SAMF Area: A.

Capital Planning and Prioritisation


Process Name: Overview Process Code: A
Sub-Process Name: N/A Sub-Process Code: N/A

Process Map Framework Mapping


(Star indicates process location)

Capital Planning and Prioritisation

Capital Expansion
Maintenance Asset Retirement
and Improvement
Management Plan Plan
Plan

Consult with Determine


stakeholders to Maintenance Identify Assets for
determine capital Demand retirement
requirements

Perform Feasibility Prioritise


Assessment and Maintenance works Seek approval to
define Business against budget retire Assets
Case allocation

Assess and update


Prioritise projects backlog in Manage retirement
and seek funding response to budget process
approval allocation

Deliver maintenance
Enter delivery program and account Account for
phase and account for maintenance retirement revenue
for capital revenue revenue

AA AB AC Monitor and review Monitor and review Monitor and review


performance performance performance
Long-term Conceptual Asset Medium-term Programme Short-term Project Level Asset
Management Plan Level Asset Management Plan Management Plan
Compliance and Governance

Process Description
AA-010 AB-010 AC-010
Long-term Conceptual Medium-term Short-term Project This process represents the Planning
Plan Programme Level Plan Level Plan and Prioritisation area within the
Strategic Asset Management
Framework.

Each chevron represents a block in


the SAMF diagram above. Blocks
underneath the chevrons are sub-
processes within the main process in
the area.

Legend
Process Start Process Step

Process End Information or


Template
Linked Process
Decision
Communication

Rule Multiple Concurrent


Process Steps
SAMF Area: A. Capital Planning and Prioritisation
Process Name: Long-term Conceptual Plan Process Code: AA-010
Sub-Process Name: N/A Sub-Process Code: N/A

Process Map Framework Mapping


(Star indicates process location)

Capital Planning and Prioritisation

Capital Expansion
Maintenance Asset Retirement
and Improvement
Management Plan Plan
Plan

Consult with Determine


stakeholders to Maintenance Identify Assets for
determine capital Demand retirement
External Stakeholders

requirements

Perform Feasibility Prioritise


Assessment and Maintenance works Seek approval to
define Business against budget retire Assets
Macro economic, external Case allocation

stakeholders input.
Assess and update
Prioritise projects backlog in Manage retirement
and seek funding response to budget process
approval allocation
Feasibility Assessment

Deliver maintenance
Enter delivery program and account Account for
Develop an initial phase and account for maintenance retirement revenue
Perform strategic concept Feasibility
for capital revenue revenue

Assessment paper
Monitor and review Monitor and review Monitor and review
performance performance performance
Owner / Planner / F&S

Compliance and Governance

Perform current- and Generation of


Start desired-state projected needs Long-term Conceptual Plan Process Description
analysis
This process relates to the development of
Update long term new concepts, as well as the review of
conceptual AMP existing concepts. It should be conducted
in 3- to 5-year intervals. Generally, the
timeframe of the concepts identified
YES should be such that the expected starting
3-5 Yearly review
Approval to include on date is around 20 years from the current
plan? date. Consultation with external
stakeholders is important.
Review concepts for
approval to include Concepts should be identified in alignment
on Long-term with the strategic direction of the
Approver

Conceptual Plan University. No financial information is


NO recorded for concepts due to the low level
of forecasting reliability.

DB-010
Medium-term Legend
Programme Level Plan
Process Start Process Step

Process End Information or


Template
Linked Process
Decision
Communication

Rule Multiple Concurrent


Process Steps
SAMF Area: A. Capital Planning and Prioritisation
Process Name: Medium-term Programme Level Plan Process Code: AB-010
Sub-Process Name: N/A Sub-Process Code: N/A

Process Map Framework Mapping


(Star indicates process location)

Capital Planning and Prioritisation

Capital Expansion
Maintenance Asset Retirement
and Improvement
Management Plan Plan
Plan
Internal Stakeholders

Consult with Determine


stakeholders to Maintenance Identify Assets for
determine capital Demand retirement
requirements

Information: Needs Assessment Perform Feasibility


Assessment and
Prioritise
Maintenance works Seek approval to
define Business against budget retire Assets
Case allocation

Assess and update


Prioritise projects backlog in Manage retirement
Perform Needs and seek funding
approval
response to budget process
allocation
Assessment

Deliver maintenance
Enter delivery program and account Account for
phase and account for maintenance retirement revenue
for capital revenue revenue

Information:
Risk & Prioristisation Tool Monitor and review Monitor and review Monitor and review
performance performance performance

Compliance and Governance


Owner / Planner

Create Final
Generate list of
Rate and prioritise Medium-term
Programmes /
list of Programmes Programme Level
Initiatives / Portfolios Process Description
DA-010 Long-term Plan
Conceptual Plan
This process relates to the refinement of
existing concepts as well as the
identification of new programmes of work.
The process should be conducted
annually. The timeframe of the identified
programmes should be such that the
expected starting date is around 10 years
from the current date. Consultation with
internal stakeholders is important at this
Annual Review level.

Programmes should be identified in


alignment with the strategic direction of
Approve Medium-
the University. Financial information could
term Programme
Level Plan be recorded at this stage, but would rely
Approver

RULE: Long Term


heavily on estimates.
University Plan approved

Legend
Process Start Process Step

DC-010 Short-term Process End Information or


Project Level Plan Template
Linked Process
Decision
Communication

Rule Multiple Concurrent


Process Steps
SAMF Area: A. Capital Planning and Prioritisation
Process Name: Short-term Project Level Plan Process Code: AC-010
Sub-Process Name: N/A Sub-Process Code: N/A

Process Map Framework Mapping


(Star indicates process location)

Capital Planning and Prioritisation

Capital Expansion
Maintenance Asset Retirement
and Improvement
Management Plan Plan
Plan

These steps to occur concurrently


Consult with Determine
stakeholders to Maintenance Identify Assets for
determine capital Demand retirement
requirements

Perform Gap Analysis Perform Feasibility Prioritise


Assessment and Maintenance works Seek approval to
Business Case Short-term define Business against budget retire Assets
Case allocation
Project Level Plan

Assess and update


Prioritise projects backlog in Manage retirement
and seek funding response to budget process
approval
Owner / Planner

Complete Conceptual allocation

Review Existing Feasibility Update Short-term Move to Detailed


Programme Plan Assessment Project Level Plan Planning if applicable Deliver maintenance
Enter delivery program and account Account for
phase and account for maintenance
Medium-term Stop for capital revenue revenue
retirement revenue

Programme Level Plan

Monitor and review Monitor and review Monitor and review


performance performance performance

Receive approved ad
hoc Requests Information: Long
Compliance and Governance

Term Plan satisfied

Process Description
This process relates to the refinement of
Information: existing programmes as well as the
Approved Ad Hoc
Project Requests
identification of new projects. The process
Annual Review
should be conducted annually. The
Process timeframe of the projects identified should
be such that the expected starting date is
less than 5 years from the current date.
Both internal and external stakeholders
Short-Term Plan to be reviewed are important. Detailed financial planning
to ensure alignment with Mid- Approve Short-term and prioritisation activities are conducted.
Project Level Plan
Approver

Term Plan. This review cycle


should be completed every 12 Projects should be identified and reviewed
months
in alignment with the strategic direction of
the University. Detailed financial
information should be recorded if required.

