Abstract of Total Capital Budget for the year 2019-20

(Rs. In lakhs)
Bengaluru Tumakuru Hassana Mysuru Bagalkote Kalaburagi Total

Sl.
Particulars
No. Budet Budet Budet Budet Budet Budet Budet
Nos. Nos. Nos. Nos. Nos. Nos. Nos.
19-20 19-20 19-20 19-20 19-20 19-20 19-20

A MAIN CAPITAL WORKS


List-I : Commissioned
1 13 10709.00 22 3691.51 21 2205.50 36 2233.20 47 5653.00 11 5983.00 150 30475.21
Works

2 List-II : Ongoing Works 54 124483.00 35 31751.00 60 21193.00 47 15123.00 26 12476.00 34 14323.00 256 219349.00

List-III : Works proposed


3 to be taken up 90 5748.00 84 3411.00 46 2734.00 45 1381.00 60 7460.00 39 591.00 364 21325.00
this year

4 Sub-Total 157 140940.00 141 38853.51 127 26132.50 128 18737.20 133 25589.00 84 20897.00 770 271149.21

5 List-IV 60 0.00 100 0.00 85 0.00 64 0.00 119 0.00 67 0.00 495 0.00

Total of Works 217 140940.00 241 38853.51 212 26132.50 #### 18737.20 252 25589.00 151 20897.00 1265 271149.21
GENERAL CAPITAL
B 5000.00 2200.00 2500.00 3122.66 6585.98 3039.98 0 22448.62
WORKS

C Total 217 145940.00 241 41053.51 212 28632.50 #### 21859.86 252 32174.98 151 23936.98 1265 293597.83

D a) Civil Budget (at the disposal of CEE (P&C) for meeting the budgetary requirement for Civil works). 4000.00

b) Construction of office complex at A.R Circle Bangaluru 10000.00

c)Construction of multipurpose auditorium , Amphi theatre executive hostel block and addtion hostel block at HRDC hudi Bangaluru. 2500.00

LDC / SCADA (at the disposal of CEE LDC for procurement of materials for Telecommunication Division and for meeting Expenditure for SCADA works
E
only).

a) SCADA Phase-I 1690.00

b) New works 4199.00

c) GCB in respect of SADA and Telecomunication Divisions 5889.00

F Transport for meeting expenditure for procurement of Vehicles. 50.00


T&P, Computers and RT and R&D (at the disposal of CEE (P&C) for meeting budgetary requirment for procurement of Tools & Plants, Computers, office
G 5000.00
equipments and RT and R & D equipments

H Contingency Budget : (to be held by CEE (P&C) for releasing budgetary requirement for taking up unforeseen and urgent works/Expenses. 4000.00

I GRAND TOTAL (Rs.in Lakhs) 330925.83


List - I : Abstract of Commissioned works for the year 2019-20
Rs. in Lakhs

Sub-Stations Augmentations Exclusive Lines TB's & Others Total

Name of the
Sl. No.
Zone Revised
Budget Budget Budget Budget Budget Budget
Nos. Budget Nos. Nos. Nos. Nos.
18-19 19-20 19-20 19-20 19-20 19-20
18-19

1 Bengaluru 9 2353.00 2164.30 10299.00 1 25.00 2 185.00 1 200.00 13 10709.00

2 Tumakuru 7 580.00 638.33 1733.13 10 419.05 5 1539.33 0 0.00 22 3691.51

3 Hassana 7 1431.20 1582.55 1360.00 5 91.00 8 604.50 1 150.00 21 2205.50

4 Mysuru 16 1129.00 1190.00 1641.00 16 444.20 3 98.00 1 50.00 36 2233.20

5 Bagalkote 15 399.00 425.17 4041.00 23 625.00 8 827.00 1 160.00 47 5653.00

6 Kalaburagi 5 1589.51 1190.82 793.00 2 60.00 2 4700.00 2 430.00 11 5983.00

Total 59 7482 7191 19867.13 57 1664.25 28 7953.83 6 990.00 150 30475.21

List - I
List - II : Abstract of Ongoing works for the year 2019-20
Rs.in Lakhs

Sub-Stations Augmentations Exclusive Lines TB's & Others Total

Sl. No. Name of the Zone


Budget Budget Budget Budget Budget
Nos. Nos. Nos. Nos. Nos.
19-20 19-20 19-20 19-20 19-20

1 Bengaluru 26 111575.00 11 2793.00 10 4990.00 7 5125.00 54 124483.00

2 Tumakuru 11 21225.00 12 1656.00 10 7870.00 2 1000.00 35 31751.00

3 Hassana 16 12723.00 34 5570.00 9 2700.00 1 200.00 60 21193.00

4 Mysuru 11 10530.00 32 4108.00 3 210.00 1 275.00 47 15123.00

5 Bagalkote 8 5966.00 10 1469.00 6 4001.00 2 1040.00 26 12476.00

6 Kalaburagi 9 9518.00 21 3847.00 3 458.00 1 500.00 34 14323.00

Total 81 171537.00 120 19443.00 41 20229.00 14 8140.00 256 219349.00

List - II
List - III : Abstract of Works Proposed to be taken up during 2019-20
Rs.in Lakhs

Sub-Stations Augmentations Exclusive Lines TB's & Others Total


Name of the
Sl. No.
Zone
Budget Budget Budget Budget Budget
Nos. Nos. Nos. Nos. Nos.
19-20 19-20 19-20 19-20 19-20

1 Bengaluru 15 2443.00 57 2898.00 18 407.00 0 0.00 90 5748.00

2 Tumakuru 3 300.00 72 2750.00 9 361.00 0 0.00 84 3411.00

3 Hassana 5 905.00 27 1116.00 9 630.00 5 83.00 46 2734.00

4 Mysuru 6 1100.00 24 204.00 15 77.00 0 0.00 45 1381.00

5 Bagalkote 9 1804.00 37 2561.00 12 2757.00 2 338.00 60 7460.00

6 Kalaburagi 9 280.00 20 248.00 8 43.00 2 20.00 39 591.00

Total 47 6832.00 237 9777.00 71 4275.00 9 441.00 364 21325.00

List - III
List - IV : Abstract of Works which have been cleared by either TAC/TCCM. Or
administrative sanction has been accorded for the DPR (in the absence of
TAC/TCCM clearance) and are not intended to be taken up during the year 2019-20

Rs. in Lakhs
Sub-Stations Augmentations Exclusive Lines TB's & Others Total
Name of the Zone
Nos. Nos. Nos. Nos. Nos.

Bengaluru 10 20 24 6 60

Tumakuru 32 35 33 0 100

Hassana 41 20 21 3 85

Mysuru 35 23 0 6 64

Bagalkote 59 26 31 3 119

Kalaburagi 37 12 18 0 67

Total 214 136 127 18 495

List - IV
GENERAL CAPITAL BUDGET FOR 2019-20
Rs. In Lakhs

Bengaluru Tumakuru Hassana Mysuru Bagalkote Kalaburagi


TOTAL
Zone Zone Zone Zone Zone Zone
Category Particulars
Budget Budget Budget Budget Budget Budget
Budget19-20
19-20 19-20 19-20 19-20 19-20 19-20

A Providing new 11kV Switch Gears 2562.11 580.44 674.8 1135.39 608.71 156.97 5718.42

Providing new EHV breakers & C&R


B 1620.34 176.60 234.27 385.00 706.16 169.72 3292.09
panels

C Spare Transformers 54.00 100.00 314.00 194.50 164.39 1115.54 1942.43

D Survey & Investigation 100.00 169.43 257.59 213.00 581.96 303.92 1625.90

Land acquisition, levelling and area


E 200.00 725.00 516.30 784.93 3413.55 1165.25 6805.03
fencing

F Protection Equipments & Metering 189.04 97.86 130.00 342.85 493.01 0.00 1252.76

Budgetary grant for procurement of


G 274.51 350.67 373.04 66.99 618.20 128.58 1811.99
materials for Minor Capital Works.

Total 5000.00 2200.00 2500.00 3122.66 6585.98 3039.98 22448.62


Zone Wise Abstract of all Works 2019-20
Rs inLakhs

Sub-Stations Augmentations Exclusive Lines TB's & Others Total


Sl. Name of the
No. Zone
Budget Budget Budget Budget Budget
Nos. Nos. Nos. Nos. Nos.
19-20 19-20 19-20 19-20 19-20

1 Bengaluru 50 124317.00 69 5716.00 30 5582.00 8 5325.00 157 140940.00

2 Tumakuru 21 23258.13 94 4825.05 24 9770.33 2 1000.00 141 38853.51

3 Hassana 28 14988.00 66 6777.00 26 3934.50 7 433.00 127 26132.50

4 Mysuru 33 13271.00 72 4756.20 21 385.00 2 325.00 128 18737.20

5 Bagalkote 32 11811.00 70 4655.00 26 7585.00 5 1538.00 133 25589.00

6 Kalaburagi 23 10591.00 43 4155.00 13 5201.00 5 950.00 84 20897.00

Total 187 198236.13 414 30884.25 140.00 32457.83 29.00 9571.00 770 271149.21
List I - Commissioned Works 2019-20
Rs. in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up to
Sl. Work Original / Total Work Budget
Name of the Work District Savings & Date of LOI Cost of DWA Supplied 31/03/19 Remarks
No. Code Revised Cost 2019-20
BCR Materials &
DPR & Date
others

BENGALURU TRANSMISSION
ZONE

Vikas Tech Park:


a) Establishing 2x150MVA,
220/66kV Station with line.
b) Vikas Technical
Budget 18-19
Park_Evacuation line 1: Running
STN FQV-20L & LINE fqv-150L
66kV 630 sqmm UG cable from
Stn Rtn -200L.
Vikas Technical Park 220kV S/s
7587.86 & a) 28.04.10 a) 3123.78 Stn Rtn-100L
to 66 kV Shobha Developers S/s Bengaluru ES 42.81
1 AA1038 31.10.09 b) 04.11.11 b) 1064.93 0.00 7789.43 600.00 Cable : Rtn Bills 368.41L
3.5 Kms Urban BCR 2.67
c) 09.03.11 c) 1794.96 Total: 838.41
c) Vikas Technical
Park_Evacuation line 2:
FY 19-20
66kV 1000 sq. mm SC UG cable UG cable FQV-100L
line from the proposed 220 kV
Vikas Tech Park S/s to
Devarabeesanahalli for a route
length of 3.5 ckt. Kms

Budget 18-19
Cable: Supply Rtn -1400L
Koramangala: Erection & civil -200L
Establishing 220/66/11kV GIS Stn: Erection and civil -100L
substation at Kormangala with Total: 1700.00
Bengaluru ES.8.75 & 37339.12 &
2 AA1131 220 kV 1000 sqmm LILO UG 06.05.17 18047.93 0.00 18047.93 13188.28 3500.00
Urban BCR 1.334 24.11.15
cable from existing HSR- Budget 19-20
NIMHANS UG cable with Supply - 3000L
associated 66kV lines. erection/civil - 500L
Total: 3500L

Budget 18- 19
Hulimangala : Supply rtn -334L
Stn14.03.1
Establishing 2x12.5MVA,
Bengaluru ES 1.39 & 4531.08 & 8 Stn713.26
3 AA1161 66/11kV Keonics (ElectronicCity) 0.00 3474.13 3187.70 350.00 Budget 19-20
Urban BCR 0.27 23.12.16 cable4278. cable2760.87
Sub-Station for a route length of Supply Rtn - 354L
98
3.789Kms. swg -120L
Total -474L
Cost of
Cost of
Energy Deptly. Cum Exp up to
Sl. Work Original / Total Work Budget
Name of the Work District Savings & Date of LOI Cost of DWA Supplied 31/03/19 Remarks
No. Code Revised Cost 2019-20
BCR Materials &
DPR & Date
others

Dobbaspet (Nelamangala): FY 18-19


a) Establishing 2x100MVA, Final 10% Bill against Handing over:
220/66kV Station with 220kV Supply: 31Lakhs
LILO of Kadur-Nelamangala Erection: 2Lakhs
5259.00 & a) 25.04.07 a) 2555.42
b) 66kV lines to Nelamangala & Bengaluru ES 38.7 Civil: 15Lakhs
4 AB1009 05.05.12 b) 05.09.07 b) 993.54 1487.00 5416.94 4646.58 37.00
Kolala Sub-Station upto loc 65 Rural BCR 4.72 Total : 48 L
c) 02.02.13 c) 380.98
c) Construction of 66kV SC line
on DC towers from Dabaspet to FY 19-20
Kolala from location 66 to 99 for a FQV BILLS: 17L
distance of 5.856 kms LS: 20L

Jigani :
Establishing 2x31.5MVA &
FY-18-19
2x150MVA, 220/66KV Station b)
Workslip: 518.18 L
Jigani line:Construction of 220KV 6491.35 &
Bengaluru ES 9.93
5 AB1014 DC line with drake Conductor for 20.07.09 08.10.07 9301.38 1300.21 10601.59 7622.33 200.00
Rural BCR 2.54 FY-19-20
a route length of 5.714 Kms to
Stn & Line FQV:- 200L
LILO Somanahalli Yerandanahalli
line using MONOPOLE on the
road median.

FY 18-19
Line civil & erection-40L
Tree cut-348L
B. V. Halli : Land compension-150L
Establishing 1x12.5MVA, Total-538
ES 1.32 797.16 &
6 AC1056 66/11kV Sub-Station with Ramanagar 14.02.17 953.29 43.00 996.29 984.34 1000.00 FY 19-20
BCR 1.421 05.12.15
associated line for a distance of Land compensation-150L
18.40Kms QV-50L
Total-200L
Excess due to tree cut & land
compensation of 700L
Cost of
Cost of
Energy Deptly. Cum Exp up to
Sl. Work Original / Total Work Budget
Name of the Work District Savings & Date of LOI Cost of DWA Supplied 31/03/19 Remarks
No. Code Revised Cost 2019-20
BCR Materials &
DPR & Date
others

FY 18-19:
Land compn-110L
Rtn-93L
TB erection & civil-10L
Srigiripura : Line Civil-25L
Establishing 1x8MVA, 66/11kV ES 3.05 761.87 & Total-238L
7 AC1060 Ramanagara 13.06.16 780.78 30.00 810.78 878.73 290.00
Sub-Station with associated line BCR 1.96 08.09.15 FY -19-20
for a distance of 8.6Kms QV-30L
tree cut-125L
Total-155L
Excess due to tree cut and land
compensation - 360L

Workslip-1 approved for Rs.10559.9L


FY-18-19:
10% retention supply, civil, erection:
1060L
Land / tree cut comp:723L
Railways payment:17L
Mittemari:
Total-1800L
Establishing 2x100MVA,
ES 25.38 7564.79 & FY-19-20:
8 AE1026 220/66/11kV Station with C.B.Pura 10.07.15 8858.74 38.64 8897.38 8128.38 4300.00
BCR 1.46 10.07.15 Retention bills: 1100L
associated lines for a distance of
Amount for the execution of NON DWA
220kV 91 kms & 66kV 80.36 kms
civil and electrical works & other minor
works:200L
Land compensation:1000L
Total:2300L
Cost of
Cost of
Energy Deptly. Cum Exp up to
Sl. Work Original / Total Work Budget
Name of the Work District Savings & Date of LOI Cost of DWA Supplied 31/03/19 Remarks
No. Code Revised Cost 2019-20
BCR Materials &
DPR & Date
others

Sarjapura :
a) Est 2x100 MVA, 220/66/11 kV
S/S with 220kV LILO of Somanahalli-
Malur line
b) Const. of 66KV LILO line from
Sarjapura station to 66 kV S/C
Hoody-Chandapura line near
Muttenallur Village limits for a
6855.93 &
distance of 8.5 Kms and Const. of Bengaluru ES 21.13 a) 26.04.07 a)4339.33 FY 19-20
9 AB1008 06.10.08 1200.67 5882.86 5000.58 22.00
66KV S/C line from 220/66/11KV Rural BCR 2.38 b) 05.09.07 b) 342.86 22L - Balance works payment
Sarjapura station to the CTT for
running 66KV 630 sqmm UG Cable
to 66/11KV S/s at Attibele for a
distance of 11.1 Kms and Terminal
Bay at Attibele.
a) 5.885 Kms
b) 8.5 & 11.1 Kms

9 Total of Sub-stations 56012.05 4100 54128 51426 10299

FY 18-19
PV Bill : 16.18 L
Malur Industrial Area: 10% Rtn: 0.95 L
Replacing of 2X8 MVA, 66/11kV by 435.98 & 24.08.17 & MEI bill: 18.65 L
1 AD1040 KOLAR 4.83 298.00 302.83 308.23 25.00
2X20 MVA Transformer at 66/11KV 10.06.15 18.12.17 Adopter Panel: 1.73 L
S/S Malur Industrial Area 1AP: 2.2 L
Brk Erection: 2.5L
Total: 42.23 L

1 Total of Augmentation 4.83 298.00 302.83 308.23 25.00

FY 18-19
Tubagere Sub-station: 61.41 & Erection & retention - Rs.24.68L
Bengaluru
1 AB1046 Stringing of 2nd circuit for NA 24.01.12 05.12.13 74.13 0.00 74.13 49.31 15.00
Rural
Providing LILO arrangement FY 19-20
Erection & retention - Rs.15L

Work slip approved for Rs.665.6L


FY- 18-19:
Suppply:80L
Erection:20L
Malur- Malur I/A: Construction Civil: 27L
of 66kV SC line for a distance of Crop/ tree cut comp:15L
10.77Kms partly on MC towers 569.61 & Total: 142L
2 AD1041 Kolar NA 05.09.17 619.75 0.00 619.75 477.62 170.00
and partly on DC towers from 23.09.15
220/66kV Malur S/s to 66/11kV FY-19-20:
Malur Industrial area S/s Retention bills: 40L
Tree cut comp:10L
construction of 66KV TB at Malur R/s 38L
Total: 88L
Cost of
Cost of
Energy Deptly. Cum Exp up to
Sl. Work Original / Total Work Budget
Name of the Work District Savings & Date of LOI Cost of DWA Supplied 31/03/19 Remarks
No. Code Revised Cost 2019-20
BCR Materials &
DPR & Date
others

2 Total of Lines 693.88 0.00 693.88 526.93 185.00

Budget 18-19
400kV R/S Hoody: 895.98 &
Bengaluru Erection-100L
1 AA1057 Providing 63MVAR Bus Reactor NA 01.07.09 06.01.11 726.20 0.00 726.20 267.82 200.00
Urban
at 400/220kV Station.
Budget 19-20
erection & civil - 200L

1 Total of TB's & Others 726.20 0.00 726.20 267.82 200.00

13 Total for Bengaluru Zone 57436.96 4397.52 55850.81 52529.33 10709.00

Tumakuru transmission zone

Shyagale(Lokikere): Establishing
40.00 Lakhs budget surrendered during
1x8MVA, 66/11kV Sub-Station ES 2.56 455.42 &
1 BB1048 Davanagere 06.09.13 530.52 50.82 581.34 526.73 76.00 2018-19 and 40.00 lakhs required for FY-
with associated line for a distance BCR 1.93 13.01.12
2019-2020 for LD and crop compensation
of 6.04 Kms.

Pavagada:
Establishing 2x100MVA,
ES 81.5 7160.37 &
2 BA1034 220/66kV Station with associated Tumakuru 16.01.13 7661.00 1812.37 9473.37 7887.75 1400.00 Tree/Crop- Rs 348.08L , Retention-Rs-
BCR 4.00 17.10.11
lines for a distance of 120.00 625L,
Kms.
FY 2018-19 Split up
Crop: 15.25 lakhs
PV: 40.00 Lakhs
Supply: 40.00lakhs
Rentation: 64.00 lakhs
Nallur : 566.96 &
ES 4.633 & Total-159.25 Lakhs
3 BB1078 Establishing 1x8MVA, 66/11kV Davangere 09.02.17 20.03.18 534.75 22.58 557.33 364.80 80.00
BCR 4.83 FY-2019-20
Sub-Station with associated line
QV: 28.00 Lakhs
LD: 8.27 Lakhs
Total: 36.27 Lakhs

Neeragunda Gate: Establishing


1x8MVA, 66/11kV Sub-Station in
Neeraguda gate in Hosadurga
Taluk, Chitradurga Dist.by ES 14.05 646.70 &
4 BC1070 Chitradurga 20.01.16 663.00 24.60 687.60 600.60 25.50
constructing 66kv SC tap line on DC BCR 2.95 07.12.15
towers from existing 66kv
Hosadurga-Bagur line for a distance
of 10.205 kms
Cost of
Cost of
Energy Deptly. Cum Exp up to
Sl. Work Original / Total Work Budget
Name of the Work District Savings & Date of LOI Cost of DWA Supplied 31/03/19 Remarks
No. Code Revised Cost 2019-20
BCR Materials &
DPR & Date
others

Theriyur:
Establishing 1 x 8 MVA 66/11 KV
ES 1.008 & 488.65 &
5 BA1119 S/S with associated line in Tumakuru 20.09.17 498.41 31.50 529.91 513.63 42.00
BCR 1.25 28.01.17
Madhugiri Taluk, Tumakuru
District.

Thippur:
ES 2.091 & 442.5 &
6 BA1120 Establishing 1 x 8 MVA 66/11 KV Tumakuru 27.09.17 509.60 31.50 541.10 514.30 54.00
BCR 3.20 01.07.16
S/S with associated line

Madadakere :
Establishing 2x8MVA, 66/11kV ES.224.72 777.14 &
7 BC1054 Chitradurga 21.12.16 851.34 49.34 900.68 914.49 55.63
Sub-Station with associated lines for BCR 1.289 03.07.15
a distance of 13.33Kms

7 Total of Sub-stations 11248.62 2022.71 13271.33 11322.30 1733.13

K.B. Cross:
ES 621.73 &
Providing Spare 1 x 100 MVA Retention Bill Rs 173.59 Lakhs
1 BA1091 Tumakuru 14040.5 12.02.14 16.09.17 621.73 0.00 621.73 718.68 200.00
220/110/11 KV Power Surrender - 100.00 Lakhs
BCR 3.903
transformer
Huliyar:
Providing Additional 1x10MVA, 253.85 &
2 BA1116 Tumakuru BCR 1.69 23.07.18 107.26 40.00 147.26 10.00 85.00 Retenation-57.91Lakhs
110/11kV Power Transformer at 03.03.15
110/11kV Station.
Ankasandra:
Providing Additional 1x8MVA, 112.36 &
3 BA1117 Tumakuru BCR 1.01 11.07.18 92.20 32.20 124.40 110.38 10.00
66/11kV Power Transformer at 03.11.14 Retention-25 & FQV = Rs 57.50 Lakhs
66/11kV Station.

Kallur:
Replacing 1x10 MVA,110/11kV 204.53 &
4 BA1127 Tumakuru BCR 1.14 0.00 190.33 20.00
by 1x 20 MVA, 110/11kV 11.05.17
Transformer.

Chowdanakuppe: Providing
ES 1.36 168.49 &
5 BA1063 additional 1x8MVA, 66/11kV Tumakuru 03.10.13 75.00 98.00 173.00 67.38 11.00
BCR 1.15 12.10.11
Transformer

BG Kere:
ES NA 201.58 &
6 BC1034 Providing additional 1x6.3MVA, Chitradurga 23.01.12 92.53 78.55 171.08 85.17 3.29
BCR 0.76 05.03.11
66/11kV transformer

Rangenahalli:
ES NA 170.97 &
7 BC1040 Providing additional 1x8MVA, Chitradurga 16.03.17 92.58 32.00 124.58 116.32 16.40
BCR 1.14 12.10.11
66/11kV Transformer
Cost of
Cost of
Energy Deptly. Cum Exp up to
Sl. Work Original / Total Work Budget
Name of the Work District Savings & Date of LOI Cost of DWA Supplied 31/03/19 Remarks
No. Code Revised Cost 2019-20
BCR Materials &
DPR & Date
others

Halukurke:
Providing Additional 1x10 MVA, 229.41 &
8 BA1118 Tumakuru BCR 1.058 04.07.17 275.50 33.00 308.50 116.33 13.00
110/11 kV Power Transformer at 02.09.14
110/11kV Station.
Yadavani:
Providing additional 1x12.5 MVA, BCR 2.19 224.28 &
9 BA1122 Tumakuru 23.12.17 88.26 153.00 241.26 203.01 22.00
66/11kV Power Transformer ES 160.48 13.01.16
Transformer
Dyavaranahalli:
ES NA 170.97 &
10 BC1041 Providing additional 1x8MVA, Chitradurga 16.03.17 89.52 0.00 89.52 120.18 38.36
BCR 1.14 12.10.11
66/11kV Transformer

10 Total of Augmentation 1534.58 466.75 2001.33 1737.78 419.05

Vasanthanarasapura to
Anthrasanahally:
Construction of 220kV DC line
from PGCIL station at
2241.56 &
1 BA1094 Vasanthanarasapura to existing Tumakuru NA 18.05.15 2799.00 1466.39 4265.39 3941.00 150.00 FQV -128.96Lakhs
28.06.14
220kV station at
Anthrasanahally along with
terminal bays for a distance of
18.8 kms.

220kV SRS, Davangere to 66kV


MUSS Davangere:
27.00 Lakhs budget surrendered during
Construction of 66kV DC Line on 258.00 &
2 BB1056 Davanagere NA 17.10.12 248.50 0.00 248.50 284.73 42.00 2018-19 and 27.00 lakhs required for FY-
DC Narrow Based Towers in the 30.03.12
2019-2020 for LD
existing corridor for a distance of
3.263 Kms.

Tumakuru to Rampura limits: The budget will be booked subject to


Construction of 400kV DC with approval of Time extension proposal.
Quad Moose ACSR from V.N.pura 43277.77 & 40.5 Crores for 2nd Retension.
3 BC1052 Chitradurga NA 24.12.14 54347.73 8980.00 63327.73 61657.34 1000.00
to Rampura Limits 08.04.14
(Kelaginakanive) for distance of If not approved.40.5Crores is required for
188.74Kms FY-19-20

HAL Project: a) Construction of


220/220KV MC line for Shifting
of Existing 220KV B1,B2 &
B3,B4 Lines at proposed
HALpremises
b) Construction of 110KV D/C FQV-300Lakhs, Retention-96.13Lakhs,
line with NBT for the Compension-100Lakhs, Surrendor-
4 BA1121 Tumakuru NA 5764.00 31.05.16 3645.52 3279.80 6925.32 5308.89 300.00
shifting of existing 110KV S/C 200Lakhs
Nittur-Doddaguni line at Prposed b. Commissioned on 29.12.2018
HAL premises
near Bidarehalli Kaval village
limits in Gubbi taluk in
Tumakuru District.
Cost of
Cost of
Energy Deptly. Cum Exp up to
Sl. Work Original / Total Work Budget
Name of the Work District Savings & Date of LOI Cost of DWA Supplied 31/03/19 Remarks
No. Code Revised Cost 2019-20
BCR Materials &
DPR & Date
others

Thallak-Hanagal:
Construction of 66kV D/C Thallak - 543.28 &
5 BC1038 Chitradurga NA 28.01.12 575.96 45.00 620.96 658.18 47.33
Hanagal line in the existing corridor 18.07.11
for a distance of 33.52 Kms.

