ALLISONBulletin HY25-1380-M1/US. Owner's Manual
Allison Installation 10-Bolt PowerShift PTOs
Pre Installation of PTO
1, Install PTO pressure switch, part #379502, into port on Hydraulic Valve Cap. Torque between
120-140 In-tbs [14-16 Nm] (Fig 1)
2, If unit has a wetspline output option, install tee fitting (379627) into output bearing cap (Fig 2).
Fig.
PTO Installation
When installing a PTO, always wear protective
clothing and safety glasses.
1. Begin by draining the oil from the transmission.
Use caution, since the oil may be hot (Fig. 3).
NOTE: Installation shown is for Left Side (Street
Side) of transmission
2, Remove the PTO aperture plate with a
15mm socket (Fig. 4).
Fig.4
3Bulletin HY25-1380-M1/US. Owner's Manual
Allison Installation 10-Bolt PowerShift PTOs
PTO Installation (Continued)
3. Remove the gasket and clean the aperture
surface (Fig. 5).
NOTE: Do not reuse the gasket that comes with the
transmission.
4. Using a screwdriver, install the guide pins until
they bottom out (Fig. 6).
NOTE: Do not use sealing compounds because
they are generally incompatible with automatic
transmission fluid,
5. Install the special gasket over the guide pins.
The ribbed surface should face outward, toward
the installer (Fig. 7).
NOTE: To ensure proper backlash and sealing of
PTO to transmission, only use gasket furnished
with the PTO.
6. Position the PTO and secure it with the top
capscrew (Fig. 8).
Fig. 6
7
maisBulletin HY25-1380-M1/US. Owner's Manual
Allison Installation 10-Bolt PowerShift PTOs
PTO Installation (Continued)
7. Install the remaining capscrews. Torque all to
40-50 Ibs-ft [54-68 Nm] (Fig. 9).
NOTE: Always use a crossing pattern with
tightening capscrews.
Alist of recommended tools can be found on:
www.phtruck.com/Chelsea/Catalogs/Recommended
Tools
Fig.
8, Ifinstalling a wet spline output, attach hose
to tee fitting on output flange. If Non-Wet Spline
Option, attach hose to fitting at PTO valve (Fig. 10).
9, Remove the Transmission High Pressure
port plug and securely install the 90° elbow
fitting (379486) supplied with the PTO (Fig. 11)
See page 14 for pressure port locations on
Allison transmissions.
Fig. 17 (Left side shown)
10. Wet Spline Option - Connect the pressure hose
between the tee fitting on the output bearing
cap and high pressure port on the transmission.
Non-Wet Spline Option - Attach hose between
PTO valve fitting and High Pressure Port on the
transmission (Fig. 12).
12 Products Division
Chelsea Sve Brann 1 38656 USABulletin HY25-1380-M1/US. Owner's Manual
Allison Installation 10-Bolt PowerShift PTOs
PTO Installation (Continued)
11. After determining the position of the rotatable
flange/pump, install the flange with the gasket
and capscrews supplied with the PTO (Fig. 13).
Installing Rotatable Flanges
The rotatable flange is shipped loose with the PTO
Units for ease of installation. After determining
the flange position, attach the flange to the PTO
bearing cap using the capscrews provided in the
bag kit. After installing the capscrews make sure
to torque the screws to 24-28 Ibs-ft [33-39 Nm]
Consideration should be taken on the size and weight
of the pump being installed. (see page 5)
CAUTION: If not installing direct mount pump at
this time, install gasket, cover plate, and bolts to
Wet Spline Output Option to prevent transmission
fluid from leaking out of PTO flange if truck
engine is turned “ON” (Fig. 14).
NOTE: Also see pages 30-34 for Wet Spline
information.
12. Complete the assembly by installing the
electrical connection to the valve assembly
(Fig. 15) and the pressure switch (379502)
|. 16). Not available for the 287 Series
Installations.
13. Reference SK-Drawings in this book for
complete installation information.
NOTE: After installation is complete, refill
transmission with oil as per manufacturer
recommendation. Run PTO for approximately 5-10
minutes. Check for any unusual noise or vibration.
Also check for leaks and/or loose fittings or fasteners.
