Professional Documents
Culture Documents
Project Beam No. Client Struc 12 KV Switchgear Building Title Date 25 FEB 2023
Project Beam No. Client Struc 12 KV Switchgear Building Title Date 25 FEB 2023
B3
CLIENT DCAP STRUC 12 KV Switchgear Building
TITLE DATE 25 FEB 2023
Location :
8
hmin (cantilever/cm) 97.14
Constant h min (general /cm) 48.57 End & Contin Midspan
fy ksc. 4000 h min (one end-cont /c 42.01 25cm 25cm
fc' ksc 280 h min (both end cont 37.01 6-DB16 4 4-DB16 5.8
β1 ksc 0.8500
42.95
k =0.85X β1 x 6120/(6120 + fy) 0.437 50cm 42.25 50cm
m = fy /fc' 14.286 b(cm) = 25
ρmax = 0.75 ρb = 0.75k / m 0.0229 h(cm) = 50 4-DB16 5.8 6-DB16 4
εy 0.0020 0.00187
Comp steel is Comp steel is
below yeild fs' below yeild fs'
< fy < fy
2). In case of compression steel below yeild stress ( fs' < fy)
Asfy = 0.85β1 fc' bc + As'0.003Es x (c-d')/c ; Find c from Polynomial equation Ax2 +Bx+C = 0
A = 0.85β1 fc' b 5057.50 5057.50
B = ( As'0.003Es - Asfy) 965.1 965.1
C = - As'0.003Es x d' -285475.8 -285475.8
2.1). Check tension controlled( εt > 0.005 ? , εt = 0.003*(dt-c)/c ) 0.01487 0.0149 > 0.005 OK tension controlled
Check Shear
Dia of strrirup mm 10 10
BAR ARRANGEMENT ( Use Only Deform Bar, DB = End & Cont MID
TOP BAR 16 6 4
BOTTOM BAR 16 4 6