You are on page 1of 18

MEASUREMENT SHEET DATE: 13.01.

2018
COMPANY NAME: AZICO BIOPHORE INDIA PVT.LTD.
DESCRIPTION OF WORK: INSULATION WORK
VENDOR NAME: RAMO ENTERPRISES
TOTAL COST: Rs.2,02,797
AMOUNT IN WORDS: Two lakh two thousand seven hundred ninty seven rupees only
TOTAL TOTAL
UNIT TOTAL
S.NO. DESCRIPTION QTY QTY
COST COST
SQ.MT SQ .FT
PRODUCTION BLOCK-
1 100 mm ROCKWOOL WITH SS CLADDING ss
SSR -805 ss
Jacket inlet =7.9*0.75 =5.93 5.93 63.81 40 2552.27 al
Bend 5 no's =0.65*0.75*2*5 =4.88 4.88 52.51 40 2100.35
Flange box 2 no's =0.8*0.95*2 =1.52 1.52 16.36 40 654.21
Jacket outlet =7.1*0.75 =5.33 5.33 57.35 40 2294.03
Bend 3 no's =0.65*0.75*2*3 =2.93 2.93 31.53 40 1261.07
Flange box 2 no's =0.8*0.95*2 =1.52 1.52 16.36 40 654.21

GLR-801
Jacket inlet =9.26*0.75 =6.95 6.95 74.78 40 2991.28
Flange box 2 no's =0.65*0.75*2*5 =1.52 1.52 16.36 40 654.21
Bend 5 no's =0.65*0.75*2*5 =4.88 4.88 52.51 40 2100.35
Tee 1 no. =0.17*0.75*2 =0.26 0.26 2.80 40 111.90
Jacket outlet =4.98*0.75 =3.74 3.74 40.24 40 1609.70
Bend 2 no's =0.65*0.75*2*2 = 1.95 1.95 20.98 40 839.28
Flange box 2 no's =0.65*0.75*2*5 =1.52 1.52 16.36 40 654.21

SSR-804
Jacket inlet =7.18*0.75 =5.39 5.39 58.00 40 2319.86
Bend 4 no's =0.65*0.75*4*2 =3.90 3.9 41.96 40 1678.56
Flange box 2 no's =0.65*0.75*2*2 =1.52 1.52 16.36 40 654.21
Jacket outlet =6.96*0.75 =5.22 5.22 56.17 40 2246.69
Bend 4 no's =0.65*0.75*2*4 = 3.99 3.99 42.93 40 1717.30
Flange box 2 no's =0.65*0.75*2*5 =1.52 1.52 16.36 40 654.21

SSR-803
Jacket inlet =7.45*0.75 =5.59 5.59 60.15 40 2405.94
Bend 4 no's =0.65*0.75*4*2 =3.90 3.9 41.96 40 1678.56
Flange box 2 no's =0.65*0.75*2*2 =1.52 1.52 16.36 40 654.21
Jacket outlet =4.75*0.75 =3.56 3.56 38.31 40 1532.22
Bend 3 no's =0.65*0.75*2*3 = 2.93 2.93 31.53 40 1261.07
Flange box 2 no's =0.65*0.75*2*5 =1.52 1.52 16.36 40 654.21

898.35 TOTAL
35934.1
COST
TOTAL
35934.1
COST

TOTAL TOTAL
UNIT TOTAL
S.NO. DESCRIPTION QTY QTY
COST COST
SQ.MT SQ .FT
SSR-802
Jacket inlet =9.76*0.75 =7.32 7.32 78.76 40 3150.53
Bend 5 no's =0.65*0.75*2*5 =4.88 4.88 52.51 40 2100.35
Flange box 2 no's =0.8*0.95*2 =1.52 1.52 16.36 40 654.21
Jacket outlet =6.12*0.75 =4.59 4.59 49.39 40 1975.54
Bend 3 no's =0.65*0.75*2*3 =2.93 2.93 31.53 40 1261.07
Flange box 2 no's =0.8*0.95*2 =1.52 1.52 16.36 40 654.21

