Professional Documents
Culture Documents
TBM SHEET Nitrogen (N2) PDF
TBM SHEET Nitrogen (N2) PDF
Control Measure
• Use only correct fittings for N2 at Utility sta-
tions.
• Nitrogen valves at Utility Station shall be
chained & locked (LOTO).
• Install signage & barricade around the area
purging activities.
• Only trained competent person are allow to
operate nitrogen equipment.
• Use whip checks for N2 hose connection
• Follow Permit To Work (PTW) & Task Risk As-
sessment (TRA) requirements strictly.