Legend
Process Start Process Step

Process End Information or


Template
Linked Process
Decision
Communication

Rule Multiple Concurrent


Process Steps
SAMF Area: B. Capital Expansion and Improvement
Process Name: Overview Process Code: B
Sub-Process Name: N/A Sub-Process Code: N/A

Process Map Framework Mapping


(Star indicates process location)

Capital Planning and Prioritisation

Capital Expansion
Maintenance Asset Retirement
and Improvement
Management Plan Plan
Plan

Consult with Determine


stakeholders to Maintenance Identify Assets for
determine capital Demand retirement
requirements

Perform Feasibility Prioritise


Assessment and Maintenance works Seek approval to
define Business against budget retire Assets
Case allocation

BA BB BD Assess and update


BC BE Prioritise projects backlog in Manage retirement
Consult with Stakeholders Perform Feasibility Enter delivery phase and and seek funding response to budget process
Prioritise projects and Monitor and review approval allocation
to Determine Capital Assessment and develop account for capital
seek funding approval performance
Requirements Business Case revenue Deliver maintenance
Enter delivery program and account Account for
phase and account for maintenance retirement revenue
for capital revenue revenue

BB-010 BC-010 BE-010 Monitor and review Monitor and review Monitor and review
BA-010 performance performance performance
Feasibility Assessment Review and BD-010 Performance
Capital Requirements
& Business Case prioritisation of Project Definition Management and Compliance and Governance
Analysis
Development submitted cases Review

Process Description
This process represents the Capital
BC-020 Expansion and Improvement area
BD-020 within the Strategic Asset
Capital Funding
Project Delivery Management Framework.
Review process

Each chevron represents a block in


the SAMF diagram above. Blocks
underneath the chevrons are sub-
processes within the main process in
BD-030 the area.
Capital Expenditure
Control

Legend
Process Start Process Step

Process End Information or


Template
Linked Process
Decision
Communication

Rule Multiple Concurrent


Process Steps
SAMF Area: B. Capital Expansion and Improvement
Process Name: Consult with Stakeholders to Determine Capital Requirements Process Code: BA
Sub-Process Name: Capital Requirements Analysis Sub-Process Code: BA-010

Process Map Framework Mapping


(Star indicates process location)

Capital Planning and Prioritisation

Capital Expansion
Maintenance Asset Retirement
and Improvement
Management Plan Plan
Plan

Consult with Determine


AB-010 Feasibility Assessment AC-010 Review
Faculty / Service Head

stakeholders to Maintenance Identify Assets for


determine capital Demand retirement
& Business Case and prioritisation requirements

Development of submitted cases


Perform Feasibility Prioritise
Assessment and Maintenance works Seek approval to
define Business against budget retire Assets
Case allocation

Identify and Receive short- Receive approved


Receive rejected Business Case
document capital form Business template and submit Prioritise projects
Assess and update
Business Case and seek funding
backlog in Manage retirement
requirenments Case for prioritisation approval
response to budget
allocation
process

Information: Template: Template:


Service Level Business Case Business Case
Capital Enter delivery
Deliver maintenance
program and account Account for
phase and account for maintenance retirement revenue
Requirements Conduct meeting for capital revenue revenue

to determine
capital expansion
Monitor and review Monitor and review Monitor and review
requirements performance performance performance
Arrange periodic
planning meeting Compliance and Governance
with Faculty /
Service Head YES

N
Planning Manager

O Process Description
This process involves the creation /
collection of projects from the various
Start
stakeholders within the University.
Record Rejection Record status in Record Statusin
Complete
Does ad-hoc request for capital in Asset Asset Asset
required section After projects have been identified
expansion exist? Management Management Management
of Business Case
Asset Plan (AMP) plan Asset Plan Asset through communication with Faculty
Management Management Management and Service Heads, a small area of
Plan Plan Plan
Template: the Business Case template is
Business
Case
Are high-level strategic populated with the project details.
requirements met? NO

NO
If required, the detailed Business
Case phase is entered, otherwise the
Commit funding
for detailed project could be rejected or delivered
Business Case straight away, depending on the
Information: development
Y outcome of the Assessment.
Strategic Is High Level Feasibility
Approver

Requirements E satisfied? Y
Criteria S E
S Legend
Review for high level Approve project
Issue Updated Feasibility and for capital Process Start Process Step
YES NO
Business Case service delivery funding review
requirements phase Process End Information or
Template
Linked Process
Is a detailed Feasibility Decision
Assessment and Communication
Business Case required? Multiple Concurrent
Rule
Process Steps
SAMF Area: B. Capital Expansion and Improvement
Perform Feasibility Assessment & develop Business
Process Name: Case
Process Code: BB
Sub-Process Name: Feasibility Assessment & Business Case Development Sub-Process Code: BB-010

Process Map Framework Mapping


(Star indicates process location)

Capital Planning and Prioritisation

Review Business Capital Expansion


Maintenance Asset Retirement
and Improvement
Case Template Plan
Management Plan Plan

approved for
Service / Faculty Head

Feasibility Template: BC-010 Review and


Consult with
Assessment Template: Feasibility prioritisation of stakeholders to
Determine
Maintenance Identify Assets for
BA-010 determine capital retirement
Business Case Assessment submitted cases requirements
Demand
Capital Requirements
Analysis
Perform Feasibility Prioritise
Assessment and Maintenance works Seek approval to
define Business against budget retire Assets
Case allocation

Plan and resource Review Approved Plan and resource Submit Business
Review Service Level Assess and update
Feasibility Feasibility Business Case Case for prioritisation Prioritise projects backlog in Manage retirement
Requirements and seek funding response to budget process
Assessment Assessment development approval allocation

Deliver maintenance
Enter delivery program and account Account for
phase and account for maintenance retirement revenue
for capital revenue revenue

Monitor and review Monitor and review Monitor and review


performance performance performance
Delegated Resource

Combine Justification Write detailed


with Feasibility Business Case Compliance and Governance
Assessment
Prepare Feasibility Template: Template:
Conduct Feasibility YES Feasibility Business
Assessment
Assessment Assessment Case
Template
Template:
Process Description
Feasibility Assessment
If a project requires a detailed
Template:
Business Feasibility Assessment and Business
Case Case, this process is followed. It is
Is the project feasible? possible for some projects to bypass
this sub-process.
Approver

Review Feasibility Review Business A Feasibility Assessment is


Assessment Case for approval performed. If a project is considered
feasible, the detailed Business Case
is then written.
NO
Business Case
Following processes are the
Approved? prioritisation and approval of funding
of submitted Business cases.
Planning Manager

Receive rejected YES


Terminate project and
Feasibility
reflect in AMP
Assessment
Asset Legend
Management
Plan Process Start Process Step