SSR-801
Jacket inlet =9.76*0.75 =7.32 7.32 78.76 40 3150.53
Bend 5 no's =0.65*0.75*2*5 =4.88 4.88 52.51 40 2100.35
Flange box 2 no's =0.8*0.95*2 =1.52 1.52 16.36 40 654.21
Jacket outlet =5.5*0.75 =4.23 4.23 45.51 40 1820.59
Bend 4 no's =0.65*0.75*2*4 =3.90 3.9 41.96 40 1678.56
Flange box 2 no's =0.8*0.95*2 =1.52 1.52 16.36 40 654.21
496.36
First floor header boxes 28 no's = 0.00 0.00
1.50*0.72*28 =30.24 30.24 325.38 34 11063.00

SSR-805
Vapour column =1.2*0.87 =1.04 1.04 11.19 34 380.47
Bend 1 no. =0.75*0.87*2 =1.31 1.31 14.10 34 479.25
Header =2.41*0.70 =1.69 1.69 18.18 34 618.27
Valve box 7 no's =1.5*0.70*7 =7.35 7.35 79.09 34 2688.92
Tee 11 no's =0.25*0.50*11*2 =2.75 2.75 29.59 34 1006.06
Tee 2 no's =0.50*0.35*2*2 =0.70 0.7 7.53 34 256.09
Short piece 2 no's =0.8*0.5*2 =0.8 0.8 8.61 34 292.67
Heder t/o line lengths =1.83*0.55*5 =5.0 5 53.80 34 1829.20
Steam line length =1.45*0.55 =0.79 0.79 8.50 34 289.01

GLR-801
Vapour column =1.2*0.87 =1.31 1.04 11.19 34 380.47
Bend 1 no. =0.75*0.87*2 =1.31 1.31 14.10 34 479.25
Header =2.41*0.70 =1.69 1.69 18.18 34 618.27
Valve box 7 no's =1.5*0.70*7 =7.35 7.35 79.09 34 2688.92
Tee 11 no's =0.25*0.50*11*2 =2.75 2.75 29.59 34 1006.06
Tee 2 no's =0.50*0.35*2*2 =0.70 0.7 7.53 34 256.09
Short piece 2 no's =0.8*0.5*2 =0.8 0.8 8.61 34 292.67
Heder t/o line lengths =1.8*0.55*5 =4.95 4.95 53.26 34 1810.91
Steam line length =1.45*0.55 =0.79 0.79 8.50 34 289.01

786.02
TOTAL
46578.96
COST

TOTAL TOTAL
UNIT TOTAL
S.NO. DESCRIPTION QTY QTY
COST COST
SQ.MT SQ .FT
SSR-805
Vapour column =1.20*0.87 =1.04 1.04 11.19 34 380.47
Bend 1 no. =0.75*0.7*2 =1.05 1.05 11.30 34 384.13
0.00 0.00
GLR-802 0.00 0.00
Vapour column =5.0*0.60 =3.0 3 32.28 34 1097.52
Bend 2 no. =0.6*0.6*2*2 =1.44 1.44 15.49 34 526.81
Flange box 5 no's =0.8*0.9*5 =3.6 3.6 38.74 34 1317.02
Header =1.80*0.46 =0.83 0.83 8.93 34 303.65
Valve box 5 no's =1.5*0.70*5 =5.25 5.25 56.49 34 1920.66
Tee 9 no's =0.25*0.46*9*2 =2.07 2.07 22.27 34 757.29
Tee 2 no's =0.45*0.48*2*2 =0.86 0.86 9.25 34 314.62
Short piece 2 no's =0.8*0.46*2 =0.72 0.72 7.75 34 263.40
Heder t/o line lengths =1.85*0.46*5 =4.26 4.26 45.84 34 1558.48
Steam line length =1.45*0.46 =0.67 0.67 7.21 34 245.11
0.00 0.00
GLR-803 0.00 0.00
Vapour column =5.0*0.60 =3.0 3 32.28 34 1097.52
Bend 2 no. =0.6*0.6*2*2 =1.44 1.44 15.49 34 526.81
Flange box 5 no's =0.8*0.9*5 =3.6 3.6 38.74 34 1317.02
Header =1.80*0.46 =0.83 0.83 8.93 34 303.65
Valve box 5 no's =1.5*0.70*5 =5.25 5.25 56.49 34 1920.66
Tee 9 no's =0.25*0.46*9*2 =2.07 2.07 22.27 34 757.29
Tee 2 no's =0.45*0.48*2*2 =0.86 0.86 9.25 34 314.62
Short piece 2 no's =0.8*0.46*2 =0.72 0.72 7.75 34 263.40
Heder t/o line lengths =1.85*0.46*5 =4.26 4.26 45.84 34 1558.48
Steam line length =1.45*0.46 =0.67 0.67 7.21 34 245.11
0.00 0.00
Balance header steam lines = 0.00 0.00
2.6*0.46*4 =4.78 4.78 51.43 34 1748.72
Tee 4 no's =0.25*0.46*2*2 =0.92 0.92 9.90 34 336.57
Bend 2 no's =0.46*0.3*2*2 =0.55 0.55 5.92 34 201.21
Valve box 20 no's =1.5*0.68*20 =20.40 20.4 219.50 34 7463.14
0.00
2 Rockwool & Aluminium cladding 797.75 0.00
Second floor near VTD P/T brine line 0.00
t/o from header 0.00 0.00
Brine inlet length =28.5*0.50 =14.25 14.25 153.33 28 4293.24
Bend 16 no's =16*0.5*0.5*2 =8.0 8 86.08 28 2410.24
Brine outlet length =29*0.5 =14.5 14.5 156.02 28 4368.56
Flange box 22 no's =22*0.8*0.8 =14.08 14.08 151.50 28 4242.02
0.00
546.93 0.00
0.00
TOTAL
42437.44
COST

