RISK ASSESSMENT

Applying single/ double coats of emulsion paint for the external wall and doors of the porta cabin
LOCATION
STE TEMPORARAY SITE OFFICE AND LAY DOWN AREA IN SITE
TASK:
TASK APPLYING SINGLE/DOUBLE COATS OF EMULSION PAINT FOR THE EXTERNAL WALL AND DOORS OF
DISCRIPTION: THE PORTA CABIN
SEQUENCE OF POTENTIAL Risk Residual
CONTROL MEASURES ACTION BY
JOB RISKS/HAZARDS level risk

 Confined area without H  Wear respirator that will protect for these condition M STE
adequate ventilation. such as Specific absorption rate or Powered Air
Purifying Respirator or provide proper ventilation.

 Skin irritation H  Wear long-sleeved, loose fitting clothing that covers M STE
all exposed skin.

Painting external  Wash exposed areas thoroughly with soap and water
wall and door of after handling.
porta cabin
 Do not wash skin or hands with paint thinner or
lacquer thinner, use hand cleaner.

 Skin irritation to hands M  Wear gloves that are impervious to paint and thinner. L STE

 Contamination of clothing M  Wash work clothes separately from other clothing; L STE
rinse washer after thoroughly after use.

STE-SLI-JSA-18-001 Page 1/3


RISK ASSESSMENT
Applying single/ double coats of emulsion paint for the external wall and doors of the porta cabin
LOCATION
STE TEMPORARAY SITE OFFICE AND LAY DOWN AREA IN SITE
TASK:
TASK APPLYING SINGLE/DOUBLE COATS OF EMULSION PAINT FOR THE EXTERNAL WALL AND DOORS OF
DISCRIPTION: THE PORTA CABIN
SEQUENCE OF POTENTIAL Risk Residual
CONTROL MEASURES ACTION BY
JOB RISKS/HAZARDS level risk

 Eye irritation H  Wear goggles that seal eyes from paint. M STE

 Fire H  Properly store paints that may be combustible. M STE

 Properly dispose of dirty rags into airtight containers.

 No smoking allowed in or around painting area or


paint storage area.

Painting external  Promptly clean up spills and leaks.


wall and door of
porta cabin  Keep combustible away from ignition sources.

 Keep fire extinguisher near painting operation.

 Training requirements M  Respiratory protection program L STE

 Glove protection

STE-SLI-JSA-18-001 Page 2/3


RISK ASSESSMENT
Applying single/ double coats of emulsion paint for the external wall and doors of the porta cabin
LOCATION
STE TEMPORARAY SITE OFFICE AND LAY DOWN AREA IN SITE
TASK:
TASK APPLYING SINGLE/DOUBLE COATS OF EMULSION PAINT FOR THE EXTERNAL WALL AND DOORS OF
DISCRIPTION: THE PORTA CABIN
SEQUENCE OF POTENTIAL Risk Residual
CONTROL MEASURES ACTION BY
JOB RISKS/HAZARDS level risk

 PPE training

 Personal protective M  Respirator L STE


equipment (PPE)
requirements  SCBA (self-contained breathing apparatus)

 Eye protection

 Spilling of paint M  Wear face mask, goggles, hand gloves and basic PPE. L STE

 Plastic sheet will be kept underneath the painting area.


Painting external