5 Total of Lines 61616.71 13771.19 75387.90 71850.14 1539.33

22 Total of Tumakuru Zone 74399.91 16260.65 90660.56 84910.22 3691.51


HASSANA TRANSMISSION
ZONE
Probable for Mar-19 :
Bills on hand: Rtn:7.11
Arasikere: bills to receive:
Establishing 2x100MVA, Rtn:22.00
3526.17 &
220/110kV and 1x10MVA, ES 29.5 work Bills:20.00
1 CA1037 Hassana 06.09.11 24.11.12 3251.50 193.00 3444.50 2868.93 460.00
110/11kV Station Arasikere BCR 3.67
Taluk,with associated lines for a For fy-19-20 LD:325.15
distance of 9.883 Kms. FQV: 130.00
Total:455.15

Bills on hand :
Jade: 1) BR No: 517/06.09.2018 Rs.0.98 Lakhs.
Establishing 1x10MVA, 110/11kV 2) BR No: 1239/27.02.2019 Rs.7.97
Sub-Station at Jade in Soraba ES 0.97 792.16 & Lakhs.
2 CD1034 Shimoga 26.12.14 780.27 50.62 830.89 778.05 10.00
Taluk, Shivamogga District along BCR 0.62 22.08.13
with associated line for a Budget FY 2019-20
distance of 11.850 Kms. Line Civil FQV difference amount Rs.10.00
Lakhs.

LD Rs.48.34 Lakhs. Bills on hand: 1) BR


No: 1298/10.03.2019 Rs.3.72 Lakhs. 2)
BR No: 1296/10.03.2019 Rs.0.85 L 3) BR
No: 1291/10.03.2019 Rs.13.42 L. 4) BR
No: 1297/10.03.2019 Rs.4.47 L. 5) BR No:
1299/10.03.2019 Rs.2.90 L. 6) BR No:
Rippenpete: 1300/10.03.2019 .4.01 L. 7) BR No:
Establishing 1x10MVA, 110/11kV 1301/10.03.2019 Rs.7.89 L. 8) BR No:
916.38 &
Sub-Station at Ripponpet in ES 0.571 1302/10.03.2019 Rs.7.99 L. 9) BR No:
3 CD1055 Shimoga 18.02.15 21.01.16 975.42 51.95 1027.37 909.71 40.00
Hosanagara Taluk, along with ES 0.82 1292/10.03.2019 Rs.7.00 L. 10) BR No:
associated line for a distance of 1293/10.03.2019 Rs.2.76 L. 11) BR No:
10.16Kms 1295/10.03.2019 Rs.2.20 L. 12) BR No:
1294/10.03.2019 Rs.2.62 L. Total
Rs.59.83 Lakhs.
Probable Expenditure:
Retention Rs.28.00 Lakhs
Crop compensation Rs.5.82Lakhs
Total Rs.33.82 Lakhs
Cost of
Cost of
Energy Deptly. Cum Exp up to
Sl. Work Original / Total Work Budget
Name of the Work District Savings & Date of LOI Cost of DWA Supplied 31/03/19 Remarks
No. Code Revised Cost 2019-20
BCR Materials &
DPR & Date
others

Shivapura:
Establishing 1x10MVA, 110/11kV
Sub-Station at Shivapura in Chikkamagal ES 1.116 520.34 &
4 CE1008 23.05.07 318.64 140.90 459.54 305.67 50.00 Budget FY 2019-20
Tarikere Taluk, Chikkamagaluru uru BCR 1.6 05.03.09
civil-40Lakhs
District along with associated
T&P - 10Lakhs
line for a distance of 0.03 Kms.

LD Rs.2.25 Lakhs
Bills on hand :
BR No: 1277/08.03.2019 Rs.17.64 Lakhs.
BR No: 1278/08.03.2019 Rs.1.02 Lakhs.
BR No: 1303/10.03.2019 Rs.6.95 Lakhs.
BR No: 1304/10.03.2019 Rs.2.19 Lakhs.
Total Rs.27.80 Lakhs.
Santhekadur:
Probable expenditure:
Establishing 1x8MVA, 66/11kV
Power Transformer supply Rs.75.00
Sub-Station at Santhekadur in ES 1.25 & 395.99 &
5 CD1039 Shimoga 12.02.18 422.08 0.00 422.08 272.71 185.00 Lakhs. Erection Rs.20.00 Lakhs.
Shivamogga Taluk & District BCR 2.047 22.06.16
Civil Rs.5.00 Lakhs.
along with associated line for a
Total Rs.100.00 Lakhs.
disance of 0.095Kms.
Budget for 2019-20
Supply Rs.125.00 Lakhs
Erection Rs.10.00 Lakhs
Civil Rs.20.00 Lakhs
Retention Rs.30.00 Lakhs
Total Amount Rs.185.00 Lakhs

Bills on hand:
BR No: 1276/08.03.2019 Rs.14.96 Lakhs.
BR No: 1279/08.03.2019 Rs.2.80 Lakhs.
BR No: 1288/08.03.2019 Rs.2.26 lakhs.
BR No: 1280/08.03.2019 Rs.13.55 Lakhs.
BR No: 1286/08.03.2019 Rs.15.26 lakhs.
BR No: 1287/08.03.2019 Rs.2.39 Lakhs.
Kortigere: BR No: 1283/08.03.2019 Rs.56.98 Lakhs.
Establishing 1x10MVA, 110/11kV BR No: 1284/08.03.2019 Rs.5.18 lakhs.
Sub-Station at Koratigere in ES 1.87 & 692.42 & Total Rs.113.38 Lakhs. LD Rs.20.78
6 CD1060 Shimoga 04.01.18 683.76 0.00 683.76 520.90 265.00
Shikaripura Taluk , Shivamogga BCR 0.61 22.06.16 Lakhs.
District along with associated Retention Rs.57.53 Lakhs.
line for a distance of 7.139Kms Probable Expenditure: Rs.40.00 Lakhs
Budget for 2019-20
Supply Rs.40.00 Lakhs.
Erection Rs.30.00 Lakhs
Retention Rs.50.00 Lakhs
Civil Rs.70.00 Lakhs
Land/crop Rs.75.00 Lakhs
Total Rs.265.00 Lakhs
Cost of
Cost of
Energy Deptly. Cum Exp up to
Sl. Work Original / Total Work Budget
Name of the Work District Savings & Date of LOI Cost of DWA Supplied 31/03/19 Remarks
No. Code Revised Cost 2019-20
BCR Materials &
DPR & Date
others

On Hand Bills:8.55
MEI:31.85
Bills to receive:15.66
Total:56.06
For Fy 19-20
Work bills to receive:
S:82.51
Rudrapatna: E:15.91
Establishing 1 X 8 MVA ,66/11 C:50.91
KV S/S at Rudrapatna in ES 1.64 467.64 & Subtotal:149.36
7 CA1063 Hassana 12.03.18 527.13 31.85 58.98 320.88 350.00
Arkalgud Taluk, Hassana District BCR 1.37 31.10.07 Compensation:25
along with associated line for a Workslip2:40
disance of of 4.8Kms. Rtn:
S:63.96
E:0.14
C:11.54
Subtotal:75.64
LD:52.7
FQV:12.52
Total:355.22

7 Total of Sub-stations 6958.80 468.32 6927.12 5976.85 1360.00

Netlamadnur 220kV R/S:


Replacement of 1x10MVA,
Probable Expenditure for 2018-19 :
110/11kV Transformer by
Dakshina 274 & Erection - 3 L, Retention(MEI) - 2 L
1 CB1045 1x20MVA, 110/11kV Transformer BCR 1.43 09.02.17 103.98 60.58 164.56 155.61 6.00
Kannada 18.11.15
at existing 220/110/33/11kV
Netlamudnur sub-station in
Bantwal Taluk.

Bills on hand:
1) BR No: 1235/25.02.2019 Rs.2.17 lakhs.
2) BR No: 1236/24.02.2019 Rs.10.53
Lakhs. 3) BR No: 1237/24.02.2019
Balligavi:
Rs.1.16 Lakhs.
Providing additional 1x10MVA,
284.42 & Total Rs.13.86 Lakhs.
2 CD1057 110/11kV Transformer at Shimoga BCR 0.78 05.07.16 126.89 50.94 177.83 171.28 40.00
18.07.14 Budget 2019-20
110/11kV Balligavi sub-station in
Supply Rs.28.00 Lakhs
Shikaripura Taluk.
Erection Rs.6.00 Lakhs
Civil Rs.5.00 Lakhs
Retention Rs.1.00
Total Rs.40.00 Lakhs
Cost of
Cost of
Energy Deptly. Cum Exp up to
Sl. Work Original / Total Work Budget
Name of the Work District Savings & Date of LOI Cost of DWA Supplied 31/03/19 Remarks
No. Code Revised Cost 2019-20
BCR Materials &
DPR & Date
others

Kadur: Budget 2019-20


Providing additional 1 X10MVA, Retention Bill Rs.30.00 Lakhs
Chikkamagal 236.14 &
3 CE1039 110/11kV Spare Transformer at BCR 1.660 27.08.16 88.95 25.63 114.58 111.14 30.00 Total Rs.30.00 Lakhs
uru 12.06.15
220/110kV Kadur Station in
Kadur Taluk .

CR Patna:
Replacement of 1 X 12.5MVA, 20MVA, power transformer commissioned
174.86 &
4 CA1057 66/11 KV power Transformer by 1 Hassana BCR 0.951 0.00 155.00 155.00 158.39 10.00 on 12.12.2018 remaining works under
16.03.15
X 20 MVA, 66/11kV Power progress.
Transformer at CR Patna S/S

Bantwala:
Replacement of existing
Probable expenditure for 2018-19: PV - 20
1x10MVA,110/33KV Transformer
Dakshina 204.02& L, Work Cost - 8 L.
5 CB1054 by 1x20MVA,110/33KV BCR 0.46 0.00 180.43 5.00
Kannada 12.06.17 Award Cost: Supply - 1.76L, Erection -
Transformer at 110/33/11kV
9.16L, Civil - 1.54; Total - 12.47L.
Bantwala sub-station in Bantwal
Taluk.

5 Total of Augmentation 319.82 292.15 611.97 776.85 91.00

Hagare Sub-Station: Providing Work is combined package


LILO arrangement to Hagare S/S For probable Fy 2018-19
by stringing of 2nd ckt on existing Workslip3:2.00
32.77 &
1 CA1034 DC towers from 66kV Hassana- Hassana 23.05.16 28.46 2.66 31.12 26.78 3.00 Fro Fy-19-20
22.03.13
Chikkamagalur line to Hagare FQV:2.00
S/S with TB at Hagare S/s for a LD:1.00
distance of 0.7Kms Total:3.0

Balupete:
Providing LILO arrangements to Work is combined package
66/11kV Balupete Sub-Station by For probable Fy 2018-19
stringing the 2nd ckt line on the Workslip3:1.00
33.31 &
2 CA1035 existing DC towers from 66kV Hassana 23.05.16 38.38 2.66 41.04 36.72 3.50 Fro Fy-19-20
11.02.13
Hassana-S.K.Pura 2nd Ckt line to FQV:2.00
66/11kV Balupet S/S with TB at LD:1.50
66/11kV Balupet S/s for a Total:3.50
distance of 0.6Kms
Cost of
Cost of
Energy Deptly. Cum Exp up to
Sl. Work Original / Total Work Budget
Name of the Work District Savings & Date of LOI Cost of DWA Supplied 31/03/19 Remarks
No. Code Revised Cost 2019-20
BCR Materials &
DPR & Date
others

Doddahally:
Stringing of 66kV 2nd circuit on Work is combined package
existing 66kV DC towers from tap For probable Fy 2018-19
point of 2nd circuit of 66kV Workslip3:1.00
29.05 &
3 CA1043 Kadavinakote-Hootagally line to Hassana 23.05.16 37.50 2.80 40.30 37.52 3.00 Fro Fy-19-20
07.11.12
the existing 66/11kV Doddahally FQV:2.00
S/S with TB at Doddahally Sub- LD:1.00
Station for a distance of Total:3.0
0.315Kms

Bills to be received :
Hangarahally: Workslip-3 :6.65
Construction of 66kV D/C line For Fy 19-20
for providing LILO arrangement to 52.93 & LD:4.06
4 CA1047 Hassana 23.05.16 39.48 29.34 68.82 71.41 25.00
66/11kV Hangarahalli S/S with 03.04.13 Rtn:20.48
TB at 66/11kV Hangarahalli Total:24.54
S/S.for a distance of 0.35 kms Time extension agenda received at this
office on 11.12.2018, to be cleared in CPC.

FQV for an amount of Rs. 91,21,70,297.19


which is 9.67% excess over the DWA
Varahi - Khemar & Khemar -
amount Rs. 83,17,16,150.26 submitted
Kavoor:
CEE, T&P vide letter no 13207-10 Dated
Construction of 220kV DC line Dakshina ES 57.812 10082.99 &
5 CB1008 07.02.07 8317.16 2221.76 10538.92 9752.92 450.00 13.02.2019 of CEE,TZH.
in the existing corridor of 110kV Kannada BCR 2.71 05.03.09
Retention - Rs.282.19Lakhs.
SC SK line for a distance of 113.3
Bills on FQV - Rs. 70Lakhs.
Kms

Gurupura Sub-Station:
Construction of 110kV LILO line
from the proposed (under
Dakshina 72.32 & Bills to be received; Rtn: 0.25
6 CB1028 Construction) 220/110kV Varahi- 19.08.16 113.21 8.25 121.46 105.00 3.00
Kannada 06.07.13 LD-3.00, Supply-0.68
Kavoor DC line (b/n Loc no.30 &
31) to 110kV S/s at Gurupura for
a distance of 1.50Kms.

Bill to receive:
Shravanabelagola:
S:1.42
Providing metering and protection 21.47 &
E:0.67
7 CA1054 to 66kV Yachenahalli- Hassana 30.07.14 06.01.17 22.70 22.70 19.34 7.00
Rtn:3.03
Shravanabelagola at 66/11kV sub
LD:1.84
station at Shravanabelagola
Cost of
Cost of
Energy Deptly. Cum Exp up to
Sl. Work Original / Total Work Budget
Name of the Work District Savings & Date of LOI Cost of DWA Supplied 31/03/19 Remarks
No. Code Revised Cost 2019-20
BCR Materials &
DPR & Date
others

Bills on hand:
1. BR No: 1170/08.02.2019 Rs.9.00 Lakhs
2. BR No: 1171/08.02.2019 Rs.0.42 Lakhs
3. BR No: 1172/08.02.2019 Rs.3.53
110/11KV MUSS Thirthahalli Lakhs. 4. BR No: 1173/08.02.2019
LILO: Rs.2.14 Lakhs. 5. BR No:
1) Construction of 110kV, 1269/08.03.2019 Rs.1.56 lakhs. 6. BR No:
0.523KM LILO Line tapping from 1268/08.03.2019 Rs.9.30 Lakhs.
110kV SK line to the existing 7. BR No: 1267/08.03.2019 Rs.1.56 lakhs.
155.43 &
8 CD1059 110/11kV Thirthahalli Sub- Shimoga 17.03.18 200.29 0.00 200.29 140.69 110.00 8. BR No: 1266/08.03.2019 Rs.0.42
19.12.15
station in Thirthahalli Taluk, Lakhs. 9. BR No: 1265/08.03.2019
Shivamogga District. Rs.0.16 Lakhs.
2) Construction of 110kV line Total Rs.28.09 Lakhs
Terminal bay at 110/11kV Budget for 2019-20
Thirthahalli S/s. Retention Rs.20.00 Lakhs
Supply Rs.51.00 Lakhs
Erection Rs.20.00 Lakhs
Civil Rs.15.00 Lakhs
Total Rs.106.00 Lakhs
8 Total of Lines 8797.18 2267.47 11064.65 10190.38 604.50

Probable expenditure from Nov to Mar-19:


Providing Capacitor Bank and Hsn Circle: On Hand: 23.96
762.72 &
1 CA1056 allied equipment’s in KPTCL Sub- Hassana 07.08.15 517.05 301.67 818.72 559.97 150.00
09.09.14
stations of Hassana Zone. Budget required for the FY19-20:
Hsn Circle: Retention & LD 149.51

1 Total of TB's & Others 517.05 301.67 818.72 559.97 150.00


21 Total of Hassana Zone 16592.85 9859.32 10625.28 17504.05 2205.50

MYSURU TRANSMISSION ZONE

Kalamandir Campus:
a) Establishing 2x12.5 MVA,
66/11kV Gas Insulated (GI) Sub-
Station near Dhobighat in
Mysuru with associated line
ES 4.38 15.02.14
1 DA1043 b) Running of 66 kv single core, Mysuru 3521.03 & 3880.29 390.00 4270.29 3901.15 193.00
BCR 0.52 12.09.16
630 sq mm XLPE copper UG cable 15.05.14
LILO line for a route length of
3.08 kms from the existing 66 kv
bogadi-mysuru south line to the
proposed Kalamandir GIS Station.

Kanagalu
ES 1.61 & 410.20 &
2 DA1106 Establishing 1x8MVA, 66/11kV Mysuru 09.06.17 476.57 31.27 507.84 493.18 50.00 Physically & Financially will be Closed
BCR 2.4 17.03.16
Sub-Station with associated line
Cost of
Cost of
Energy Deptly. Cum Exp up to
Sl. Work Original / Total Work Budget
Name of the Work District Savings & Date of LOI Cost of DWA Supplied 31/03/19 Remarks
No. Code Revised Cost 2019-20
BCR Materials &
DPR & Date
others

Kittur :
ES 1.93 & 398.43 &
3 DA1107 Establishing 1 x 8 MVA,66/11 KV Mysuru 12.06.17 422.61 39.88 462.49 442.36 54.00 Physically & Financially will be Closed
BCR 2.78 28.12.15
sub-station with associated lines

Bannikuppe
Establishing 1x8MVA, 66/11kV ES 0.99 & 628.76 &
4 DA1115 Mysuru 20.03.18 563.00 100.00 663.00 613.32 60.00 Amount required for payment of FQV Bills
Sub-Station with associated line BCR 1.12 11.05.17
for a distance of 3.575Kms

Maliyur:
Establishing 1x8MVA, 66/11kV ES 1.048 & 651.24 &
5 DA1119 Mysuru 26.09.17 605.71 64.50 670.21 567.04 62.00 Physically & Financially will be Closed
Sub-Station with associated line BCR 1.14 06.03.17
for a distance of 2.809Kms

Chandalli (Madapura) Village:


Establishing 1x8MVA, 66/11kV ES 1.318 & 716.11 &
6 DA1120 Mysuru 16.02.18 627.00 160.00 787.90 468.00 245.00 11kV Switchgear to be supplied by KPTCL,
Sub-Station with associated line BCR 1.23 10.04.17
for a distance of 5.668Kms

Madavadi (Parinamipura) :
Establishing 1x8MVA, 66/11kV ES 1.29 & 570.79 &
7 DA1121 Mysuru 26.09.17 527.00 45.00 572.00 530.14 50.00
Sub-Station with associated line BCR 1.46 06.03.17
for a distance of 1.153Kms

Hemmargala:
Establishing 1x8MVA, 66/11kV ES 1.609 & 645.90 &
8 DA1123 Mysuru 26.09.17 588.70 65.00 653.70 605.80 57.00
Substation with associated line BCR 1.62 20.03.17
for a distance of 3.905Kms

Tumbekere:
Establishing 1x8MVA, 66/11kV ES 12.84 504.98 &
9 DB1047 Mandya 12.03.18 638.96 140.00 778.96 615.75 100.00
Sub-Station with associated line BCR 1.34 24.01.12
for a distance of 6.596 Kms.

Vadakepura Limits:
Establishing 1x8MVA, 66/11kV ES 1.313 520.20 &
10 DB1098 Mandya 20.03.18 505.91 80.00 585.91 363.56 140.00 Amount required for payment of FQV bills
Sub-Station with associated line BCR 1.72 11.05.17
for a distance of 0.356Kms
Cost of
Cost of
Energy Deptly. Cum Exp up to
Sl. Work Original / Total Work Budget
Name of the Work District Savings & Date of LOI Cost of DWA Supplied 31/03/19 Remarks
No. Code Revised Cost 2019-20
BCR Materials &
DPR & Date
others

Devalapura Handpost
(Kasalagere)
ES 1.523 849.21 &
11 DB1101 Establishing 1 x 8MVA, 66/11 KV Mandya 14.03.18 761.84 120.00 881.84 779.09 50.00 Amount required for payment of FQV bills
BCR 1.16 11.05.17
Sub-Station with associated line
for a distance of 7.65Kms

Bargi:
Establishing 1x8MVA, 66/11kV Chamarajan ES 2.03 & 783.36 & Physically Closed; Amt required for FQV
12 DD1043 16.09.17 654.68 125.00 779.68 653.43 80.00
Sub-Station with associated line agar BCR 1.77 10.08.16 payments
for a distance of 10.864Kms

Kothanoor:
Chamarajan ES 1.1 & 833.18 & Amount required for payment of Non DWA
13 DD1044 Establishing 1x8MVA, 66/11kV 15.11.17 853.49 119.00 972.49 649.75 180.00
agar BCR 0.91 10.01.17 items after approval of FQV
Sub-Station with associated line.

Agara mamballi : Establishing 1


x 8 MVA,66/11 KV sub-station Chamarajan ES 1.005 & 690.70 & Amount required for payment of Non DWA
14 DD1049 20.03.18 638.98 90.00 728.98 526.79 200.00
with associated line for a distance agar BCR 1.02 12.06.17 items after approval of FQV
of 3.047Kms

Ranganathapura(Tumbla) Village
Establishing 1x8MVA, 66/11kV Sub- ES 1.72 & 544.15 &
15 DA1116 Mysuru 26.05.17 563.00 30.11 593.11 517.70 20.00 Physically & Financially will be Closed
Station with associated line for a BCR 2.05 11.01.17
distance of 0.597Kms

(Thirumalapura) Vaderahalli
Establishing 1 x 8MVA, 66/11 KV ES 1.321 & 635.59 &
16 DB1100 Mandya 01.09.17 591.38 39.69 631.07 545.20 100.00 Physically & Financially Closed
Sub-Station with associated line for BCR 1.4 13.04.17
a distance of 3.869Kms

16 Total of Sub-stations 12899.12 1639.45 14539.47 12272.26 1641.00

Kadakola:
Replacing 2x8MVA, 66/11kV Tr. ES NA 237.08 & • Final Variation submitted to SEE,
1 DA1046 Mysuru 08.01.13 19.27 210.20 229.47 220.75 5.00
by 2x12.5MVA, 66/11kV BCR 0.92 03.08.11 T(W&M) Circle, Mysuru on 07.11.2018
Transformer

Vajamangala:
331.59 &
2 DA1104 Providing additional 1X20 MVA , Mysuru BCR 2.589 03.09.16 144.79 189.00 333.79 300.49 31.00 Physically Closed.
29.06.15
66/11 KV transformer .

Seelenere:
ES NA 226.74 &
3 DB1082 Providing additional 1 X 12.5 Mandya 28.03.15 89.00 147.00 236.00 186.67 20.00 DPR to be approved
BCR 1.22 12.02.14
MVA ,66/11 kV Transformer
Cost of
Cost of
Energy Deptly. Cum Exp up to
Sl. Work Original / Total Work Budget
Name of the Work District Savings & Date of LOI Cost of DWA Supplied 31/03/19 Remarks
No. Code Revised Cost 2019-20
BCR Materials &
DPR & Date
others

R.K Nagar :
Replacement of 2 nd 12.5 MVA
198.75 &
4 DA1098 NGEF Power Transformer by 20 Mysuru 30.06.17 35.33 161.18 196.51 180.33 23.00 Amt required FQV payments
16.03.15
MVA, 66/11kV Power
Transformer

Hampapura :
Providing Additional 1x12.5MVA
66/11kV Transformer and 227.39 & Physically Closed (Amt required for FQV &
5 DA1108 Mysuru 1.16 29.06.17 90.96 243.34 334.30 181.04 70.00
Replacement of 1 X 8 MVA by 1 X 25.08.15 PV Payments)
12.5 MVA, 66/11kV with
additional SWG

Hanagodu :
152.75 & Physically Closed (Amt required for FQV &
6 DA1109 Replacement of 1 X 8 MVA by 1 X Mysuru BCR 1.23 30.06.17 20.35 121.57 141.92 125.86 40.00
05.10.15 PV Payments)
12.5 MVA 66/11kV Transformer.

Huygonahalli 220kV:
Providing additional 1x12.5 MVA, ES NA 296.98 &
7 DB1070 Mandya 05.08.15 135.56 182.44 318.00 192.13 80.00 Physically Closed
66/11kV at 220/66/11kV BCR 0.93 19.02.14
Transformer

BG Pura:
Replacing 1x8MVA, 66/11kV by ES NA 146.24 &
8 DB1077 Mandya 16.02.17 22.40 116.37 138.77 94.51 20.00 Physically Closed
1x12.5MVA, 66/11kV BCR 0.68 08.11.13
Transformer

Hardanahally (Devalapura):
ES NA 186.58 &
9 DB1086 Provding Additional 1 X 8 MVA, Mandya 02.07.16 90.00 35.00 125.00 85.81 30.00 Amount required for payment of FQV Bills
BCR 0.95 28.06.14
66/11kV Transformer

P.G.Palya :
Chamarajan 186.91 & Physically Closed ; Amt required for FQV
10 DD1037 Providing Additional 1X8 MVA, BCR 0.84 03.11.14 75.45 45.00 120.45 84.94 11.00
agara 03.11.14 payments
66/11kV Transformer

Haradanahalli :
Providing additional 1 X 8 MVA,
66/11 KV Transformer and ES NA 270.38 & Physically Closed
11 DA1105 Mysuru 12.05.17 85.00 224.16 309.16 73.34 14.00
Replacing 1 X 6.3 MVA by 1 X 8 at BCR 2.10 18.08.15 (FQV Balance amount to be paid)
66/11 KV in Periyapatna taluk,
Mysuru District.