TOTAL TOTAL
UNIT TOTAL
S.NO. DESCRIPTION QTY QTY
COST COST
SQ.MT SQ .FT
1.5" to 1" brine line to condenser near
VTD-804
Brine inlet length =9.10*0.4 =3.64 3.64 39.17 28 1096.66
Brine outlet length =7.7*0.4 =3.08 3.08 33.14 28 927.94
Valve box 2 no's =2*1.5*0.62 =1.86 1.86 20.01 28 560.38
Bend 2 no's =0.40*0.4*2*2 =0.64 0.64 6.89 28 192.82
Steam inlet =3.2*0.41 =1.31 1.31 14.10 28 394.68
Bend 2 no's =0.45*0.4*2*2 =0.72 0.72 7.75 28 216.92
Steam outlet =2.1*0.41 =0.88 0.88 9.47 28 265.13
Bend 3 no's =0.45*0.4*2*3 =1.08 1.08 11.62 28 325.38
Valve box 2 no's =2*1.5*0.62 =1.86 1.86 20.01 28 560.38
Flange box 3 no's =0.8*0.7*3 =1.68 1.68 18.08 28 506.15
3" reciever outlet =0.66*0.6 =0.396 0.396 4.26 28 119.31

Brine to condenser @VTD-803 beside


Brine inlet =3.0*0.45*2t = 2.7 2.7 29.05 28 813.46
Valve box 2 no's =1.5*0.7*2 =2.1 2.1 22.60 28 632.69
Flange box 2 no's =0.8*0.7*2 =1.12 1.12 12.05 28 337.43
Brine outlet =3.2*0.45*2t =2.88 2.88 30.99 28 867.69
Valve box 2 no's =1.5*0.7*2 =2.1 2.1 22.60 28 632.69
Flange box 2 no's =0.8*0.7*2 =1.12 1.12 12.05 28 337.43
0.00
Steam line to Driers=36.5*0.53 =19.35 19.35 208.21 28 5829.77
Bend 15 no's =0.53*0.5*2*15 =7.95 7.95 85.54 28 2395.18
Flange box 8 no's =8*0.8*0.83 =5.31 5.31 57.14 28 1599.80
Valve box 1 no. =1.5*0.76 =1.14 1.14 12.27 28 343.46
0.00
1" steam to TD-802 0.00
Inlet length =8.2*0.42 =3.44 3.44 37.01 28 1036.40
Bend 6 no's =0.45*0.42*2*6 =2.27 2.27 24.43 28 683.91
Valve box 2 no's =1.5*0.7*2 =2.1 2.1 22.60 28 632.69
Flange box 6 no's =0.8*0.7*6 =3.36 3.36 36.15 28 1012.30
Outlet length =5.84*0.42 =2.45 2.45 26.36 28 738.14
Bend 3no's =0.45*0.42*2*3 =1.16 1.16 12.48 28 349.48
Valve box 3 no's =1.5*0.7*2 =3.15 3.15 33.89 28 949.03
Flange box 6 no's =0.8*0.7*3 =3.36 3.36 36.15 28 1012.30

