PERHITUNGAN PEMBESIAN

TEROWONGAN

Data Asumsi:
Mutu Beton K300 = 300 kg/cm2 29,419,950 = 29 Mpa = 29,420 (Asumsi)
Mutu Baja = 3900 kg/cm2 382,459,350 = 240 Mpa = 240,000 (Asumsi)
Berat Jenis Beton = 2400 kg/m3
Tebal Pelat = 50 cm = 0.5 m (asumsi)
b = 4.665 m
γ = 1800 kg/m3 (asumsi)
h = 3 m

RA

P1 = 30 kN/m2
P2 = 83.33 kN/m2
P rata-rata = 56.66 kN/m2
P3 = γxh
= 5400 kg/m2
= 54 kN/m2

Momen arah x = RA x 1/2 x L - 1/16 x q x L^2


Ra = Rb = 1/2 q L
= 132.17
Momen arah x = 166.4 kNm = 166,375 Nm

Momen Arah Y = RA x 1/2 x L - 1/16 x q x L^2


Ra = Rb = 1/2 q L
= 125.955
Momen arah y = 158.6 kNm = 158,558 Nm

Perhitungan Tulangan Utama


ρ min = 1,4/fy
= 0.00583

ρ max = 0,75∗(β 〖 𝐹〗 ^′ 𝑐)/𝐹𝑦∗ β ∗


600/(600+𝐹𝑦)
= 0.04745

Rn = (Mu) / (Φ * b * d)
= 739.45
0,85 ∗(1−
√(1−2,535𝑅𝑛/(𝐹^′ 𝑐)))
PERHITUNGAN PEMBESIAN
TEROWONGAN
m = Fy/(0.85*Fc)
= 9.60
1/m ∗(1−
ρ =
√(1−(2𝑅𝑛∗𝑚)/𝐹𝑦))

= 0.0031

As = ρxbxd
= 2,917 mm2
Dipakai D22 -125 = 3041 > 2,917 ok

Perhitungan Tulangan Bagi

Rn = (Mu) / (Φ * b * d)
= 704.70

m = Fy/(0.85*Fc)
= 9.60
1/m ∗(1−
ρ = √(1−(2𝑅𝑛∗𝑚)/𝐹𝑦))

= 0.0030

As = ρxbxd
= 1,489 mm2
Dipakai D22 -250 = 1521 > 1,489 ok