Process End Information or


NO Template
Linked Process
Decision
Communication

Rule Multiple Concurrent


Process Steps
SAMF Area: B. Capital Expansion and Improvement
Process Name: Prioritise projects and seek funding approval Process Code: BC
Sub-Process Name: Review and prioritisation of submitted cases Sub-Process Code: BC-010

Process Map Framework Mapping


(Star indicates process location)

Capital Planning and Prioritisation

Capital Expansion
Maintenance Asset Retirement
and Improvement
Management Plan Plan
Plan
Resource

Update Asset Consult with Determine


Management Plan stakeholders to
determine capital
Maintenance
Demand
Identify Assets for
retirement
(AMP) with status requirements

Asset
Management Perform Feasibility
Assessment and
Prioritise
Maintenance works Seek approval to
Plan define Business
Case
against budget
allocation
retire Assets

Assess and update


Prioritise projects backlog in Manage retirement
and seek funding response to budget process
approval allocation

Deliver maintenance
Enter delivery program and account Account for
phase and account for maintenance retirement revenue
for capital revenue revenue

Template:
Business Case Monitor and review Monitor and review Monitor and review
BB-010 performance performance performance

Feasibility Assessment
& Business Case Compliance and Governance

Development
Delegated Authority

Business Prioritise Proposed


Confirm funding and Submit for Capital
Case Capital Expansion or
cash flow requirements Funding Approval
received Improvement Projects
BC-020 Process Description
Capital Funding
Review process This process deals with prioritising
Committees submitted Business cases and
submitting for funding approval.
BA-010
Capital
Requirements Information:
Analysis Prioritisation
Criteria

Legend
Process Start Process Step

Process End Information or


Template
Linked Process
Decision
Communication

Rule Multiple Concurrent


Process Steps
SAMF Area: B. Capital Expansion and Improvement
Process Name: Prioritise projects and seek funding approval Process Code: BC
Sub-Process Name: Capital Funding Review process Sub-Process Code: BC-020

Process Map Framework Mapping


(Star indicates process location)

Capital Planning and Prioritisation

Capital Expansion
Maintenance Asset Retirement
and Improvement
Management Plan Plan
Plan

Consult with Determine


stakeholders to Maintenance Identify Assets for
determine capital Demand retirement
requirements

Review submission Perform Feasibility Prioritise


Receive capital Assessment and Maintenance works Seek approval to
and Approve or define Business against budget retire Assets
funding request Case allocation
Reject
BC-010 Information: Assess and update
Review and Budgetary Prioritise projects
and seek funding
backlog in Manage retirement
response to budget process
Committees

prioritisation of Is funding approved? Process Criteria approval allocation

submitted cases
Deliver maintenance
Enter delivery program and account Account for
phase and account for maintenance retirement revenue
for capital revenue revenue

YES
Monitor and review Monitor and review Monitor and review
performance
Template: performance performance

Business
Compliance and Governance
Case
N
O

Process Description
Planning Manager

This is the approval process for


Terminate project Reflect project submitted Business cases. Approved
and reflect in AMP status in AMP project proceed to the project
Asset Asset delivery phase.
Management Management
Plan Plan
Delegated Authority

Receive Approved
Budget Request
BD-010
Project
Definition

Legend
Process Start Process Step

Process End Information or


Template
Linked Process
Decision
Communication

Rule Multiple Concurrent


Process Steps
SAMF Area: B. Capital Expansion and Improvement
Process Name: Enter delivery phase and account for capital revenue Process Code: BD
Sub-Process Name: Project Definition Sub-Process Code: BD-010

Process Map Framework Mapping


(Star indicates process location)

Capital Planning and Prioritisation


Planning Manager

Capital Expansion
Maintenance Asset Retirement
and Improvement
Management Plan Plan
Plan

Reflect Status in AMP Consult with Determine


stakeholders to Maintenance Identify Assets for
determine capital Demand retirement
requirements
Asset
Management
Perform Feasibility Prioritise
Plan Assessment and Maintenance works Seek approval to
define Business against budget retire Assets
Case allocation

Assess and update


Prioritise projects backlog in Manage retirement
and seek funding response to budget process
approval allocation
Delegated Authority

Deliver maintenance
Enter delivery program and account Account for
phase and account for maintenance retirement revenue
Plan and resource Communicate plans with Commit Resources and for capital revenue revenue

definition phase stakeholders establish accountability

BC-020 Information: Monitor and review Monitor and review


performance
Monitor and review
performance performance
Capital Funding Accountabilities
Review process Compliance and Governance

Process Description
This is the project definition phase of
Development Manager

delivering the work.

Review Planning
Develop Detailed Documentation and
Planning Documentation Proceed with Project
Delivery
Information: BD-020
Detailed Planning Project Delivery
Documentation
Approver

Review and approve


planning documentation

Legend
Process Start Process Step

Process End Information or


Template
Linked Process
Decision
Communication

Rule Multiple Concurrent


Process Steps
SAMF Area: B. Capital Expansion and Improvement
Process Name: Enter delivery phase and account for capital revenue Process Code: BD
Sub-Process Name: Project Delivery Sub-Process Code: BD-020

Process Map Framework Mapping


(Star indicates process location)

Capital Planning and Prioritisation

Capital Expansion
Maintenance Asset Retirement
and Improvement
Management Plan Plan
Plan

Consult with Determine


stakeholders to Maintenance Identify Assets for
determine capital Demand retirement
requirements

Review
Review and Perform Feasibility Prioritise
established Assessment and Maintenance works Seek approval to
communicate define Business against budget retire Assets
delivery Case allocation
delegations
BD-010 milestones
Project Manager

Project Prioritise projects


Assess and update
backlog in Manage retirement
and seek funding
Definition approval
response to budget
allocation
process

NO
Manage work Enter delivery
Deliver maintenance
program and account Account for
phase and account
Is milestone achieved? for capital revenue
for maintenance
revenue
retirement revenue

Information:
Detailed
Planning Monitor and review Monitor and review Monitor and review
Documentation Capital Expenditure
performance performance performance

Control Sub-Process Compliance and Governance


BD-030
Information: +
Financial Y
Plan E
S Process Description
Perform This is the project delivery phase of
Delegated
Resource

delegated tasks Reflect status in the project.


NO
to achieve AMP
milestones Asset
Management
Capital expenditure review (Sub-
Plan process BD-030) is completed
throughout the project delivery
phase.
Approver

Authorise next Approve delivery


delivery phase YES completion
status

Is the project finished?