Kirugavalu:
ES NA 193.40 &
12 DB1072 Replacing 1x6.3MVA, 66/11kV by Mandya 28.03.15 38.95 30.86 69.81 58.02 10.00
BCR 0.78 05.12.13
1x12.5MVA, 66/11kV Transformer
Cost of
Cost of
Energy Deptly. Cum Exp up to
Sl. Work Original / Total Work Budget
Name of the Work District Savings & Date of LOI Cost of DWA Supplied 31/03/19 Remarks
No. Code Revised Cost 2019-20
BCR Materials &
DPR & Date
others

Ravandur :
Provding Additional 1X8 MVA,and 233.05 &
13 DA1102 Mysuru BCR 2.1 02.07.16 84.18 146.48 230.66 174.45 40.00 Physically & Financially will be Closed
replacing 1x8MVA by 12.5MVA 22.06.15
66/11kV Transformer.

Bylukuppe:
Providing Additional 1X8 MVA,and 232.28 &
14 DA1103 Mysuru BCR 3.24 04.06.16 85.79 146.48 232.27 172.22 40.00 Physically & Financially will be Closed
replacing 1x8MVA by 1x12.5MVA 29.06.15
66/11kV Transformer.

Terakanambi:
Chamarajana 226.51 &
15 DD1031 Replacing 2X8MVA, 66/11kV by BCR 0.96 13.05.16 12.22 239.78 252.00 193.17 10.00 Physically & Financially will be Closed
gara 27.12.12
2x12.5MVA, 66/11kV Transformers

Hardanahally (Devalapura):
Replacing the existing 1 X 8 MVA by
ES NA 155.78 &
16 DB1088 1 X 12.5 MVA at 66/11 KV in Mandya 125.00 125.00 92.35 0.20 Physically Closed
BCR 0.64 08.04.15
Nagamangala taluk, Mandya
District.

16 Total of Augmentation 1029.25 2363.86 3393.11 2416.08 444.20

Vajamangala-Varun limits:
Construction of 220/66KV MCMV
line from location 4(3) to 20 along
Physically Closed
the proposed 66kV Vajamangala- 556.67 &
1 DA1072 Mysuru NA 13.08.14 705.03 55.00 760.03 728.21 25.00 (FQV is approved.However LD has to be
Kadakola DC line corridor in 04.05.13
approved from CPC)
Varun limits and providing 2 Nos.
of 66kV TBs at Kadkola R/S for
a distance of 4.52 kms

SFC-Madhuvanahalli to
Kollegala Limits: Reconstruction
of existing I BEAM 66kV line by
66kV D/C towers with Chamaraja ES 1.81 564.2 & Final variation is approved, revised price
2 DD1040 09.11.16 510.00 125.00 635.00 564.62 23.00
replacement of existing nagara BCR 0.296 23.06.15 schedule is to be approved.
deteriorated Coyote Conductor
/earth wire by new one for a
distance of 22.0KM
Cost of
Cost of
Energy Deptly. Cum Exp up to
Sl. Work Original / Total Work Budget
Name of the Work District Savings & Date of LOI Cost of DWA Supplied 31/03/19 Remarks
No. Code Revised Cost 2019-20
BCR Materials &
DPR & Date
others

Sri Rangapatna LILO:


LILO Arrangement for the
Garudanaukkada - Metagalli
136.5 &
3 DB1055 66kV line for a distance of Mandya 13.11.17 179.19 20.00 199.19 74.85 50.00 Amount required for payment of FQV Bills
31.10.12
1.322Kms along with TBs at Sri
Rangapatna Sub-Station for a
distance of 1.322 kms

3 Total of Lines 1394.22 200.00 1594.22 1367.68 98.00


Providing 12.1kV 2.9MVAR
Capacitor Bank and allied
equipment’sto 14 Nos of existing 324.59 & Physically Closed ; Payment required for
1 DA1097 Mysuru 07.08.15 205.95 134.86 340.81 288.80 50.00
KPTCL Sub-stations in the 09.09.14 FQV & Retention amount
jurisdiction of Mysuru
Transmission Zone.
1 Total of TB's & Others 205.95 134.86 340.81 288.80 50.00
36 Total of Mysuru Zone 15528.54 4338.17 19867.61 16344.82 2233.20
BAGALKOTE TRANSMISSION
ZONE

Khadaklat:
Upgradation of 2x5MVA,33/11 kV ES 3.064 & 920.69 &
1 EE1118 Belgaum 23.08.16 923.41 79.01 1002.42 978.53 30.00
S/S to 2x10 MVA, 110/11 kV S/S BCR 1.96 05.02.16
with associated line.

FY 2018-19:
CC: 17.00
Halaki: Total: 17.00
Establishing 1x10MVA, 110/11kV ES 4.72 767.97 &
2 EF1061 Bagalkote 12.09.06 882.02 39.75 921.77 954.82 38.00
Sub-Station with associated line BCR 1.94 06.01.15 FY 2019-20:
for a distance of 13.154Kms Budget not required.
Excess due to veriation of CC bills in the
line and awaiting for the approval.

FY 2018-19:
Tolamatti:(Anagawadi)
ES 3.21 721.67 & FY 2019-20:
3 EF1062 Establishing 1x10MVA, 110/11kV Bagalkote 20.09.16 746.17 39.75 785.92 803.36 29.00
BCR 1.48 23.03.15 Budget not required
Sub-Station with associated line.

Navalagi: FY 2018-19:
Establishing 2x10MVA, 110/11kV ES 4.89 791.98 & FY 2019-20:
4 EF1066 Bagalkote 20.02.16 856.05 73.37 929.42 885.18 13.00
Sub-Station with associated line BCR 2.15 06.01.15 Budget not required
for a distance of 1.906Kms
Cost of
Cost of
Energy Deptly. Cum Exp up to
Sl. Work Original / Total Work Budget
Name of the Work District Savings & Date of LOI Cost of DWA Supplied 31/03/19 Remarks
No. Code Revised Cost 2019-20
BCR Materials &
DPR & Date
others

FY 2018-19
CC : 9.00
Devaragennur: Up-gradation of Savings : 9.0
33/11kV to 2x10MVA, 110/11kV ES 6.252 761.22 & Total: 18.09
5 EG1030 Bijapur 22.10.16 820.00 82.53 902.53 914.65 18.00
Sub-Station with associated line BCR 4.18 10.06.15
for a distance of 1.464Kms FY 2019-20:
Budget not required.

Fy2018-19
CC:6.11
PV29.05
Hiremasali:
LD8.79
Establishing 1x10MVA, 110/11kV ES 1.64 625.40 &
6 EG1050 Bijapur 16.08.16 660.00 39.75 699.75 691.70 55.00 INC9.90
Sub-Station with associated line BCR 1.6 13.08.15
Total53.85
for a distance of 6.955Kms
Savings8.9
FY19-20
Budget not required

Garag (Shedabal):
Establishing 2x10MVA, 110/11kV ES.13.36 920.16 &
7 EB1030 Dharwad 16.09.17 952.95 127.67 1080.62 997.47 90.00
Sub-Station with associated line BCR 6.71 05.09.15
for a distance of 4.598Kms

Budget break up for 2018-19:


Retention of station supply: Rs. 1296.00L
Line: Rs. 312.00L
Doni 400kV (Gadag):
Erection: Rs. 61.00L
Establishing 2x500MVA,
ES 12.39 13249.28 & Civil: Rs. 40.00L
8 EC1010 400/220kV Station with Gadag 30.07.16 17638.35 100.00 17738.35 16007.74 1920.00
BCR 2.1 25.03.14
associated 440kV & 220kV link
Budget break up for 2019-20:
lines for a distance of 26.798Kms
LD: Rs. 880.00L
PV: Rs. 150.00L
QV: Rs. 150.00L

Belavanaki:
Establishing 1x10MVA, 110/11kV ES 4.05 1071.11 &
9 EC1018 Gadag 07.06.17 1204.66 40.00 1244.66 1161.48 165.00
Sub-Station with associated line BCR 1.83 13.08.15
for a distance of 22.27Kms
Cost of
Cost of
Energy Deptly. Cum Exp up to
Sl. Work Original / Total Work Budget
Name of the Work District Savings & Date of LOI Cost of DWA Supplied 31/03/19 Remarks
No. Code Revised Cost 2019-20
BCR Materials &
DPR & Date
others

Budget required for the Remaining Year


18-19
Supply ( T& P , Aux Trf, Fire Fighting
Equpiments, Yard Lighting , Furniture for
Islampur: Control Room , Mandatory Spares & Misc)-
Establishing 2x10MVA, 110/11kV ES 7.26 811.67 & Rs 19.00 Lacs
10 EE1048 Belagum 04.01.18 935.19 63.62 998.81 886.47 92.00
Sub-Station with associated line BCR 3.92 01.06.15 Ret - Rs 47.224 Lacs
for a distance of 7.875Kms Civil- Rs 56.685 Lacs
Erection- Rs 3.692 Lacs
CC- Rs 11.22 Lacs
Total - Rs 137.82 Lacs

Budget required for the Remaining Year


18-19
Supply ( Trf , Aux Trf , Battery charger ,
Fire Fightining Equpiments, Station Yard
Kakamari: Lighting ) - Rs 164.005 Lacs
Ret - Rs 126.645 Lacs
Establishing 2x10MVA, 110/11kV ES 4.870/ 861.42 &
11 EE1065 Belagum 05.01.18 880.03 42.00 922.03 493.65 415.00 Civil - Rs 170.26 Lacs
Sub-Station with associated line 2.59 16.08.16
Erection- Rs 19.084 Lacs
& TB.
SWG Cost ( CGL) - Rs 42.00 Lacs
CC- Rs 25.00 Lacs
Total - Rs 546.995 Lacs
Say- Rs 547.00 Lacs

Budget Required For the Year 18-19


Ret - Rs 28.98 Lacs
CC- Rs 20.00 Lacs
Morab: Civil- Rs 65.18 Lacs
Establishing 2x10MVA 110/11kV ES 6.83 949.92 & Erection- Rs 04.41 Lacs
12 EE1114 Belagum 23.12.16 956.21 81.43 1037.64 894.94 154.00 Total - Rs 118 Lacs
Sub-Station with associated line BCR 2.37 05.05.15
for a distance of 7.526Kms Bagalkot required for the year 19-20

LD : Rs. 25.59
QV: Rs. 20.00
45.59
FY 2018-19:
LD: 46.00
Civil: 50.00
QV: 24.00
Hebballi: Ret: 90.00
Establishing 1x10MVA, 110/11kV ES 2.2 769.06 & PV: 30.89
13 EF1063 Bagalkote 03.06.17 914.21 40.00 954.21 848.41 326.00
Sub-Station with associated line BCR 1.02 02.01.15 Total: 240.89
for a distance of 14.18Kms. FY 2019-20:
Ret: 90.00
LD: 46.00
PV: 30.89
Total: 166.89
Cost of
Cost of
Energy Deptly. Cum Exp up to
Sl. Work Original / Total Work Budget
Name of the Work District Savings & Date of LOI Cost of DWA Supplied 31/03/19 Remarks
No. Code Revised Cost 2019-20
BCR Materials &
DPR & Date
others

FY 2018-19:
Supp: 90.00
Talikote:
Erc: 60.00
Up-gradiation of existing 33/11kV
ES 3.58 1140.34 & Civil: 23.57
14 EG1049 S/s to 2x10MVA, 110/11kV Sub- Bijapur 09.06.17 1323.29 80.00 1403.29 1069.48 394.00
BCR 1.83 18.08.15 Total: 173.57
Station with associated line for a
distance of 17.557Kms
FY 2019-20:
Budget required of Rs: 238.40

FY 2018-19:
Sup: 150.00
Rodagi (Khedagi cross) : Erc: 10.00
Establishing 1x10MVA, 110/11kV ES 1.52 758.09. & Civil: 50.81
15 EG1051 Bijapur 06.06.17 863.25 40.00 903.25 628.07 302.00
Sub-Station with associated line BCR 1.26 05.10.15 Total: 210.81
for a distance of 10.969
FY 2019-20:
Budget required Carry forward: 166.00

15 Total of Sub-stations 30555.79 968.88 31524.67 28215.95 4041.00

Ugar:
Replacement of 1x10MVA, 258.50 &
1 EE1095 Belagum BCR 0.64 11.11.16 64.98 203.95 268.93 262.64 1.00
110/11kV by 1x20MVA, 20.11.14
110/11kV transformer

FY 2018-19:
LD: 1.29
110KV S/S Teradal:
244.70 & Total: 3.32
2 EF1056 Providing additional 1X10MVA, Bagalkote BCR 0.67 27.05.17 109.51 48.79 158.30 253.05 11.00
03.12.14
110/11kV Power Transformer
FY 2019-20:
Budget not required.

Haveri:
207.93 &
3 EA1019 Providing spare 1x20MVA, Haveri BCR 1.89 25.03.17 61.26 217.74 279.00 209.05 83.00
01.08.14
110/33-11kV Transformer

Karwar(Shejwad):
Uttar 320.05 &
4 ED1021 Providing additional 1x20MVA, BCR 1.52 22.03.17 225.35 200.00 425.35 366.46 68.00
Kannada 21.08.14
110/33-11kV Transformer

Haliyal:
Replacement of 1X10 MVA,
Uttar 330.2 &
5 ED1022 110/11kV by 1X20MVA, BCR 1.3 18.04.17 99.42 240.00 339.42 319.14 21.00
Kannada 13.08.15
110/11kV Power Transformer at
110kV S/s Haliyal
Cost of
Cost of
Energy Deptly. Cum Exp up to
Sl. Work Original / Total Work Budget
Name of the Work District Savings & Date of LOI Cost of DWA Supplied 31/03/19 Remarks
No. Code Revised Cost 2019-20
BCR Materials &
DPR & Date
others

Sirsi:
Uttar 284.66 &
6 ED1023 Replacement of 1x10MVA by BCR 1.51 23.05.17 99.99 220.77 320.76 272.89 40.00
Kannada 10.07.15
1x20MVA 110/11KV Transformer

FY 2018-19:
Supply: 18.36
Ret: 9.14
QV: 8.38
Ere: 15.00
Civil: 7.00
110KV S/S Banahatti:
Total: 57.88
Replacement of 1x10MVA, 257.56 &
7 EF1052 Bagalkot BCR 1.13 22.03.18 58.60 240.50 299.10 258.15 70.00
110/11kV by 1x20MVA, 17.11.15
FY 2019-20:
110/11kV Transformer
Supply: 18.36
Ret: 9.14
QV: 8.38
Ere: 15.00
Civil: 7.00
Total: 57.88
FY 2018-19:
LD: 17.00
Civil: 4.47
Erc: 8.00
Rampur:
Others: 5.85
Replacement of 1x10MVA, 171.55 &
8 EF1064 Bagalkote BCR 0.96 30.03.17 16.37 200.00 216.37 324.01 30.00 PV : 18.80
110/33kV by 1x20MVA, 21.08.14
Ret: 18.35
110/33kV Transformer
Total: 72.47

FY 2019-20:
Budget not required

FY 2018-19:
LD: 12.89
Ere: 1.00
Hirebevanur: Civil: 2.00
222.40 &
9 EG1039 Providing additional 1x10MVA, Bijapur BCR 0.88 17.03.17 88.23 41.07 129.30 107.46 24.00 QV: 8.04
17.09.14
110/11kV Transformer. Ret: 1.36
Total: 25.25

FY 2019-20:
Budget required of Rs: 7.00
Cost of
Cost of
Energy Deptly. Cum Exp up to
Sl. Work Original / Total Work Budget
Name of the Work District Savings & Date of LOI Cost of DWA Supplied 31/03/19 Remarks
No. Code Revised Cost 2019-20
BCR Materials &
DPR & Date
others

FY 2018-19:
Supply: 1.00
QV: 3.00
Lachyan: PV: 8.50
Replacing 1x10MVA, 110/11kV 245.85 & Total: 12.50
10 EG1040 Bijapur 27.03.17 63.89 241.07 304.96 229.26 15.00
by 1x20MVA, 110/11kV BCR 0.80 27.10.14 Savings: 43.50 (Due to cost of transformer)
Transformer.
FY 2019-20:
Budget required of Rs: 6.00

FY 2018-19:
QV: 00
110 KV S/S Malaghan: Supply: 15.00
Replacement of 1X10 MVA, Erection: 1.00
110/11 KV by 1X20 MVA, 110/11 252.44 & Civil: 2.00
11 EG1044 Bijapur BCR 1.37 25.03.17 58.41 247.12 305.53 226.88 10.00
KV transformer instead of 13.08.15 Total: 18.00
Providing additional 1x10MVA, Savings: 15.00
110/11kV Transformer
FY 2019-20:
Budget required of Rs: 6.26

FY 2018-19:
Supply: 63.55
Ere: 1.74
Civil: 17.40
Moratagi:
237.24 & Total: 82.69
12 EG1046 Providing additional 1x10MVA, Bijapur BCR 0.83 25.10.16 88.37 148.87 237.24 216.58 24.00
25.03.14
110/11kV Transformer
FY 2019-20:
Budget required for carry forward
QV: 8.00
Savings: 17.49

FY 2018-19:
Supply: 178.00
Ere: 7.85
B Bagewadi: Civil: 21.00
1x100MVA Transformer TOTAL: 206.85
579.19 &
13 EG1048 220/110KV for arranging the Bijapur BCR 3.39 16.09.17 847.00 0.00 847.00 787.37 115.00
19.01.15
power supply to the Chimmalagi FY 2019-20:
LIS. QV: 40.00
PV : 40.00
Total: 80.00
Cost of
Cost of
Energy Deptly. Cum Exp up to
Sl. Work Original / Total Work Budget
Name of the Work District Savings & Date of LOI Cost of DWA Supplied 31/03/19 Remarks
No. Code Revised Cost 2019-20
BCR Materials &
DPR & Date
others

FY 2018-19:
Supply: 20.00
110/11kV Devanagaon: Erec : 10.01
Providing additional 1x10MVA, Ret: 10.00
271.09 &
14 EG1054 110/11kV Transformer at Vijayapura BCR 0.61 22.03.18 99.74 41.63 141.37 119.87 6.00 Civil: 13.50
25.05.17
110/11kV Devanagaon Sub- Total: 53.51
station
FY 2019-20:
Budget required of Rs: 19.00

Dambal:
172.34 &
15 EC1014 Providing additional 1x10MVA, Gadag BCR 1.14 22.02.18 78.42 17.29 95.71 88.93 12.00
28.01.13
110/11kV Transformer

FY 2018-19:
Supply: 16.00
Ret: 3.50
QV: 2.00
110KV S/S Shirabur:
PV: 22.98
Replacement of 1x10MVA, 252.58 &
16 EG1042 Bijapur BCR 1.37 22.02.18 46.96 254.39 301.35 268.84 4.00 Civl: 2.00
110/11kV by 1x20MVA, 14.08.15
Others: 3.35
110/11kV Transformer
Total: 49.83

FY 2019-20:
Budget not required

Gadag Road:
215.78 &
17 EB1026 Providing additional 1x10MVA, Dharwad BCR 1.12 15.09.16 71.92 6.24 78.16 66.70 1.00
2.06.14
110/11kV Transformer

Lakamanahalli:
239.65 &
18 EB1027 Replacing 1x10MVA by 1x20MVA, Dharwad BCR 1.79 13.05.16 48.09 198.12 246.21 202.42 1.00
19.06.15
110/11kV Transformer

FY 2018-19:
110 KV S/s Badami: Replacement
253.68 & LD: 1.30
19 EF1067 of 1X10 MVA, 110/11 KV by 1X20 Bagalkote BCR 1.15 11.11.16 62.28 248.69 310.97 251.37 3.00
18.05.15 FY 2019-20:
MVA, 110/11 KV transformer
Budget not required.
Cost of
Cost of
Energy Deptly. Cum Exp up to
Sl. Work Original / Total Work Budget
Name of the Work District Savings & Date of LOI Cost of DWA Supplied 31/03/19 Remarks
No. Code Revised Cost 2019-20
BCR Materials &
DPR & Date
others

Budget for the Year 18-19


Supply- Rs 02.00 Lacs
Erection - Rs 04.00 Lacs
Ret- Rs 25.06 Lacs
SWG - Rs 42.41 Lacs
220KV Kudachi:
243.87 & QV- Rs 12.00 Lacs
20 EE1091 Providing additional 1x10MVA, Belagum BCR 0.68 15.06.17 106.83 35.00 141.83 162.46 2.00
27.08.13 LD- Rs 1.15 Lacs
110/11kV Transformer
Transportation of 1X10 MVA - Rs 3.00
Lacs
Total - Rs 89.62 Lacs
Say Rs 90.00 Lacs

For theYear 18-19


Erection - Rs 12.18 Lacs, Transportation
M.K.Hubli:
of 20 MVA- Rs 4.00 Lacs
Replacement of 1x10MVA,
256.48 & QV- Rs 1.00 Lacs
21 EE1109 110/11kV by 1x20MVA, 110/11kV Belagum BCR 0.64 22.02.18 59.38 41.63 101.01 72.03 20.00
21.08.14 Civil Rs 11.44 Lacs
transformer at 110 KV S/S
Ret- Rs 24.63
M.K.Hubli
Total - Rs 53.25 Lacs

For the Remaining Year 18-19


Soundatti:
Civil- Rs 2.72 Lacs
Providing spare 1x10MVA, 188.48 &
22 EE1111 Belagum BCR 0.88 17.06.16 64.42 20.99 85.41 75.45 6.00 QV- Rs 3.00 Lacs
110/11KV Transformer at 110KV 26.08.14
Ret - Rs 6.86
S/S Soundatti
Total - Rs 12.58 Lacs

Budget required for the Remaining Year 18-


19
Supply - Rs 15.44 Lacs,Ret- Rs 11.42Lacs,
SD- Rs 15.56 Lacs,Civil- Rs 11.21 Lacs
Nehru Nagar:
420.54 & Erection- Rs 20.00 Lacs
23 EE1112 Replacing 2x10MVA, 110/11kV by Belagum BCR 0.78 22.02.18 67.04 42.37 109.41 460.97 58.00
04.06.14 SWG- Ret- Rs 5.15 Lacs
2x20MVA, 110/11kV Transformers
Trf PV- Rs 40 Lacs ( 20 Lacs for each Trf )
QV- Rs 3.00 Lacs
Total - Rs 121.78 Lacs

23 Total of Augmentation 2586.46 3156.23 5742.69 5601.98 625.00

Gadag-Bagalkote :
ES 16.23 4869.82 &
1 EF1021 Construction of 220kV DC line Dharwad 31.01.14 7624.00 81.66 7705.66 7660.45 433.00
BCR 1.016 21.09.11
for a distance of 95.295 Kms.
Cost of
Cost of
Energy Deptly. Cum Exp up to
Sl. Work Original / Total Work Budget
Name of the Work District Savings & Date of LOI Cost of DWA Supplied 31/03/19 Remarks
No. Code Revised Cost 2019-20
BCR Materials &
DPR & Date
others

FY 2018-19:
Mahalingapur-Mudhol : LD : 26.37
Conversion of 110KV SC tap line CC: 12.65
to LILO line at 110kV Uttur Sub- Total: 40.00
station by construction of 110kV 240.75 &
2 EF1059 Bagalkote 22.07.15 263.70 15.26 278.96 194.20 50.00
TB & 110kV SC line on DC towers 28.02.15 FY 2019-20:
from 110kV Mahalingapur- Budget not required.
Mudhol station for a distance of (If dicision of LD is accorded within this
5.945Kms. F/Y 2018-19, if not it will be spill over
2019-20)

FY 2018-19:
Kudagi Ultra Mega Power Plant
QV: 12.00
Evacuation Lines:
Others: 3.00
Construction of 220kV MC Line
2143.75 & Total: 15.00
3 EG1037 from proposed Kudagi 400kV Bijapur 04.03.14 3161.88 255.85 3417.73 3512.10 1.00
23.05.13
STPP to LILO existing 220kV
FY 2019-20:
B.Bagewadi-Bijapur DC line for a
Budget not required.
distance of 18.168 kms.

Hirekerur - Rattihalli Line:


Stringing of 110kV 2nd Circuit on
existing D/C towers between 200.52 &
4 EA1021 Haveri 27.05.17 203.82 0.00 203.82 167.10 57.00
Rattihalli and Hirekerur Sub- 05.11.14
Stations for a distance of 12.34
Kms

Bidnal LILO:
Construction of 220kV DC line for
having LILO arrangement of 1331.89 &
5 EB1028 Dharwad 06.05.17 1713.67 0.00 1713.67 1751.94 238.00
220kV Narendra-Haveri first 20.11.15
circuit to 220kV Station Bidnal
for a distance of 15.505Kms

Siddapur LILO:
Uttar 243.25 &
6 ED1024 Providing LILO arrangement to 15.06.17 215.29 57.99 273.28 229.78 46.00
Kannada 28.09.15
110kV Sub-Station Siddapur.