Steam to TD-801
Steam inlet =8.34*0.42 =3.50 3.5 37.66 28 1054.48
Bend 5 no's =0.45*0.42*2*5 =1.89 1.89 20.34 28 569.42
Flange box 7 no's =0.8*0.7*7 =3.92 3.92 42.18 28 1181.02
Valve box 1 no. =1.5*0.7 =1.05 1.05 11.30 28 316.34

1017.53
TOTAL
28490.84
COST

TOTAL TOTAL
UNIT TOTAL
S.NO. DESCRIPTION QTY QTY
COST COST
SQ.MT SQ .FT
Steam outlet =7.24*0.42 =3.04 3.04 32.71 28 915.89
Bend 4 no's =0.45*0.42*2*4 =1.51 1.51 16.25 28 454.93
Flange box 7 no's =0.8*0.7*7 =3.92 3.92 42.18 28 1181.02
Valve box 3 no. =1.5*0.7*3 =3.15 3.15 33.89 28 949.03
0.00
Steam condensate header = 0.00
19*0.42 =7.98 7.98 85.86 28 2404.21
Bend 4 no's =0.45*0.42*2*4 =1.51 1.51 16.25 28 454.93
Flange box 4 no's =0.8*0.72*4 =2.24 2.24 24.10 28 674.87
0.00 0.00
2" 50mm brine line @first floor pharma 0.00 0.00
room area 0.00 0.00
Inlet & Outlet length =41.3*0.5 =20.65 20.65 222.19 28 6221.43
Bend 26 no's =0.5*0.5*2*26 =13.0 13 139.88 28 3916.64
Flange box 40 no's = 0.8*0.7*40 =22.4 22.4 241.02 28 6748.67
Valve box 12 no's = 12*1.5*0.75 =13.5 13.5 145.26 28 4067.28
Tee 4 no's =0.50*0.25*4*2 =1.0 1 10.76 28 301.28
0.00 0.00
4" header P/T outside brine line 0.00 0.00
flange box 6 no's =0.8*0.84*6 =4.03 4.03 43.36 28 1214.16
0.00 0.00
1" brine line to condenser @ground floor 0.00 0.00
Inlet length =9*0.42 =3.78 3.78 40.67 28 1138.84
outlet length =8.2*0.42 =3.44 3.44 37.01 28 1036.40
Bend 12 no's =0.42*0.41*2*12 =4.13 4.13 44.44 28 1244.29
Flange box 4 no's =0.8*0.7*4 =2.24 2.24 24.10 28 674.87
Valve box 2 no's =1.5*0.7*2 =2.10 2.1 22.60 28 632.69
0.00 0.00
Hotwater system @ground floor 0.00 0.00
1" hot water vapour return =10.3*0.4=4.12 4.12 44.33 28 1241.27
Bend 3 no's =0.4*0.4*2*3 =0.96 0.96 10.33 28 289.23
Flange box 1 no. =0.8*0.7 =0.56 0.56 6.03 28 168.72
Valve box 1 no. =1.5*0.7 =1.05 1.05 11.30 28 316.34
0.00 0.00
1.5" hotwater to tank =9.4*0.4 =3.76 3.76 40.46 28 1132.81
Bend 1 no. =0.4*0.4*2 =0.32 0.32 3.44 28 96.41
Tee 1 no. =0.5*0.25*2 =0.25 0.25 2.69 28 75.32
0.00 0.00
1.5" hot water pump disch =8.24*0.4 =3.3 3.3 35.51 28 994.22
Bend 3 no's =0.4*0.4*2*3 =0.96 0.96 10.33 28 289.23
Valve box 1 no. =1.5*0.7 =1.05 1.05 11.30 28 316.34
Tee 1 no. =0.5*0.25*2 =0.25 0.25 2.69 28 75.32
0.00 0.00
1400.95 0.00
TOTAL
39226.66
COST

TOTAL TOTAL
UNIT TOTAL
S.NO. DESCRIPTION QTY QTY
COST COST
SQ.MT SQ .FT
1" hot water to tank =2.15*0.4 =0.86 0.86 9.25 28 259.10
Bend 2 no's =0.4*0.4*2*2 =0.64 0.64 6.89 28 192.82
Valve box 1 no. =1.5*0.7 =1.05 1.05 11.30 28 316.34