Finance

Capitalise
Reflect status in
completed
AMP
delivery
Legend
Asset BE-010
Management Performance Management Process Start Process Step
Plan and Review
Process End Information or
Template
Linked Process
Decision
Communication

Rule Multiple Concurrent


Process Steps
SAMF Area: B. Capital Expansion and Improvement
Process Name: Enter delivery phase and account for capital revenue Process Code: BD
Sub-Process Name: Capital Expenditure Control Sub-Process Code: BD-030

Process Map Framework Mapping


(Star indicates process location)

Capital Planning and Prioritisation

Capital Expansion
Maintenance Asset Retirement
and Improvement
Management Plan Plan
Plan

Consult with Determine


stakeholders to Maintenance Identify Assets for
determine capital Demand retirement

This process is a sub- requirements

process Perform Feasibility Prioritise


Assessment and Maintenance works Seek approval to
define Business against budget retire Assets
Case allocation

End
Assess and update
Prioritise projects backlog in Manage retirement
NO and seek funding
approval
response to budget
allocation
process

Does out-turn exceed Enter delivery


Deliver maintenance

Information: phase and account


program and account
for maintenance
Account for
retirement revenue
available resources? for capital revenue revenue

Financial Plan /
Exception Report Monitor and review
Monitor and review Monitor and review
Finance

YES Highlight outturn in performance performance performance

AMP and report to Compliance and Governance

Executive
Identify and report
exceptional
variances Process Description
Start Information:
Project This is the capital expenditure review
Financials Information: Asset sub-process within the Project
Exception Management Delivery process, BD-020.
Report Plan
Financial information for the project
is reviewed for exceptional variances
and action taken to manage the
Delegated resource

budget. If a reforecast indicates that


the financial outturn is expected to
Identify the cause Manage budget exceed the allocated funding, an
of exceptional and/or adjust exception report is distributed to the
variance financial out-turn appropriate authority.

Legend
Process Start Process Step

Process End Information or


Template
Linked Process
Decision
Communication

Rule Multiple Concurrent


Process Steps
SAMF Area: B. Capital Expansion and Improvement
Process Name: Monitor and review performance Process Code: BE
Sub-Process Name: Performance Management and Review Sub-Process Code: BE-010

Process Map Framework Mapping


(Star indicates process location)

Capital Planning and Prioritisation

Capital Expansion
Maintenance Asset Retirement
and Improvement
Management Plan Plan
Plan

Consult with Determine


stakeholders to Maintenance Identify Assets for
determine capital Demand retirement
requirements

Perform Feasibility Prioritise


Assessment and Maintenance works Seek approval to
define Business against budget retire Assets
Information: Information: Information: Case allocation

Key Performance Key Performance Financial Plan /


Drivers and Metrics Drivers and Metrics Exception Reports Assess and update
Prioritise projects backlog in Manage retirement
and seek funding
Delegated resource

response to budget process


approval allocation

Deliver maintenance
Identify Performance Enter delivery
phase and account
program and account Account for

Measures, Targets & Review strategic Maintain financial for capital revenue
for maintenance
revenue
retirement revenue

Accountabilities effectiveness control


Is delivery completed?
Start
Monitor and review Monitor and review Monitor and review
performance performance performance

Compliance and Governance

Track and record


performance
Process Description
NO The process for monitoring and
YES reviewing performance applies to the
entire area of the SAMF and is a
consistently applied conceptually
Information: throughout the execution of all
Financial
Information stages.

Update AMP and


Finance

Capitalise completed
project
End

Asset
Management
Plan
Legend
Process Start Process Step

Process End Information or


Template
Linked Process
Decision
Communication

Rule Multiple Concurrent


Process Steps
SAMF Area: C. Maintenance Management
Process Name: Overview Process Code: C
Sub-Process Name: N/A Sub-Process Code: N/A

Process Map Framework Mapping


(Star indicates process location)

Capital Planning and Prioritisation

Capital Expansion
Maintenance Asset Retirement
and Improvement
Management Plan Plan
Plan

Consult with Determine


stakeholders to Maintenance Identify Assets for
determine capital Demand retirement
requirements

Perform Feasibility Prioritise


Assessment and Maintenance works Seek approval to
CB CC CD define Business against budget retire Assets
CA CE Case allocation
Prioritise Maintenance Assess and update Deliver Maintenance
Determine Maintenance Monitor and Review
Works against Budget backlog in response to Program and account for
Demand Performance Prioritise projects
Assess and update
backlog in
allocation budget allocation Maintenance Revenue and seek funding
approval
response to budget
Manage retirement
process
allocation

Deliver maintenance
Enter delivery program and account Account for
phase and account for maintenance retirement revenue
CD-010 for capital revenue revenue

CB-010 CC-010 CE-010


CA-010 Develop proposed
Determine Information: Backlog Performance
Condition Monitoring Annual Maintenance Monitor and review Monitor and review Monitor and review
Maintenance Budget Impact Assessment Management performance performance performance

Planning Program
Compliance and Governance

CB-020 Process Description


CA-020 CD-020
Prioritise Maintenance This process represents the
Strategic Maintenance Arrange provision of
Projects against Maintenance Management area
Review Maintenance Services
allocated funding within the Strategic Asset
Management Framework.

Each chevron represents a block in


the SAMF diagram above. Blocks
CD-030 underneath the chevrons are sub-
Maintenance processes within the main process in
Expenditure Control the area.

Legend
Process Start Process Step

Process End Information or


Template
Linked Process
Decision
Communication

Rule Multiple Concurrent


Process Steps
SAMF Area: C. Maintenance Management
Process Name: Determine Maintenance Demand Process Code: CA
Sub-Process Name: Condition Monitoring Sub-Process Code: CA-010

Process Map Framework Mapping


(Star indicates process location)

Capital Planning and Prioritisation

Capital Expansion
Maintenance Asset Retirement
and Improvement
Management Plan Plan
Plan

Consult with Determine


stakeholders to Maintenance Identify Assets for
determine capital Demand retirement
requirements

Perform Feasibility Prioritise


Originator

Review outcomes from Assessment and


define Business
Maintenance works
against budget
Seek approval to
retire Assets
previous works programs Case allocation

Start Assess and update


Prioritise projects backlog in Manage retirement
and seek funding response to budget process
approval allocation

Deliver maintenance
Enter delivery program and account Account for
phase and account for maintenance retirement revenue
for capital revenue revenue

Monitor and review Monitor and review Monitor and review


performance performance performance

Compliance and Governance

Review Condition Audit Issue Condition Based


Undertake Condition
database to ensure Reports to Strategic
Audit for current year
integrity of data Maintenance Review Process Description
CA-020
Resource

Strategic This is the process for performing


Maintenance condition monitoring activities.
Review

Information: Information: Information:


Annual 3 yearly Condition
Desktop Condition Audit Based
Review Reports

Legend
Process Start Process Step

Process End Information or


Template
Linked Process
Decision
Communication

Rule Multiple Concurrent


Process Steps
SAMF Area: C. Maintenance Management
Process Name: Determine Maintenance Demand Process Code: CA
Sub-Process Name: Strategic Maintenance Review Sub-Process Code: CA-020

Process Map Framework Mapping


(Star indicates process location)

Capital Planning and Prioritisation

Capital Expansion
Maintenance Asset Retirement
and Improvement
Management Plan Plan
Plan

