW LINERS 8 hrs 1/09/23 4:30 AM 1/09/23 12:30 PM 13MBCSEN,13MECBOI[2] KRG 4:30 AM INSTALL NEW LINERS
679 0% 40215890 1303-CV005-CH109 FINAL INSPECTION 1 hr 1/09/23 12:30 PM 1/09/23 1:30 PM 13MBCWEA,13MBCSEN KRG ENGY WEAR TECH 12:30 PM FINAL INSPECTION
680 0% 40215890 1303-CV005-CH109 STRIP SCAFFOLD DECK 2 hrs 1/09/23 1:30 PM 1/09/23 3:30 PM 13MBCSCF[3] KRG KML SCAFFOLD 01 1:30 PM STRIP SCAFFOLD DECK
681 0% 1303 AREA SECONDARY CRUSHING & SCREENING - TOOL TIME 0 hrs 2/09/23 5:00 PM 2/09/23 5:00 PM 5:00 PM 1303 AREA SECONDARY CRUSHING & SCREENING - TOOL TIME COM
COMPLETE
682 0% ALL TOOL TIME COMPLETE 0 hrs 2/09/23 5:00 PM 2/09/23 5:00 PM 5:00 PM ALL TOOL TIME COMPLETE
683 0% DE-ISOLATIONS & COMMISSIONING 43.5 hrs 31/08/23 11:30 PM 2/09/23 7:00 PM
684 0% 1301-BN010 COMMENCE REMOVAL OF BN010 / FE001 PERMIT 1.5 hrs 31/08/23 11:30 PM 1/09/23 1:00 AM 13OPTOPE[2] KML OPERATIONS 11:30 PM COMMENCE REMOVAL OF BN010 / FE001 PERMIT
685 0% 1303-BN007 COMMENCE REMOVAL OF BN007 / CH019 / CH020 / CH021 PERMIT 1.25 hrs 1/09/23 6:30 PM 1/09/23 7:45 PM 13OPTOPE[2] KML OPERATIONS 6:30 PM COMMENCE REMOVAL OF BN007 / CH019 / CH020 / CH021 PERMIT

686 0% 1303-SN005 COMMENCE REMOVAL OF SN005 / SN006 / FE002 / FE003 / CH042 / 2 hrs 2/09/23 5:00 PM 2/09/23 7:00 PM 13OPTOPE[2] KML OPERATIONS 5:00 PM COMMENCE REMOVAL OF SN005 / SN006 / FE002 / FE003 / CH042 / CH
CH043 / CH054 / CH055 / CH040/109
687 0% 1301-CR001 COMMENCE REMOVAL OF CR001 / LU023 / RB001 / DS001 PERMIT 1.5 hrs 2/09/23 12:00 PM 2/09/23 1:30 PM 13OPTOPE[2] KML OPERATIONS 12:00 PM COMMENCE REMOVAL OF CR001 / LU023 / RB001 / DS001 PERMIT
688 0% 1303-CV002 COMMENCE REMOVAL OF CV002 / CH010 / CH011 / CH018 PERMIT 0.75 hrs 1/09/23 1:00 PM 1/09/23 1:45 PM 13OPTOPE[2] KML OPERATIONS 1:00 PM COMMENCE REMOVAL OF CV002 / CH010 / CH011 / CH018 PERMIT

689 0% 1301-CV003 CV003 REPLACE BUMP STOPS & REMOVE BELT CLAMP 1 hr 1/09/23 7:30 AM 1/09/23 8:30 AM 13MBCBTE KML OPERATIONS ENGYTECH BELTS 7:30 AM CV003 REPLACE BUMP STOPS & REMOVE BELT CLAMP
690 0% 1301-CV001 COMMENCE REMOVAL OF CV001 / CV003 / CS001 / CH006/008 1.25 hrs 1/09/23 7:30 AM 1/09/23 8:45 AM 13OPTOPE[2] KML OPERATIONS 7:30 AM COMMENCE REMOVAL OF CV001 / CV003 / CS001 / CH006/008 PERMIT
PERMIT
691 0% 13030-CV005 COMMENCE REMOVAL OF CV005 / CV007 PERMIT 0.75 hrs 1/09/23 4:00 PM 1/09/23 4:45 PM 13OPTOPE[2] KML OPERATIONS 4:00 PM COMMENCE REMOVAL OF CV005 / CV007 PERMIT
692 0% 1301-BN010 REMOVAL OF BN010 / FE001 PERMIT COMPLETE 0 hrs 1/09/23 1:00 AM 1/09/23 1:00 AM 13OPTOPE[2] KML OPERATIONS 1:00 AM REMOVAL OF BN010 / FE001 PERMIT COMPLETE
