Week 10 : Assignment 10
(https://examform.nptel.ac.in/2023_10/exam_form/dashboard)
Your last recorded submission was on 2023-10-04, 18:47 Due date: 2023-10-04, 23:59 IST.
IST
If already
registered, click 1) The particular task performance in CPM is known 1 point
to check your
payment status Dummy
Event
Activity
Contract
Course
outline
2) In Project Evaluation and Review Technique (PERT) and Critical Path Method 1 point
(CPM), what is the relationship between time and cost?
How does an
NPTEL Time and cost have a direct relationship
online
Time and cost have an inverse relationship
course
work? () Time and cost are independent of each other
The relationship between time and cost varies based on project characteristic
Week 0 ()
3) In CPM network critical path denotes the 1 point
Week 1 ()
Path where maximum resources are used
Week 2 () Path where minimum resources are used
Path where delay of one activity prolongs the duration of completion of project
Week 3 ()
Path that gets monitored automatically

Week 4 ()
4) Which of the following statements accurately describes the time-cost relationship in 1 point
PERT/CPM?
Week 5 ()
Increasing the project duration will always result in increased costs

https://onlinecourses.nptel.ac.in/noc23_mg107/unit?unit=89&assessment=169 1/3
04/10/2023, 18:53 Project Management For Managers - - Unit 12 - Week 10

Week 6 () Decreasing the project duration will always result in decreased costs
Increasing or decreasing the project duration has no effect on costs
Week 7 () The time-cost relationship varies depending on specific project circumstances

5) Network of a project is constructed based on 1 point


Week 8 ()

Critical path
Week 9 ()
Normal time and Crash Time

Week 10 () Precedence Logic


Basic Logic
Lesson-46
Slacks &
6) For an activity in a CPM analysis, the early Finish time is 13 and the late Finish time 1 point
Floats- II (unit?
is 13. Duration of activity is 6. Which of the following statements is true?
unit=89&lesso
n=90)
The early start is 6
Lesson-47 The duration of the activity is 13
Time and Cost
The slack of this activity is 13
Relationship
(unit? The activity is on the critical path
unit=89&lesso
n=91) 7) In the time-cost optimization, using CPM method for network analysis, the crashing 1 point
of the activities along the critical path is done starting with the activity having
Lesson-48
Crashing of
Longest duration
Networks- I
(unit? Highest cost slope
unit=89&lesso Least cost slope
n=92)
Shortest duration
Lesson-49
Crashing of 8) Crashing of a project is the process of reducing the _________________________ 1 point
Networks II
of the project?
(unit?
unit=89&lesso Cost
n=93)
Time
Lesson-50 Material
Crashing of
networks- III
Labor
(Free Float
Method) (unit? 9) In Project crashing, rent and overheads are treated as 1 point
unit=89&lesso
n=94) Significant Cost
Insignificant costs
Quiz: Week
10 : Direct Costs
Assignment Indirect Costs
10
(assessment?
10) Assertion (A): The change in critical path required rescheduling in a PERT network. 1 point
name=169)
Reason (R): Some of the activities cannot be completed in time due to unexpected breakdown of
Week 11 () equipment’s or non-availability of raw materials.

Both A and R are individually true and R is the correct explanation of A


FEEDBACK
LINK () Both A and R are individually true but R is not the correct explanation of A
A is true but R is false

https://onlinecourses.nptel.ac.in/noc23_mg107/unit?unit=89&assessment=169 2/3
04/10/2023, 18:53 Project Management For Managers - - Unit 12 - Week 10

DOWNLOAD A is false but R is true


VIDEOS () You may submit any number of times before the due date. The final submission will be
considered for grading.