Assign priority weighting Determine Breakdown


Determine Staffing Issue Maintenance Consult with Determine
to Condition Audit or Unplanned stakeholders to Maintenance Identify Assets for
Requiremetns Business Case determine capital Demand retirement
requirements Requirements requirements

Template:
Business Perform Feasibility
Assessment and
Prioritise
Maintenance works Seek approval to
Case define Business
Case
against budget
allocation
retire Assets
Originator

Assess and update


Prioritise projects backlog in Manage retirement
and seek funding response to budget process
approval allocation

Determine Maintenance Review Short and Mid- Determine Planned, Pass Total Volume of
Requirements with Term Plans and identify Preventative and Maintenance to Enter delivery
Deliver maintenance
program and account Account for
phase and account for maintenance retirement revenue
Condition Standards 'big ticket' items Routine Requirements FINANCE for capital revenue revenue

Monitor and review Monitor and review Monitor and review


performance performance performance

Compliance and Governance

Process Description
Receive Condition Develop Annual Works This is the process for performing
Based Reports Program based on Financial Review strategic maintenance review and
funding allocation
Information: communicating with Finance.
Issue Notice
of Funding
Grant
Resource

Update Asset Submit to Finance for


Update Maintenance Management Plan Project Coding
Backlog (AMP)

CA-010
Condition
Monitoring

Asset CB-010 Legend


Management Determine
Plan Maintenance Budget Process Start Process Step

Process End Information or


Template
Linked Process
Decision
Communication

Rule Multiple Concurrent


Process Steps
SAMF Area: C. Maintenance Management
Process Name: Prioritise Maintenance Works against Budget allocation Process Code: CB
Sub-Process Name: Determine Maintenance Budget Sub-Process Code: CB-010

Process Map Framework Mapping


(Star indicates process location)

Capital Planning and Prioritisation

Capital Expansion
Maintenance Asset Retirement
and Improvement
Management Plan Plan
Plan

Consult with Determine


stakeholders to Maintenance Identify Assets for
determine capital Demand retirement
requirements

Perform Feasibility Prioritise


Assessment and Maintenance works Seek approval to
define Business against budget retire Assets
Case allocation

Assess and update


Prioritise projects backlog in Manage retirement
and seek funding response to budget process
Receive report on Issue Notice of approval allocation
Apply Appropriate Perform Variance Determine funding
current Maintenance Award to relevant
Funding Model Analysis allocation (Award)
Requirements Department Deliver maintenance
Enter delivery
CA-020 CB-020 phase and account
program and account
for maintenance
Account for
retirement revenue
Finance

for capital revenue revenue


Strategic Prioritise
Maintenance Maintenance
Review Projects against Monitor and review
Monitor and review Monitor and review
allocated funding performance performance performance

Compliance and Governance

Information: Information: Information: Information:


Total Maintenance Capital Replacement Internal Issue notice of
Liability Business Valuation Report Budgetary funding grant
Case Constraints Process Description
This is the process for determining
the allocated maintenance budget.

Legend
Process Start Process Step

Process End Information or


Template
Linked Process
Decision
Communication

Rule Multiple Concurrent


Process Steps
SAMF Area: C. Maintenance Management
Process Name: Prioritise Maintenance Works against Budget allocation Process Code: CB
Sub-Process Name: Prioritise Maintenance Projects against allocated funding Sub-Process Code: CB-020

Process Map Framework Mapping


(Star indicates process location)

Capital Planning and Prioritisation

Capital Expansion
Maintenance Asset Retirement
and Improvement
Management Plan Plan
Plan

Consult with Determine


stakeholders to Maintenance Identify Assets for
determine capital Demand retirement
requirements

Perform Feasibility Prioritise


Assessment and Maintenance works Seek approval to
define Business against budget retire Assets
Case allocation

Assess and update


Prioritise projects backlog in Manage retirement
and seek funding response to budget process
approval
CC-010 allocation
Information:
Information:
Allocated
Backlog Deliver maintenance
Budget
Maintenance Planning Resource

Enter delivery program and account Account for


Impact phase and account
for capital revenue
for maintenance
revenue
retirement revenue

Assessment
Update backlog
with un-allocated
Monitor and review Monitor and review Monitor and review
Review Annual projects performance performance performance

Maintenance Allcoate funding for


Receive Notice of Prioritise program
Requirements unplanned Compliance and Governance
Award maintenance work
against budget maintenance
CB-010 allocation
Determine Establish / Finalise
Maintenance Annual
Budget Maintenance
Process Description
Works Program
This is the process for prioritising
Allocate funding for
Allocate staffing maintenance works against the
compliance related
costs
projects allocated budget.

Project codes
Finance

allocated by
Finance

Legend
Process Start Process Step

Process End Information or


Template
Linked Process
Decision
Communication

Rule Multiple Concurrent


Process Steps
SAMF Area: C. Maintenance Management
Process Name: Assess and update backlog in response to budget allocation Process Code: CC
Sub-Process Name: Information: Backlog Impact Assessment Sub-Process Code: CC-010

Process Map Framework Mapping


(Star indicates process location)

Capital Planning and Prioritisation

Capital Expansion
Maintenance Asset Retirement
and Improvement
Management Plan Plan
Plan

Information: Information: Information:


Findings Findings Backlog Report Consult with Determine
stakeholders to Maintenance Identify Assets for
determine capital Demand retirement
requirements

Perform Feasibility Prioritise


Maintenance Resource

Assessment and Maintenance works Seek approval to


define Business against budget retire Assets
Case allocation

Develop short report on Actively communicate Prioritise projects


Assess and update
Assess backlog with and seek funding
backlog in Manage retirement
backlog with Finance on report approval
response to budget process
strategic point of view allocation
findings
CB-020
Deliver maintenance
Prioritise Maintenance Enter delivery
phase and account
program and account
for maintenance
Account for
retirement revenue
Projects against for capital revenue revenue

allocated funding

Monitor and review Monitor and review Monitor and review


performance performance performance

Compliance and Governance

Information:
Backlog Report

Process Description
This is the process for performing the
maintenance backlog impact
Assessment.