693 0% 1303-BN007 REMOVAL OF BN007 / CH019 / CH020 / CH021 PERMIT COMPLETE 0 hrs 1/09/23 7:45 PM 1/09/23 7:45 PM 13OPTOPE[2] KML OPERATIONS 7:45 PM REMOVAL OF BN007 / CH019 / CH020 / CH021 PERMIT COMPLETE
694 0% 1303-SN005 REMOVAL OF SN005 / SN006 / FE002 / FE003 / CH042 / CH043 / 0 hrs 2/09/23 7:00 PM 2/09/23 7:00 PM 13OPTOPE[2] KML OPERATIONS 7:00 PM REMOVAL OF SN005 / SN006 / FE002 / FE003 / CH042 / CH043 / CH054
CH054 / CH055 / CH040/109 COMPLETE
695 0% 1301-CR001 REMOVAL OF CR001 / LU023 / RB001 / DS001 PERMIT COMPLETE 0 hrs 2/09/23 1:30 PM 2/09/23 1:30 PM 13OPTOPE[2] KML OPERATIONS 1:30 PM REMOVAL OF CR001 / LU023 / RB001 / DS001 PERMIT COMPLETE
696 0% 1303-CV002 REMOVAL OF CV002 / CH010 / CH011 / CH018 PERMIT COMPLETE 0 hrs 1/09/23 1:45 PM 1/09/23 1:45 PM 13OPTOPE[2] KML OPERATIONS 1:45 PM REMOVAL OF CV002 / CH010 / CH011 / CH018 PERMIT COMPLETE
697 0% 40208157 1303-CV002 18W OF ME CONVEYOR BRAKE SYSTEM INSP 1.5 hrs 1/09/23 5:00 PM 1/09/23 6:30 PM
698 0% 40208157 1303-CV002 REMOVE BELT CLAMPS (TIE IN WITH PERMIT) 1.5 hrs 1/09/23 5:00 PM 1/09/23 6:30 PM 13MBCBTE[2] ENGYTECH BELTS 5:00 PM REMOVE BELT CLAMPS (TIE IN WITH PERMIT)
699 0% 1301-CV001 REMOVAL OF CV001 / CV003 / CS001 / CH006/008 PERMIT 0 hrs 1/09/23 8:45 AM 1/09/23 8:45 AM 13OPTOPE[2] KML OPERATIONS 8:45 AM REMOVAL OF CV001 / CV003 / CS001 / CH006/008 PERMIT COMPLETE
COMPLETE

Scheduler:-Scott Everard Page 8 Printed:- 25/08/23 4:53 PM


Coordinator:-Doug Wolfendon
CR1-0723 Concave & Mantle Shutdown CR1-0723 Final Gantt Rev1
Start 26/08/23 8:00 PM _ Finish 2/09/23 7:00 PM
ID % WO Equipment Task Name Duration Start Finish Resource Names Team Sub Team
Complete Thu 24 Aug
Fri 25 AugSat 26 Aug
Sun 27 Aug
Mon 28 Aug
Tue 29 Aug
Wed 30 Aug
Thu 31 AugFri 1 SepSat 2 SepSun 3 SepMon 4 SepTue 5 SepW ed 6 SepThu 7 SepFri 8 SepSat 9 SepSun 10 S
12 6
PM12
PM6AM12
AM6PM
12
PM6AM12
AM6PM12
PM6AM
12
AM6PM12
PM6AM
12
AM6PM12
PM6AM
12
AM6PM12
PM6AM
12
AM6PM
12
PM6AM
12
AM6PM12
PM6AM12
AM6PM12
PM6AM
12
AM6PM
12
PM6AM
12
AM6 PM
12
PM6AM
12
AM6PM12
PM6AM
12
AM6 PM
12
PM6AM12
AM6PM12
PM6AM
12
AM6PM
12
PM6AM12
AM6PM12
PM6AM
12
AM6PM
12
PMAM
700 0% 40178895 1301-CV003 CV003 VSD POWERCELL REFURB SIEMENS 1 hr 1/09/23 10:30 AM 1/09/23 11:30 AM
701 0% 40178895 1301-CV003 COMMISIONING - FUNCTION TEST AND BACK UP 1 hr 1/09/23 10:30 AM 1/09/23 11:30 AM 13EECENG KML ELECTRICAL 01 SIEMENS 10:30 AM COMMISIONING - FUNCTION TEST AND BACK UP
