You are on page 1of 1

Month Mardi Khola flow (m3/s) Garchyang Khola flow (m3/s) In descending order Rank % time of exceedence Power

time of exceedence Power (MW) Actual Power(MW) Energy (GWh)

Jan 3.7000 0.2831 4.1769 1.0000 8.3333 3.2426 0.5527 0.4035


Feb 3.3300 0.2547 3.5343 2.0000 16.6667 2.7437 0.5527 0.4035
Mar 3.7400 0.2861 2.8535 3.0000 25.0000 2.2152 0.5527 0.4035
Apr 3.8500 0.2945 1.2699 4.0000 33.3333 0.9858 0.5527 0.4035
May 5.1800 0.3963 1.1858 5.0000 41.6667 0.9205 0.5527 0.4035
0.7121 45.0000 0.5528 0.5527 0.1614
Jun 15.5000 1.1858 0.5669 6.0000 50.0000 0.4401 0.4401 0.2174
Jul 46.2000 3.5343 0.4062 7.0000 58.3333 0.3154 0.3154 0.2757
Aug 54.6000 4.1769 0.3963 8.0000 66.6667 0.3076 0.3076 0.2274
Sep 37.3000 2.8535 0.2945 9.0000 75.0000 0.2286 0.2286 0.1957
Oct 16.6000 1.2699 0.2861 10.0000 83.3333 0.2221 0.2221 0.1645
Nov 7.4100 0.5669 0.2831 11.0000 91.6667 0.2197 0.2197 0.1613
Dec 5.3100 0.4062 0.2547 12.0000 100.0000 0.1978 0.1978 0.1524

Catchment Area=12.24m^2 Actual Power


Firm Energy = 1.732728
0.6000
Total Energy= 3.5732
Secondary Energy= 1.8405 0.5000

0.4000

0.3000

0.2000

0.1000

0.0000

You might also like