You are on page 1of 1

PROJECT Added PTHO-31 BEAM NO.

B9
CLIENT ; Kyowa Hakko Bio STRUC 2nd FL of Prodcution
TITLE ; Check RC beam capacity DATE ######
Location :
8 B
hmin (cantilever/cm) 97.14 N
Constant h min (general /cm) 48.57 End & Contin Midspan
fy ksc. 4000 h min (one end-cont /c 42.01 10mm @410cm 30cm 30cm
fc' ksc 280 h min (both end cont / 37.01 3-DB25 5 3-DB25 7.25

β1 ksc 0.8500
82.75
k =0.85X β1 x 6120/(6120 + fy) 0.437 90cm 82.03 90cm
m = fy /fc' 14.286 b(cm) = 30
ρmax = 0.75 ρb = 0.75k / m 0.0229 h(cm) = 90 3-DB25 7.25 3-DB25 5

ρmin = 14 /fy 0.0035 End & Contin Midspan


BENDING MOMENT Mu kg.m 0 32100
SHEAR Vu kg 21,240 21,240
covering(cm) = cm 5 5
Layer (Top Bar)= LEVEL 1 1
Layer (Bottom Bar)= LEVEL 1 1
d'(cm) = cm 7.25 7.25 Max bending
d(cm) = cm 82.025 82.75 moment & Shear
ρ = As /(bd) 0.0060 0.0059
ρ' = As' /(bd) 0.0060 0.0059
force from result
ρmin < ρ < ρmax YES / No ? YES YES <== Satisfactory !!
Ru = ρ x fy (1-0.59xq) ;q = ρ fy / fc' ksc 22.7 22.5
ΦMn = 0.9 x Rux bx d2 ; Φ = 0.9 kg.m 41291.6 41676.0

Mu <= ΦMn ?? ; Φ = 0.9 OK / No ? OK OK


Req for Doubly Reinforced Beams Yes / No ? No No
Check Shear

Φ Vc = 0.53 Φ fc' bd Φ = 0.85 kg 18549.89 18713.85

2.1 Φ fc' bd kg 73499.56 74149.20

Vu- Φ Vc = kg 2690.11 2526.15


THE CAPACITY IS
Vu- Φ Vc <= 2.1 Φ fc' bd PASS / No? PASS PASS

Φ Vc/2 = kg 9274.94 9356.92


MORE THAN
1.1Φ fc' bd = kg 38499.77 38840.06 MAXIMUM
fyt = yeild strength of strrirup ksc 4000 4000 BENDING
Provide for spacing strriupt
MOMENT , PASS
Choose DIA OF STRIPRUP

Dia of strrirup mm 10 10

ST-2 = mm 410.1 413.8

ST-1(Distance from 2h form column edge; spacing not exceeds)

1/4 of Effective depth of beam mm. 205.06

8 diameter of minimum size of main bar mm. 200.00

24 time stirrup diameter mm. 240.00

300 mm mm. 300.00


0.3L 0.3L
Top Bar Top Bar
End Center End
0.75L
L Bot Bar Bot Bar

BAR ARRANGEMENT ( Use Only Deform Bar, DB = End & Cont MID
TOP BAR 25 3 3
BOTTOM BAR 25 3 3
PROVIDE DIAMETER OF STRIPRUP 410.13