You are on page 1of 17

1.

Introduction:AQUATIC INFRA is distinguished name in consultancy and


constructionof swimming pools (All weather pools, Olympic size pools with all
the International standards), Sauna, Jacuzzi and all other swimming related work
and supplies or we can simply say “All services related to Swimming Pool under one
roof”. We work with the latest technology and equipment on a turnkey basis. Our
designers and engineers have a varied experience in making swimming pools at
various locations in India and can therefore, give you a pool with long lasting life to
work at different and difficult & hostile climate. Our method & expertise enables us
to offer you a pool of virtually any shape.

AQUATIC INFRA is engaged in doing turnkey swimming pools projects including


Civil works from past 05 years. We are also core specialist in designing and execution
of pools, water bodies besides Water proofing / strengthening of old civil structures.

AQUATICS INFRA is also renowned name in swimming pool material supplies of major
local and international brands.

Short Introduction of

1. SACHIN JADHAV (Technical Director (MD) of the firm)

2.ADNAN AHMAD ( Execution Director of the firm)

3.MOHAMMED JAVED KHAN ( Marketing Director of the firm )

Being in the field for last 25 years Sachin Jadhav have been Technically Directing the
firmwho himself is a water treatment expert.

2. OBJECTIVES: To construct and operate the pool. Providing a recreational, community


activity center to the people. Swimming pool has the ability to bring diverse groups of
people together to play and exercise in one place.

3. FUTURE: Some people say that public pools are in danger of extinction, but other say
that there is hope for the future. There are many people who are moving to public pools
rather than private pools as they become more affluent and move to better
neighborhoods.
4. BENEFITS: Community swimming pool & Indoor games offers a means of social
interaction, relaxation and stress relief. They give an opportunity to participate in
aerobic, yet low- impact exercise. Swimming & Indoor games also increase safety in
the community. It is not just an exercise, but also a life-saving skill. The community
pools & indoor games can also be a big help to the people who have special needs.
Swimming pools& indoor games can also be used for recreational activities, such as
informal swimming, pool parties, indoor games competition and many other group
activities. Swimming pool & indoor games can be used for exercise such as swimming
laps, & water aerobics. Pools & Indoor games are also used for educational purposes,
swimming lessons; lifeguard trainings & overall development are examples. Schools
also can often use the pools & Indoor games for various activities and competitions.
Pool & indoor games serves the need of many people who suffer from medical
conditions or injuries.

5. MEDICAL BENEFITS: Exercise is a huge component of staying healthy, both physically and
mentally. It is thought that swimming & indoor games can prolong your life. Swimming, indoor
games and aerobic exercise are excellent, low-impact activities anyone can do to improve health
and cardiovascular functions. Swimming & indoor games is particularly important for seniors as
it allowsseniors to exercise their entire body & mind with minimal stress. Benefits include building
of bone density, increase endurance, physical & mental mobility. Swimming not only is a way to
stay healthy itis also a preventative measure for health. Swimming can help prevent locomotive
impairment, visual problems and development disabilities that are associated with stroke
and cerebral palsy. It also helps with stiffness and pain associated with arthritis. As a form
of exercise, swimming can prevent type 2 diabetes, hypertension and heart disease. Swimming &
indoor games can also improve one’s mood and overall sense of well-being. It is also the best
exercise for burning calories

6. EMPLOYMENT /SPORTS OPPORTUNITIES: By building a community pool facility, along with


the management of the pools after completion will provide a host of employment opportunities
for theyouth from the community. From students to seniors, the pool will create a number of jobs
at varying skills and experience levels for many individuals in the community.

BOT PROJECTS: This project will strictly be on a Built – Operate – Transfer basis for not less than
12 years. The project will be made up on the land provided by Gym Khana etc and the detailed
working ofthe project of constructing the Swimming pool, Filtration Plant Room, Balancing Tank
& Pool deck will be done by Ederra Infra. The pool’s post
construction will also be operated and maintained by Ederra Infra for the stipulated period
mentioned herein.

7. EXECUTION METHODOLOGY: The execution methodology will be as per universal standards


which would begin from excavation, soling, PCC, RCC, Side wall Pardi, Filling in Plinth, Masonry
at plinth level, Flooring, skirting, chambers, waterproofing, Tiling, etc.
Phase 1 - EXCAVATION

Earthwork in excavation by mechanical means (hydraulic excavator)/manual over

areasincluding disposal of excavated earth

Phase II

Rubble Soling work of 300mm, filling the voids with murrum & Kapachi,rolling,

watering and compacting .


Phase III - PCC work

Providing and laying plain cement Concrete of M10 grade , 100mm thick ; using 20 mm

nominal size well-graded approved quality aggregate and river sand as per approved design

mix, including compacting, curing, establishing approved dewatering system to keep site dry

all time, cleaning, preparing surfaces, junctions, etc. including shuttering complete to the

satisfaction of the EIC at all depths and leads.