Belgaum-Ghataprabha:
Re-construction of 110kV SC line on
DC towers in the existing 110kV
Ghataprabha line corridor from 863.65 &
7 EE1026 Belgaum 17.07.07 812.74 40.00 852.74 681.56 1.00
Belgaum (6-pole structure near 08.08.06
Kanabargi) to 110kV Ghataprabha
Sub-Station for a distance of 49.045
Kms.
Cost of
Cost of
Energy Deptly. Cum Exp up to
Sl. Work Original / Total Work Budget
Name of the Work District Savings & Date of LOI Cost of DWA Supplied 31/03/19 Remarks
No. Code Revised Cost 2019-20
BCR Materials &
DPR & Date
others

FY 2018-19:
QV: 4.00
Atharga LILO: Total: 4.00
94.76 &
8 EG1026 Conversion of 110kV tap line to LILO Bijapur 08.01.16 102.82 5.14 107.96 108.40 1.00 Savungs: 10
24.01.12
line for a distance of 10.705 kms.
FY 2019-20:
Budget not required.
8 Total of Lines 14097.92 455.90 14553.82 14305.53 827.00

SRS Hubli :
1789.35 &
1 EB1015 R & M Works at 220kV SRS Hubli Dharwad 0.00 13.09.11 1714.71 0.00 1714.71 1648.51 160.00
03.03.11
Station

1 Total of TB's & Others 1714.71 0.00 1714.71 1648.51 160.00

47 Total of Bagalkote Zone 48954.88 4581.01 53535.89 49771.97 5653.00

KALABURAGI TRANSMISSION
ZONE

Budget for FY 19-20


Mallat (Manvi): Establishing
Supply: 20.00 Lakhs
2x100MVA, 220/110/11kV and
Erection: 10.00 Lakhs
1x10MVA, 110/11kV Station with
ES 34.22 3948.94 & Civil: 60.00 Lakhs
1 FA1032 associated 220kV and 110kV Raichur 12.02.13 4093.00 39.86 4132.86 3356.27 650.00
BCR 3.48 17.07.12 RTN: 450.00 Lakhs
lines.
QV: 80.00 Lakhs
220KV line: 2.80Kms.
PV: 30.00 Lakhs
110KV lines:39.727 Kms
Budget Surrendered:Rs- 150.0 Lakhs

Probable Expenditure for 2018-19


Total : 41.66 Lakhs
Bachigondanahalli:
Budget reqd for 2019-20
Establishing 1x8MVA, 66/11kV ES1.883 474.36 &
2 FB1039 Bellary 23.12.16 549.00 36.00 585 522.67 28.00 Crop bills:22.0 Lakhs
Sub-Station with associated line BCR 1.49 23.09.14
Retention Amt: 5.5 lakhs
or a distance of 6.85Kms
Total:27.50 Lakhs

Expenditure to be booked in 2018-19


Work completed bills: 181.1 Lakhs
QV:39.5 Lakhs-
PV 25.0 Lakhs( Subject to Approved by
Harivi :
Corporate office for brought out items)-
Establishing of 66/11kV Sub-
ES 1.36 & 467.78 & Crop bills:12.0 Lakhs-
3 FB1081 station with installed capacity of Bellary 16.03.16 561.06 24.33 585.39 392.53 95.00
BCR 1.20 05.11.14 LD: 26.0 Lakhs (Subject to approval of
1x8MVA 66/11kV Transformer or
delay condonation)
a distance of 6.638Kms
Total :283.5 Lakhs.
Budget is required for FY2019-20- 95
lakhs. retention amount 60 lakhs
crop compensation 20 lakhs
QV civil 15 lakhs.
Cost of
Cost of
Energy Deptly. Cum Exp up to
Sl. Work Original / Total Work Budget
Name of the Work District Savings & Date of LOI Cost of DWA Supplied 31/03/19 Remarks
No. Code Revised Cost 2019-20
BCR Materials &
DPR & Date
others

Budget of Rs.41.83 Lakhs has been


proposed for surrender.
Utilisation of Balance Budget for year
Yeradona:
2018-19
Establishing of 1x10MVA,
ES 3.58 528.71 & LD - 67 Lakhs
4 FD1015 110/11kV Sub-Station with Koppal 02.11.11 413.29 36.20 449.49 624.57 15.00
BCR 2.32 06.04.11 Retention - 3 Lakhs
associated line for a distance of
PV - 25 Lakhs.
4.964 Kms.
Total 95 Lakhs
Subject to Approval of LD, PV during this
FY-2018-19

If PV OM for the project is not placed


Bennur: during 2018-19 budget of Rs32Lkahs is
Establishing 1x10MVA, 110/11kV ES 1.94 required for 2019-20 and the same needs
5 FD1026 Koppal 802.56 & 28.02.17 895.90 32.00 927.90 828.28 5.00
Sub-station with associated line BCR 1.39 to be retained in List-I.
28.09.15
for a distance 8.647Kms Subject to Approval of PV bills during FY-
2018-19

5 Total of Sub-stations 6512.25 168.39 6680.64 5724.32 793.00

Expenditure for FY-2018-19


Supply - 69.74 Lakhs
Erection -9.42Lakhs
Civil - 47.19 Lakhs.
Dept Supply:a)110kV Breakers: 6.31Lakhs
BislaHalli : b) 33kV Breakers:8.65Lakhs(Gescom)
Creating 33kV reference by 292.46 & c) Power Trf : 9.5515Lakhs (
1 FB1050 Bellary BCR 1.517 24.10.17 189.58 146.34 335.92 250.68 28.00
Providing 1x20MVA, 110/33kV 03.08.13 Total - 150.86 Lakhs
Transformer. Proposed Budget Required- 27.60 Lakhs
for FY-2019-20
LD: 18.6Lakhs
Supply & Erection - 4Lakhs
Civil - 5Lakhs

Departmentally supply portion:


Siruguppa :
for supply of 2 No's of 11KV MCVCB +1AP
Replacing 1x10MVA, 110/11kV 197.51 &
2 FB1085 Bellary BCR 1.123 28.10.17 10.78 151.98 162.76 162.29 32.00 PO placed to MEI. Material not yet
by 1x20MVA, 110/11kV 12.09.14
received. So for payment of supply bills
Transformer
and labour bills budget is required

2 Total of Augmentation 200.36 298.32 498.68 412.97 60.00


Cost of
Cost of
Energy Deptly. Cum Exp up to
Sl. Work Original / Total Work Budget
Name of the Work District Savings & Date of LOI Cost of DWA Supplied 31/03/19 Remarks
No. Code Revised Cost 2019-20
BCR Materials &
DPR & Date
others

Final 10% retention amount pending for


Bellary 400kV pooling station approval of FQV which is submitted to
to Ramapura limits: CEE/T&P on 05.06.2018.
Construction of 400kV MC Line Rtn.: 3251.86 Lakhs
with Quad Moose Conductor from QV:851.56
Proposed Bellary 400kV pooling 25819.26 & Probable Exp for FY-2018-19
1 FB1080 Bellary 24.12.14 34190.82 0.00 34190.82 32100.43 4100.00
station (BPS to Ramapura limits 26.02.15 Total:4103.42 Lakhs.
(Kelagina kanavi) to connect to Additional Budget Required - 118.58
400kV Madhurgiri & Lakhs for FY-2018-19 subject to Approval
Chikkanayakan Halli DC Lines for of FQV pending at Corporate offfice.
a distance of 43.018Kms

YTPS to 400kV Bellary pooling


station (BPS): Budget for FY-2019-20 is Nil : Subject to
Construction of 400kV DC Line approval of QV by Coprporate office in
39439.25 &
2 FA1036 with Quad Moose Conductor from Raichur NA 19.10.15 51500.42 0.00 51500.42 42995.44 600.00 2018-19 else same budget shall be
26.02.15
YTPS to Proposed 400kV Bellary escalated to 2019-20.
pooling station (BPS) for a Subject to Approval of FQV
distance of 142.49Kms

2 Total of Lines 85691.24 0.00 85691.24 75095.87 4700.00

Budget of Rs.237.17 Lkahs has been


surrendered for FY 2018-19
Lingapur 220kV switching
Budget requirement fro FY2019-20
station : 1488.04 &
1 FB1063 Bellary NA 04.03.14 1768.92 12.83 1781.75 1439.32 410.00 For payment of RetentionFinal Bills,QV
R & M Works at 220kV Lingapur 16.02.13
Bills and LD bills
Station
Retention-& QV: 237.35 Lakhs
LD : 172.00Lakhs
Total 409.35
Cost of
Cost of
Energy Deptly. Cum Exp up to
Sl. Work Original / Total Work Budget
Name of the Work District Savings & Date of LOI Cost of DWA Supplied 31/03/19 Remarks
No. Code Revised Cost 2019-20
BCR Materials &
DPR & Date
others

Probable Exp. upto 31.03.2019


Supply: 30 Lakhs
Erection: 6.23 Lakhs
Providing 12.1KV, 2.9MVAR Rtn: 5 Lakhs
Capacitor Bank and other allied 577.83 &
2 FC1055 Kalaburagi 07.08.15 387.00 232.45 619.45 294.14 20.00
equipment’s in KPTCL Sub- 02.09.14 Budget required for the year 19-20
stations of Kalaburagi Zone. Supply: 0.00 Lakhs
Rtn: 20 Lakhs
Erection: 0.00 Lakhs
Civil: 0.00 Lakhs

2 Total of TB's & Others 2155.92 245.28 2401.20 1733.46 430.00


11 Total of Kalaburagi Zone 94559.77 711.99 95271.76 82966.62 5983.00

150 Total of List-I for All Zones 307472.91 40148.66 325811.91 304027.01 30475.21
List-II Ongoing Works 2019-20
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

BENGALURU TRANSMISSION
ZONE
FY-18-19
Samanduru : 498L - Surrender
a)Establishing 2x8MVA, 66/11kV
764.24 &
Sub-Station.b) laying of 3cx300 ES 0.40 Budget 19-20
1 AA1129 Bengaluru Urban 24.02.14 27.08.14 735.60 0.00 735.60 522.97 2500.00
Sqmm UG Cable from Anekal S/s BCR 0.72 Supply -1000L
to Samanduru s/S for a Route Erection & civil- 1000L
length of 8.64 Kms. Total-2000L

Budget 2018-19
BTS-378.0L
ITI :
RTn bills -1171.00
Establishing 2x150 MVA,
supply: 416.83L
220/66/11kV GIS substation at ITI
erection : 300L
with 220kV DC 1200 sq mm Copper ES.32.31 & 14429.10 &
2 AA1132 Bengaluru Urban 06.05.17 19711.21 0.00 19711.21 14080.58 3500.00 Erection and civil -400L
single core XLPE UG cable from BCR 1.203 15.04.15
Total -2665.83L
existing Hoody-Hebbal for a route
Budget 19-20
length of 2.607Kms along with
Supply - 3000L
associated 66kV line.
erection / civil - 500L
Total -3500L

FY 18-19
Supply: 205.42
Erection : 50L
Civil 365.08L
Brindavan alloys:
TR cost: 1900 L
Establishing 220/66/11kV GIS
ES 21.86 7710.86 & Total: 3450.50 L
3 AA1154 Sub-station along with Bengaluru Urban 30.12.17 10570.24 0.00 10570.24 5250.89 4500.00
BCR 2.95 05.09.15 FY- 19-20
construction of 220kV DC line for a
Supply retention - Rs.2100L
distance of 0.52 kms
Erection retention - Rs.200L
Civil - Rs. 500L
Total Rs.3400L
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

Kumbalgodu:
Establishing 2x150MVA, Budget 18-19
220/66/11 kV sub-satation at Supply-3000L
ES 24.33 37339.12 &
4 AA1156 Kumbalagodu with 220kv Bengaluru Urban 15.03.18 48981.49 0.00 48981.49 20363.50 21990.00 Erection and civil-225L
BCR 0.65 24.11.15
1200sqmm UG Cable between FY 19-20
400/220kv Bidadi and Supply - 15000L
Vrishabhavathi Valley Erection/civil - 13900L

Huskuru : Establishing Budget 18- 19


2x12.5MVA, 66/11kV Sub-Station Stn:05.01.1 5L -Surrender
Stn759.21
with Cable from existing 66/11 KV ES 8.11 & 5140.00 & 8
5 AA1162 Bengaluru Urban cable:4278.9 0.00 5038.19 0.00 2500.00
Malgudi(Elecrtronic City sector-II, BCR 0.96 22.12.16 cable:15.03. Budget 19-20
8
Phase-II) Substation for a Route 18 Supply - 1500L
length of 6.885Kms Erection / civil -1000L

Budget 18-19
Station: 1) Supply-367L 3)
Supply rtn=100L 4) CIVIL &
Kumbaranahalli : Establishing
ES 0.85 & 2662.00 & Erection-33.00L Cable:
6 AA1163 2X12.5MVA, 66/11kV Power Bengaluru Urban 06.02.17 694.61 0.00 694.61 1617.29 900.00
BCR 0.4 06.02.17 200L
Transformer at Kumbaranahalli
Total:700L Budget 19-20
Supply - 600L erection/Civil
- 300L Total: 900L

Mylasandra (Near Electronic


City): Establishing 3 X 500 MVA,
FY2018-19
400/220kV GIS Sub-Station at
Supply-1000.00L
Mylasandra (Near Electronic City) in
Total: 1000L
Bengaluru South Taluk, Bengaluru
ES 124.88 36730 & FY 2019-20
7 AA1166 Urban District along with Bengaluru Urban 24.03.18 44017.63 0.00 44017.63 10794.71 28000.00
BCR 2.58 30.02.17 SUPPLY=25000.00 L
associated transmission lines and
ERECTION/CIVIL=12016.50
providing additional terminal bays
L
(3 Nos) at 220/66/11Kv S/s at
Total: 37016.5L
Yerandanahalli (Short closed work
code AA1043)
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

Hoskote:
a) Establishing 2x100MVA,
220/66kV Station with 220/66kV
MC line from BIAL with 220kV TB
at BIAL
b) Hoskote 220KV LILO line from
Hoody-Kolar line
c) 66KV SC line from Hoskote to a) 220kV
Mandur, Pillaguppa-sulibele line to S/s & 220kV
FY 19-20
Nandagudi, 66 kV TB at Nandagudi MCMV line (a) & (b) :
5249.00 & 1000L for land
ES 61.72 23.4.07 5057.5 (a) & (b):
8 AB1007 & BIAL Bengaluru Rural 05.07.06 7475.45 6686.78 900.00 comp,erection & civil for
BCR 4.05 b) 23.04.07 1525.3
d) Hoskote to Tower no5 of existing 220kV Hoskote - Hoody -
c) &d) (c) 892.65
Pillagumpa-Sulibele 66kV line and Kolar line
08.06.07
Tower no5 of existing Pillagumpa-
Sulibele 66kV line to Hoskote s/s
1) 21.03 Kms
2) 13.12 Kms
3) 10.25 Kms
4) 10.28 Kms.

FY - 18-19
Mandur: 9L- Surrender
Establishing 1x12.5MVA, 66/11kV 724.54 &
ES 1.26
9 AB1018 Sub-Station with 66kV D/C line Bengaluru Rural 12.05.08 03.10.07 486.10 129.00 615.10 439.72 50.00 FY 19-20
BCR 1.10
from Budigere for a distance of 9.00 Rs.80L for balance station
Km. portion work.

FY - 18-19
Sondekoppa: Nil FY- 2019-20:
Establishing 2x8MVA, 66/11kV 848.02 & 93L Supply Retention Bills
ES 2.09
10 AB1019 Sub-Station with 66kV tap from Bengaluru Rural 28.04.08 16.03.07 647.27 177.00 824.27 598.78 120.00 1L Erection Bills
BCR 1.49
Dobbaspet - Nelamangala SBT line 6L Civil Bills
for a distance of 12.50 Kms. 20L- Treec Cut Bills(Approx)
TOTAL==> 120L
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

FY2018-19
Devanahalli Hardware Park:
Bills on hand- 808.79lakhs
Establishing 2 X 500 MVA,
supply- 940.01 lakhs
400/220kV Sub-Station (400KV
Erection & civil-
GIS & 220KV AIS) at KIADB
1107.94lakh
Hardware Park, Devanahalli, ES 98.39 & 36815 &
11 AB1057 Bangalore Rural 16.03.18 43939.54 0.00 43939.54 4392.60 30000.00 Total: 2856.74
Bengaluru Rural District and also BCR 2.60 04.02.17
FY 2019-20
for creation of required 220kV
SUPPLY=20900.00
Terminal Bays at the receiving
ERECTION=12034.25
220/66kV sub-stations for
CIVIL=4000.00
evacuation of power.
Total: 36934.25L

FY 18-19
Land and tree cut
compensation-1423L
Supply Rtn-850L
Erection -50L
Kothipura (Ramanagara):
Civil-50L
Establishing 2x100MVA,
Isolators - 88L
220/66kV Station with 220/66kV ES 27.22 10501.25 &
Breaker-75L
12 AC1015 MC lines from Bidadi & SC line Ramanagara BCR 2.02 05.01.09 13.2.07 7637.98 1323.00 8960.98 13480.51 1900.00
CTR-14.5L
from Tubinakere.
Total-2552.33L
220 KV DC line -68.82 Kms,
MCMV 18.117 Kms
FY 19-20
Land compensation-800L
MCMV line portion-1000L
TB portion-100L
Total-1900L
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

a) Magadi:
Establishing 2x100MVA,
220/66/11kV Station with
associated line.
b) Evacuation of 66kV lines from FY - 18-19
Magadi station: Supply - Rs.50L
1. Construction of 66KV MC and Erection - Rs.15.21L
D/C towers to link 66KV Magadi & Civil - Rs.50L
T.G.Halli 66KV Gudemaranahalli Total Rs.115.21 L
ES 40.39 7659.56 &
13 AC1029 sub-station Ramanagara 24.09.07 8660.00 0.00 8660.00 8773.65 800.00
BCR 1.77 02.08.14
2. Construction of 66KV S/C line on FY 19-20
D/C towers from Magadi station to Supply - Rs.300L
Hulikatte Erection - Rs.400L
3. Construction of 66KV Terminal Civil - Rs.300L
Bay at the 66KV Hulikatte Total - Rs.1000L

FY 18-19
Forest payment-20L
Vandaraguppe: Establishing FY 19-20:
1x8MVA, 66/11kV Sub-Station ES 1.40 531.57 & Rtn: 120L
14 AC1055 Ramanagar 18.05.16 573.42 30.00 603.42 496.72 190.00
with associated line for a distance BCR 1.568 29.08.15 Tree Cut: 3L
of 0.926Kms Civil & Erection : 7L
QV& PV-30L
Other bills-30L
Total-190L

FY18-19:
Line supply & erection-85L
Hegganur: Establishing 1X8 MVA, Total -85L
66/11 kV s/s with construction of ES 1.82 FY19-20
991.51 &
15 AC1065 SC line DC towers from Ramanagara BCR1.011 14.02.17 1064.61 35.00 1099.61 853.78 300.00 Forest-100L ,
21.03.16
Doddalahalli S/s for a distance of Rtn-200L
12.238 kms. QV-30L
Line Civil & erecn-50L
Total-380
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

FY-18-19
Stn supply-808L
Stn Civil-101.55L
stn erection-68L
Line civil-139L
Channapatna: Line erection-101L
Establishing 1x100 MVA, Total-1217.55L
220/66/11KV Sub-station (220kV- FY 19-20
ES 5.29 & 9342.30 &
16 AC1068 Partial Hybrid/ Partial AIS, 66kV Ramanagara 16.03.18 8910.88 0.00 8910.88 2222.42 3500.00 Stn supply- 994L
BCR 1.13 10.10.17
AIS) in the premises of existing Stn Civil- 400L
66/11kV Sub station Channapatna stn erection - 70L
, Ramanagara District. Line supply- 880L
Line civil- 337L
Line erection-666L
Tree cut-153L
Stn supply-700L
Total-4200

FY 18-19
Line supply-100L
Station civil-60L
Line civil-30L
Total-190L
Uragahalli:
ES 5.87 & 1412.15& FY 19-20
17 AC1069 Establishing 2x8MVA, 66/11kV Ramanagara 20.03.18 1193.12 0.00 1193.12 597.52 450.00
BCR 2.52 01.03.17 Retension-195L
Sub-Station with associated line.
Running bill-45L
Tree cut-100L
Land compensation-92L
QV-33L
Total-465L

FY 18-19
Erection stn & line -20L
Station civil-60L
Line civil-66L
Total-86L
FY 19-20
Kunur: Establishing 1x12.5MVA, ES 1.262 & 822.65 & Trf-120L
18 AC1070 Ramanagara 21.03.18 703.77 0.00 703.77 315.04 500.00
66/11kV S/s at Kunur BCR 1.06 11.07.17 Switch gear-60L
Retention-150L
Running bill-10L
Tree cut-70L
Land compensation-82L
QV-30L
Total-522L
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

FY- 18-19:
Suppply:150L
Erection:100L
Civil:41L
Total: 291L
FY-19-20:
T.Gollahalli (Thimmasandra) Suppply:2000
Establishing 2x100MVA, Erection:400
220/66/11kV and 1x12.5MVA Civil: 600
ES 38.00 9106.29 &
19 AD1006 66/11kV Station with associated Kolar 07.09.16 9533.08 46.16 9579.24 6036.14 5000.00 Retention bills(20%) Supply,
BCR 2.243 19.09.15
lines for a distance of 220kV 27.269 Civil, Erection:2200L
Kms & 66kV Land / tree cut comp to be
(5.828+10.93+12.28)Kms approved for :1300L
Total:6500L
Work slip was submiited to
appoval for 1700L,
considering WS amount the
budget is requested

FY 18-19
Bills under process -
Rs.170L
Land compensation -
Channarayapattana: Establishing
992 & Rs.100L
20 AB1034 2x8MVA, 66/11kV Sub-Station Bengaluru Rural 0.00 471.81 400.00
10.05.17 S/E/C/Rtn -130L
with associated line.
FY 19-20
Compensation - 200L
S/E/C/Rtn - 300L

Bagganadoddi:
a)Establishing 1x8MVA, 66/11kV
Sub-Station with associated line
b)Running of 3Cx300 sqmm , 66kV
(E) grade Copper conductor UG 2913.00 & FY 19-20
21 AA1179 Bengaluru Urban 0.00 0.00 1500.00
cable 21.11.17 station & UG cable Supply -
from proposed 66/11kV 800L
Kumbaranahalli S/s to proposed Erection & Civil - 1200L
66/11kV Bagganadoddi S/S for
9.052Kms
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

FY 18-19
Bills in hand
earthmat & Civil bills-75L
Station supply-75L
Sathanur(Achalu): Total-150L
780.02 &
22 AC1073 Establishing 2x8MVA, 66/11kV Ramanagara 0.00 138.17 550.00 FY 19-20
21.12.17
Sub-Station with associated line Supply-450L
erection -15L
Civil-130L
Switch gear-55L
Total-650L
FY 18-19
Bommepalli cross:
661.64 & Supply+Civil: 55 L
23 AE1049 Establishing 1x8MVA, 66/11kV C.B.Pura 0.00 0.00 520.00
05.02.18 FY 19-20
Sub-Station with associated line
S+E+C=600 L

Sasalu(Sriramanahalli:
1118 & FY 19-20
24 AB1058 Establishing 1x8MVA, 66/11kV Bengalulru Rural 0.00 0.00 400.00
10.05.17 500L - 50% of the DPR cost
Sub-Station with associated line

Tadigol Cross :
FY 19-20
25 AD1021 Establishing 2x8MVA, 66/11kV C. B. PURA 0.00 0.00 500.00
S+E+C=600 L
Sub-Station with associated line.

Yelahanka (DG Plant):


a) Establishing 2x150MVA,
220/66kV Station b) 220-220 kV
MC line from Nelamangala-
D.B.Pura to Singanayakanahalli
10.33Kms c) Running of DC 220KV, FY 18-19
2000 Sq mm UG cable for a route Bills on hand RS 30.24L
length of 5.875 Kms from Retention Rs.150L
400/220kV Singanayakanahalli LD Rs. 34L
station to 220/66/11kV DG Plant 9902.75 & a) 3346.95 FQV Rs.200L
ES 30.68
26 AA1042 Yelahanka station & Construction Bengaluru Urban 25.06.10 (a)28.04.10 (d) & (e) 0.00 5677.88 31774.22 105.00 Total: 414.24 L
BCR 4.05
of two numbers of 220 kV Terminal 2330.93
Bay at 220/66KV/11kV DG Plant FY 19-20
sub-station. d) 220-66 kV MC line 5 lacs nominal budget, the
from yelahanka to 8 pole structure work is to be shifted to list-1 &
Chikkabettahalli 5.84k Kms e) 66 to be deleted
kV DC line from DG Plant to DG
Plant-Peenya 1 & 2.
1.07 Kms.

26 Total of Sub-stations 224726.77 1740.16 227992.23 129907.80 111575.00


Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

FY-19-20
Augmentation of 1x12.5 MVA,
SWG cost: 150 L (If MEI
66/11kV Power Transformer 1 by 340.27 &
1 AA1168 Bengaluru Urban BCR 1.00 27.03.17 3.08 0.00 3.08 0.00 150.00 delays the supply of
1x20MVA at 220/66/11kV R/s 17.05.17
Switchgear, the budget has
Somanahalli, Bengaluru.
been provisioned)

66/11kV S/S Kodigehalli: 397.72& FY-19-20


2 AA1176 Bengaluru Urban BCR 1.72 28.09.17 2.16 163.00 165.16 2.16 2.00
Replacing 2x8MVA, 66/11kV Power 28.03.17 Nominal Budget: 2 L
Transformer by 2x20MVA,

FY 2018-19:
83L for Handing Over of
Nelamangala 400kV:
220KV Bays.
Providing additional 3rd 500MVA, 4489.57 &
3 AB1028 400/220kV three phase Power ICT Bengaluru Rural BCR 3.06 20.03.10 04.02.11 4177.12 0.00 4177.12 4060.98 190.00
FY 2019-20
with associated equipments for a
100L for Handing Over of
distance of 3.06 kms
220KV Bays.
90L for 400KV Panel Works

Somanahalli: Replacing
2x100MVA, 220/66/11kV Power
1635.73 & FY 19-20:
4 AA1170 Transformer by 2x150MVA at Bengalulru urban 0.00 0.00 900.00
17.05.17 Supply - 1000L
220/66/11kV R/s Somanahalli,
Bengaluru.

Naganathapura:
Augumentation of 2x100 MVA,
FY 18-19:
220/66/11kV Power Transformer
Supply TF -42L
by 2x150MVA, 220/66/11kV Power 1616.20 &
5 AA1164 Bengaluru Urban 0.00 0.00 0.00 900.00
Transformers at 220/66/11kV 28.01.17
FY 19-20:
Naganathapura Receiving Station,
Supply - 1000L
Bangalore South Taluk, Bangalore
Urban District.