Disengage PTO and shut vehicle engine off. Repair
any discrepancies found.
13 Parker Hannifin Corp
helena Products Bion
Chelsea live Branch, MS 38654 USABulletin HY25-1380-M1/US. Owner's Manual
Allison Installation 10-Bolt PowerShift PTOs
Pressure Port and Aperture Opening Identification
‘These drawings represent left and right views of the MD and HD pressure ports on the transmission.
Toe ~ Topileft WW h
(257.8) x
.
Main Pressure Port aacteeth
488-20UNF-2A Main Pressure Port
175 10255 PS 24a! 438"-20UNF-28
Both Sides (180) 47510 255 PSI
Both Sider
Allsoni0-Sok Pad
wie 7 MD
ral yi niger a
498"-20UNF-2A Main Pressure Port
475 t0 255 PSI L— 2430 _| 438"-20UNF-28
Both Sides (5180) 17510 255 PSI
Both Sie
Alisont0-Bok Pad
HD 36
Tea Pr es,
\ eae
Aliens 0-Gok Pas s7-Teth Seez0UNE2A
Standard Hose Specifications by Transmission Lt Sige ony
TRANS. | {Uae | LOCATION 267 Series |aaci7as Series 859 Series | "ZOB77
MD__|P*___| Top Right (Right Press. Port)|320190-6x| 320180-2x | 829075-0X | 920141-1%
MDP | LH Side (Lett Press. Por) | 320130-1x|_320130-5x_| 320130-5x | 320141-1X
MD |°P"___| RH Side (Right Press. Port) |320130-4x| 320075-1X_| 320075-1x | s20141-1X
HO | °P Top Right (Left Press. Port) |320130-6x | 329075-2x_| 329075-2x | a29141-1X
HD |=P!___| LH Side (Lett Press. Port) _[320130-1x|_320180-4x | s20130.4x | s20741-1x
HOY LH Side (Left Press. Port) = 329130-5x | 320130-5x | 320141-1X
HON Top Right (Left Press. Port) 5 329130-4X__| 820075-4x | $20141-1X
MD‘? | *R",°S" | LH Side (Left Press. Port) = 329130-5x | 329130-5x | 320141-1X
MD" | =R’,°S* | RH Side (Right Press Por) | __— 329075-1X | 329075-1x | 329141-1X
An HD with 2 PTOs requires a 379556 ‘T” fitting and a 379703 swivel nut $0 degree elbow to attach 2 hoses to
the single port on the lett side.
1 Lubrication Option “R’, “S” shitter Options "@” and “H’ for 277 and 870 Series
2 Lubrication Option “R’, “S" for 278 Series10-Bolt PowerShift PTOs
Owner's Manual
Installation Sketches
Bulletin HY25-1380-M1/US
s9ysinig Od 6 o1nssoic aP Jo} pounbou st
woo worssjussued, oy YoRDeMLOD “LON
(9 sau Zbe-yS)
weyo 19g fieredes 90} 19510 ‘812 9 LIZ
a?
4801 Z1-01 23s
evenbiol vous 32
ainsseid 2068/6 883
onc, See
a vented
» seveue ono ae
ovens
wou 0809 o
ourarent 2
pet ‘
Ave ‘
soot ura pri-oes
ox onto, vous
eiraseng 2098/8
spn o
ne
Somme
g tmwowp sezeve
gS 2
Ss 2 f
3. @
th 8 eng .
5° 8 wero novos oun decoy g
g298 Ss 2
Qe a s
phage Ty &
gi. o8 eum eee
zsgs aug bq%5
£8 eee
Egos aoe
50 5K
§c=z
ato8
s2 38 Teno uouniony 1 x27 20826 9) 9oueeI
geen sani tonyaue amon
2608 eumenta wale sow10-Bolt PowerShift PTOs
Owner's Manual
Installation Sketches
Bulletin HY25-1380-M1/US
(9 neu Z2p-HS)
mons w yur 23g
Yeroi evo Ur Ha
gig
els
(suo eg Aeveiedes o804 p10 822 ee
ron tH
He
865
io
ae
sonues poods
treace
vemsomstoid
zossze
‘oienbuol
pinay
8
ory