PROJECT Replacement Electric Chiller 80 SUBJECT Roof slab 125mm thk LOCATION 2 side discont slab

CLIENT DCAP DATA FROM max forces ( middle slab )

TITLE SHINRYO DATE 28 Oct 23

Short Dimension (m) 3.8

Long Dimension (m) 4.8

Slab Thickness (cm) 12.5 <-- min thickness = 9.56cm

Covering of concrete (cm) 4

m = S/ L 0.792
Slab type = ( inter =1, discont 1 side= 2 ,
discont 2 side= 3 , discont 3 side= 4 , 3
discont all side= 5 )

TWO WAY SLAB (YES/NO) YES

CONSTANT

fy ksc 4000

fc' ksc 280

Ultimate of Dead Load (1.2 DL ) kg / m² 480 <-- DL = 2400*0.125+100 ( finishing load on slab)

Ultimate of Live Load (1.6 LL ) kg / m² 320 <-- LR = 200 kg/m2

β= ksc 0.85

k = β 6120/(6120 + fy) 0.514

m = fy / 0.85 fc' 16.807

ρ max = 0.75 k / m 0.023 SHORT LONG

ρ = 0.5 ρb 0.015 External(-Mdisc) Middle(+M) Continious(-Mcont) External(-Mdisc) Middle(+M) Continious (-Mcont)

Coefficeint Moment 0.0321 0.049 0.062 0.025 0.037 0.049

Bending Moment Mu (kg.m/m) 371.1 569.4 712.5 288.8 427.4 566.0

Effe deep (actual) (cm) 7.9 6.7

Effec Depth of Slab. (Req) (cm) 2.782 3.446 3.855 2.454 2.985 3.436

Check depth of Slab (O.K / No) O.K O.K O.K O.K O.K O.K

Ru = Mu / Φbd² ,b = 1 m, Φ = 0.9 ksc / m 6.61 10.14 12.69 7.15 10.58 14.01

ρ require = (1- (1-2xRu/ 0.85 fc' ) )/m 1/m 0.0017 0.0026 0.0033 0.0018 0.0027 0.0036

Require As = ρbd cm²/m 1.32 2.05 2.58 1.22 1.81 2.42

Minimum Re-Bar As = cm²/m 2.25 2.25

Provide As cm²/m 5.65 5.65 5.65 5.65 5.65 5.65

Provide Dia of Re-Bar ( RB / DB) DB 12 12 12 12 12 12

Spacing Of Re-bar m 0.2 0.2 0.2 0.2 0.2 0.2

Check As and spacing of Re-bar Pass/ No Pass Pass Pass Pass Pass Pass

** Remark For the amount of requirement for top rebar in short span = 6.61 > 4.15 anyway

Check Shear Strength actually the opening posititon is not located at the edge of span ( M-max = 2865 kg*m/m.) but

Vu (max ) = 1.15WL/2 2208.0 next to the edge of span =975 mm .,so bending moment is 760 kg*m/m. , therefore a amount of reamining re-bar

ΦVc = Φ 0.53 √fc' b d ; Φ = 0.75 (kg) 4456.5

Φ Vc >= Vu (Ok/ No) O.K

DB12@0.40

DB12@0.20 End L/4 L/4 DB12@0.200 Cont (add)


0.95m 0.95m

12.5cm

DB12@0.20 Mid span SHORT SPAN

DB12@0.40

DB12@0.20End L/4 L/4 DB12@0.200 Cont(add)


1.2m 1.2m

DB12@0.20 Mid-span LONG SPAN