FY 18-19
Supply/Erection/Civil -
Army Welfare Housing
30.41L
Organisation: 400.00 &
6 AA1177 Bengaluru Urban 0.00 49.82 200.00 FY19-20
Providing Additional 1X31.5MVA, 21.10.17
Transformer Cost - 220L
66/11kV Power Transformer
retention - 20L
Erection & Civil -10L
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

FY 19-20
Providing additional 20 MVA TR at 387.00&
7 AB1061 Bengaluru Rural BCR 1.46 0.00 0.00 150.00 50% of the DPR cost
220 kV KIADB Doddaballapura 12.02.18
including Tr. Su - 200L

FY 18-19
Supply-50L
Total-50L
FY -19-20
Bidadi:
erection -6L
Providing additional 1x20 MVA 359 &
8 AC1075 Ramanagara 0.00 0.00 200.00 civil-19L
Power Transformer at 220/66/11 17.06.17
swith gear-45L
kV Bidadi Sub-station
Transformer-160L
QV-5L
Rtn-15L
Total-250L

FY 18-19
DWA cost-70L
Hukunda: swith gear-30L
Providing additional 1x8MVA, 225.17 & Total-100L
9 AC1076 Ramanagara 0.00 21.43 50.00
66/11kV Power Transformer at 25.05.17 additional budget of Rs.95L
66/11kV Hukunda Sub-station. requested
FY -19-20
QV-5L

FY 18-19
DWA cost-70L
V.G.Doddi: swith gear-30L
Providing additional 1x8MVA, 225.30 & Total-100L
10 AC1077 Ramanagara 0.00 0.00 50.00
66/11kV Power Transformer at 10.05.17 additional budget of Rs.95L
66/11kV V.G.Doddi Sub-station. requested
FY -19-20
QV-5L

Kanakapura : Providing 1X20MVA,


66/11kV Power transformer as a 307.00&
11 AC1087 Ramanagara 0.00 1.00 shifted as per approved dpr
SPARE at Kanakapura 66/11kV 11.10.18
S/s with associated bay equipments

11 Total of Augmentation 4182.36 163 4345.36 4134.39 2793.00

Hebbal-ITI:
1780.46 &
Replacing Coyote ACSR by HTLS FY 19-20
1 AA1046 Bengaluru Urban NA 21.06.11 07.02.12 1679.14 0.00 1679.14 934.50 100.00
Conductor from the existing 66kV Rtn /erection/civil - 100L
line for a distance of 14.334 Kms.
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

FY 19-20
BIAL toVidyanagar: Running 66kV
Supply retention - 1000L
SC 1000Sq mm XPLE copper UG
5082.46 & Erection - 30L
2 AA1134 Cable for a route length 9.5 Kms Bengaluru Urban NA 15.12.15 5947.00 0.00 5947.00 4364.20 1250.00
25.02.15 Civil - 220L
from 220/66/11kV Sub-station to
Final retention & FQV -
66/11kV Vidyanagar S/s
700L

FY 18-19:
Probable : 170L
a) supply - 100L
EPIP & Yerandanahalli: 2) Erection & civil - 70L
Strenghtening of existing 66 kV line FY-19-20
2202.46 &
3 AA1146 between EPIP & Yerandanahalli Bengaluru Urban NA 30.07.16 2177.30 0.00 2177.30 1287.26 800.00 Erection-400L
13.08.15
sub-station by replacing Coyote by Civil-100L
Drake ACSR Supply/Erection and Rnt
bills: 300L
Total:800L

Budget 18-19
Supply-100L
Somanahally to Kolar via Malur: 3085.00 &
Budget 19-20
4 AB1017 Construction of 220kV DC line Bengaluru Rural NA 19.12.06 28.08.06 2739.09 0.00 2739.09 3381.37 800.00
Supply -400L
(balance works).
erection/ civil -400L
Total: 800L

FY 18-19
T.K Halli to Iggalur: Construction
Line supply - 27.63L
of 66kV DC line for a distance of
Total -27.63L
9.924Kms from 220/66/11kV
FY 19-20
T.K.Halli Station to 66kV Iggalur 304.32 &
5 AC1063 Ramanagara NA 05.06.17 326.26 0.00 326.26 143.88 100.00 Line erection-26L
Tap point in the existing corridor of 16.04.15
Line supply-50L
66kV T.K Halli-Akkurmole SC line
Rtn-20L
and Providing 66kV TB's at T.K
Total-96L
Halli

FY- 18-19:
Suppply:50L
Erection:45L
Civil: 15L
Malur to Lakkur: Total:110L
Construction of 66kV SC line on DC FY- 19-20:
297.43 &
6 AD1042 towers and partly on DC towers Kolar NA 13.03.17 410.00 0.00 410.00 233.33 285.00 Suppply:80L
20.02.13
from 220/66kV Malur Sub-station Erection:10L
to 66/11kV Lakkur Sub-station Civil: 35L
tree/crop cut comp:10L
Additional Rs 80L required if
re-check survey gets
approval
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

Kanteerava GIS Station:


Establishing link line between FY 18-19:
220/66/11kV Sir.M.V.GIS 10L - Surrender
station(East Division Compound) 1782.00 &
7 AA1190 Bengaluru Urban 0.00 0.00 1000.00
and 66kV Kanteerava GIS station 24.01.18 FY 19-20
by laying kV SC 1000Sqmm UG Supply/Erection/Civil -
cable for a route length of 100L
2.488Kms

66kV Mattikere- Jalamangala


Line: Construction of 66kV Line
564.07& FY 19-20
8 AC1080 from 66/11kV Mattikere to Ramanagara NA 0.00 0.00 100.00
05.05.18 Supply/Erection - 100L
Jalamangala for a distance of
10.78Kms

FY 18-19
Somanahalli :
Supply: 300 L
Replacing 66 kV North and South
657 &
9 AA1171 Strung bus by rigid bus at Bengalulru urban 0.00 0.00 500.00
26.09.17 FY 19-20
220/66/11 kV Somanahalli sub-
Supply+Erection+Civil: 500
station
L

Ramnagara Sub-Stn. :
Constructing additional 66kV FY-19-20
34.13 &
10 AC1036 circuit from Bidadi - Bevoor line to Ramanagara 0.00 0.00 55.00 supply, erection and civil
11.01.13
provide LILO arrangements for a bills-55L
distance of 0.65 kms.

10 Total of Lines 13278.79 0.00 13278.79 10344.54 4990.00

FY2018-19
SUPPLY=50 L
ERECTION=100.00
CIVIL=100.00
Peenya : 3539.98 & Total : 250 L
1 AA1050 R & M works at Peenya 220/66kV Bengaluru Urban NA 17.02.11 12.11.13 4093.35 0.00 4093.35 3306.63 800.00 FY 2019-20
Station. SUPPLY=100.00
ERECTION=200.00
CIVIL=200.00
Total: 500 L
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

Probable expenditure for


remaining FY2018-19
SRS Hoody : 1807.71 & Bill on hand -158.00L
2 AA1054 R & M Works at SRS Hoody Bengaluru Urban NA 27.08.11 07.11.13 2452.88 0.00 2452.88 1599.78 500.00 Supply: 150.00 L
220/66kV Station FY 2019-20
SUPPLY & RETN=250.00
ERECTION=100.00
CIVIL=50.00

FY 18-19:
Providing Capacitor Bank and
2779.67 & Supply+Erection: 2375 L
3 AA1150 allied equipment’s in KPTCL Sub- Bengaluru Urban NA 12.12.16 2308.36 0.00 2308.36 2170.07 800.00
13.01.15 FY 19-20
stations of Bengaluru Zone.
Supply+Erection: 560

Renovation and upgradation of FY 18-19:


protection systems of 220 kV Supply+Erection: 835 L
1353.30 &
4 AA1153 substations (26 Nos.) & 400 kV (2 Bengaluru Urban NA 26.12.15 1573.21 0.00 1573.21 1031.14 2000.00
20.06.14
Nos) in Bengaluru Transmission FY 19-20
Zone Supply+Erection: 240 L

FY-19-20
Somanahalli: 2286.04 & a) supply-65L & Erection -
5 AA1073 R&M works at Somanahalli Bengaluru Urban NA 04.09.10 08.03.12 2016.71 0.00 2016.71 1617.38 355.00 50L
220/66kV Station FY-19-20
rtn -308L
Erection -100L

FY 19-20
Nelamangala: 859.04 & 149L Balance Supply &
6 AB1030 Providing 63MVAR Bus Reactor at Bengaluru Rural NA 20.07.09 06.01.11 641.73 0.00 641.73 232.94 170.00 Retention Bills
400/220kV Station. 7L Balance Erection Bills
14L Balance Civil Bills
TOTAL==> 170Lakhs

FY 18-19
Bills on hand -35.00L
KIADB DB Pura:
2488.00 &
R & M works at 220/66kV KIADB FY 19-20
7 AB1048 Bengaluru Rural BCR 1.67 08.11.12 04.03.14 3072.66 0.00 3072.66 2738.98 500.00
DB Pura Station for a distance of supply retention( 10 %) : 250
0.56 L
Erection & civil : 50 L,
work slip: 200 L

7 Total of TB's & Others 16158.90 0.00 16158.90 12696.92 5125.00


Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

54 Total for Bengaluru Zone 258346.82 1903.16 261775.28 157083.65 124483.00

Tumakuru transmission zone


FY 2018-19 Split up
Supply Rentation, Erection
and Civil : 400.00 lakhs
Benkikere (Channagiri): Total- 400.00 Lakhs
Establishing 2x100MVA, 220/66kV FY 2019-20 Split up
ES.1.39 Supply Retension-1975.93
1 BB1042 Station with associated 220kV line Davanagere 8341.82 & 31.05.17 9763.96 0.00 9763.96 7652.82 3000.00
BCR 0.518 Lakhs
for a distance of 47.43Kms 20.11.14
Civil: 823.30 Lakhs
erection: 493.98 lakhs
Total- 3293.22 Lakhs

Surrender of Rs. 1800.00 lakhs for


FY-2018-19 Split up for FY-2018-19
Supply and rentation :1500 Lakhs
Civil: 400.00 lakhs Erection: 153.34
lakhs FY 19-20: Supply & etension-
Jagalur (Hiremallanahole): 1800 Lakhs PV : 530.00 Work Slip:
a) Establishing 2x500MVA,400/220 124.00 Lakhs Total - 1800.00
KV partly GIS S/S i.e., 400kV GIS Already surrender of Rs. 151.72
a) 14186.67 Lakhs Surreder of Rs. 1560.00 due
and 220kV AIS with associated
ES.13.68 & 19.11.15 29.07.16&6. 18597.43& to Forest clearnace FY 2018-19
2 BB1049 400kV lines. Davanagere 408.63 18597.43 20402.31 10000.00
BCR 2.83 b) 8142.88 5.17 9434.43 Split up Supply and Rentation:
b) 220kV DC Line to Thallak, 1195.00 lakhs erection: 200.00
& 28.04.16
Chitradurga & Kudligi along with Lakhs Civil: 255.00 Lakhs
220kv TB's Crop: 50.00 Lakhs
Total-2200.00 Lakhs
FY 2019-20 Split up
Supply Retension- 2106.04 Lakhs
Erection : 412.68 Lakhs Civil:
753.77 Laksh Crop-400Lakhs
Total-3672.49 Lakhs

Additional Rs.50.00 lakhs


required
FY-2018-19
Malladihalli : Establishing Crop: 175.00 lakhs
2x8MVA, 66/11kV Sub-Station ES 4.3 622.98 & Retantion: 25.00 lakhs
3 BC1053 Chitradurga 06.02.13 670.64 32.11 702.75 666.03 150.00
with associated line for a distance BCR 2.56 19.10.12 FY-2019-20
of 11.467 Kms. Retantion: 75.00 Lakhs
Civil: 25.00 Laksh
QV: 40.00 lakhs
LD: 10.00 lakhs
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

Splitup for 2018-19 Rs. In


Lakhs
Supply:-130.00
Erection:-30.00
Visveswarapura: Establishing Civil:- 32.70
ES 3.377 & 528.33 &
4 BC1055 1x8MVA, 66/11kV Sub-Station Chitradurga 20.03.18 517.10 32.00 549.10 236.38 275.00 Total - 192.70 Lakhs
BCR 3.87 26.04.17
with associated line
Splitup for 2019-20
Supply:-130.00
Erection:-20.00
Civil:- 09.24
QV :-10.00
Total - 169.24
Surrender 2000.00 Lakhs
Splitup for 2018-19
Supply - 3200
Erection - 200.5
Civil - 496 Lakhs
Hosadurga:
ES 18.225 Total - 3896.5 Lakhs
Establishing 2x100MVA, 220/66
5 BC1068 Chitradurga & BCR 7468.00 15.03.18 10034.77 652.28 10687.05 439.47 5000.00
KV S/s with associated 220kV &
1.22 Splitup for 2019-20
66kV lines
Supply& Rtn-:5000.00
Civil:600.00
Erection: 150.00
Crop comp:250.00
Total: 6000.00 Lakhs

Karadi:
590.73 &
6 BA1131 Establishing 1x10MVA, 110/11kV Tumakuru BCR 1.05 0.00 0.00 0.00 600.00
23.01.18
Sub-Station with associated line

Godabanalu :
Rs.1053.64
Establishing 2x12.5MVA, 66/11kV ES 5.032
7 BC1073 Chitradurga & 0.00 500.00
Sub-Station with associated line in BCR 3.18
21.04.18
Chitradurga Taluk & Dist.

Neralagunte:
Establishing 1x12.5MVA, 66/11KV ES 2.067 Rs.745.54&
8 BC1074 Chitradurga 0.00 400.00
substation with associated line in BCR 1.89 21.04.18
Challakere Taluk ,Chitradurga dist

Mallapanahalli:
ES 4.499 Rs.900.93&
9 BC1072 Establishing 2x8MVA, 66/11kV Chitradurga 0.00 400.00
BCR 3.16 05.05.18
Sub-Station with associated line
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

Changawara:
ES 1.3484 612.50 &
10 BA1134 Establishing 1x8MVA, 66/11kV Tumakuru 0.00 0.00 400.00
BCR 1.48 28.03.18
Sub-Station with associated line

Sira(Kallukote) :
Establishing 2x100MVA, 6800.90
11 BA1048 Tumakuru BCR 2.78 0.00 0.00 0.00 500.00
220/66/11kV Sub-station with &16.03.18
associated line

11 Total of Sub-stations 49018.33 1125.02 40300.29 29397.01 21225.00

Transformer Cost - 604


Lalhs
Other works - 112 Lakhs
Total - 716 Lakhs
Davanagere: 1203.66 &
1 BB1031 Replacing 2x60MVA, 220/66kV by Davanagere NA 27.10.10 248.41 1050.00 1298.41 65.50 680.00 Power Transformer allotted.
2x100MVA, 220/66kV transformers Hence, to book the
expenditure towards
transformer cost 500 Lakhs
addl budget required
during18-19

Heggere:
273.12 & Retention-63 & surrendor
2 BA1130 Providing additional 1x8MVA Power Tumakuru BCR 0.65 109.94 32.05 141.99 29.33 100.00
21.11.17 70Lakhs
Transformer at 66/11kV Substation

Kattige:
ES NA 173.45 &
3 BB1051 Providing additional 1x8MVA, Davanagere 31.12.18 103.40 148.50 251.90 22.86 100.00 Additional Rs. 45.00 Lakhs
BCR 0.90 12.10.11
66/11kV Transformer

Kundur:
ES NA 174.69 &
4 BB1052 Providing additional 1x8MVA, Davanagere 28.12.18 102.21 148.50 250.71 22.86 100.00 Additional Rs. 45.00 Lakhs
BCR 0.90 24.09.11
66/11kV Transformer

Bennihalli:
140.08 & Rs. 100 Lakhs to be
5 BB1082 Replacing 1x6.3 MVA, 66/11kV by Davangere BCR 0.75 0.00 0.00 100.00
11.05.17 surrendered
1x 12.5 MVA, 66/11kV Tranformer.
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

Halavagalu:
274.74 & Rs. 100 Lakhs to be
6 BB1083 Replacing 2x6.3MVA, 66/11kV by Davangere BCR 0.77 8.51 226.14 234.65 0.00 100.00
25.05.17 surrendered
2x 12.5MVA, 66/11kV Transformer.

Telagi:
272.75 &
7 BB1084 Replacing 2x6.3 MVA, 66/11kV by Davangere BCR 0.78 6.40 226.14 232.54 0.00 5.00
12.06.17
2x12.5MVA, 66/11kV Transformer.

Sasuvehalli :
Augmentation of one
Replacing of 1x6.3 MVA 1x8MVA 273.90&
8 BB1085 Davanagere BCR 0.66 6.50 126.00 132.50 0.00 1.00 transformer completed and
by 2x12.5MVA 66/11kv Power 29.05.17
another transformer to be
Transformer
allotted.

Savalanga:
Providing additional 223.52 & Surrender of Rs. 50.00
9 BB1087 Davangere BCR 0.59 27.12.18 82.22 148.50 230.72 0.00 150.00
1x8MVA,power Transformer at 20.05.17 lakhs
66/11kV Savalanga S/S.

Additional 80.00 required


for FY-2018-19
Supply: 74.00 lakhs
Erection: 1.00 lakhs
Kanchipura: Civil: 10.00 lakhs
ES 112.36 183.72 &
10 BC1071 Providing Additional 1x8 MVA, Chitradurga 31.12.18 82.22 1485.00 1567.22 0.00 100.00 Total : 85.00 lakhs
BCR 1.87 21.07.15
66/11kV Power Transformer. FY-2019-2020
Supply: 46.00 lakhs
Erection: 1.00 lakhs
Civil: 10.00 lakhs
Total: 57.00 lakhs

Gubbi:
411.61 &
11 BA1149 Replacing 2x10 MVA, 110/11kV by Tumakuru BCR 1.13 206.19 70.00
22.05.18
2x 20 MVA, 110/11kV Transformer

JG Halli:
Replacing 2x6.3MVA, 66/11kV
285.90 &
12 BC1081 power transformer by 2x 12.5 MVA, Chitradurga BCR 1.00 0.00 150.00
19.09.18
66/11kV power at 66/11kV J.G
Halli S/s.
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

12 Total of Augmentation 749.81 3,590.83 4,340.64 346.74 1,656.00

Kibbanhalli - CN Hally - Huliyar :


Rs -100.00 Lakhs proposed
Construction of 110kV DC line in
to be Surrender to (TL&SS
the new corridor from 220kV 966.15 &
1 BA1024 Tumakuru NA 15.09.10 733.50 242.00 975.50 681.97 300.00 Division, Tumakuru)
K.B.Cross to Thimmanahally 01.12.09
Compensation Rs-86.39
tapping point for a distance of
Lakhs
26.00 Kms.

Vasanthanarasapura to
Madhugiri:
Construction of 220kV DC line with
Compensation Rs-510.00
Moose ACSR from PGCIL Station at 5678.46 &
2 BA1096 Tumakuru NA 07.07.15 6056.94 1889.00 7945.94 6694.52 500.00 Lakhs, Retention Rs-251.82
Vasanthanarasapura to existing 15.09.14
Lakhs,
220kV station at Madhugiri along
with terminal bays for a distance of
44.481KMS.

Splitup for 2018-19 Supply -


2428.72 lakhs
Work slip: 600.00 lakhs
Erection - 200.00 lakhs
Civil - 200.00 lakhs
Crop - 130.53 lakhs
400 KV BTPS from Rampura
Total - 3559.25 Lakhs
Limts to Chikkanayakanahalli: a) 49189.74
3 BA1112 a) Construction of 400 KV Quad Tumakuru NA & 21.11.15 29.07.16 17820.75 1264.57 19085.32 14733.69 4000.00
Splitup for 2019-20 Supply-
Moose DC Line from 400 KV
110.00
Rampura Limits to Jagaluru Limits
Erection-150.00
for 65Kms
Civil- 150.00
b) Construction of 400 KV Quad
Crop - 250.00
Moose DC Line from 400 KV
PV- 560.00
Jagaluru Limits to
LD - 50.00
Chikkanakanahalli for 123.69Kms
Total- 1270.00 lakhs
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

Surrender of Rs. 41.33


Lakhs
Split up for 2018-19
Errection-10.88 Lakhs
Civil-4.00Lakhs
Crop - 15.00.
Total - 19.88 Lakhs
Davanagere - Chitradurga No. 1 :
Re-construction of 66kV S/C line
771.90 & Split up for 2019-20
4 BB1018 on D/C towers in the existing Davanagere NA 28.04.10 570.24 75.00 645.24 501.35 100.00
27.07.09 Supply & Retension-128.00
corridor for a distance of 55.70
Lakhs
Kms.
Errection-10 Lakhs
Civil-7 Lakhs
Crop - 15
Total - 160 Lakhs
Excess due to Work slip, PV
and Crop compensation

Split up for 2018-19 Supply


& Retension-6.44 Lakhs
Errection-5 Lakhs
Civil-5 Lakhs
Total - 16.44 Lakhs
Davanagere - Chitradurga No. 2:
Re-construction of 66kV S/C line Split up for 2019-20
649.58 &
5 BB1019 on D/C towers in the existing Davanagere NA 28.04.10 453.79 86.00 539.79 447.47 70.00 Supply & Retension-73
14.07.09
corridor for a distance of 53.84 Errection-22 Lakhs
Kms. Civil-10 Lakhs
Crop - 15
Total - 120 Lakhs
Excess due to Work slip, PV
and Crop compensation
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

Split up for 2018-19


Supply & Retension-48.66
lakha
Total - 48.66 Lakhs

Davanagere to Harapanahalli: Supply & Retension-175.81


Construction of new 66kV SC line 737.11 & lakha
6 BB1039 Davanagere NA 14.07.14 955.31 0.00 955.31 794.86 100.00
on DC towers for a distance of 28.03.11 Split up for 2019-20
45.40 kms.
Total - 175.81 Lakhs

Excess due to Work slip


69.59 Lakhs and crop-
31.37 lakhs

Tallak: Rs.19.00 lakhs Surrender


Construction of Balance 220kV DC for FY-2018-19
line from LILO Point of 220kV 7359.37 & Fy-2019-2020
7 BC1017 Chitradurga NA 22.09.09 5082.28 1312.24 6394.52 5718.56 25.00
Hiriyur-Chitradurga to 400/220kV 21.04.08 Short close proposal of
PGCIL Hiriyur station for a distance Rs.50.00 lakhs
of 20.90 kms Work stoped by agency.

Pandarahalli - Holalkere:
Fy-2019-2020
Construction of 66kV DC line in the
512.08 & Short close proposal of
8 BC1025 existing corridor of 66kV S/C line Chitradurga NA 22.05.07 646.00 0.00 646.00 444.91 25.00
10.08.06 Rs.50.00 lakhs
with TBs for a distance of 25.34
Work stoped by agency.
Kms.
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

Construction of 220KV link lines:


1. Hiriyur PGCIL to Hiriyur:
For the FY-2018-19
Construction of 220kV SC line on
Supply:-200.00 lakhs
DC towers for a length of 15.168
Erection:-100.00 lakhs
Kms from existing 400/220KV
civil:-100.52 lakhs
PGCIL station at Beerenahalli(
Crop comp:-77.00 lakhs
Hiriyur) to existing 220/66/11KV
Total: 477.52 lakhs.(274.55
Hiriyur S/s in existing Corridor of
budget booked)
220KV S/C line from Hoysala Katte
4944.26 &
9 BC1069 to 220/66/11 KV Station Chitradurga 26.01.18 5548.55 534.00 6082.55 3736.76 2500.00
24.11.16 For the FY-2019-20.
Hiriyur(Partly in new Corridor
Supply:-1301.55 lakhs
i.e.from PGCIL point to link 220KV
Erection:-200.00 lakhs
S/C line from Hoysala Katte to
civil:-350.00 lakhs
220/66/11 KV SRS at Hiriyur)
Crop comp:-442.00 lakhs
including re-arrangement of
Total: 2293.55 lakhs.
existing 220KV lines near
surrendered Rs.600.00
Beernahalli 400KV Station &
Lakhs
dismantling of existing 220KV line
Tower.

PC Approved. Work to be
taken up.
Honnalli -Lingadahalli: Stringing of
66 2nd circuit from loc 98 on
Rs. 290.00 lakhs required
Honnalli -Lingadahalli line to 66kv
for the work of Stringing of
Lingadahalli S/s for a distance of 240.46 &
10 BB1090 Davangere 0.00 250.00 2nd circuit using coyote
2.215 in the existing corridor along 30.08.18
ACSR conductor on existing
with formation of 4 Nos of terminal
DC towers of 66kv line from
bays at 66 kV Lingadahalli S/s in
loc 98 of Honnalli -
Channagiri taluk,Davangere district
Lingadahalli proposal
submitted

10 Total of Lines 37867.36 5402.81 43270.17 33754.09 7870.00

Providing 12.1kV 2.9MVAR


Capacitor Banks and Other allied
Rs 200L required for
equipments to 57 Nos of existing 1430.00 &
1 BA1109 Tumakuru 07.08.15 1000.00 600.00 1600.00 754.84 500.00 payment of Rtn amount and
KPTCL Sub-station in the 23.09.14
Civil * erection.
jurisdiction of Tumakuru
Transmission Zone

Renovation and Up gradation of


Protection systems of 220kV
1283.10 & WS-2 submitted for
2 BA1115 substations(11 Nos) & 400kV Sub- Tumakuru NA 26.12.15 1505.46 0.00 1505.46 883.63 500.00
20.06.14 approval.
stations(1 No) in Tumakuru
Transmission Zone
2 Total of TB's & Others 2505.46 600.00 3105.46 1638.47 1000.00
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

35 Total of Tumakuru Zone 90140.96 10718.66 91016.56 65136.31 31751.00


Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

HASSANA TRANSMISSION ZONE

Kadavina Kote:
Establishing 2x100MVA, 220/66kV Stn 5026.21
LOI Supply:265.36
Station at 220/66kV Kadavinakote & 23.9.08 220kV
LOI Erection:29.46
sub-station in Hassan Taluk & ES 35.66 220kV Line 15.06.06
1 CA1027 Hassana 6137.07 168.76 6305.83 6201.81 300.00 LOI Civil:20.07
District along with associated BCR 3.91 796.98 66kV
Total
220kV & 66kV lines. 66kV Line 14.06.07
DWA cost:316.89
220kV 16.355 Kms 1428.32
66kV 36.39 Kms.

For 2019-20
Rtn: S:42.82
E:0.26
C:7.35
Subtotal:50.43
LD: S:14.71
Shettihalli:
E:5.05
Establishing 1x8MVA, 66/11kV
C:11.30
Sub-Station at Shettihalli in ES 3.59 465.60 &
2 CA1036 Hassana 30.04.10 280.72 135.79 416.51 278.60 170.00 Subtotal:31.06
Bantwal Taluk, D.K. District along BCR 2.55 17.12.09
Balance Work:
with associated line for a distance
S:20.56
of 2.34 Kms.
E:1.35
C:27.85
Subtotal:49.76
Compensation as per DC
order:37.9
Final :169.15

Shortclosed on 07.05.2016.
Jeppu:
To be tendered for balance
Establishing 1x20MVA, 110/33kV
works
& 2x10MVA, 110/11kV Sub-Station ES 2.95 1518.53 &
3 CB1012 Dakshina Kannada 29.01.08 901.68 436.15 1337.83 1007.15 450.00
at Jeppu in Mangaluru Taluk, D.K. BCR 1.06 20.12.06
Balance works estimate
District along with associated line
amount Rs. 1094.05L (60%
for a distance of 10.00 Kms.
Budget asked for next year)
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

Probable expenditure for


2018-19: Tree cut
compensation - 7 L
Balance works Supply - 6 L,
Karaya:
Errection -1.5 L, Civil works
Establishing 2x10MVA, 110/11kV
Road & TB - 35 L; Total -
Sub-Station at Karaya in ES 2.367 1761.26 &
4 CB1013 Dakshina Kannada 07.02.08 1097.16 476.89 1574.05 1401.82 50.00 42.5 L. Additional budget
Belthangadi Taluk, D.K. District BCR 0.60 20.12.06
will be sought after
along with associated line for a
awarding the work.
distance of 15.00 Kms.
Savings due to agency has
not taken up TB work at
Puttur and balance
revetment work.