702 0% 40208655 1301-CV003 09W OF EL WEIGHTOMETER ZERO INS 1 hr 1/09/23 11:30 AM 1/09/23 12:30 PM
703 0% 40208655 1301-CV003 09W OF EL WEIGHTOMETER ZERO INS(run up) 1 hr 1/09/23 11:30 AM 1/09/23 12:30 PM 13ELTELE KML ELECTRICAL 01 11:30 AM 09W OF EL WEIGHTOMETER ZERO INS(run up)
704 0% 40208654 1301-CV001 09W OF EL WEIGHTOMETER ZERO INS 1 hr 1/09/23 12:30 PM 1/09/23 1:30 PM
705 0% 40208654 1301-CV001 09W OF EL WEIGHTOMETER ZERO INS(run up) 1 hr 1/09/23 12:30 PM 1/09/23 1:30 PM 13ELTELE KML ELECTRICAL 01 12:30 PM 09W OF EL WEIGHTOMETER ZERO INS(run up)
706 0% 1303-CV005 REMOVAL OF CV005 / CV007 PERMIT COMPLETE 0 hrs 1/09/23 4:45 PM 1/09/23 4:45 PM 13OPTOPE[2] KML OPERATIONS 4:45 PM REMOVAL OF CV005 / CV007 PERMIT COMPLETE
707 0% 40212855 1301-SR105-CO013 CV007 ROBICON VSD POWER CELL REFURB 1 hr 1/09/23 4:45 PM 1/09/23 5:45 PM
708 0% 40212855 1301-SR105-CO013 COMMISIONING - FUNCTION TEST AND BACK UP 1 hr 1/09/23 4:45 PM 1/09/23 5:45 PM 13EECENG KML ELECTRICAL 02 4:45 PM COMMISIONING - FUNCTION TEST AND BACK UP
709 0% 40209135 1303-CV005-CO015-5 CV005 REPLACE TAIL PULLEY 1 hr 1/09/23 4:45 PM 1/09/23 5:45 PM
710 0% 40209135 1303-CV005-CO015-5 RUN UP: CONMON BASE LINE 1 hr 1/09/23 4:45 PM 1/09/23 5:45 PM 13ENCCMO CONMON 4:45 PM RUN UP: CONMON BASE LINE
711 0% 40208657 1303-CV005 09W OF EL WEIGHTOMETER ZERO INS 1 hr 1/09/23 4:45 PM 1/09/23 5:45 PM
712 0% 40208657 1303-CV005 09W OF EL WEIGHTOMETER ZERO INS(run up) 1 hr 1/09/23 4:45 PM 1/09/23 5:45 PM 13ELTELE KML ELECTRICAL 02 4:45 PM 09W OF EL WEIGHTOMETER ZERO INS(run up)
713 0% ALL DEISOLATIONS COMPLETE 0 hrs 2/09/23 7:00 PM 2/09/23 7:00 PM 7:00 PM ALL DEISOLATIONS COMPLETE
714 0% PLANT FEED ON 0 hrs 2/09/23 7:00 PM 2/09/23 7:00 PM 7:00 PM PLANT FEED ON
715 0% POST SHUT WORK 24 hrs 2/09/23 7:00 PM 3/09/23 7:00 PM
716 0% 40210927 PRIMARY OUTAGE PREP/POST WORKS 24 hrs 2/09/23 7:00 PM 3/09/23 7:00 PM
717 0% 40210927 1301-CR001 PRIMARY POST SHUTDOWN PACK UP & DEMOBE 24 hrs 2/09/23 7:00 PM 3/09/23 7:00 PM 13MBCBOI,13MBCSEN,13MBCFIT ENGYTECH MECH 01 7:00 PM PRIMARY POST SHUTDOWN PACK UP & DEMOBE
718 0% 40210927 1301-CR001 PRIMARY POST SHUTDOWN PACK UP & DEMOBE 24 hrs 2/09/23 7:00 PM 3/09/23 7:00 PM 13MCCFIT[2],13MCCRIG KG MECH 03 7:00 PM PRIMARY POST SHUTDOWN PACK UP & DEMOBE
719 0% 40210927 1301-CR001 PRIMARY POST SHUTDOWN PACK UP & DEMOBE 24 hrs 2/09/23 7:00 PM 3/09/23 7:00 PM 13MCCSCF[2] KG SCAFFOLD 01 KG SCAFFOLD 01 7:00 PM PRIMARY POST SHUTDOWN PACK UP & DEMOBE
