AQUATICS INFRA is also renowned name in swimming pool material supplies of major
local and international brands.
Short Introduction of
Being in the field for last 25 years Sachin Jadhav have been Technically Directing the
firmwho himself is a water treatment expert.
3. FUTURE: Some people say that public pools are in danger of extinction, but other say
that there is hope for the future. There are many people who are moving to public pools
rather than private pools as they become more affluent and move to better
neighborhoods.
4. BENEFITS: Community swimming pool & Indoor games offers a means of social
interaction, relaxation and stress relief. They give an opportunity to participate in
aerobic, yet low- impact exercise. Swimming & Indoor games also increase safety in
the community. It is not just an exercise, but also a life-saving skill. The community
pools & indoor games can also be a big help to the people who have special needs.
Swimming pools& indoor games can also be used for recreational activities, such as
informal swimming, pool parties, indoor games competition and many other group
activities. Swimming pool & indoor games can be used for exercise such as swimming
laps, & water aerobics. Pools & Indoor games are also used for educational purposes,
swimming lessons; lifeguard trainings & overall development are examples. Schools
also can often use the pools & Indoor games for various activities and competitions.
Pool & indoor games serves the need of many people who suffer from medical
conditions or injuries.
5. MEDICAL BENEFITS: Exercise is a huge component of staying healthy, both physically and
mentally. It is thought that swimming & indoor games can prolong your life. Swimming, indoor
games and aerobic exercise are excellent, low-impact activities anyone can do to improve health
and cardiovascular functions. Swimming & indoor games is particularly important for seniors as
it allowsseniors to exercise their entire body & mind with minimal stress. Benefits include building
of bone density, increase endurance, physical & mental mobility. Swimming not only is a way to
stay healthy itis also a preventative measure for health. Swimming can help prevent locomotive
impairment, visual problems and development disabilities that are associated with stroke
and cerebral palsy. It also helps with stiffness and pain associated with arthritis. As a form
of exercise, swimming can prevent type 2 diabetes, hypertension and heart disease. Swimming &
indoor games can also improve one’s mood and overall sense of well-being. It is also the best
exercise for burning calories
BOT PROJECTS: This project will strictly be on a Built – Operate – Transfer basis for not less than
12 years. The project will be made up on the land provided by Gym Khana etc and the detailed
working ofthe project of constructing the Swimming pool, Filtration Plant Room, Balancing Tank
& Pool deck will be done by Ederra Infra. The pool’s post
construction will also be operated and maintained by Ederra Infra for the stipulated period
mentioned herein.
Phase II
Rubble Soling work of 300mm, filling the voids with murrum & Kapachi,rolling,
Providing and laying plain cement Concrete of M10 grade , 100mm thick ; using 20 mm
nominal size well-graded approved quality aggregate and river sand as per approved design
mix, including compacting, curing, establishing approved dewatering system to keep site dry
all time, cleaning, preparing surfaces, junctions, etc. including shuttering complete to the
PHASE IV – RCC
Providing and laying in position machine batched and machine mixed design mix M-30 grade
cement concrete for 300mm reinforced cement concrete work, using cement content as par
approved design mix, including pumping of concrete to site of laying but excluding the cost of
Engineer-in-Charge.
Plumbing work before concrete filling
by themanufacturer for bonding after cleaning of the surface and the walls
using brushor soft broom using Dr Fixit Super latex / URP or approved
adding2% by weight of cement approved waterproofing compound finished smooth with wooden
rundha to correct line, plumb and level to external surfaces as per drawing etc. required including
Providing & applying of Waterproofing Double coat of Dr. Fixit Fast Flex or Equivalent, a 2-
component cementitious waterproof liquid applied membrane coating for wet areas in
cementitious,concrete and masonry substance, as per specification. Allowing air curing for 48
hours between thecoats, application methodology should be 1 vertical and 2nd horizontal using
SWIMMING POOL :Providing and Laying thick Premium (1st) quality vitrified body and light
/ dark in color, endura pool tiles with coated round edges and baked at very high temperature,
rectangular in shape suitable for barefoot usage in wet area and tile should comply with
the international ASA & FINA standards. The glaze of the tile should be of feather / sheen finish.
Water absorption of glaze should be less than 0.5% and water absorption of tile body should be
less than 2.5% as per testmethod 10545-2, Minimum Modulus of Rapture 30 N/mm2 as per test
method 10545-3, Scratch Hardness minimum 5 as per test method EN-101, Linear Thermal
expansion less than 9x10-6K-1 and should also be resistant to swimming pool water cleaning agents
fixed on a minimum 4mm thick bed of tile adhesive Diamond Star of Ardex endura or equivalent
ofby leaving 3mm space/grove around all four sides of each tile with the help of 3mm wide pvc
spacer and pointed the same with approved colored epoxy grout of make Roof / Ardex endure /
equivalent
GROUTING WORK OF POOL
PHASE VII – FINAL STAGE AFTER CLEANING & ACID WASHING OF POOL
See our expertise through the project we completed
N.C.P.A .Lodha
Mr Tangri
Wada
Imperial Height
WADHWA
THE ADDRESSE
Ahuja Tower
Amzani Resort
Unicosmos School
Taj Mahal Palace, Mumbai
8) RUNWAL GARDEN
MAINTENANCE SITE
a) SWIMMING POOL , URMI BUSINESS PARK – LOWER PAREL WAST – SITARAM
JADHAVT ROAD
ADRESS:- H)
SHOP13,
WATERCHAWL19, MATOSHREE
BODIES,JIO JANKI NAGAR, BEHIND MANISHA NAGAR, KALWA, THANE,
GARDEN,B.K.C
MAHARASHTRA,400605