Mulky:
Probable expenditure for
Up-grading 2x5MVA, 33/11kV sub-
2018-19: Station civil - 10 L,
station to 1x10MVA, 110/11kV Sub- ES 13.326 937.43 &
5 CB1015 Dakshina Kannada 29.01.08 598.00 143.76 741.76 408.14 500.00 Line Erection - 20L,
Station at Mulky in Mangaluru BCR 4.20 11.12.06
Compensation - 20L.
Taluk, along with associated line
for a distance of 11.00 Kms.

Probable expenditure from


18-19: Supply & Civil - 250
L

Station(DWA): S-1055.91L E-
38.33L C-343.89L
Switchgear: Rs.65.84Lakhs
Madavu:
Probable expenditure for
Establishing 2x20MVA, 110/33- Stn:07.07.1
2018-19:
11kV & 1x10MVA, 110/11kV Sub- ES 9.273 2414.24 & 8 Stn:1438.13
6 CB1017 Dakshina Kannada 219.52 333.72 1863.72 1500.00 Tree cut compensation -
Station at Madavu in Puttur Taluk, BCR 1.2 23.09.09 Line:18.01.1 Line:778.91
150L
along with associated line for a 0
Line(DWA):S-627.26L, E-
distance of 27.00 Kms.
49.03L, C-102.61L.
For 2019-20: Retention-
Rs.200.63L, Tree cut-500L

Budget required for FY19-20


is: Retention-Rs.200.63L,
Tree cut-500L
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

Substation commissioned
on 05.03.2015
Mangalore SEZ:
Probable Expenditure for
Establishing 2x100MVA,
2018-19: Bill on Work slip -
220/110kV and 2x20MVA,
4375.96 & 34 L
7 CB1024 110/11kV Station at MSEZ near Dakshina Kannada BCR 0.9 13.5.11 3726.98 128.64 3855.62 3852.01 350.00
21.10.10 Budget for 2019-20: Land
Bajpe in Mangalore taluk , along
compensation and treecut
with associated lines for a distance
compensation appx - 200
of 6.854Kms
Lakhs
Work cost- 50 Lakhs

Budget for 2019-20:


Karkala: (Department supplied
Up-gradation of 2x5MVA, 33/11kV Material Cost- 48Lakhs),
Sub-station to 2x10MVA, 110/11kV ES 1.58 Civil: 50Lakhs, LD-
8 CC1016 Udupi 1127.95 & 24.06.16 921.80 115.50 1037.30 1061.38 130.00
Sub-station at Karkala in Karkala BCR 0.909 29.5lakhs(supply-15.02,
18.02.15
Taluk along with associated line for erection-2lakhs, civil-
a distance of 1.10Kms 12.12lakhs) Total-
127.5Lakhs. say 130lakhs
Budget FY 2019-20
Retention Rs.43.00 Lakhs
Supply Rs.12.00 Lakhs
Erection Rs.20.00 Lakhs
Civil Rs.45.00 Lakhs
Konandur: Total Rs.120.00 Lakhs
Establishing 1x10MVA, 110/11kV Stn:07.01.0 Budget FY 2019-20:
Sub-Station at Konandur in ES 1.05 875.98 & 6 Retention Rs.6.00 lakhs
9 CD1022 Shimoga 631.22 396.26 1027.48 976.20 530.00
Thirthahalli Taluk, along with BCR 0.71 29.08.08 Line:07.07.1 Supply Rs.184.00 Lakhs
associated line for a distance of 8 Erection Rs.40.00 Lakhs
11.83 Kms. Civil Rs.80.00 Lakhs
compensation Rs.100.00
Lakhs
Total Rs.410.00 Lakhs
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

Bills on hand:
1) BR No: 1285/08.03.2019
Rs.18.35 Lakhs.
2) BR No: 1284/08.03.2019
Rs.3.38 lakhs.
3) BR No: 1282/08.03.2019
Rs.25.90 Lakhs.
4) BR No: 1281/08.03.2019
Mcgann Hospital;
Rs.3.99 Lakhs.
Establishing 1x10MVA,110/11KV
Stn:15.03.1 Total Rs.51.62 Lakhs.
S/S at McGann Hospital premises ES 1.51 & 1655.35 &
10 CD1062 Shivamogga 8 1540.20 0.00 1540.20 958.83 600.00 Prbable: Rs. 8.40 Lakhs
in Shivamogga Taluk along with BCR 0.75 09.03.17
Line:12.03.1 LD Rs.42.27 Lakhs.
associated line for a distance of
8 Retention Rs.4.02 Lakhs.
2.123Kms.
Probable Expenditure:
Rs.60.00 Lakhs (11KV
switchgear)

Budget for 2019-20


Supply Rs.180.00 Lakhs
Erection Rs.46.00 Lakhs
Civil Rs.60.00 Lakhs

Chikkamagalur: Part A:
Establishing 2 x 100MVA,
220/66KV Substation & 1 x 12.5
MVA 66/11 KV Sub Station at
Chikkamagalur and
Construction of 220KV DC line for
a length of 28.55 Kms from 220KV FQV is being prepared & will
Shimoga-Mysuru DC line to the 220KV S&L be submitted. Budget 2019-
proposed 220/66KV S/S at 27.03.08 20 (As per estimate)
ES 71.43 5935.32 &
11 CE1009 Chikkamagalur on PTK Basis Chikkamagaluru Eva-line 3974.94 1311.80 5286.74 4465.32 150.00 Supply Rs.120.00 Lakhs
BCR 3.38 29.11.06
Part B:Construction of 66KV 14.06.0714. Erection Rs.20.00 Lakhs
Evacuation lines from the proposed 06.07 Civil Rs60.00 Lakhs
220KV Station at Chikkamagalur 1) Total Rs.200.00 Lakhs
Chikkamagalur to Hassana DC line:
0.6 Kms 2) Chikkamagalur MC line
: .74Kms. 3) 66KV DC line from
proposed 66KV MC line to
Balehonnur (Mattavara Limits): 7.8
Kms
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

Bills on hand:
1) BR No: 1178/13.02.2019
Rs.4.79 Lakhs. 2) BR No:
1289/08.03.2019 Rs.24.46
Lakhs. 3) BR No:
Yemmedoddi: 1290/08.03.2019 Rs.15.06
Establishing 2x10MVA, 110/11kV Lakhs. LD Rs.11.01 Lakhs.
Sub-Station at Yemmedoddi in ES 1.87 & 1016.17 & Budget for 2019-20
12 CE1016 Chikka-magalur 05.01.18 1104.30 0.00 1104.30 614.33 650.00
Kadur Taluk & District, along with BCR 0.61 02.05.16 Supply/ Rs.250.00 Lakhs
associated line for a dist of Erection Rs73.00 Lakhs
8.731Kms Civil Rs.92.00 Lakhs
Retention Rs.135.00 Lakhs
Land/Crop Rs.100.00 Lakhs
Total Rs.650.00 Lakhs
Budget surrendered in the
year 2018-19 Rs.150 Lakhs.

Heggunje :
Establishing 2x100 MVA, 220/110
8651.63 &
13 CC1020 kV , 1x10 MVA 110/11kV Sub Udupi 0.00 38.88 6000.00
04.04.17
Station at Heggunje in Udupi Taluk
& District along with associated
lines and TB's

Belman(Nandalike):
Establishing 1x10MVA, 110/11KV
sub-station at Belman(Nandalike) 878.75 & LOI issued to M/s Sri
14 CC1031 Udupi 0.00 0.00 650.00
in Karkala Taluk, along with 05.02.18 Vinayaka Electricals,
associated line for a distance of
1.031 Kms.

Nagarthi:
Establishing 1x8 MVA,66/11kV
Sub-station at Nagarthi in ES 1.67& 680.67 &
15 CA1066 Hassana 0.00 0.29 600.00 LOI issued
Holenarasipura Taluk, along with BCR 1.5 17.09.18
Associated Line for a distance of
4.343kms
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

For Fy 2018-19
Tree cut compensation:20.00
Horticulture:17.00
Coffee board:15.00
cropcomp: 9.00
subtotal:61.0
MEI Rtn:3.96
On hand bills: 16.12
Hettur:
Rtn: S:106.12
Establishing 1x8MVA, 66/11kV
E:22.48 C:40.01
Sub-Station at Hettur in S.K.Pura ES 0.05 642.98 &
16 CA1055 Hassana 14.08.15 738.78 156.77 895.55 655.58 93.00 Subtotal:168.61
tq & Hassana District along with BCR 0.3 01.10.14
Balance work bills: S:61.16
associated line for a distance of
E:52.25 C:36.9
12.67kms
SubTotal: 150.31 Total:400.00
For FY-2019-20 LD:
S:44.10 E:3.3
C:26.50 Subtotal:73.9
FQV:18.67
Total for 19-20 :92.57

16 Total of Sub-stations 23869.89 3689.84 25456.89 23784.06 12723.00


Vittla:
Replacing 1x10MVA,110/11kV &
1x10MVA, 110/12.1kV Probable Exp for 2018-19:
489.27 &
1 CB1049 Transformer by 2x20MVA, Dakshina Kannada BCR 1.4 14.09.17 136.80 345.19 481.99 320.71 125.00 Work cost - 15 L, PV - 19L.
17.07.15
110/11kV Transformer at Budget for 2019-20:
110/11kV Vittla S/s in Bantwala Balance work cost - 125L
Taluk .

Salagame:
2X12.5MVA, 66/11kV class
Replacement of 2 X 8 MVA, 66/11
275.27 & power transformer is
2 CA1068 KV power Transformer by 2 X 12.5 Hassana BCR 2.018 0.00 0.00 200.00
23.03.17 required for copletion of the
MVA, 66/11kV Power Transformer
work.
at Salagame S/S in Hassana Taluk

Shanthigrama:
Replacement of 2 X 8 MVA, 66/11 1X12.5MVA, 66/11kV class
KV Transformer by 2 X 12.5 MVA , 275.27 & power transformer is
3 CA1069 Hassana BCR 2.018 0.00 80.65 150.00
66/11kV Transformer at 66/11kV 20.03.17 required for copletion of the
Shanthigrama sub-station in work.
Hassana Taluk & District
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

Probabl for 18-19:


MEI:27.20
Juttanahally: Transformer to be diverted
Providing Additional 1x8MVA, For Fy 19-20
222.54 &
4 CA1070 66/11kV Trnasformer at 66/11kV Hassana BCR 1.77 0.00 24.11 95.00 DWA:88.21
28.03.17
Juttanahlly sub-station in C.R. Transportation of
Patna Taluk, Hassan District Transformer:3.00
FQV:5.00
Total:96.21

Tr diverted from Singapura


For Fy 19-20
DWA:86.01
Transportation of
Chikkabommenahally:
Transformer:3.00
Augmentation of 1 X 8 MVA, 66/11
FQV:5.00
KV Transformer by 1 X 12.5 MVA 244.09 &
5 CA1072 Hassana BCR 0.74 0.00 0.00 90.00 Total:94.01
,66/11kV Transformer@ 66/11kV 12.06.17
8MVA releeased
Chikkabommenahally S/S in
Transformer from
Arkalgud Taluk.
Singapura is alloted to
Chikkabomenahally.
11kV Switchgear received at
MWD stores.

For fy-2018-19
DWA:81.94
Bychanahally: Providing additional
MEI:31.86
1x8MVA transformer @ 66/11kV 232.09 &
6 CA1073 Hassan BCR 0.78 0.00 73.82 90.00 For Fy 19-20
sub-station Bychanahally, in 17.05.17
Pending Bills:10.00
Arkalagud Taluk.
FQV:5.00
Total:15.00
For fy-2018-19
MEI:22.22
K.Byrapura: Providing additional For Fy 19-20
1x8MVA, 66/11kV transformer at 209.30 & DWA:82.13
7 CA1074 Hassan BCR 0.88 0.00 19.71 90.00
66/11kV K.Byrapura sub-station in 12.06.17 FQV:5.00
C. R. Patna Taluk. Tr diverted from Bagur
Transportation:3.00
Total:90.13
Kallusadarahally :Providing
For Fy 19-20
additional 1x10 MVA, 110/11 kV
271.33 & DWA:100.85
8 CA1075 power transformer at 110/11 kV Hassan BCR 0.84 0.00 0.00 200.00
12.06.17 Trfr :126.56
Kallusadarahally Sub station in
MEI:32.61
Arasikere Taluk.
Total:260.02
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

For fy-2018-19
Arehalli :Providing additional 1x8
Work bills to receive:10.00
MVA, 66/11 kV power transformer 277.26&
9 CA1076 Hassan BCR 0.47 0.00 0.00 150.00 For Fy 19-20
at 66/11 kV Arehalli Sub station in 21.11.17
DWA:111.83
Belur Taluk.
MEI:51.99

Probable expenditure for


Salethur: 2018-19: Supply+Civil - 25L
Providing additional 1X10 MVA Award Cost: Supply -
Dakshina 285.78 &
10 CB1050 110/11kV Transformer at BCR 0.8 0.00 7.66 100.00 62.94L, Erection - 15.64L,
Kannada 16.06.17
110/11kV Salethur sub-station in Civil - 20.01; Total - 98.59L.
Bantwala Taluk, D.K. District. Cost of switchgear(DPR):
Rs.47.65L

Probable expenditure for


2018-19: Supply - 20L.
Cost of LOI: Supply-
Netlamudnur: Providing additional 113.49L, Erection - 20.41L,
1x20 MVA, 110/33 kV transformer 335.86 & Civil - 16.37L; Total -
11 CB1051 Dakshina Kannada BCR 0.996 0.00 0.00 300.00
at 220 kV Netlamadnur station, in 31.10.17 150.27L
Bantwal Taluk. Cost of Power Transformer:
Rs.191L
20 MVA, Transformer
required
Probable expenditure for
2018-19: Civil - 10L.
Cost of LOI: Supply- 97.83L,
Erection - 24.35L, Civil -
Bantwala:Providing additional 1x20
39.50L; Total - 161.68L
MVA, 110/33 kV transformer at 338.10 &
12 CB1052 Dakshina Kannada BCR 0.988 0.00 15.57 300.00 Cost of Power Transformer:
110 kV Bantwal sub-station, in 23.10.17
Rs.191L
Bantwal Taluk .
20 MVA, Transformer
required

Gurupura:
Award Cost: Supply -
Replacement of 1x10MVA,
19.15L, Erection - 13.89L,
110/11kV transformer by 249.52&
13 CB1053 Dakshina Kannada BCR 0.65 0.00 0.00 150.00 Civil - 1.72; Total - 34.76L.
1x20MVA, 110/11kV Transformer 30.10.17
Transformer cost - 191L,
at 110/11kV Gurupura sub-station
Switchgear - 14.52L (PO)
in Mangaluru Taluk.
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

Cost of LOI 87.6Lakhs,


Transformer cost-
122.17Lakhs, Switchgear
Cost- 17.77Lakhs.
Budget required for FY 2019-
20, Supply-43.56Lakhs,
Madhuvana:Providing additional Erection-17.17Lakhs, Civil-
1x20 MVA, 110/11KV Transformer 256.44 & 6.86Lakhs, Dept.
14 CC1030 Udupi BCR 0.75 0.00 7.92 100.00
at 110/11KV Madhuvana Sub- 05.07.17 Switchgear - 22.75Lakhs,
station in Udupi Taluk and District. Total- 90.34Lakhs, Budget
required is 100Lakhs. Since
released Power Transformer
at 110kV S/s Vitla is
proposed to be diverted to
Madhuvana. Savings in new
Power Transformer cost.

Hiriyadka: Replacement of existing


Cost of LOI 14.27Lakhs,
1x10MVA, 110/33KV Transformer
212.13& Transformer cost-
15 CC1032 by 20MVA, 110/33KV Transformer Udupi BCR0.79 0.00 0.00 180.00
26.09.17 160.73Lakhs, NFE cost-
at 110/33/11kV Hiriadka Sub-
8.3Lakhs.
station in Udupi Taluk & Dist.

Thogarsi: Providing additional 1 x


10MVA, 110/11KV Transformer at
289.70 &
16 CD1063 110/11kV Thogarsi sub-station in Shivamogga BCR 0.55 0.00 0.00 150.00 LOI issued
11.10.17
Shikaripura Taluk, Shivamogga
District

Tyvarachatnalli: Replacement of
existing 6.3MVA 66/11KV
transformer to 12.5 MVA, 66/11kV 176.10 &
17 CD1064 Shivamogga BCR 0.56 0.00 0.00 150.00
transformer at 66/11KV 07.10.17
Tyavarechatnahalli sub-station in
Shivamogga taluk & District

Mudigere:
Replacement of 2x6.3MVA,
66/11kV Transformers by 574.31 &
18 CE1040 Chikkamagaluru BCR 0.74 0.00 6.06 150.00 LOI issued
2x12.5MVA, 66/11kV Transformer 01.03.18
at 66/11kV Mudigere sub-station
in Mudigere Taluk.
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

Chikkamagalur:
Replacing 2X12.5MVA, 66/11kV
Transformer by 2X20MVA, 66/11kV 647.00&
19 CE1042 Chikkamagalur BCR 1.21 0.00 0.00 300.00 LOI to be issued
transformer at 66kV 09.03.18
Chikkamagaluru Substationin
Chikkamagaluru Taluk & District.

Javagal:
Replacement of 1 X 10 MVA,
110/11 KV power Transformer by 204.20&
20 CA1077 Hassana BCR 0.52 0.00 150.00 LOI issued
1 X 20 MVA 110/11KV power 08.06.18
transformer at 110/11KV Javagal
S/S in Arasikere Taluk

Ramnathapura:
Augmentation of 1x6.3MVA 12.5MVA, 66/11kV class
66/11kV power transformer by power transformer
207.38&
21 CA1078 1x12.5 MVA 66/11 KV Power Hassan BCR 2.76 0.00 30.00 Comissioned on 22.12.2018.
02.05.18
Transformer at 66/11 KV Switchgear work under
Ramanathapura S/s in Arakalagud progress
Taluk, Hassan District.

Bagur:
12.5MVA, 66/11kV class
Replacement of 1 X 8 MVA, 66/11
power transformer
KV Power Transformer by 1 X 12.5 166.89&
22 CA1079 Hassana BCR 0.52 0.00 10.00 Comissioned on 20.12.2018.
MVA, 66/11 KV Power Transformer 27.06.18
Switchgear work under
at 66/11 KV Bagur S/S in C. R.
progress
Patna Taluk

Belur:
Replacement of 1x6.3MVA,
66/11kV Power Transformer-2 by 152.68&
23 CA1080 Hassan BCR 0.82 0.00 150.00 work to be takenup
1x12.5MVA, 66/11 KV Power 08.06.18
Transformer at 66/11KV Belur S/s
in Belur Taluk, Hassan District

Rameshwaranagara:
Replacement of 2x8MVA, 66/11kV
2X12.5MVA, 66/11kV class
Power Transformer by 2x12.5MVA ,
292.35& power transformer is
24 CA1081 66/11KV Power Transformer at Hassan BCR 0.6 0.00 200.00
08.06.18 required for copletion of the
66/11 KV Rameshwaranagara
work.
S/s in Hassan Taluk, Hassan
District
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

Basavaghatta
Replacement of 2x8MVA, 66/11kV 2X12.5MVA, 66/11kV class
Power Transformers by 2x12.5MVA 278.63& power transformer is
25 CA1082 Hassan BCR 0.63 0.00 200.00
66/11KV Power Transformers at 27.06.18 required for copletion of the
66/11KV Basavaghatta S/s in work.
Hassan Taluk, Hassan District

Halebeedu:
Replacement of1x12.5MVA, 20 MVA, 66/11kV class
66/11kV Power Transformer by 229.09& power transformer is
26 CA1083 Hassan BCR 0.63 0.00 200.00
1x20 MVA 66/11KV Power 28.06.18 required for copletion of the
Transformer at 66/11KV Halebeedu work.
S/s in Belur Taluk, Hassan District

Singapura:
Enhancement of 1x8MVA,
12.5 MVA, power
66/11kV Power Transformer-2 by
186.75& transformer commissioned
27 CA1084 1x12.5MVA 66/11 kV power Hassan BCR 3.34 80.65 30.00
08.05.18 on 28.12.2018. Switchgear
transformer at 66/11kV Singapura
under progress.
S/s in Holenarasipura Taluk,
Hassan District

For Fy 19-20
DWA:90.42
Shanivarsanthe:
MEI:52.43
Providing additional 1X8MVA,
234.92& FQV:5.00
28 CA1085 66/11kV Power Transformer at Kodagu BCR 0.87 0.00 130.00
01.06.18 Transportatio:3.00
66/11kV at Shanivarasanthe
Total:150.85
Substation Somavarpet Taluk.
Power transformer to be
diverted.

Nittur:
Replacement of 1x10MVA,
110/11KV Power Transformer by 355.16&
29 CC1035 Udupi BCR 2.321 0.00 200.00 Tendered
1x20MVA, 110/11KV Power 07.04.18
Transformer at 110/11kV Nittur
S/s .

Kundapura:
Cost of LOI 143Lakhs,
Providing additional 1X10MVA,
329.45& Transformer cost-
30 CC1036 110/11KV Power Transformer at Udupi 0.00 200.00
07.04.18 126.56Lakhs, Switchgear
existing 110/33/11kV Kundapura
Cost- 28.68Lakhs.
substation in Kundapura Taluk.
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

Manipal: Cost of LOI 222.03Lakhs,


Providing additional 1X20 MVA, Transformer cost-
440.70&
31 CC1037 110/11KV Power Transformer at Udupi BCR 0.769 0.00 400.00 160.73Lakhs, NFE cost-
09.03.18
110/33/11KV Manipal Sub-station 8.3Lakhs, Switchgear Cost-
in Udupi Taluk and District. 48.24Lakhs.

Probable expenditure for


2018-19: Supply - 35L.
Karaya:
Award Cost: Supply -
Creating 33KV reference by
Dakshina 323.41& 112.11L, Erection - 16.47L,
32 CB1057 installing 1x20MVA, 110/33KV BCR 1.08 0.00 300.00
Kannada 08.06.18 Civil - 27.33; Total -
Power Transformer at 110/11k
155.91L.
Karaya S/s in Belthangudi Taluk
Transformer cost - 191L

Holaluru:
Replacement of 1x 8 MVA, 66/11KV
Power transformer by 1x 148.84&
33 CD1066 Shimoga BCR 4.21 0.00 100.00 work to be takenup
12.5,66/11kV power transformer at 05.04.18
66/11kV Holalur S/s in
Shivamogga taluk .

Puttur: Providing additional 1x20


MVA, 110/33kV Transformer at 110 Dakshina Kannada 301.27 &
34 CB1059 BCR 1.05 0.00 200.00 Tendered
kV Puttur Sub-station in puttur District 23.1.19
Taluk, Dakshina Kannada District.

34 Total of Augmentation 136.80 345.19 481.99 636.86 5570.00

For Fy-19-20
pending work bills to
receive:
S:16.00
Hassana: E:15.11
a) Re-orientation of 220kV & 66kV C:10.56
lines from Hassana 220kV Station. Subtotal:41.67
b) Shifting of 220kV B-4 LILO line Rtn:
passing through Airport Land near S:267.18
2092.57 &
1 CA1031 Bhoovanahalli Cross. Hassana 21.09.07 1569.93 280.25 1850.18 1176.34 800.00 E:10.66
11.7.07
c) Providing 2Nos of 66kV TB's for C C:33.84
R Patna 66kV DC line at Subtotal:311.68
220kV/66KV R/S Hassana for a LD;
distance of 66kV 7.8/220kV S:133.59
17.68Kms E:5.33
C:16.92
Subtotal:155.84
Land compensation:440.00
Total for Fy 19-20:949.19
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

Shanthigrama:
Construction of
1) 2 Nos of 220kV DC lines from
400KV PGCIL Station to LILO the
existing Shimoga-Mysore 220KV DC
2266.14 &
2 CA1032 M1& M2 lines near Melgodu limits- Hassana 13.03.09 1050.11 72.00 1122.11 767.23 250.00
16.08.08
7.14 Kms
2) 220KV DC line from
Shanthigrama Station to existing
B4 line near Hedanahalli limits-
7.76 Kms.

Shortclosed on 04.10.2017.
To be tendered for balance
Kavoor - Kulashekar : works. Balance works
Construction of 110kV DC line from estimate amount Rs.
ES 2.4332 1099.36 &
3 CB1007 Kavoor to Kulashekara in the Dakshina Kannada 05.04.07 906.92 10.50 917.42 475.48 100.00 386.55L. Additional budget
BCR 1.18 14.10.08
existing 33kV line corridor for a will be sought after
distance of 8.50 Kms awarding the work

Puttur:
Construction of 110-110kV MC and
110kV DC lines from loc no.28
(Kabaka Railway Crossing limits) to
562.43 & Budget for 2019-20: Supply-
4 CB1018 the 110/33/11kV Puttur S/S for a Dakshina Kannada 07.09.10 431.30 8.17 439.47 199.46 50.00
17.12.09 10 Lakhs, Erection-10
dist of 4.5Kms & Construction of
Lakhs, Civil-30 Lakhs.
2nos of 110kV TBs at
110/33/11kV Puttur S/S for a
distance of 4.5 Kms

Probable Exp from 18-19:


Kavoor-Baikampady: Pending Bills-40 Lakhs
Strengthening of 110kV-Kavoor-
517.94 &
5 CB1020 Baikampady line converting SC line Dakshina Kannada 23.10.10 345.65 12.43 358.08 210.95 110.00 Budget required for FY 19-
28.01.10
by DC line with TB at Kavoor for a 20:
distance of 3.885 Kms Retention - 83.32L , Civil -
15.00L, Others-12L
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

Budget required for FY 19-


Brahmavara-Nittur: 20: Supply : 10.1Lakhs,
Stringing 2nd circuit in the existing Supply ret : 27.9Lakhs,
173.11 &
6 CC1029 110kV Brahmavara-Nittur line and Udupi 14.09.17 157.32 12.32 169.64 108.02 50.00 Erection: 4.5Lakhs, Erection
05.05.15
creating 110kV TB at Brahmavara Retn: 0.4Lakhs, Civil:
& Nittur Sub-Stations. 2.3Lakhs, Civil Retn: 0.7
Lakhs, LD: 0.10Lakhs Total-
46Lakhs. Budget required
50Lakhs.