720 0% 40210927 1301-CR001 PRIMARY POST SHUTDOWN PACK UP & DEMOBE 24 hrs 2/09/23 7:00 PM 3/09/23 7:00 PM 13MECCND[2] FREO 7:00 PM PRIMARY POST SHUTDOWN PACK UP & DEMOBE
721 0% 40178895 1301-CV003 CV003 VSD POWERCELL REFURB SIEMENS 3 hrs 2/09/23 7:00 PM 2/09/23 10:00 PM
722 0% 40178895 1301-CV003 POST REPACK OLD POWERCELLS AND DO OGA 3 hrs 2/09/23 7:00 PM 2/09/23 10:00 PM 13ELTELE[2] 7:00 PM POST REPACK OLD POWERCELLS AND DO OGA
723 0% 40212855 1301-SR105-CO013 CV007 ROBICON VSD POWER CELL REFURB 3 hrs 2/09/23 10:00 PM 3/09/23 1:00 AM
724 0% 40212855 1301-SR105-CO013 POST REPACK OLD POWERCELLS AND DO OGA 3 hrs 2/09/23 10:00 PM 3/09/23 1:00 AM 13ELTELE[2] 10:00 PM POST REPACK OLD POWERCELLS AND DO OGA
725 0% 40215032 1302-FE005 FE005 REPL HAGGLUND DRIVE 4 hrs 2/09/23 7:00 PM 2/09/23 11:00 PM
726 0% 40215032 1302-FE005 POST - REINST SCAFFOLD HEAD PROTECTION 4 hrs 2/09/23 7:00 PM 2/09/23 11:00 PM 13MCCSCF[3] KG SCAFFOLD 01 KG SCAFFOLD 01 7:00 PM POST - REINST SCAFFOLD HEAD PROTECTION
727 0% 40213519 1303-SN006 18W OF MC SECONDARY SCREEN ROTABLE CHANGE 0.5 hrs 2/09/23 7:00 PM 2/09/23 7:30 PM
728 0% 40213519 1303-SN006 POST OUTAGE & INFORM METS OF CHANGEOUT 0.5 hrs 2/09/23 7:00 PM 2/09/23 7:30 PM 13METSUP 7:00 PM POST OUTAGE & INFORM METS OF CHANGEOUT
729 0% 40214519 18W OF MC ROTABLE INSERT CHANGE OUT 0.5 hrs 2/09/23 7:00 PM 2/09/23 7:30 PM
730 0% 40214519 1303-SN006-CH055 POST SHUT - KML SUPERVISOR 0.5 hrs 2/09/23 7:00 PM 2/09/23 7:30 PM 13METSUP 7:00 PM POST SHUT - KML SUPERVISOR
731 0% OVA 120.5 hrs 27/08/23 3:15 PM 1/09/23 3:45 PM
732 0% 40218402 1303-HP010-GA020 CR002 GA020 CHANGE OUT DISCHARGE GATE 54.75 hrs 30/08/23 9:00 AM 1/09/23 3:45 PM
733 0% 40218402 1303-HP010-GA020 DISCONNECT HYDRAULICS 2 hrs 30/08/23 9:00 AM 30/08/23 11:00 AM 13MCCHYD KG MECH 02 9:00 AM DISCONNECT HYDRAULICS
734 0% 40218402 1303-HP010-GA020 DISCONNECT ELECTRICAL 2 hrs 30/08/23 9:00 AM 30/08/23 11:00 AM 13ELTELE[2] KG MECH 02 KML ELECTRICAL 02 9:00 AM DISCONNECT ELECTRICAL
735 0% 40218402 1303-HP010-GA020 SCAF ERECT EAST AND WEST SIDE OF BELT 4 hrs 30/08/23 11:00 AM 30/08/23 3:00 PM 13MCCSCF[3] KG MECH 02 KG SCAFFOLD 01 11:00 AM SCAF ERECT EAST AND WEST SIDE OF BELT
736 0% 40218402 1303-HP010-GA020 UNBOLT HARD SKIRTS & RIG / REMOVE FRAME 5 hrs 30/08/23 3:00 PM 30/08/23 8:00 PM 13MCCFIT,13MCCBOI[2],13MCCRIG,13MCCSEN KG MECH 02 3:00 PM UNBOLT HARD SKIRTS & RIG / REMOVE FRAME
737 0% 40218402 1303-HP010-GA020 SET UP RIGGING GEAR TO THE KNIFEGATE 3 hrs 30/08/23 8:00 PM 30/08/23 11:00 PM 13MCCFIT,13MCCBOI[2],13MCCRIG,13MCCSEN KG MECH 02 8:00 PM SET UP RIGGING GEAR TO THE KNIFEGATE