Hot water to drier @ground floor


inlet =5.6*0.4 =2.24 2.24 24.10 28 674.87
Bend 3 no's =0.4*0.4*2*3 =0.96 0.96 10.33 28 289.23
Flange box 4 no. =0.8*0.7*4 =2.24 2.24 24.10 28 674.87
Valve box 1 no. =1.5*0.7 =1.05 1.05 11.30 28 316.34
Outlet =5.*0.4 =2.0 2 21.52 28 602.56
Bend 3 no's =0.4*0.4*2*3 =0.96 0.96 10.33 28 289.23
Flange box 4 no. =0.8*0.7*4 =2.24 2.24 24.10 28 674.87
Valve box 1 no. =1.5*0.7 =1.05 1.05 11.30 28 316.34

Steam line from saichand =


16.3*0.65 =10.59 10.59 113.95 28 3190.56
Bend 7 no's =0.6*0.65*2*7 =5.46 5.46 58.75 28 1644.99
Flange box 3 no's =0.8*0.95*3 =2.28 2.28 24.53 28 686.92
0.00 0.00
361.75 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
TOTAL
10129.03
COST 202797.03
100mm 1394.71 40 55788.45
50mm 1583.76 34 53847.99
50mm 3327.16 28 93160.6
202797

202797.0

35934
19854.4
55788.4
MEASUREMENT SHEET DATE: 08.03.2018
COMPANY NAME: AZICO BIOPHORE INDIA PVT.LTD.
DESCRIPTION OF WORK: INSULATION WORK
VENDOR NAME: RAMO ENTERPRISES 25
TOTAL COST: Rs.
AMOUNT IN WORDS:
TOTAL TOTAL
UNIT TOTAL
S.NO. DESCRIPTION QTY QTY
COST COST
SQ.MT SQ .FT
Brine tank
1 50 mm thermocol &aluminium cladding al tc
Flange box 20 no's = 0.8*0.9*20 =14.4 14.4 154.94 28 4338.43 ss
Valve box 16 no's =1.5*0.92*16 =22.08 22.08 237.58 28 6652.26 al lrb
Strainer box 4 no's =0.8*1.3*4 =4.16 4.16 44.76 28 1253.32 al lrb
2" line length =2.3*0.5 =1.15 1.15 12.37 28 346.47
4" line length =2.2*0.72 =1.58 1.58 17.00 28 476.02
Bend 3 no's =0.65*0.75*2*3 =2.93 2.93 31.53 28 882.75 total
Valve box 1 no's =1.5*0.72 =1.08 1.08 11.62 28 325.38
Flange box 5 no's = 0.8*0.75*5 =3.0 3 32.28 28 903.84
Flange box 5 no's = 0.8*0.8*5 =3.2 3.2 34.43 28 964.10
576.52 0.00
PB-I
2 50 mm LRB & aluminium cladding
Top floor steam line =13.8*0.45 =6.21 6.21 66.82 28 1870.95
Bend 7 no's =0.45*0.42*2*7 =2.65 2.65 28.51 28 798.39
Flange box 3 no's =0.8*0.43*3 =1.03 1.03 11.08 28 310.32
Valve box 1 no. =1.5*0.43 =0.65 0.65 6.99 28 195.83
Short piece =0.6*0.43 =0.22 0.22 2.37 28 66.28

MTD/MST/003 pump disch =4.1*0.5 =2.05 2.05 22.06 28 617.62


Valve box 3 no's =1.5*0.75*3 =3.38 3.38 36.37 28 1018.33
Flange box 7 no's =0.8*0.75*7=4.2 4.2 45.19 28 1265.38
Pump disch to PB-II line =4.7*0.5 =2.35 2.35 25.29 28 708.01
Flange box 7 no's =0.8*0.75*7=4.2 4.2 45.19 28 1265.38

VTD-201 beside dryer (SS+RWL)


Steam inlet =7.5*0.4 =3.0 3 32.28 34 1097.52
Bend 3 no's =0.4*0.4*2*3 =0.96 0.96 10.33 34 351.21
Flange box 3 no's =0.8*0.7*3 =1.68 1.68 18.08 34 614.61
Valve box 1 no.=1.5*0.6 =0.90 0.9 9.68 34 329.26
Tee 1 no. =0.2*0.4*2 =1.6 1.6 17.22 34 585.34