Bills on hand:1) BR No:


1245/02.03.2019 Rs.4.05
MRS to Lingadahalli:
Lakhs. 2) BR No:
Construction of new 66kV SC line
1248/05.03.2019 Rs.13.11
on DC towers for a distance of
lakhs. Total Rs.17.16 Lakhs.
46.039Kms in the existing corridor 823.01 &
7 CD1058 Shimoga 20.03.18 864.20 0.00 864.20 236.56 450.00 Budget for 2019-20
of 66kV DVG-2 SC line From MRS 11.09.15
Retention Rs.50.00 lakhs
Shivamogga to Lingadahalli
Supply Rs.250.00 Lakhs
(Channagiri Taluk) in Shivamogga &
Erection Rs.50.00 Lakhs
Davanagere Districts.
Civil Rs.100.00 Lakhs
Total Rs.450.00 Lakhs

Bills on hand:
1. BR No: 950/09.01.2019
Rs.68.59 Lakhs 2. BR No:
1229/22.02.2019 Rs.67.73
Lakhs 3. BR No:
1230/22.02.2019 Rs.16.69
lakhs. 4.BR No:
Chikamagalur-Balehonur: 1273/08.03.2019 Rs.83.42
Construction of 66kV DC line with Lakhs. 5. BR No:
coyote ACSR in the existing corridor Chikka ES 19.13 517.94 & 1272/08.03.2019 Rs.3.95
8 CE1013 13.07.06 945.96 0.00 945.96 1068.04 800.00
of 66kV SC line from magaluru BCR 9.38 06.07.04 Lakhs. 6. BR No:
chikkamagalur to Balehonnur 1271/08.03.2019 Rs.14.51
(43.74 Kms) Lakhs. 7. BR No:
1270/08.03.2019 Rs.17.11
Lakhs. Total Rs.272.00 Lakhs.
Budget for 2019-20 Supply &
Erection Rs.296.00 Lakhs
Civil Rs.180.00 Lakhs
Retention Rs.324.00 Lakhs
Total Rs.800.00 Lakhs
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

Baikampady: Providing
110KV,20MVAR Capacitor Bank 85.30&
9 CB1056 Dakshina Kannada 0.00 0.00 90.00 Tendered
along with associated TB at existing 04.11.17
110/33/11KV Baikampady S/s

9 Total of Lines 6271.39 395.67 6667.06 4242.08 2700.00

Renovation and upgradation of Budget required for the


protection system of 220kV Sub- FY19-20:
1257.03 &
1 CA1059 stations (10Nos) & 400kV Sub- Hassana 26.12.15 1449.82 0.00 1449.82 822.76 200.00
20.06.14
Station (1No) in Hassana Hsn Circle: 79.46
Transmission Zone Mng Circle: 138

1 Total of TB's & Others 1449.82 0.00 1449.82 822.76 200.00


60 Total of Hassana Zone 31727.90 4430.70 34055.76 29485.76 21193.00

MYSURU TRANSMISSION ZONE


Chandravadi
(Nallitalapura):Establishing
ES 1.16 & 523.98 & Amount required for regular
1 DA1117 1x8MVA, 66/11kV Sub-Station with Mysuru 24.03.18 504.00 100.00 604.00 264.80 280.00
BCR 1.54 06.03.17 payment
associated line for a distance of
1.290Kms

220kV Shivanasamudra: ES 48.94


9252.27 & Amount required for
2 DB1089 Establishing 2x100MVA, 220/66kV Mandya & 15.03.18 9653.72 520.00 10173.72 8852.77 2000.00
03.06.17 payment of FQV bills
Station with assosiated lines BCR 3.45

66kv Badanakuppe Industrial


area : Establishing 2 X 31.5 MVA,
66/11kV Station with MCMV with ES 2.06 & 3408.19 & Awaiting for 1* 31.5 MVA
3 DD1041 Chamarajanagar 11.01.18 3069.48 302.00 3371.48 1834.36 800.00
220kv at top x arm provision & BCR 0.51 11.01.17 Transformer
66kv at bottom assosiated d/c
lines

Awating for 8MVA power


Jannur:
Transformer & Switch gear
Establishing 1x8MVA, 66/11kV ES 1.13 700.9 &
4 DD1046 Chamarajanagar 20.03.18 709.66 110.00 819.66 406.09 400.00 & Amount required for
Sub-Station with associated line for BCR 1.11 23.10.17
payment of Non DWA items
a distance of 8.63Kms
after approval of FQV
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

220kV Begur:
ES 30.680
Establishing 2X100MVA, 12499.11&
5 DD1045 Chamarajanagar & BCR 0.00 0.00 4000.00
220/66kV Station with assosiated 27.02.2018
1.72
lines

Hariyaldamma Temple
Establishing 1 x 8MVA, 66/11 KV ES 1.973 & 815.94 & Awaiting for transformer
6 DB1102 Mandya 767.05 118.00 885.05 420.02 300.00
Sub-Station with associated line for BCR 1.52 05.07.17 and switchgear
a distance of 8.591Kms

Kadukothanahalli
Establishing 1x 8MVA, 66/11 KV ES 1.473 & 526.11 & Physically & Financially will
7 DB1099 Mandya 4.7.18 507.56 47.00 554.56 268.07 250.00
Sub-Station with associated line for BCR 1.86 06.10.17 be Closed
a distance of 0.08Kms

Vyasarajapura
Establishing 1x8 MVA 66/11kV ES 1.883 & 593.80 &
8 DA1126 Mysuru 5.11.18 575.68 120.00 695.68 0.00 600.00 Work Under Progress
Sub-Station with associated line for BCR 2.03 06.01.18
a distance of 3.498Kms

Gargeshwari:
Establishing 1x8MVA, 66/11kV ES 0.96 & 780.89 &
9 DA1136 Mysuru 14.1.19 737.51 60.00 797.51 0.00 600.00 Work under progress.
Sub-station with associated line for BCR 1.008 23.02.18
a distance of 0.543Kms

Kaggere (Hampapura) DPR Approved vide


Establishing 1x8MVA, 66/11kV ES 0.841 & 528.36 & NO.B19/69664/17-18
10 DA1112 Mysuru 0.00 0.00 450.00
Sub-Station with associated line for BCR 1.19 15.05.17 Dtd:15.05.2017.
a distance of 1.0Kms LOI to be Issued.

Mandakalli(Koppaluru):
Establishing 1x8 MVA, 66/11 KV
Sub-station at Koppalur (Srinagar):
Mandakalli(Koppaluru) and Establishing 1x12.5MVA,
construction of 66kV LILO line from ES 1.187 & 885.21& 66/11kV Sub-Station with
11 DA1124 Mysuru 18.01.19 847.82 70.00 917.82 0.00 850.00
existing 66kV Kadakola-Mysore SC BCR 0.96 09.03.18 associated line deleted
line to proposed 66/11kV sub- instead added mandakalli-
station at Mandakalli (Koppaluru) koppaluru
for a distance of 2.261Kms

11 Total of Sub-stations 17372.48 1447.00 18819.48 12046.11 10530.00


Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

Suttur : Awaiting for 2nd 12.5 MVA


ES NA 279.99 &
1 DA1076 Replacing 2x8MVA, 66/11kV by Mysuru 13.05.16 13.72 231.00 244.72 97.66 145.00 Power Transformer which is
BCR 0.71 23.12.13
2x12.5MVA, 66/11kV Transformers to be supplied by KPTCL .

Megalapura : Awaiting for 11kV


156.76 &
2 DA1089 Replacing 1x8MVA, 66/11kV by Mysuru BCR 0.70 09.03.18 196.97 115.00 311.97 107.53 26.00 Switchgear to be supplied
12.05.14
1x12.5MVA, 66/11kV Transformer by KPTCL

Santhesargur:
270.57 & Awaiting for 2nd 12.5 MVA
3 DA1093 Replacing 2x6.3MVA, 66/11kV by Mysuru BCR 1.112 09.03.18 20.96 250.00 270.96 110.09 150.00
12.11.14 Transformer
2x12.5MVA, 66/11kV Transformers

H.D.Kote: 348.82 &


Awaiting for 2nd 20 MVA
4 DA1095 Replacing 2x12.5MVA, 66/11kV by Mysuru BCR 1.04 19.11.14 29.06.17 33.22 318.22 351.44 155.33 190.00
Transformer
2x20MVA, 66/11kV Transformers

Hunsur: 390.20 & Awaiting for 2 Nos. of 11kV


5 DA1096 Replacing 2x12.5MVA, 66/11kV by Mysuru BCR 0.93 20.11.14 25.02.17 38.60 330.72 369.32 313.67 35.00 MCVCB Breaker from MEI
2x20MVA, 66/11kV Transformers to be supplied by KPTCL.
Tubinakere 220kV R/S:
ES NA 131.00 &
6 DB1039 Providing Spare 1x12.5MVA, Mandya 04.03.14 50.93 80.00 130.93 56.75 15.00 Physically Closed
BCR 2.11 25.10.10
66/11kV Transformer
Kolkaranadoddi:
Providing Additional 1X8 MVA,and ES NA 288.31 &
7 DB1080 Mandya 02.07.16 62.00 270.00 332.00 186.07 100.00 Awaiting for switchgear
replacement 8MVA by 12.5MVA BCR 0.97 05.05.15
66/11kV Transformer.

Koppa:
ES NA 298.36 & Awaiting for 2nd
8 DB1083 Replacing 2x8MVA, 66/11kV by Mandya 02.07.16 62.00 248.00 310.00 119.11 130.00
BCR 0.67 21.11.13 Transformer
2x12.5MVA, 66/11kV Transformers

Jakkanhalli:
ES NA 176.36 &
9 DB1085 Replacing 1x6.3MVA, by Mandya 29.06.17 46.19 132.89 179.08 20.36 130.00 Awaiting for Transformer
BCR 0.78 24.07.14
1x12.5MVA, 66/11kV Transformer

Basaralu :
203.87 &
10 DB1092 Replacement of 1 X 6.3 MVA by 1 X Mandya BCR 0.81 30.06.17 59.16 132.47 191.63 24.60 145.00 Awaiting for Transformer
16.10.15
12.5 MVA 66/11kV Transformer.
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

Yethambadi :
235.30 &
11 DB1096 Providing additional 1 X 12.5 MVA, Mandya BCR 1.84 30.06.17 94.36 160.46 254.82 62.77 145.00 Awaiting for Transformer
19.12.15
66/11 KV Power Transformer.

Kushalanagara :
136.76 & Awaiting for 12.5 MVA
12 DC1010 1 X 8 by 1 X 12.5 MVA, 66/33/11 Kodagu BCR 0.96 09.05.17 13.66 113.07 126.73 0.00 127.00
15.08.15 66/33 KV Transformer
KV

Begur MUSS: 11kV Power Transformer /


168.61 &
13 DD1038 Replacing 1x6.3MVA, 66/11kV by Chamarajanagara BCR 0.72 30.06.17 60.69 117.83 178.52 28.49 150.00 Switchgear to be supplied
18.02.15
1x12.5MVA, 66/11kV Transformer by KPTCL

T.N.Pura :
426.97 &
14 DA1090 Repl 2X12.5MVA by 2X20 MVA Mysuru BCR 0.65 14.09.18 90.92 320.00 410.92 12.57 200.00 Work Under Progress
20.06.14
66/11kV Transformer

Awaiting for 2nd 1x12.5


Hullahalli :
285.16 & MVA Power Transformer &
15 DA1110 Replacement of 2 X 8 MVA by 2 X Mysuru BCR 1.11 210.00 210.00 112.28 125.00
05.05.15 11kV Switchgear to be
12.5 MVA, 66/11kV Transformer.
supplied by KPTCL.

Dattagalli:
168.51 & Tender Evaluation under
16 DA1127 Replacing 1x5 MVA, 66/11kV by Mysuru BCR 0.76 0.00 0.00 145.00
23.05.17 process
1x12.5MVA, 66/11kV Transformer

Hadli :
ES NA 248.71 & Awaiting for transformer
17 DB1068 Providing additional 1x12.5MVA, Mandya 28.08.18 91.70 160.00 251.70 27.71 160.00
BCR 1.11 23.12.13 and switchgear
66/11kV Transformer

Addihalli:
Replacing 1X6.3MVA & 1X8MVA,
66/11kV Trs. by 2x12.5MVA,
66/11kV Trs. at Addihalli along
with stringing of 2nd ckt 66kV line
b/w 220kV K.R.Pet-Santhebachally 1216.71 /
18 DB1078 Mandya 0.00 0.00 100.00
and linking by 66kV SC line to 13.06.16
Addihally Sub-station with
construction of 2Nos of 66kV TBs at
Santhebachahalli, One TB at
Addihalli Sub-station and One TB
at 220kV K.R.Pet station
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

Guddenahalli : Replacement of 1 X
158.85 & Awaiting for transformer
19 DB1093 6.3 MVA by 1 X 12.5 MVA Mandya 28.08.18 26.46 135.00 161.46 0.00 150.00
BCR 0.87 14.09.15 and switchgear
66/11kV Transformer.

Akkihebbal :
178.62 & Awaiting for transformer
20 DB1094 Replacement of 2 nd 8 by 12.5 Mandya 28.08.18 35.12 150.00 185.12 0.00 150.00
BCR 0.99 19.09.15 and switchgear
MVA, 66/11kV Transformer.

Gamanahalli : Replacement of 1 X
166.97 & Awaiting for transformer
21 DB1095 8 MVA by 12.5 MVA, 66/11kV Mandya 0.00 0.00 150.00
BCR 1.06 10.09.15 and switchgear
Transformer.

Mandagere :
257.18 & Awaiting for transformer
22 DB1104 Providing additional 1 X 12.5 MVA, Mandya 28.08.18 86.13 160.00 246.13 0.00 160.00
BCR 0.40 03.10.17 and switchgear
66/11 KV Power Transformer.
Chinakurali :
Replacement of 1 X 8 MVA, 66/11 156.19&
23 DB1107 Mandya BCR 0.56 0.00 0.00 150.00
KV Power Transformer by 1 X 12.5 21.11.17
MVA, 66/11 KV.

Kadaballi :
254.93& Awaiting for transformer
24 DB1108 Providing additional 1 X 12.5 MVA, Mandya BCR 0.86 28.08.18 84.71 160.00 244.71 22.80 150.00
26.09.17 and switchgear
66/11 KV Power Transformer.

Adichunchangiri: Additional
257.06& Awaiting for transformer
25 DB1109 1X12.5MVA 66/11kV Power Mandya BCR 0.40 28.08.18 85.70 160.00 245.70 39.43 150.00
03.10.17 and switchgear
Transformer

Ponnampet:
168.14 /
26 DC1013 Replacing 1 X 8MVA, 66/11kV by Kodagu BCR 0.43 0.00 0.00 150.00 LOI Issued
20.03.17
1x12.5MVA, 66/11kV transformers

Ponnampet : 144.89 &


27 DC1014 Kodagu BCR 0.51 0.00 0.00 150.00 LOI Issued
1 X8 by 1 X 12.5, 66/33/11 KV 20.03.17

Chandakavadi : Replacing 2X8


290.17 &
28 DD1039 MVA,66/11 KV transformers by Chamarajanagara BCR 0.69 05.11.18 33.15 245.00 278.15 0.00 150.00 Work Under Progress
16.03.15
2X12.5 MVA transformers .

Kunthur: Providing additional 235.25&


29 DD1051 Chamarajanagara BCR 0.56 86.33 0.00 86.33 0.52 80.00 Work Under Progress
1x8MVA, 66/11kV Power Tr. 26.09.17

Bandalli: Providing additional 265.14&


30 DD1052 Chamarajanagara BCR 0.49 17.09.18 114.46 0.00 114.46 33.94 100.00 Work Under Progress
1x8MVA, 66/11kV Power Tr. 11.10.17
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

Hosur Gate :
Providing additional 1x8MVA,
230.75
31 DA1129 66/11 KV Power Transformer at Mysuru BCR 0.57 0.00 0.00 100.00 LOI to be issued
27.03.18
Hosur Gate S/s at Hunsur Taluk &
Mysuru Dist.

Gavadagere:
Providing additional 1x8MVA,
230.26
32 DA1133 66/11kV Power Transformer at Mysuru BCR 0.57 0.00 0.00 100.00 LOI to be issued
16.04.18
Gavadagere substation Hunsur
Taluk Mysuru District.

32 Total of Augmentation 1487.14 4199.66 5686.80 1531.68 4108.00

Kadakola - Vajamangala:
Construction of 220kV D/C line ES 6.08 1217.40 & tender to be called for
1 DA1028 Mysuru 12.03.10 964.67 88.00 1052.67 446.05 100.00
from Kadakola to Vajamangala with BCR 1.40 24.08.09 remaining pending works
TB's for a distance of 19.64Kms

Virajpet - Madekeri: Construction


Short closure of this work is
of 66kV SC Link line on DC towers
ES 17.49 687.13 & approved in CPC, tendering
2 DC1005 between 66kV Virajpet & Madekeri Kodagu 02.02.11 655.71 186.66 842.37 262.48 50.00
BCR 7.15 25.05.10 is under process for balance
Sub-Stations for a distance of
work.
36.16kms.

Kiragavalu LILO:
Converstion of 66kV S/C Line on
132.38 &
3 DB1087 SC Tower to 66kV LILO line on DC Mandya 26.06.18 187.51 187.51 65.39 60.00
01.10.14
Towers from the existing 66kV SFC-
Vajamangala DC line.
3 Total of Lines 1807.89 274.66 2082.55 773.92 210.00
Renovation and upgradation of
protection system of 220kV Sub- 965.39 &
1 DA1101 Mysuru 26.12.15 828.72 828.72 711.93 275.00
stations (8 Nos) ) in Mysuru 10.05.13
Transmission Zone

1 Total of TB's & Others 828.72 0.00 828.72 711.93 275.00

47 Total of Mysuru Zone 21496.23 5921.32 27417.55 15063.64 15123.00

BAGALKOTE TRANSMISSION
ZONE
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

Budget required for the


Remaining Year 18-19
Supply( 1X10 MVA Power Trf
approx Cost - Rs 125 Lacs),
Mandatory Spares- Rs 134.96
Lacs
Ret - Rs 22.89 Lacs ,Civil- Rs
72.26 Lacs
Erection- Rs 14.05 Lacs
Aratagal(Kitadal): SWG Cost- 5.1Rs Lacs,CC-
Establishing 2x10MVA, 110/11kV ES 10.522 908.81 & Rs20.00 Lacs
1 EE1066 Belagum 08.06.17 922.44 80.00 1002.44 942.84 236.00
Sub-Station with associated line & BCR 5.25 17.06.15 Total - Rs 289.26 Lacs
TB for a distance of 8.574Kms Excess due to
Due to QV ( Approx)- Rs
20.00 Lacs
CC ( approx) - Rs 20.00 Lacs
Budget under Utilized for the
Year 18-19
Delay in supply of 1X10 MVA
IInd Trf
Budget of the Year 19-20
QV- Rs 20.00 Lacs
Budget required for the
Remaining Year 18-19
Supply ( 2X10 MVA Trf, 110
KVBreaker, Control Cable,Line
Conductor and Insulators ) - Rs
209 .54 Lacs Civil- Rs 141.00 Lacs
Erection- Rs 26.5 Lacs
SWG Ret- Rs 3.44 Lacs
CC- Rs 08.00 Lacs
Ret ( for Trf ) - Rs 75.51 Lacs
Koganolli Total- Rs 463.99 Lacs For the Year
Up-gradiation 33/11kV S/s to 19-20
ES 3.644 1182.71 &
2 EE1117 2x10MVA, 110/11kV Sub-Station Belgaum 06.01.18 1376.54 84.00 1460.54 694.11 780.00 Supply -Rs 256.00 Lacs
BCR 1.72 23.09.15 Civil- Rs 133.78 Lacs
with associated line for a distance of
Erection- Rs 33.81 Lacs
17.192Kms
CC- Rs 25.00 Lacs
QV- Rs 20.00 Lacs
Total- Rs 468.59
Say- Rs 469.00 Lacs
Excess due to
Due to QV- ( approx )- Rs 20.00
Lacs,
CC ( Approx) - Rs 40.00 Lacs
CC is more due to highly irrigated
Land
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

For the Year 18-19


Supply ( 1X10 MVA Trf, 110 KV CB,
Isolators,33/11 Station structure,
Aux Trf , battery Set and Charger ,
Control Cable, Yard Lightining
Fixture, furnitures, T & P , 220 KV
Towers, Conductor and Earthwire )-
Rs 151.01 Lacs
Ret - Rs 13.18 Lacs,Civil- Rs 71.3
Lacs
G.Hosakoti: Erection- Rs 25.87 Lacs
ES 3.478 & 948.89 &
3 EE1121 Establishing 2x10MVA, 110/11kV Belgaum 15.02.18 943.11 0.00 943.11 381.29 600.00 SWG- Rs 42.00 Lacs (divereted from
BCR 2.13 28.03.17 110 KV S/S Islamapur to be
Sub-Station with associated line.
booked for this project )
Total - Rs 303.36 Lacs
For the Year 19-20
Ret -Supply- Rs 182.77 Lacs
Civil- Rs 197.49 Lacs
Erection- Rs 05.31 Lacs
CC- Rs 20.00 Lacs
QV- Rs 55.00 Lacs
Total - Rs 460.57 Lacs
Say Rs 461.00 Lacs

FY 2018-19:
Sup: 186.00
Inchageri: Erc: 17.01
Establishing 1x10MVA, 110/11kV ES 0.57 958.08 & Civil: 81.00
4 EG1029 Bijapur 06.02.18 1188.60 4.00 1192.60 771.77 450.00
Sub-Station with associated line & BCR 0.6 05.11.15 Total: 284.01
TB for a distance of 19.759 Kms FY 2019-20:
Budget required of Rs.
230.23

Budget required For the


Year 18-19
Supply ( Line
Towers/Station Structure
/Earthmat Work) - Rs
200.00 Lacs
Shiraguppi: For the Year 19-20
Up-gradation of 33kV MUSS to Remaining DWA Cost- Rs
ES 5.665 & 1075.44 &
5 EE1064 1x10MVA, 110/11kV Sub-Station Belgaum 27.10.18 1228.95 41.67 1270.62 35.54 1300.00 Supply+ Erection+ Civil- Rs
BCR 2.37 24.09.16
with associated line for a distance 1028.95 Lacs
of 16.7 kms & TB. SWG- Rs 41.67 Lacs
QV- Rs 10.00 Lacs
Total- Rs 1080.62 Lacs
say Rs 1081 Lacs Excess
due to
QV (approx ) is Rs 10.00
Lacs
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

Ukkali : FY 2018-19:
Establishing 1x10MVA, 110/11KV Budget required for Sup:
S/s at Ukkali & Contruction of 25.00
40.5 904.02
6 EG1056 110KV LILO Line from 110KV B Vijayapur 10.01.19 942.51 50.00 992.51 0.00 800.00
2.63 07.04.18
Bagewadi-Vijayapura SC line for a FY 2019-20:
distance of 7.165 in B Bagewadi Budget required of Rs:
taluk. 800.00

Ronihal: FY 2018-19:
Establishing 2x10MVA 110/11KV Budget required for Sup:
S/s at Ronihal and Construction of 25.00
7.55 1097.31&
7 EG1057 110KV LILO line from B Bagewadi - Bijapur 10.01.19 1122.52 100.00 1222.52 0.00 1000.00
4.10 16.4.18
Mamadapura SC line to proposed FY 2019-20:
110KV s/s at Ronihal for a distance Budget required of Rs:
of 5.897Kms in Vijayapura Dist. 800.00

Singatalur :
Up-gradiation of existing 33/11kV 3.879MU/ 1046.60&
8 EC1021 Gadag 23.01.19 1027.85 0.00 1027.85 0.00 800.00
MUSS to 110/11kV Sub-Station 2.35 09.03.18
with associated line.

