Professional Documents
Culture Documents
Dos and Donts
Dos and Donts
[COMPANY NAME]
[Company address]
IP Based Integrated Passenger Information System DO’s and DON’T Manual
1. Equipment Placement
1.5 TV:
S. No. Do’s Don’t
1. TV can be fixed or hanged in enquiry, waiting Don’t put TV in outdoor area of station.
room, platform etc.
2. Proper fixture should be maintained for hanging There shall not be any loose fixing.
TV.
3. It should be at proper height and shall be out of It shall not be easily accessible to passengers.
reach of passengers.
4. Location should be proper that can be viewed by It shall not hide behind any banner, stall etc.
maximum passengers.
5. Shall be protected from dust and water. Shall not be in dust and water prone area.
3. Power
S. No. Do’s Don’t
1. Power supply provision to the equipment should Don’t use underrating poor-quality switches or rusty
be double the actual load. Use standard power terminals for power supply to the equipment.
chords and power points for CDC.
2. Connect CDCs through UPS only. UPS of minimum Don’t connect CDCs directly to the 230V AC line
1 KVA with minimum 25 minutes battery backup input.
on 0.8 KVA shall be provided for uninterrupted
operation of the CDC.
3. Maintain the input voltage range to the UPS Don’t connect too much of items to the same UPS.
(220V±25V).
4. Keep always power ON to the UPS Don’t switch off the power to UPS in any case.
5. Separate power cords shall be laid for different All the station items shall not be connected with few
platform devices. power cords only.
6. Loads shall be properly distributed over power Overloading shall be not done on any power cords.
cords.
7. SMPS of suitable capacity working on AC source Overall load on power supply units shall not exceed
of 160V to 270 Volts of appropriate current more than 70% of rated capacity.
capacity shall be used.
8. SMPS shall be of reputed make. Local SMPS shall not be used.
9. Power supply module shall be protected against There shall be no short circuit, very high voltage or
over/under voltage, short circuit and over load. over load.
10. Earthing connection point shall be provided on There shall be no item without earthing point.
the body. Brass bolt of 6 mm diameter shall be
provided at appropriate place & suitably marked.
11. Earth must be directly connected from the main Don’t connect it from any unusual termination or
earth pit of that particular station. rusty terminals.
12. Use proper gauge of copper wire to connect Don’t use binding wire or signal cable multi stand
(preferably 4sq mm wire). wire without lugs for earthing.
13. Before power on, everything shall be checked Without checking system shall not be power on.
properly.
4. Display Board
S. No. Do’s Don’t
1. Only after checking everything, board shall be Without checking board shall not be turned on.
turned on.
2. Boards shall be handled and carried properly Board shall not be hold or carried from display side.
while manufacturing, testing, transportation and Nothing to be kept on TV display. No tools, no
installation. metallic waste.
3. Boards shall be saved from dust and water spills. There shall be no water spill and dust entry in
display.
4. Always check the display system function with Without verifying don’t put display board directly in
test modes as mentioned in installing manual the system.
before installation.
5. LED display card or power supplies shall be Don’t try to remove LED display card or power
removed carefully. supplies while board is in running condition. Don’t
leave power terminals free hanging.
6. Proper communication shall be checked by Without checking communication do not proceed.
standard ping command
5. CDC
S. No. Do’s Don’t
1. CDC shall be loaded with software for There shall not be a different item for
announcement & display, Remote monitoring announcement, RMS or TV.
Software (RMS), PDC, LED display (TV) and display
boards of different sizes like Single Line,
Multiline, At a glance, True colour Indoor and
outdoor video display, Coach Guidance.
2. Installation software and hardware should be Without prior training never install or uninstall
done by trained professionals. software or hardware.
3. CDC shall be switched OFF only after closing all CDC shall not be power off directly.
running programs and with proper shut down
operation.
4. Make sure your hands are clean and dry while Do not eat or drink near system.
using system.
5. Keep the system neat and clean. And use system Don’t damage, remove or disconnect any labels,
properly. part, cables or equipment.
6. Report any problem with the administrator. Don’t install or download any software or modify or
Unauthorised access to any file, folder or delete any system files.
software is prohibited.
7. CD-ROMs, usb, speakers and other multimedia Don’t use them for playing music, web browsing or
equipment are railway property and shall be used any recreational activities.
for passenger’s information.
8. The IP based IPIS shall be in start-up. The user shall not need to open software manually
after system restarts.
9. Only authenticated personnel should be allowed Without proper training don’t use the software.
to use the software.
10. Configuration setting is very important for proper Don’t change the configuration setting without prior
functioning of the entire system. So, take care in training.
handling it.
11. Follow software user manual if any doubts in Without knowing the operating of software don’t try
using the software. to transfer data to display boards or TV display.
12. Data entered regarding trains and coaches shall Data shall not be entered from any third-party app,
be proper and verified by railway authority. or from old charts etc.
13. Any changes made in system shall be informed to Without any authority or permission, no changes
higher authority and with their permission. shall be made.