A

Gabions wired together to


25mm WIDE EXPANSION JOINT
FILLED WITH FLEXEL MATERIAL form one continuous apron
AND SEALED WITH MASTIC
SEALANT

1800

1800

1800
℄ Drift
6000

6000

6000
Marker post with reflex
B B c/c 10,000

Plan
Scale 1:100
A

Front Elevation
Scale 1:100

℄ Rectangular hollow section


80 x 80 x 3.6mm filled
with concrete
Reflex on both sides white
and red as shown on plan

DOS 6000 DOS

Marker post 100


see detail 1 60

900
0.5% Direction of flow Indication of height

300 100
cm

200
1050
above carriageway

.5 1:1 30
1:1 .5 Post to be fixed in block-outs 400 200
DOS

DOS

300mm rockfill cm
Blinding with C15/20 concrete 120 x 120 x 160 with
Gabions
Rock Fill 120
100 expansive mortar
200mm thick C25/20 continuously reinforced
SECTION B-B
500

500
300

concrete slab
Blinding with C15/20 concrete SCALE 1:20
150

500 160

R12 hooks c/c 2000 for fixing with gabions

DETAIL 1
SECTION A-A SCALE 1:10
SCALE 1:50
REVISIONS KENYA NATIONAL HIGHWAY AUTHORITY SCALE:
RESIDENT ENG. J.K.K. DATE: MAY 2022
DESCRIPTIONS DATE: LOWER EASTERN REGION
P. O. BOX 2603 - 90100 SENIOR ENG. J.C. CHULUNI - MWITIKA KM 8+870 DWG No: 1
MACHAKOS
DRAWN BY: AEs SHEET No. 1 of 2.