Report to relevant
Receive
stakeholders (ie.
Backlog Report
TEFMA)
Finance

Information: CD-010
Backlog Report Develop proposed
Annual Maintenance
Planning Program

Information:
Backlog Report

Legend
Process Start Process Step

Process End Information or


Template
Linked Process
Decision
Communication

Rule Multiple Concurrent


Process Steps
SAMF Area: C. Maintenance Management
Process Name: Deliver Maintenance Program and account for Maintenance Revenue Process Code: CD
Sub-Process Name: Develop proposed Annual Maintenance Planning Program Sub-Process Code: CD-010

Process Map Framework Mapping


(Star indicates process location)

Capital Planning and Prioritisation

Capital Expansion
Maintenance Asset Retirement
and Improvement
Management Plan Plan
Plan

Consult with Determine


stakeholders to Maintenance Identify Assets for
determine capital Demand retirement
requirements

Perform Feasibility Prioritise


Assessment and Maintenance works Seek approval to
define Business against budget retire Assets
Information: Case allocation
Information: Information:
Project Codes
Cash Flow Plan Cash Flow Plan
Maintenance Resource

from Finance Prioritise projects


Assess and update
backlog in Manage retirement
and seek funding response to budget process
approval allocation

Deliver maintenance
Enter delivery program and account Account for
phase and account for maintenance retirement revenue
for capital revenue revenue

CD-020
Receive allocation of Devlop CFS based on Distribute Cash Flow Arrange provision
codes expected delivery time plan to Finance of Maintenance Services Monitor and review Monitor and review Monitor and review
performance performance performance

Compliance and Governance

Process Description
This is the process for developing
the proposed annual maintenance
works program, based on the
allocated funding..
Finance

Distribute Maintenance
Receive Cash Flow Plan
codes

CC-010 Information:
Backlog Cash Flow Plan
Impact
Assessment

Legend
Process Start Process Step

Process End Information or


Template
Linked Process
Decision
Communication

Rule Multiple Concurrent


Process Steps
SAMF Area: C. Maintenance Management
Process Name: Deliver Maintenance Program and account for Maintenance Revenue Process Code: CD
Sub-Process Name: Arrange provision of Maintenance Services Sub-Process Code: CD-020

Process Map Framework Mapping


(Star indicates process location)

Capital Planning and Prioritisation

Capital Expansion
Maintenance Asset Retirement
and Improvement
Management Plan Plan
Plan

Consult with Determine


stakeholders to Maintenance Identify Assets for
determine capital Demand retirement
requirements

Prioritise
Maintenance Resource

Perform Feasibility
Assessment and Maintenance works Seek approval to
define Business against budget retire Assets
Case allocation

Assess and update


Procurement of Perform Prioritise projects
and seek funding
backlog in
response to budget
Manage retirement
process
approval
goods and maintenance
allocation

services activities Deliver maintenance


CD-010 CD-030 Enter delivery
phase and account
program and account
for maintenance
Account for
retirement revenue
for capital revenue revenue

Develop proposed Maintenance


Annual Maintenance Expenditure
Monitor and review Monitor and review Monitor and review
Planning Program Control performance performance performance

Compliance and Governance

Process Description
This is the process for arranging
provision of maintenance services.

Legend
Process Start Process Step

Process End Information or


Template
Linked Process
Decision
Communication

Rule Multiple Concurrent


Process Steps
SAMF Area: C. Maintenance Management
Process Name: Deliver Maintenance Program and account for Maintenance Revenue Process Code: CD
Sub-Process Name: Maintenance Expenditure Control Sub-Process Code: CD-030

Process Map Framework Mapping


(Star indicates process location)

Capital Planning and Prioritisation

Capital Expansion
Maintenance Asset Retirement
and Improvement
Management Plan Plan
Plan

CE-010 Consult with


stakeholders to
determine capital
Determine
Maintenance Identify Assets for
retirement
Demand
Information: Performance requirements
Maintenance Resource

Finance Reports Management


Perform Feasibility Prioritise
Assessment and Maintenance works Seek approval to
Manage issues define Business
Case
against budget
allocation
retire Assets

and take action


Assess and update
Prioritise projects backlog in Manage retirement
TEAM level and seek funding
approval
response to budget
allocation
process

expenditure Investigate major


review variances Enter delivery
Deliver maintenance
program and account Account for
phase and account for maintenance retirement revenue
for capital revenue revenue

Advise controlling
group of Monitor and review Monitor and review Monitor and review
significant issues performance performance performance

Compliance and Governance

Process Description
This is the maintenance expenditure
control procedure.
Finance

Generate and
distribute
Financial Reports
CD-020
Arrange provision of
Maintenance Services
Controlling group

Receive
notification of Legend
significant issues
Process Start Process Step

Process End Information or


Template
Linked Process
Decision
Communication

Rule Multiple Concurrent


Process Steps
SAMF Area: C. Maintenance Management
Process Name: Monitor and Review Performance Process Code: CE
Sub-Process Name: Performance Management Sub-Process Code: CE-010

Process Map Framework Mapping


(Star indicates process location)

Capital Planning and Prioritisation

Capital Expansion
Maintenance Asset Retirement
and Improvement
Management Plan Plan
Plan

Information: Information:
Maintenance Key Performance Information: Information: Consult with Determine
stakeholders to Maintenance Identify Assets for
Works Drivers and Metrics Key Performance Financial Plan / determine capital Demand retirement
requirements
Programme Drivers and Metrics Exception Reports
Prioritise
Delegated resource

Perform Feasibility
Assessment and Maintenance works Seek approval to
define Business against budget retire Assets
Case allocation

Identify Performance
Review strategic Maintain financial Prioritise projects
Assess and update
Measures, Targets & and seek funding
backlog in Manage retirement

effectiveness control approval


response to budget process
Accountabilities allocation

CD-030 Is delivery completed?


Maintenance Enter delivery
Deliver maintenance
program and account Account for
Expenditure phase and account
for capital revenue
for maintenance
revenue
retirement revenue

Control

Monitor and review Monitor and review Monitor and review


Track and record performance performance performance

performance
Compliance and Governance
Information:
Financial Information

NO YES
Process Description
This is the maintenance performance
management process.

Update AMP and


Finance

Maintenance Works
Programme
End

Asset
Management
Plan

Legend
Process Start Process Step

Process End Information or


Template
Linked Process
Decision
Communication

Rule Multiple Concurrent


Process Steps
SAMF Area: D. Asset Retirement
Process Name: Overview Process Code: D
Sub-Process Name: N/A Sub-Process Code: N/A

Process Map Framework Mapping


(Star indicates process location)

Capital Planning and Prioritisation

Capital Expansion
Maintenance Asset Retirement
and Improvement
Management Plan Plan
Plan

Consult with Determine


stakeholders to Maintenance Identify Assets for
determine capital Demand retirement
requirements

DA DB DC DD DE Perform Feasibility
Assessment and
Prioritise
Maintenance works Seek approval to

Identify assets for Seek approval to retire Manage retirement Record retirement Monitor and review define Business
Case
against budget
allocation
retire Assets

retirement assets process events performance


Assess and update
Prioritise projects backlog in Manage retirement
and seek funding response to budget process
approval allocation

DE-010 Enter delivery


Deliver maintenance

DA-010 DB-010 DD-010 phase and account


program and account
for maintenance
Account for

DC-020 Performance for capital revenue revenue


retirement revenue

Identify assets for Approval for retirement Record retirement


Project Definition Management &
retirement assets events
Review Monitor and review Monitor and review
performance
Monitor and review
performance performance

Compliance and Governance

DA-020 Process Description


DC-030
Economic and
Project Delivery This process represents the Asset
Strategic Analysis
Retirement area within the Strategic
Asset Management Framework.

Each chevron represents a block in


the SAMF diagram above. Blocks
DC-040 underneath the chevrons are sub-
Retirement processes within the main process in
expenditure control the area.