Steam outlet =4.15*0.4 =1.66 1.66 17.86 28 500.12


Bend 3 no's =0.4*0.4*2*3 =0.96 0.96 10.33 28 289.23
Flange box 1no's =0.8*0.7* =0.56 0.56 6.03 28 168.72
Tee 1 no. =0.25*0.45*2 =0.23 0.23 2.47 28 69.29

414.15 TOTAL
28264.4
COST
TOTAL
28264.4
COST

TOTAL TOTAL
UNIT TOTAL
S.NO. DESCRIPTION QTY QTY
COST COST
SQ.MT SQ .FT
Same floor hot water system
Flange box 9 no's =0.8*0.75*9 =5.4 5.4 58.10 28 1626.91
Valve box 3 no's =1.5*0.7*3 =3.15 3.15 33.89 28 949.03

First floor south side header near steam lin


Flange box no's =156*0.8*0.82 =102.34 102.34 1101.18 28 30833.00
Valve box 4 no's =1.5*0.9*4 =5.40 5.4 58.10 28 1626.91

2.5" first floor steam line =19*0.5 =9.5 9.5 102.22 28 2862.16
1.5" line =4*0.45 =1.8 1.8 19.37 28 542.30
Bend 4 no's =0.4*0.45*2*4 =1.44 1.44 15.49 28 433.84

North side steps area


Flange box 11 no's =11*0.8*0.82 =7.22 7.22 77.69 28 2175.24

GLR-202 & SSR-201


Jacket outlet =0.75*0.48*2 =0.72 0.72 7.75 28 216.92
Chilled inlet =1.75*0.5 =0.88 0.88 9.47 28 265.13
5 outlet Bend 3 no's =0.5*0.5*2*3 =1.5 1.5 16.14 28 451.92
Short piece =0.7*0.5 =0.35 0.35 3.77 28 105.45

Pharma Room
Valve box 9 no's = 1.5*0.8*9 =10.8 10.8 116.21 28 3253.82
Flange box 2no's =0.8*0.8*2 =1.28 1.28 13.77 28 385.64

3 PB-V, VI,VII
50mm LRB & Aluminium cladding
2nd floor west side
Flange box 29 no's =29*0.8*0.8 =18.56 18.56 199.71 28 5591.76
5 inlet line =10.8*0.62 =6.69 6.69 71.98 28 2015.56
5 outlet line =10.8*0.62 =6.69 6.69 71.98 28 2015.56
Brine inlet =10.8*0.62 =6.69 6.69 71.98 28 2015.56
Brine outlet =10.8*0.62 =6.69 6.69 71.98 28 2015.56

T/o lineflange box 23no's=0.8*0.8*23 =14.72 14.72 158.39 28 4434.84


Tee 23 no's =0.25*0.45*2*23 =5.18 5.18 55.74 28 1560.63

Pharma room (SS+LRB)


2" line =3*0.5 =1.5 1.5 16.14 34 548.76
Bend 4 no's =0.5*0.5*2*4 =2.0 2 21.52 34 731.68

3rd floor steps area


2" steam line =6.0*0.5 =3.0 3 32.28 28 903.84
2404.86 TOTAL
67562.04
COST

TOTAL TOTAL
UNIT TOTAL
S.NO. DESCRIPTION QTY QTY
COST COST
SQ.MT SQ .FT
4 KILO LAB
50 mm LRB & Aluminium cladding
VTD-101 (SS+LRB)
Valve box 4 no's =1.5*0.75*4 =4.50 4.5 48.42 34 1646.28
Flange box 40 no's =0.8*0.8*40 =25.6 25.6 275.46 28 7712.77
Valve box 2no's =1.5*0.8*2 =2.4 2.4 25.82 28 723.07
Bend 38 no's =0.5*0.45*2*38 =17.1 17.1 184.00 28 5151.89
2" line length =37.4*0.45 =16.83 16.83 181.09 28 5070.54

Kilo lab level -1 product area


Condenser end box =1.5*1.0*8no's =12.0 12 129.12 28 3615.36

Filter cleaning area south of elect room


Steam inlet =8.4*0.50 =4.2 4.2 45.19 28 1265.38
Brine inlet =13.6*0.65 =8.84 8.84 95.12 28 2663.32
Brine outlet =13.6*0.65 =8.84 8.84 95.12 28 2663.32
Chilled inlet =13.6*0.65 =8.84 8.84 95.12 28 2663.32
Chilled outlet =13.6*0.65 =8.84 8.84 95.12 28 2663.32
Flange box 12 no's =0.8*0.8*12 =7.68 7.68 82.64 28 2313.83