738 0% 40218402 1303-HP010-GA020 UNBOLT KNIFE GATE FROM CHUTE 4 hrs 30/08/23 11:00 PM 31/08/23 3:00 AM 13MCCFIT,13MCCBOI[2],13MCCRIG,13MCCSEN KG MECH 02 11:00 PM UNBOLT KNIFE GATE FROM CHUTE
739 0% 40218402 1303-HP010-GA020 RIG GATE OUT AND RIG GATE BACK IN 8 hrs 31/08/23 3:00 AM 31/08/23 11:00 AM 13MCCFIT,13MCCBOI[2],13MCCRIG,13MCCSEN KG MECH 02 3:00 AM RIG GATE OUT AND RIG GATE BACK IN
740 0% 40218402 1303-HP010-GA020 BOLT KNIFE GATE BACK UP TO THE CHUTE 5 hrs 31/08/23 11:00 AM 31/08/23 4:00 PM 13MCCFIT,13MCCBOI[2],13MCCRIG,13MCCSEN KG MECH 02 11:00 AM BOLT KNIFE GATE BACK UP TO THE CHUTE
741 0% 40218402 1303-HP010-GA020 REMOVE RIGGING 2 hrs 31/08/23 4:00 PM 31/08/23 6:00 PM 13MCCFIT,13MCCBOI[2],13MCCRIG,13MCCSEN KG MECH 02 4:00 PM REMOVE RIGGING
742 0% 40218402 1303-HP010-GA020 RE-INSTATE HARD SKIFT FRAME & HARD SKIRT 5 hrs 31/08/23 6:00 PM 31/08/23 11:00 PM 13MCCFIT,13MCCBOI[2],13MCCRIG,13MCCSEN KG MECH 02 6:00 PM RE-INSTATE HARD SKIFT FRAME & HARD SKIRT
743 0% 40218402 1303-HP010-GA020 RECONNECT HYDRAULICS 2 hrs 31/08/23 11:00 PM 1/09/23 1:00 AM 13MCCHYD KG MECH 02 11:00 PM RECONNECT HYDRAULICS
744 0% 40218402 1303-HP010-GA020 RECONNECT ELECTRICAL 2 hrs 1/09/23 1:00 AM 1/09/23 3:00 AM 13ELTELE[2] KG MECH 02 KML ELECTRICAL 02 1:00 AM RECONNECT ELECTRICAL
745 0% 40218402 1303-HP010-GA020 DEMOB TOOLING AND OLD PARTS 2 hrs 1/09/23 7:00 AM 1/09/23 9:00 AM 13MCCFIT[2] KG MECH 02 7:00 AM DEMOB TOOLING AND OLD PARTS
746 0% 40218402 1303-HP010-GA020 COMMISIONING 2 hrs 1/09/23 1:45 PM 1/09/23 3:45 PM 13MCCFIT[2] KG MECH 02 1:45 PM COMMISIONING
747 0% 40218444 1302-CV007 CV007 HEAD END - REPLACE LT-0445 4 hrs 29/08/23 11:30 PM 30/08/23 3:30 AM
748 0% 40218444 1302-CV007 REPLACE LT-0445 HEAD END CV-007 4 hrs 29/08/23 11:30 PM 30/08/23 3:30 AM 13ELTELE[2] KML ELECTRICAL 02 11:30 PM REPLACE LT-0445 HEAD END CV-007
749 0% 40218517 1303-BN007-CH019 FE006 CH019 HARD SKIRT MAINTENANCE 2 hrs 29/08/23 1:45 AM 29/08/23 3:45 AM
750 0% 40218517 1303-BN007-CH019 FE006 CH019 HARD SKIRT MAINTENANCE 2 hrs 29/08/23 1:45 AM 29/08/23 3:45 AM 13MBCBOI,13MBCSEN,13MECTRA TMS BM T001 1:45 AM FE006 CH019 HARD SKIRT MAINTENANCE
751 0% 40218493 1303-CR003-CU003 CU003 INVESTIGATE AND REPAIR CHILLER 72 hrs 27/08/23 3:15 PM 30/08/23 3:15 PM
752 0% 40218493 1303-CR003-CU003 CU003 INVESTIGATE AND REPAIR CHILLER 36 hrs 27/08/23 3:15 PM 30/08/23 3:15 PM 13ELTFRI KML FRIDGE 01 3:15 PM CU003 INVESTIGATE AND REPAIR CHILLER

Scheduler:-Scott Everard Page 9 Printed:- 25/08/23 4:53 PM