Legend
Process Start Process Step

Process End Information or


Template
Linked Process
Decision
Communication

Rule Multiple Concurrent


Process Steps
SAMF Area: D. Asset Retirement
Process Name: Identify assets for retirement Process Code: DA
Sub-Process Name: Identify assets for retirement Sub-Process Code: DA-010

Process Map Framework Mapping


(Star indicates process location)

Capital Planning and Prioritisation

Capital Expansion
Maintenance Asset Retirement
and Improvement
Information: Plan
Management Plan Plan

University & Service


Level Asset Information Consult with Determine
stakeholders to Maintenance Identify Assets for
determine capital Demand retirement
requirements

Is the asset being replaced by Perform Feasibility


Assessment and
Prioritise
Maintenance works Seek approval to
Identify retiring assets other, new asset(s)? define Business against budget retire Assets
Case allocation
from performance Link with
Asset Owner / Finance

review Capital Expansion and


Assess and update
Improvement Process Prioritise projects
and seek funding
backlog in Manage retirement
response to budget process
approval allocation

YES
Deliver maintenance
Enter delivery
Start phase and account
program and account
for maintenance
Account for
retirement revenue
for capital revenue revenue

Ad-hoc requirement for


asset retirement
Monitor and review Monitor and review Monitor and review
performance performance performance

NO Compliance and Governance

Process Description
Information:
Ad-hoc asset retirement This process represents the
information
identification of assets for retirement.
The process identifies retirement
assets by way of routine
performance review, as well as ad-
hoc requests or events.

A clear link is established between


this area of the SAMF and the
Delegated Resource

Capital Expansion and Improvement


Document assets in the
Develop Business Case Asset Management area, since retirement of assets
Plan could trigger the acquisition of new
DA-020 ones.
Economic and
Strategic Analysis

Legend
Template: Business Case Asset Management Plan
Process Start Process Step

Process End Information or


Template
Linked Process
Decision
Communication

Rule Multiple Concurrent


Process Steps
SAMF Area: D. Asset Retirement
Process Name: Identify assets for retirement Process Code: DA
Sub-Process Name: Economic and Strategic Analysis Sub-Process Code: DA-020

Process Map Framework Mapping


(Star indicates process location)

Capital Planning and Prioritisation

Capital Expansion
Maintenance Asset Retirement
and Improvement
Management Plan Plan
Plan

Consult with Determine


stakeholders to Maintenance Identify Assets for
determine capital Demand retirement
requirements

Asset
Management Perform Feasibility
Assessment and
Prioritise
Maintenance works Seek approval to

Plan define Business


Case
against budget
allocation
retire Assets

Retirement
Impact Assessment Prioritise projects
Assess and update
backlog in Manage retirement
and seek funding response to budget process
approval allocation
Delegated Resource

Review Asset Deliver maintenance

Perform strategic Enter delivery


phase and account
program and account Account for

Management Plan Update Business for capital revenue


for maintenance
revenue
retirement revenue

and economic
for retirement Case
analysis
DA-010 assets DB-010 Monitor and review Monitor and review Monitor and review
performance performance performance
Identify assets Approval for
for retirement retirement assets Compliance and Governance

Process Description
Capital Expansion and Template:
This process details the strategic and
Maintenance Management Business Case
economic analysis that is performed
Information
as part of the asset retirement
process. This information is required
for the approval process that follows.

Legend
Process Start Process Step

Process End Information or


Template
Linked Process
Decision
Communication

Rule Multiple Concurrent


Process Steps
SAMF Area: D. Asset Retirement
Process Name: Seek approval to retire assets Process Code: DB
Sub-Process Name: Approval for retirement assets Sub-Process Code: DB-010

Process Map Framework Mapping


(Star indicates process location)

Capital Planning and Prioritisation

Capital Expansion
Maintenance Asset Retirement
and Improvement
Management Plan Plan
Plan

Consult with Determine


stakeholders to Maintenance Identify Assets for

Asset Asset determine capital


requirements
Demand retirement

Management Should the proposal go to Management


Plan approval stage? Plan
Perform Feasibility Prioritise
Assessment and Maintenance works Seek approval to
define Business against budget retire Assets
Case allocation

Review proposed YES Reflect status in Assess and update


Prioritise projects backlog in
retirements in Asset Asset Management and seek funding response to budget
Manage retirement
process
approval allocation
Management Plan Plan
Reviewer

DA-020
Economic and Asset Deliver maintenance
Enter delivery
Strategic Analysis Management phase and account
program and account
for maintenance
Account for
retirement revenue
for capital revenue revenue
NO Plan
Information:
Criteria for Monitor and review Monitor and review Monitor and review
performance
retirement performance performance
Expansion &
Maintenance Reflect status in Reflect Status in Compliance and Governance
Information Asset Management Asset Management
Plan Plan
Asset DA-010 DC-020
Identify assets Project
Management
for retirement Definition
Process Description
Plan
This process represents the approval
process for retirement assets.

Review and approve


asset retirement
YES
Approver

NO

Is the asset approved for


retirement?

Legend
Process Start Process Step

Process End Information or


Template
Linked Process
Decision
Communication

Rule Multiple Concurrent


Process Steps
SAMF Area: D. Asset Retirement
Process Name: Manage retirement process Process Code: DC
Sub-Process Name: Project Definition Sub-Process Code: DC-010

Process Map Framework Mapping


(Star indicates process location)

Capital Planning and Prioritisation

Capital Expansion
Maintenance Asset Retirement
and Improvement
Management Plan Plan
Plan

Reflect Status in Consult with Determine


Finance

stakeholders to Maintenance Identify Assets for


determine capital Demand retirement
Asset requirements

Asset Management Plan


Management Perform Feasibility
Assessment and
Prioritise
Maintenance works Seek approval to
define Business against budget retire Assets
Plan Case allocation

Assess and update


Prioritise projects backlog in Manage retirement
and seek funding response to budget process
approval allocation

Communicate Enter delivery


Deliver maintenance
Delegated Authority

program and account Account for


phase and account
plans with Commit for capital revenue
for maintenance
revenue
retirement revenue

Plan and resource stakeholders Resources and


definition phase establish Monitor and review
performance
Monitor and review
performance
Monitor and review
performance

accountability
DB-010 Information: Compliance and Governance

Approval for Accountabilities


retirement assets
Capital Expansion &
Maintenance Process Description
Management Link
This process represents the project
definition phase of asset retirement.
Development Manager

Resources are established and


Review Planning
committed, and plans are
Documentation
Develop Planning communicated to stakeholders.
and Proceed with
Documentation Delivery DC-030
Information: Project Delivery
Planning
Documentation
Approver

Review and
approve planning
documentation Legend
Process Start Process Step

Process End Information or


Template
Linked Process
Decision
Communication

Rule Multiple Concurrent


Process Steps
SAMF Area: D. Asset Retirement
Process Name: Manage retirement process Process Code: DC
Sub-Process Name: Project Delivery Sub-Process Code: DC-020

Process Map Framework Mapping


(Star indicates process location)

Capital Planning and Prioritisation

Capital Expansion
Maintenance Asset Retirement
and Improvement
Management Plan Plan
Plan

Consult with Determine


stakeholders to Maintenance Identify Assets for
determine capital Demand retirement
requirements

Review and
Review established Perform Feasibility Prioritise
communicate Assessment and Maintenance works Seek approval to
delivery milestones define Business against budget retire Assets
delegations Case allocation

DC-010
Project Assess and update
Prioritise projects
Definition and seek funding
backlog in
response to budget
Manage retirement
process
approval allocation
Manager

Deliver maintenance
Information: Manage work Enter delivery program and account Account for
phase and account for maintenance retirement revenue
Planning for capital revenue revenue

documentation Is milestone achieved?