PHASE IV – RCC

Providing and laying in position machine batched and machine mixed design mix M-30 grade

cement concrete for 300mm reinforced cement concrete work, using cement content as par

approved design mix, including pumping of concrete to site of laying but excluding the cost of

centering, shuttering, finishing and reinforcement. Including admixtures in recommended

proportions. asper IS 9103 to accelerate, retard setting of concrete

improve workability without impairing strength and durability as per direction of

Engineer-in-Charge.
Plumbing work before concrete filling

Concrete filling in the pool


PHASE V – BASE COAT WORK
Providing, Applying & Curing of base coat as per specifications provided

by themanufacturer for bonding after cleaning of the surface and the walls

using brushor soft broom using Dr Fixit Super latex / URP or approved

Equivalent on the complete area complete as per instruction.

PHASE VI – PLASTERING (POOL)


Providing and applying minimum single coat 20 mm thick cement sand plaster in C.M., including

adding2% by weight of cement approved waterproofing compound finished smooth with wooden

rundha to correct line, plumb and level to external surfaces as per drawing etc. required including

independent scaffolding, curing, etc. complete to the approval of the EIC.


PHASE VI – WATER PROOFING (POOL)

Providing & applying of Waterproofing Double coat of Dr. Fixit Fast Flex or Equivalent, a 2-

component cementitious waterproof liquid applied membrane coating for wet areas in

cementitious,concrete and masonry substance, as per specification. Allowing air curing for 48

hours between thecoats, application methodology should be 1 vertical and 2nd horizontal using

Dr. Fixit Fast flex,


PHASE VII - TILING LAYING WORK

SWIMMING POOL :Providing and Laying thick Premium (1st) quality vitrified body and light

/ dark in color, endura pool tiles with coated round edges and baked at very high temperature,

rectangular in shape suitable for barefoot usage in wet area and tile should comply with

the international ASA & FINA standards. The glaze of the tile should be of feather / sheen finish.

Water absorption of glaze should be less than 0.5% and water absorption of tile body should be

less than 2.5% as per testmethod 10545-2, Minimum Modulus of Rapture 30 N/mm2 as per test

method 10545-3, Scratch Hardness minimum 5 as per test method EN-101, Linear Thermal

expansion less than 9x10-6K-1 and should also be resistant to swimming pool water cleaning agents

as per test method ISO 10545

fixed on a minimum 4mm thick bed of tile adhesive Diamond Star of Ardex endura or equivalent

ofby leaving 3mm space/grove around all four sides of each tile with the help of 3mm wide pvc

spacer and pointed the same with approved colored epoxy grout of make Roof / Ardex endure /

equivalent
GROUTING WORK OF POOL
PHASE VII – FINAL STAGE AFTER CLEANING & ACID WASHING OF POOL
See our expertise through the project we completed

Sada ,Vasco, Goa

N.C.P.A .Lodha

Natu Parajpe, Kalwa

Mr Tangri

Wada

Imperial Height
WADHWA

THE ADDRESSE

Ahuja Tower

Amzani Resort

Unicosmos School
Taj Mahal Palace, Mumbai

Courtyard Hayatt Hotel, Mumbai

Willington Catholic Gymkhana, Mumbai

Holiday Inn Hotel, Mumbai


Eka Club, Gujrat

Taj Exotica Hotel, Goa

Taj Wellington Mews Luxury


Apartments, Mumbai

The Westin Mumbai Garden City


Projects

1) N.C.P.A – WADALA, MUMBAI

2) NATU PARAJPE,KALWA, THANE

3) MERIDIAN BUILDPRO PRIVATE LIMITED(NANDIVARDHAN)– THANE

4) SADA OLYMPIC SIZE POOL,VASCO,GOA

5) (PRIVATE BUNGLOW POOL) – LONAVALA

6) PIRAMAL VALKINTH CLUSTER – PIRAMAL REALTY

7) MR. CHETAN DOSHI – (PRIVATE BUNGLOW POOL) – KAMSHET

8) RUNWAL GARDEN

9) TAJ @ THE TREES – GODREJ PROPERTIES - VIKROLLI

AND MANY MORE………

MAINTENANCE SITE
a) SWIMMING POOL , URMI BUSINESS PARK – LOWER PAREL WAST – SITARAM
JADHAVT ROAD

b) SEWAGE TREATMENT PLANT,GRAND HYATT HOTEL – SANTACRUZ EAST (


VAKOLA)

C) SWIMMING POOL,NATU PARAJPE I – (PARSIK NAGAR )KALWA

D) OLYMPIC POOL- GOA (SADA)

E) WATER TREATMENT PLANT , N.C.P.A THEATRE-NARIMAN POINT.

F) SWIMMING POOL,N.C.P.A WADALA

G) SWIMMING POOL,GOLAL CITY – VIRAR,WEST

ADRESS:- H)
SHOP13,
WATERCHAWL19, MATOSHREE
BODIES,JIO JANKI NAGAR, BEHIND MANISHA NAGAR, KALWA, THANE,
GARDEN,B.K.C
MAHARASHTRA,400605

You might also like