PROJECT ; The replacement Chiller 8000 FLOOR / SLAB NO.

LOCATION slab 400mm thk underneath transformers


CLIENT ; DCAP BUILDING NAME STEP-down

Clear Short Dimension (m) 4.100


Clear Long Dimension (m) 12.000

Slab Thickness (cm) 40.0


m = S/ L 0.34
Covering of concrete (cm) 4
ONE WAY SLAB (YES/NO) YES

CONSTANT
fy ksc 4000.00
fc' ksc 280.00
β= ksc 0.85

k = β 6120/(6120 + fy) 0.51


m = fy / 0.85 fc' 16.81
ρ max = 0.75 k / m 0.023 SHORT LONG
ρ = 0.5 ρb 0.015 External(-Mdisc) Middle(+M) Continious(-McontExternal(-Mdisc) Middle(+M) Continious (-Mcont)
Bending Moment Mu (kg.m/m) 4200.0 14400.0 4200.0
Effec Deep (actual) (cm) 35.2
Effe Depth of Slab. (Req) (cm) 9.358 17.328 9.358
Check depth of Slab (O.K / No) O.K O.K O.K
Ru = Mu / Φbd² ,b = 1 m, Φ = 0.9 ksc / m 3.766 12.913 3.766

ρ require = (1- √(1-2xRu/ 0.85 fc' ) )/m 1/m 0.001 0.003 0.001
Require As = ρbd cm²/m 3.341 11.690 3.341

Minimum re-Bar (Or Temp re- Bar) As = cm²/m 7.2 7.2


Provide As cm²/m 13.40 13.40 13.40 13.40 13.40 13.40

Provide Dia of Re-Bar ( RB / DB) DB 16 16 16 16 16 16


Spacing Of Re-bar m 0.15 0.15 0.15 0.15 0.15 0.15

Check As and spacing of Re-bar Pass/ No Pass Pass Pass Pass Pass Pass

Check one-way Shear force [ out plane shear , /wo not provide shear reinforcement], ACI318-05
Vu = 16,880.0 kg . ( out- of plane shear ) <-- 4.22 ksc x100cmx40cm
фVc = 0.53x 0.75 x fc'^0.5x100 cm x deff

23,413.1 kg . > Vu , PASS!!