NO
Monitor and review Monitor and review Monitor and review
performance performance performance

Compliance and Governance


Capital Expenditure Control
DC-030
+
Y
E
Process Description
S
This process represents the project
Delegated Resource

delivery phase of asset retirement.


Perform delegated Reflect Status in
DD-010 Record
tasks to achieve Asset Management
Retirement Events
milestones Plan NO
+ Asset
Management
Plan
Is the project finished?
Approver

Authorise next Approve delivery


YES
delivery phase completion status

Reflect status in
Asset Management
Finance

Plan
DE-010
Information:
Performance
Legend
Asset
Register Management
Process Start Process Step
& Review
Process End Information or
Template
Linked Process
Decision
Communication

Rule Multiple Concurrent


Process Steps
SAMF Area: D. Asset Retirement
Process Name: Manage retirement process Process Code: DC
Sub-Process Name: Retirement expenditure control Sub-Process Code: DC-030

Process Map Framework Mapping


(Star indicates process location)

Capital Planning and Prioritisation

Capital Expansion
Maintenance Asset Retirement
and Improvement
Management Plan Plan
Plan

Consult with Determine


stakeholders to Maintenance Identify Assets for
determine capital Demand retirement
End requirements

NO Perform Feasibility Prioritise


Assessment and Maintenance works Seek approval to

Information: Information: define Business


Case
against budget
allocation
retire Assets

Financial Plan / Project Financials Does out-turn exceed


Exception Report available resources? Prioritise projects
and seek funding
Assess and update
backlog in Manage retirement
response to budget process
approval allocation
Finance

Deliver maintenance

Identify and report Highlight out-turn Enter delivery program and account Account for
YES phase and account
for capital revenue
for maintenance
revenue
retirement revenue

exceptional and report to Exec


variances
Start Monitor and review
performance
Monitor and review
performance
Monitor and review
performance

Compliance and Governance

Information: Asset
Exception Management
Process Description
Report Plan This is a sub process of the Project
Delivery process within the asset
retirement area of the SAMF.
Delegated resource

Control Costs and/ It represents the expenditure control


Identify the cause that is to be exercised throughout the
or adjust financial
of exceptional delivery phase.
out-turn as
variance
required

Legend
Process Start Process Step

Process End Information or


Template
Linked Process
Decision
Communication

Rule Multiple Concurrent


Process Steps
SAMF Area: D. Asset Retirement
Process Name: Record retirement events Process Code: DD
Sub-Process Name: Record retirement events Sub-Process Code: DD-010

Process Map Framework Mapping


(Star indicates process location)

Capital Planning and Prioritisation

Capital Expansion
Maintenance Asset Retirement
and Improvement
Management Plan Plan
Plan

Consult with Determine


stakeholders to Maintenance Identify Assets for
determine capital Demand retirement
requirements

Delegated Resource
Perform Feasibility Prioritise
Assessment and Maintenance works Seek approval to
define Business against budget retire Assets
Case allocation

Track and record Prioritise projects


Assess and update
backlog in Manage retirement
and seek funding
retirement events approval
response to budget
allocation
process

Start
Deliver maintenance
Enter delivery program and account Account for
phase and account for maintenance retirement revenue
for capital revenue revenue

Monitor and review Monitor and review Monitor and review


performance performance performance

Compliance and Governance


Finance

Update Asset Process Description


Management Plan
This process represents the tracking
Asset End
and recording of retirement events n
Management the Asset Management Plan.
Plan

Legend
Process Start Process Step

Process End Information or


Template
Linked Process
Decision
Communication

Rule Multiple Concurrent


Process Steps
SAMF Area: D. Asset Retirement
Process Name: Monitor and review performance Process Code: DE
Sub-Process Name: Performance Management & Review Sub-Process Code: DE-010

Process Map Framework Mapping


(Star indicates process location)

Capital Planning and Prioritisation

Capital Expansion
Maintenance Asset Retirement
and Improvement
Management Plan Plan
Plan

Consult with Determine


stakeholders to Maintenance Identify Assets for
determine capital Demand retirement
requirements
Template: Information: Information:
Business Information:
Key Performance Key Performance Financial Plan /
Case Drivers and Metrics Exception Reports
Perform Feasibility
Assessment and
Prioritise
Maintenance works Seek approval to
Drivers and Metrics define Business against budget retire Assets
allocation
Delegated resource

Case

Assess and update


Prioritise projects backlog in Manage retirement
and seek funding response to budget process
approval allocation
Identify Performance
Review strategic Maintain financial and
Measures, Targets &
effectiveness operational control Deliver maintenance
Accountabilities Enter delivery
phase and account
program and account Account for
for maintenance retirement revenue
Start Is delivery completed? for capital revenue revenue

Monitor and review Monitor and review Monitor and review


performance performance performance

Track and record


performance Compliance and Governance

Information:
Financial Information

Process Description
NO YES
This process represents the tracking
and recording of retirement events n
the Asset Management Plan.
Finance

Update Asset
Management Plan
Asset End
Management
Plan

Legend
Process Start Process Step

Process End Information or


Template
Linked Process
Decision
Communication

Rule Multiple Concurrent


Process Steps
SAMF Area: INSERT TITLE HERE
Process Name: INSERT PROCESS NAME HERE Process Code: PROCESS CODE
Sub-Process Name: INSERT SUB-PROCESS NAME HERE Sub-Process Code: SUB-PROCESS CODE

Process Map Framework Mapping


(Star indicates process location)

Capital Planning and Prioritisation

Capital Expansion
Maintenance Asset Retirement
and Improvement
Management Plan Plan
Plan

Consult with Determine


stakeholders to Maintenance Identify Assets for
determine capital Demand retirement
requirements

Perform Feasibility Prioritise


Assessment and Maintenance works Seek approval to
define Business against budget retire Assets
Case allocation

Assess and update


Prioritise projects backlog in Manage retirement
and seek funding response to budget process
approval allocation

Deliver maintenance
Enter delivery program and account Account for
phase and account for maintenance retirement revenue
for capital revenue revenue

Monitor and review Monitor and review Monitor and review


performance performance performance

Compliance and Governance

Process Description
Sample Description. Enter the
description of the process on the
page here.

This will make it easy for the user to


interpret what they are looking at.

Legend
Process Start Process Step

Process End Information or


Template
Linked Process
Decision
Communication

Rule Multiple Concurrent


Process Steps