You are on page 1of 1

Project Name

Job Ref.
CHECKING AND PACKING HALL
Calc. By Date Checked By Date Rev.
M.Nour Sheet No.

CONNECTION ID :- ( C-1 ) referance


ECP
1)- APPLIED FORCES : case a/b
M = 3.50 mt a
Q = 2.00 t
B
Text = 0.00 t
w
2)- BOLTS USED ARE :
e h
M 16 Q 10.9
p
A = 2.01 cm2
AS = 1.41 cm2
qall = 2.00 t/cm2 H
t/cm2
Y1
fall = 3.30 Y2
Y3
N.A Y4
Y6 Y5
3)- DIMS. OF HEAD PLATE USED ARE :
H = 50 cm X
B = 30 cm

4)- NO. OF BOLTS REQUIRED :


n = 16 bolts e = 4.00 cm
No of bolts ber row 4 p = 12.00 cm

5)- ARRANGEMENT OF BOLTS :


y1 = 66.00 cm y8 = 12.70 cm
y2 = 55.90 cm y9 = 3.50 cm
y3 = 48.70 cm y10 = 0.00 cm
y4 = 41.50 cm y11 = 0.00 cm
y5 = 34.30 cm y12 = 0.00 cm
y6 = 27.10 cm y13 = 0.00 cm
y7 = 19.90 cm y14 = 0.00 cm
after the previous input click on Tools--->Solver----->Solve to get the value of X
6)- CHECK FORCES ON BOLTS :
X = 13.055 cm
4
In.v. = 43114.785 cm
Rt.a. = 0.605 t
Rsh.a = 0.125 t
Rt = 4.643 t
Rs.s = 4.020 t
2 2
Rsh.a Rt.a.
+ = 0.018 <1 SAFE
Rs.s Rt

7)- CHECK HEAD PLATE THICKNESS :


h = 180 mm
w = 35 mm
Mplate = Text,b,m x w = 2.117 cmt

tp = √(6Mplate/(FbXh)) = 0.639 cm 16.00 mm

8)- CHECK COMPRESSION ON HEAD PLATE :

2
fc = (M x X)/In.v = 0.106 t/cm < 1.4 t/cm2 SAFE