5 PB-VIII
Hot water tank top floor
Main body =1.45*5.4 =7.83 7.83 84.25 28 2359.02
Dish radius 2 sides =2*3.14*1*1*2 =12.56 12.56 135.15 28 3784.08

Hot water system to hydrogenation block


Pump suction =1.2*0.5 =0.60 0.6 6.46 28 180.77
Valve box 1 no. =1.5*0.8 =1.2 1.2 12.91 28 361.54
Pump disch to recirculation=3.4*0.5 =1.70 1.7 18.29 28 512.18
Valve box 1 no. =1.5*0.8 =1.2 1.2 12.91 28 361.54
Disch to hydrogenation =23.4*0.5 =11.7 11.7 125.89 28 3524.98
Bend 6 no's =0.5*0.5*2*6 =3.0 3 32.28 28 903.84
Hot water return to tank =25.4*0.5 =12.7 12.7 136.65 28 3826.26
Bend 9 no's =0.5*0.5*2*9 =4.5 4.5 48.42 28 1355.76
Steam line =10.6*0.45 =4.77 4.77 51.33 28 1437.11
Bend 7 no's =0.45*0.45*2*7 =2.83 2.83 30.45 28 852.62
Valve box 1 no. =1.5*0.8 =1.2 1.2 12.91 28 361.54
0.00 0.00
1st floor flange box no's=38*0.8*0.75= 22.8 22.8 245.33 28 6869.18
2" line = 21.5*0.48 =10.32 10.32 111.04 28 3109.21
Valve box 10 no. =1.5*0.8*10 =12 12 129.12 28 3615.36
0.00 0.00
0.00 0.00
0.00 0.00
2545.601 TOTAL
71567.34
COST
50 576.52 28 16142.56
50 173.67 34 5904.66
50 5364.61 0 0.00
50 5190.95 28 145346.51
167393.73
167393.75
MEASUREMENT SHEET DATE: 06.02.2019
COMPANY NAME: AZICO BIOPHORE INDIA PVT.LTD.
DESCRIPTION OF WORK: INSULATION WORK
VENDOR NAME: RAMO ENTERPRISES
TOTAL COST: Rs. RS. 77,697
AMOUNT IN WORDS:
TOTAL TOTAL
UNIT
S.NO. DESCRIPTION QTY QTY TOTAL COST
COST
SQ.MT SQ .FT
PB-VIII
50 MM LRB WITH SS CLADDING
1ST FLOOR HEADER
Steam = 3.4*0.45 =1.43 1.43
Valve box 1no. =1.5*0.7 =1.05 1.05
Flange box 1no. = 0.8*0.7 =0.56 0.56
Hot water inlet =3.8*0.45 =1.71 1.71
Bend 2no's =0.45*0.45*2*2 =0.82 0.82
Flange box 1no. = 0.8*0.7 =0.56 0.56
Valve box 1no. =1.5*0.7 =1.05 1.05
Hot water outlet =1.4*0.45 =0.63 0.63
Bend 1no's =0.45*0.45*2 =0.41 0.41
Chilled +5 line =8.2*0.45 =3.69 3.69
Flange box 2no. = 0.8*0.7*2 = 1.12 1.12
Bend 4no's =0.45*0.45*2*4 =1.64 1.64
Valve box 2no. =1.5*0.7*2 =2.10 2.1
Chilled line =8.2*0.45 =3.69 3.69
Flange box 2no. = 0.8*0.7*2 = 1.12 1.12
Bend 2no's =0.45*0.45*2*2 =0.82 0.82
Valve box 2no. =1.5*0.7*2 =2.10 2.1
Header =1.6*0.52 =0.83 0.83
Tee 9no's =0.14*2*9*0.45 = 1.13 1.13
Total Area 26.46 284.71 38 10818.96
LRB+ALUMINIUM
Hot water line @ condenser area =
8.64*0.49 = 4.23 4.23
Bend 5 no's =0.5*0.5*2*5 =2.5 2.5
Flange box 5no's =0.8*0.8*5 =3.2 3.2
Hot water @ wall side = 5.86*0.5 =2.93 2.93
Bend 2no's 0.5*0.5*2*2 =2.0 2
Total Area 14.86 159.89 28 4477.02
Nitrile Rubber
1st floor west side condenser
2.98*2.1 = 6.25 6.25
Flange box 3no's =0.8*2.16*3 =5.18 5.18
Dummy box =0.8*0.97 =0.78 0.78
Tee 2no's =0.2*0.4*2*2 =0.32 0.32
Flange box 1no. = 0.8*0.7 =0.56 0.56
Total Area 13.09 720 9424.80
TOTAL
COST 24720.8

TOTAL TOTAL
UNIT
S.NO. DESCRIPTION QTY QTY TOTAL COST
COST
SQ.MT SQ .FT
Nitrile Rubber
chilled inlet to condenser =
11.64*0.45 =5.24 5.24
Bend 11 no's =0.35*0.45*2*11 = 3.46 3.46
Flange box 6 no's =0.8*0.6*6 =2.88 2.88
Condenser 2 =1.96*1.83 =3.53 3.53
Total Area 15.11 720 10879.20
LRB+SS CLADDING
Bottom pharma room
Jacket inlet =10.21*0.57 = 5.82 5.82
Bend 5 no's =0.5*0.57*2*5 =2.85 2.85
Flange box 2no's =0.8*0.85*2 =1.36 1.36
Ground floor SSR-802
Jacket outlet =5.4*0.72 =3.89 3.89
Bend 2no's =0.65*0.72*2*2 = 1.87 1.87
Flange box 1no. =0.8*0.72 =0.58 0.58
SSR-801
Jacket inlet =2.64*0.72 =1.9 1.9
Bend 2no's =0.65*0.72*2*2 = 1.87 1.87
Flange box 2no. =0.8*0.72 *2 = 1.16 1.16
GLR - 801
Jacket outlet =4.64*0.72 =3.34 3.34
Bend 2no's =0.65*0.72*2*2 = 1.87 1.87
Flange box 2no. =0.8*0.72 *2 = 1.16 1.16
Total Area 27.67 297.73 38 11313.71

3 LRB + ALUMINIUM
SSR - 804
Steam condensate line = 24.62*0.4 = 9.85 9.85
Bend 9 no's =0.4*0.4*2*9 =2.88 2.88
Flange box 6 no's =0.8*0.75*6 = 3.6 3.6
Total Area 16.33 175.71 28 4919.90
4 Nitrile Rubber
Second floor SSR-806 beside condenser
Main body =1.9*0.62 =1.18 1.18
Flange box 2no's =0.8*0.96*2 =1.54 1.54
Condenser 2
Main body = 2.98*2.1 = 6.25 6.25
Flange box 3no's =0.8*2.16*3 =5.18 5.18
Dummy box =0.8*0.97 =0.78 0.78
Tee 2no's =0.2*0.4*2*2 =0.32 0.32
Flange box 1no. = 0.8*0.7 =0.56 0.56
Total Area 15.81 720 11383.20

TOTAL
COST 38496.01

TOTAL TOTAL
UNIT
S.NO. DESCRIPTION QTY QTY TOTAL COST
COST
SQ.MT SQ .FT
GLR-802 Condenser @ PB-VIII
Main body = 2.98*2.1 = 6.25 6.25
Flange box 1 n0. = 0.8*2.16 = 1.72 1.72
Dummy box 1no. = 0.8*0.97 = 0.78 0.78
PB-I Level - I
SSR-201 secondary condenser
Body = 0.96*0.9 = 0.86 0.86
SSR-202 secondary condenser
Body = 1.5*0.9 = 1.35 1.35
Flange box 2 no's = 0.8*1.1*2 = 1.76 1.76
Total Area 12.72 720 9158.40

LRB+AL CLADDING
PB-VIII ground floor pharma reactor
Jacket inlet & outlet = 12.50 12.5
Bend 9 no's = 0.5*0.5*2*9 = 4.5 4.5
Flange box 3 no's = 3*0.8*0.7 = 1.68 1.68

SSR-202 secondary condenser


Body = 1.5*0.9 = 1.35 1.35
Flange box 2 no's = 0.8*1.1*2 = 1.76 1.76
Total Area 21.79 234.46 28 6564.89
TOTAL
COST 15723.29
nr 56.73 720 40845.6
ss 582.44 38 22132.67
al 570.06 28 15961.81
78940.09 78940.1