8 Total of Sub-stations 8752.52 359.67 9112.19 2825.55 5966.00

Ambevadi:
Replacing 2x55MVA, 220/110kV by 1682.70 &
1 ED1007 North Canara BCR 1.30 12.09.11 722.32 744.04 1466.36 847.64 1.00
2x100MVA, 220/110kV 17.02.11
Transformer with R&M works.
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

For the Remaining Year 18-


19
SWG- Rs 06.79 Lacs
Supply- Rs 2.00 Lacs
Erection - Rs 5.00 Lacs
Civil- Rs -5.00 Lacs
Total - Rs 18.79 Lacs For
Kittur: the Year 19-20 ( Subject to
Swapping of 1x20MVA, 110/33KV allotment of 20 MVa Trf )
& 1x10MVA, 110/11KV Power 95.50 & Supply ( Balance Cable,
2 EE1120 Belgaum 22.02.18 60.05 49.32 109.37 67.23 43.00
Transformers at 110KV Sub-Station 27.09.14 Conductor and Hardware )-
Kittur with additional 11KV switch Rs 3.55 Lacs,Erection Rs
gear 10.01 Lacs
Civil- Rs 06.45 Lacs
QV- Rs 3.00 Lacs
Ret- Rs 8.03Lacs ,
Total - Rs 31.04 Lacs

Hangal:
Providing additional 1X10MVA, 199.5 &
3 EA1023 Haveri BCR 1.74 22.03.18 83.72 0.00 83.72 60.18 65.00
110/11kV Power Transformer at 10.07.15
110kV S/s Hangal

Navanagar:
Replacement of exisiting 1x10MVA 227.96 &
4 EB1023 Dharwad BCR 1.06 203.55 203.55 203.35 266.00
by 1x20 MVA , 110/11 KV 11.02.14
Transformer

Naregal:
181.41 &
5 EC1015 Providing spare 1x10MVA, 110/33- Gadag BCR 1.084 22.03.18 56.00 23.87 79.87 62.81 22.00
07.12.13
11kV Transformer
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

For theYear 18-19


( supply of Mounting
Structure, Control Cable )
15.00 lakh For theYear 19-
20
110KV S/S
Remaining Cost of the
Nagaramunnoli/Kabbur
247.71 & Tender -27.18 Lacs
6 EE1100 Replacement of 1x10MVA, Belagum BCR 0.67 02.01.18 42.50 0.00 42.50 0.00 290.00
02.12.14 Cost of new 20 MVA- Rs
110/11kV by 1x20MVA, 110/11kV
160.00 Lacs
Transformer
SWG- Cost- Rs 42.00 Lacs
QV- Rs 3.00 Lacs
Say - Rs 232.00 Lacs

Additional Budget Required


for theYear 18-19
Supply- Rs 11.89 Lacs
Erection-6.10 Lacs
Civil - Rs 5.99 Lacs
SWG Cost- Rs 4.78 Lacs
110 kV S/S Sulthanpur : Total - Rs 28.76 Lacs
Replacement of 1x10 MVA, 110/11 Says - Rs 29.00 Lacs For
kV transformer by 1x20 MVA, 283.46 & theYear 19-20
7 EE1122 Belagavi BCR 0.46 22.03.18 43.72 49.40 93.12 59.88 230.00
110/11 kV transformer at 110 kV 28.06.17 Erection+ Dec - Rs 05.10
Sulthanpur sub-station, in Raibag Lacs
Taluk, Belagavi District New 1X20 MVA Trf- Rs 200
Lacs
Total - Rs 205.10Lacs
Says - Rs 205.00 Lacs
Excess due to
Due to Cost of New 1X20 Trf
( approx )- Rs 200.00 Lacs

For theYear 18-19


110 kV S/S Satti : Providing
Token Budget - Rs 10.00
additional 1x10 MVA, 110/11 kV
289.84& Lacs
8 EE1125 transformer at 110 kV Satti sub- Belgaum 0.00 0.00 154.00
BCR 0.44 09.06.17 For theYear 19-20
station, in Athani Taluk, Belagavi
Budget of 150lakh sought
District
exculding cost of the
transformer.
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

For theYear 18-19


Tender Cost ( approx )- Rs
10.00 Lacs
( supply of Mounting
110 kV S/S Itnal : Replacement of Structure, Control Cable )
1x10 MVA, 110/11 kV transformer For theYear 19-20
by 1x20 MVA, 110/11 kV 281.98& Remaining Cost of the
9 EE1126 Belgaum 02.01.19 23.00 23.00 0.00 281.00
transformer at 110 kV Itnal sub- BCR 0.46 20.06.17 Tender -33.00 Lacs
station, in Raibag Taluk, Belagavi Cost of new 20 MVA- Rs
District 200.00 Lacs
SWG- Cost- Rs 42.00 Lacs
QV- Rs 3.00 Lacs
Total- Rs 278.00 Lacs
Say - Rs 278.00 Lacs

FY 2018-19:
Supply: 80..00
Civil: 10.00
Ere: 10.00
220KV Station, Indi: Total: 100.00
255.13 &
10 EG1043 Providing Additional 1x10MVA, Bijapur BCR 1.36 03.11.18 120.13 53.24 173.37 56.02 117.00
19.06.15
110/11kV transformer FY 2019-20
Supply: 120.00
Ere: 15.00
Civil: 15.00
Total: 150.00

10 Total of Augmentation 1151.44 1123.42 2274.86 1357.11 1469.00

Guledgud - Ilkal:
FY 2019-20:
Construction of 110kV S.C. link line
Supply: 300.00
on D/C towers from 110kV Sub- 758.25 &
1 EF1029 Bagalkote 0 30.08.11 619.68 0.00 619.68 159.28 460.00 Ere: 80.00
Station Guledgudda to 110kV Sub- 04.12.10
Civil: 79.35
Station Ilkal for a distance of
Total: 459.35
34.575 Kms.
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

FY 2018-19:
Supply: 145.05
Ere: 65.00
Civil: 35.49
Ret: 198.90
CC: 36.61
Total: 481.05
Mahalingpur to Jamkhandi: F`Y 2019-20:
construction of 110 kV DC line from Supply: 145.05
220 kV Mahalingapur S/S to 110 Ere: 65.00
917.86 &
2 EF1050 kV Jamakhandi S/S in the existing Bagalkote 03.02.17 1089.71 40.00 1129.71 671.53 200.00 Civil: 35.49
19.04.14
110 kV SC line corridor along with Ret: 198.90
110 kV Terminal bays at both ends CC: 36.61
for a distance of 23.897 kms. Forest: 200.00
Total: 681.05
(Forest clearance awaited. If
clearance obtained work will
be executed in forest area as
there is no ROW issues if not,
Budget will be spill over to FY-
19-20)

FY 2018-19:
Erec: 58.00
Civil: 70.00
Ret: 120.52
Kudagi to Vajaramatti: CC: 60.00
Construction of 220kV DC Line Total: 308.52
5002.81 &
3 EG1047 from proposed Kudagi 400kV STPP Bijapur 26.11.15 5782.67 606.00 6388.67 3835.47 2500.00
08.01.15
to 220kV Sub-station Vajramatti for FY 2019-20
a distance of 79.42Kms Erec: 200.00
Civil: 150.00
Ret: 1786.00
CC: 375.43
Rs: 2511.43

Nehru nagar-6 Pole Struture: For theYear 18-19


conversion of 110 kV Nehrunagar-6 Token Budget of Rs 10.00
pole structure SC line constructed Lacs
4 EE1113 on 110 kV SC towers(MS towers)to Belagum 82.19 & 0.00 0.00 140.00 For the Year 19-20
110 kV SC line on DC towers for a 15.05.14 Token Budget of Rs 10.00
distance of 2.3 kms Lacs

Shifting and Re-routing of 110 kV


line from Loc 125-145 of Bagalkot-
583.23 & DPR cost requested for 2019-
5 EG1055 B.Bagewadi DC line in TLM section Vijayapur 0.00 0.00 700.00
10.11.17 20.
B.Bagewadi jurisdiction in
Vijayapura District
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

a) B.Bagewadi - Bagalkote (46KM)


b) Mahalingapur - Mudhol-Vajramati
- Katarki (110kV SC line 67Km): 1341.96 & Proposed for short close and it
6 EF1013 Bagalkote 24.02.07 1957.59 0.00 1957.59 1112.80 1.00
Re-conductoring of existing wolf ACSR 19.05.08 is under process.
by LYNX ACSR conductor for a
distance of 113.00 Kms.

6 Total of Lines 9449.65 646.00 10095.65 5779.08 4001.00

Providing 12.1kV 2.9MVAR


Capacitor Bank and other allied 1612.78 &
1 EF1058 Bagalkote 07.08.15 1116.65 667.18 1783.83 990.95 100.00
equipment’s in KPTCL Sub-stations 27.08.14
of Bagalkote Zone.

Renovation and up-gradation of


protection systems of 220KV Sub 1481.29 &
2 EF1065 Bagalkote 26.12.15 1818.29 0.00 1818.29 1111.65 940.00
Stations(22 Nos) in Bagalkot 20.06.14
Transmission Zone

2 Total of TB's & Others 2934.94 667.18 3602.12 2102.60 1040.00

26 Total of Bagalkote Zone 22288.55 2796.27 25084.82 12064.34 12476.00


KALABURAGI TRANSMISSION
ZONE

Probable Expenditure for


2018-19 Supply-
Rs.150.00Lakhs
Raichur town:
Budget required for the year
Establishing of 110kV Ring Mains
19-20
& associated 110kV Sub-Stations 1883.00 &
1 FA1013 Raichur NA 14.02.07 2297.11 282.00 2579.11 2543.66 250.00 Supply: 150.00 Lakhs
viz Malayabad and Vadavatti with 30.06.06
Erection: 10.00 Lakhs
1x10MVA, 110/11kV Trs for a
Civil: 60.00 Lakhs
distance of 37.00 Kms.
PV: 20.00 Lakhs
RTN: 10.0 Lakhs
Total:250.0 Lakhs
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

Probable Exp. upto


31.03.2019
Supply: 36.81 Lakhs
Erection: 10.0 Lakhs
Civil: 40.0 Lakhs
Total: 86.81 Lakhs
Adavi Amareshwara:
ES 1.447 Budget required for the year
2 FA1049 Establishing 1x10MVA, 110/11kV Raichur 493.50 06.06.07 541.76 0.00 541.76 279.35 280.00
BCR 1.22 19-20
Sub-Station with associated line
Supply: 140.0 Lakhs
Civil: 10.00 Lakhs
PV: 10.00 Lakhs
QV: 10.00 Lakhs
RTN: 100.00 Lakhs
crop:10.0 Lakhs
Total: 280.0Lakhs
Expenditure for FY-2018-
Kudligi: 19.
Establishing 2x100MVA, On Hand Bills- 173Lakhs.
220/66/11kV & 1x12.5MVA, Bills to be submitted
66/11kV Station at Kudligi ES 36.23 4967.70 & (Supply & Erection) - 18.34
3 FB1035 Bellary 20.11.12 4565.69 38.00 4603.69 2756.65 1800.00
(Badeladaku) along with associated BCR 2.94 21.09.11 Total - 191.34Lakhs
lines & TB's for a distance of Budget required for FY-2019-
(220kV 32.63Kms & 66kV M/C 20 is 1800Lakhs.
5.36Kms) retention amount- 880
supply amount- 600
Short closed by
no:CEE/TZ/GLB/SEE(O)/A
Chowdapura:
EE-3/2016-17/6771-79
Up-gradation of 33/11kV MUSS to
Dtd:19.09.2016 Work was
1x10MVA, 110/11kV and ES 6.46 1284.94 &
4 FC1048 Kalaburagi 29.11.11 912.79 36.20 948.99 748.62 378.00 awarded to AR
1x20MVA, 110/33kV Sub-Station BCR 1.79 27.05.11
Construction. Work under
with associated line for a distance
Progess.
of 20.30 Kms.
To be Surrendred Rs.-
185.48 lakhs
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

Budget Utilisatin for 2018-19


Supply -218.35
Dep Supply- 57.28
Erection/Civil -24.37
Total- 300 lakhs
Koppal : Further the budget of Rs.
Establishing 2x100MVA, 197.46 proposed for
220/110kV and 1x10MVA, surrender.
110/11kV Station at Koppal ES 15.9 3759.87 & Budget requirement for 2019-
5 FD1016 Koppal 14.08.12 2997.91 0.00 2997.91 3340.02 1500.00
(Halavarthi) along with associated BCR 2.435 25.06.11 20
lines & TB's. Supply-709.55
11.06 (11KM-110KV&0.06KM- Erection- 121.64
220KV) Civil- 482.51
Tree/Crop cut- 21
statutory- 4
Work slip- 8
Total- 1346.64

Budget of Rs.150 Lakhs is


required for payment of
Crop cut ,Line Erection and
Retention Bills for the FY
2018-19 it self.
Budget Requirement for
Thavaragera: Establishing
2019-20
1x10MVA, 110/11kV and
ES 4.17 1433.55 & Suplly 304.49 Lakhs
6 FD1018 1x20MVA, 110/33kV Sub-Station Koppal 09.03.17 1974.90 43.50 2018.40 1504.25 610.00
BCR 1.21 16.05.13 Erection 18.72 lakhs
with associated 110kV line for a
Civil 89.27Lakhs
distance of 26.495 Kms.
Dep.Ret 2.17 Lakhs
Work Slip 22.36 Lakhs
Statutory 3.75 Lakhs
Tree/Crop 20.00 Lakhs
PV 60.00 Lakhs
Total 520.80 Lakhs

Ramsamudra:
ES 0.706
Establishing 220/110kV Sub 5831.49 & Supply bills : 100 Lakhs
7 FF1003 Yadgir MU&BCR 15.03.18 6284.13 47.63 6331.76 0.00 3000.00
Station with associated 220kV and 03.11.17 Work under Progess.
0.86
110kV lines
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

Budget Utilisatin for 2018-


19
Supply -128 Lakhs
Erection -24 Lakhs
Civil -63 lakhs
Total -215 Lakhs
Further the budget of Rs.
Mangalore:
61.43 lakhs proposed for
Up-gradation of 33/11kV MUSS to
1076.00 & surrender.
8 FD1029 2X10 MVA,110/11kV Sub-Station Koppal 0.00 0.00 419.03 500.00
27.04.17 Budget requirement for
with associated lines for a distance
2019-20
of 7.426 Kms.
Supply- 349.5
Erection- 8.19
Civil- 107.52
Tree/Crop Cut:30.00
Statutory 02.00
Dep Ret 05.01
Total 502.31 Lakhs

Budget requirement for


Kukanoor(Dyamapura) :
2019-20
Upgradation of 2x5MVA,33/11KV
Supply-920
Sub-station to 2x10MVA, 110/11kV ES6.540 1600.13&
9 FD1032 Koppal 0.00 6.04 1200.00 Erection-62
and 1x20MVA 110/33kV Sub- BCR2.67 21.4.18
Civil- 218
station Kukanoor(Dyamapura) in
Total-1200 Lakhs
Yelburga Taluk.

9 Total of Sub-stations 19574.29 447.33 20021.62 11597.62 9518.00


Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

Probable Expenditure for


2018-19
Supply : 15.70 L
Erection : 10 Lakhs
Civil : 15.0 Lakhs
Total : 40.7 Lakhs
Budget required for 2019-20
Alkod:
Supply: 170.0 Lakhs
Providing additional 1 x 10 MVA, 241.17 &
1 FA1045 Raichur BCR 1.44 26.03.18 124.78 101.95 226.73 64.04 215.00 Erection : 10 Lakhs
110/11 kV Power Transformer at 10.06.15
Civil : 5.0 Lakhs
Alkod S/s
Retn: 25 Lakhs
QV: 5.0 Lakhs
Total : 215.0 Lakhs
Transformer, 110 KV
Breaker & 11 KV
Switchgears are to be
Supplied by KPTCL

Expenditure for 2018-19


Supply : 15.36 L
Erection: 10.0 L
Civil: 15.0 L
Total : 40.36Lakhs
Addl Budget Reqd for 18-19
: 27.0 L
Maliyabad : Budget for 2019-20
Providing additional 1 x 10 MVA, 241.97 & Supply: 170.0 L
2 FA1046 Raichur BCR 1.43 26.03.18 124.83 101.95 226.78 60.60 215.00
110/11 kV Power Transformer at 10.06.15 Erection: 10.0 Lakhs
Maliyabad S/s Civil: 5.0 Lakhs
QV 5.0 Lakhs
Retn : 25.0 Lakhs
Total : 215.0Lakhs
Transformer, 110 KV
Breaker & 11 KV
Switchgears are to be
Supplied by KPTCL
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

Expenditure for the FY 2018-


19
Supply : 15.41 L
Erection: 10.0 L
Civil: 15.0 L
Total : 40.41 L
Addl budget rqd: 12.0 L
Gurugunta: Budget for 2019-20
243.44 &
Providing additional 1 x 10 MVA, Supply:170.00 L
3 FA1048 Raichur BCR 1.43 08.01.16 26.03.18 124.33 101.95 226.28 17.56 215.00
110/11 kV Power Transformer at Erection: 10.0 Lakhs
Gurugunta S/s Civil: 5.0 Lakhs
QV : 5.0 Lakhs
Retn : 25.0 Lakhs
Total : 215 Lakhs
Transformer, 110 KV
Breaker & 11 KV
Switchgears are to be
Supplied by KPTCL

Chincholi:
157.75 & Supply, Erection & Civil -
4 FC1037 Providing additional 1x10MVA, Kalaburagi BCR 1.41 19.01.18 68.49 98.16 166.65 37.14 110.00
01.08.11 136.65 Lakhs
110/33kV Transformer

Raichur:
Budget for FY-2019-20
Enhancement of 1x10MVA,
110/11KV Power Transformer by
Tfr cost : 160.73 Lakhs
20MVA ,110/11kV power 227.84&
5 FA1052 Raichur BCR 0.75 0.00 200.00 Erection cost: 34.54 Lakhs
transformer & providing 3 no's of 16.04.18
Total : 195.27 Lakhs
1x1000sq.mm XLPE CABLES TO
Transformer to e Supplied
11V Bank III at 220KV S/S
by KPTCL
Raichur.

Valkamdinni:
Budget for FY-2019-20
Replacement of 1x10MVA by
202.25& Tfr cost: 160.73 Lakhs
6 FA1053 1x20MVA 110/33KV Power Raichur BCR 0.85 0.00 0.00 200.00
11.04.2018 Erection cost:7.0 Lakhs
Transformer at 110KV S/S
Total 167.73 Lakhs
Valkamdinni.

Sindhanoor: Budget for FY-2019-20


Replacement of 1x10MVA by Tfr cost:160.73 Lakhs
217.63&
7 FA1055 1x20MVA 110/11KV Power Raichur BCR 0.75 0.00 0.00 200.00 Switchgear:37.7 Lakhs
03.06.17
Transformer at 110KV S/S Erection cost: 19.1 Lakhs
Sindhanoor Total 216.63 Lakhs
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

Addl Budget for 18-19 is Rs


24.0 Lakhs
Budget for FY-2019-20
Tfr cost: 40.0
Kogali:
178.18 & Lakhs(Released good)
8 FB1075 Providing additional 1x8MVA, Bellary BCR 1.00 0.00 0.00 150.00
20.08.13 Switchgear:28.75 Lakhs
66/11kV Transformer
Erection cost: 65.12 akhs
Total : 133.87 Lakhs
Budget required for FY 19-
20: 133.87 L

Addl Budget for 18-19 is Rs


24.0 Lakhs
Budget for FY-2019-20
Sovenahalli: Tfr cost: 40.0
178.52 &
9 FB1076 Providing additional 1x8MVA, Bellary BCR 0.994 0.00 0.00 150.00 Lakhs(Released good)
20.08.13
66/11kV Transformer Switchgear:28.75 Lakhs
Erection cost: 59.87 Lakhs
Total 128.62 Lakhs

Addl Budget for 18-19 is Rs


24.0 Lakhs
Budget for FY-2019-20
Banavikallu: Tfr cost: 40.0
180.84 &
10 FB1077 Providing additional 1x8MVA, Bellary BCR 0.99 0.00 0.00 150.00 Lakhs(Released good)
20.08.13
66/11kV Transformer Switchgear: 28.75 Lakhs
Erection cost: 62.14 Lakhs
Total : 130.89 Lakhs

HB Halli: Budget for FY-2019-20


Replacement of 1X 8MVA,66/11KV Tfr cost: 117.12 Lakhs
136.45 &
11 FB1084 Transformer by Bellary BCR 0.732 0.00 0.00 135.00 Erection cost: 16.08 Lakhs
02.09.14
1X12.5MVA,66/11KV H.B.Halli Total : 133.21 Lakhs
S/s.
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

Addl Budget for 18-19 is Rs


24.0 Lakhs
Budget for FY-2019-20
Somasamudra:
209.74 & Tfr cost: 40.0 Lakhs
12 FB1086 Providing additional 1x10MVA, Bellary BCR 1.06 0.00 0.00 135.00
15.05.14 Switchgear: 37.7 Lakhs
110/11kV Transformer
Erection cost:53.86 Lakhs
Total : 131.57 Lakhs

Addl Budget for 18-19 is Rs


25.0 Lakhs
Kamalapur (Hospet Tq.): Providing
Budget for FY-2019-20
additional
268.92 & Tfr cost : 40.0 Lakhs
13 FB1089 1 X10MVA, 110/11kV Power Bellary BCR 1.62 0.00 0.00 174.00
01.06.15 Switchgear: 37.7 Lakhs
Transformer at kamalapur in
Erection cost: 96.0 Lakhs
Hospet Tq.
Total : 173.70 Lakhs

Sankalapura: Repl of 1X10MVA by


258.56 &
14 FB1093 1X20MVA, 110/11kV Trf at Ballari BCR 0.77 0.00 0.00 218.00
01.03.18
110/11kV S/S Sankalapura

Providing additional 1 x 20 MVA


110/33 kv Transformer along with
356.58 &
15 FC1062 construction of 33kV Terminal Bay Kalaburagi BCR 1.267 0.00 13.49 200.00
10.05.17
at existing 110/33/11kV at
Kalaburagi (West) Sub-Station

Providing additional 1 X 10MVA,


298.07 & Approved in 75th
16 FC1064 110kV Power Transformer at Kalaburgi BCR 0.73 0.00 200.00
05.01.18 TCCM,Dtd: 04.11.2017.
110/33/11kV MUSS, Chowdapur.

Budget of Rs.51.82Lakhs
Bevoor :
has been proposed for
Providing additional 1 x 10 MVA, 243.72 &
17 FD1024 Koppal BCR 1.42 0.00 28.18 200.00 surrender.
110/11 kV Power Transformer at 01.06.15
Bevoor S/s
Budget required for FY-2019-
20 :227.08 Lakhs

Budget of Rs.56.82Lakhs
Ganadal :
has been proposed for
Providing additional 1 x 10 MVA, 241.45 &
18 FD1025 Koppal BCR 1.44 0.00 28.18 200.00 surrender.
110/11 kV Power Transformer at 01.06.15
Budget required for FY-2019-
Ganadal S/s
20: 231.25
Lakhs
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

Enhanncement of 1X10MVA,
110/33KV power Transformer
NGEF Make) by 1X20MVA, 200.50 & Transformer to be Supplied
19 FD1034 Koppal BCR 0.85 0.00 0.00 165.00
110/33Kv POWER Transformer at 05.02.18 by KPTCL
110/33/11kV MUSS Betegera S/s
in Koppal Tq, District.

Konkal:
164.46 & To be Surrendred Rs.
20 FF1002 Providing additional 1x10MVA, Yadgir BCR 1.48 0.00 0.00 165.00
04.06.14 163.46Lakhs
110/11kVTransformer

Creating 33 KV reference by
providing additional 1 x 20 MVA
110/33 kv Power Transformer along
326.128 &
21 FF1004 with construction of 33kv Terminal Yadgir BCR 1.392 0.00 0.00 250.00
10.10.17
Bay at Existing 110/11kV
Gurmitkal Sub-Station in Yadgir
Tq. yadgir Dist.

21 Total of Augmentation 442.43 404.01 846.44 249.19 3847.00

Munirabad - Ujjini:
Dismantling of existing 66kV
Munirabad-Sokke-Davangere line
Work short closed. Estimate
emanating from Munirabad
991.18 & is under preparation for the
1 FB1025 Generating Station & Erecting a Bellary NA 28.08.10 773.98 0.00 773.98 439.86 10.00
24.10.09 balance work at MWD,
new 66kV line with Coyote
Ballari
conductor upto 66kV Ujjani Sub-
Station in Kudligi Taluk for a
distance of 204.31 Kms
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

Work Awarded to M/S


Deepak Cable Short closed
by vide ltr
Chincholi-Mannekalli-Sedam:
No:CEE/GLB/AEE-3/6623-
i) Construction of 110kV DC link
32 Dtd:16.09.2016 Supply :
line between 110kV Chincholi and
835.67 L
110kV Manna-E-Khelly Sub-
Erection : 140 L
Stations 49.87Kms. 1128.89 &
2 FC1023 Kalaburagi BCR 1.236 11.07.11 924.99 0.00 924.99 1134.68 310.00 Civil : 130 L
ii) Stringing Second circuit on 07.01.11
Total : 1105.67 L
existing DC towers from 220kV
Balance work Awarded to
Sedam Station to 110kV
M/S AR Construction on
Chincholi Sub-Station for a
TTK basis Work under
distance of 32kms.
Progess.
Addiitional Req.-Rs.431.41
Lakhs.

Shahapur - Hattigudar:
Re-construction of 110kV DC line
from 220kV Hattigudar(Shahapur) 494.34 &
3 FC1042 Yadgir 0.00 0.00 489.57 138.00
S/s to 110kV Shahapur S/s for a 05.05.15
distance of 10.63kms using Lynx
conductors

3 Total of Lines 1698.97 0.00 1698.97 2064.11 458.00

Munirabad Circle :
Total On hand Bills for
176.94 lakhs
220kV Allipura (WUP)- 2.38
lakhs
220kV Lingasugur- 98.50
lakhs
Renovation and Upgradation of
220kV Raichur- 8.87 lakhs
Protection systems of 220kV 1384.05 &
1 FC1057 Kalaburagi 26.12.15 1436.37 0.00 1436.37 948.17 500.00 220KV Kustagi:(WUP)-
Substations (12 Nos) in Kalaburagi 20.06.14
29.88 Lakhs
Transmission Zone
220KV Sindhanur:- 7.41
lakhs
220KV Ittigi:- 29.88 lakhs
Total 176.94 Lakhs
Gulbarga Cicrle :
Total On hand Bills for

1 Total of TB's & Others 1436.37 0.00 1436.37 948.17 500.00


34 Total of Kalaburagi Zone 23152.06 851.34 24003.40 14859.09 14323.00
Rs.in Lakhs

Cost of
Cost of
Energy Deptly. Cum Exp up
Sl. Original / Total Work Budget
Work Code Name of the Work District Savings & Date of LOI Cost of DWA Supplied to 31/03/19 Remarks
No. Revised DPR Cost 2019-20
BCR Materials &
& Date
others

256 Total of List-II for All Zones 447152.53 26621.45 463353.38 293692.78 219349.00
List III Works which are proposed to be taken up during the present fiscal year 2019-20
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

BENGALURU TRANSMISSION
ZONE

FY 18-19
civil-10L
Total-10L
Shivanahalli: Establishing. FY 19-20
601.87 &
1 AC1074 1x8 MVA, 66/11kV S/s and Ramanagara 0.00 0.00 10.00 Supply-300L
18.12.17
associated line erection -20L
Civil-140L
Switch gear-40L
Total-500L

EXORA Business park: FY 18-19:


Establishing 2x150MVA, 10413 & 10L - Surrender.
2 AA1075 Bengaluru Urban 0.00 0.00 900.00
220/66/11kV Station with 09.03.18 FY 19-20
associated line. Supply+Erection+Civil: 5000 L

S.Medehalli:
Establishing 2x12.5 MVA,
ES 1.59 & 1978 & FY-19-20
3 AA1165 66/11kV sub-station at Bengaluru Urban 0.00 0.00 1.00
BCR 0.61 09.03.17 Nominal Budget: 5 L
S.Medehalli, in Anekal Taluk,
Bengaluru Urban District.

Muthanallur:
Establishing 2x31.5MVA,
1080.00 & FY-19-20
4 AA1167 66/11kV Sub-Station with Bengaluru Urban 0.00 0.00 1.00
19.04.17 Nominal Budget: 5 L
associated line at anekal
taluk.

Madappanahalli: Establishing
2x20MVA, 66/11kV Sub- 1119.73 & FY-19-20
5 AA1183 Bengaluru Urban 0.00 0.00 1.00
Station with associated line 25.05.17 Nominal Budget: 5 L
for a distance of 3.604Kms
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Nandi (Muddenahalli):
Establishing 1x8MVA,
ES 1.42 394.20 & 31.01. FY-19-20
6 AE1027 66/11kV Sub-Station with C.B.Pura 320.96 104.75 425.71 99.07 10.00
BCR 1.41 20.06.11 12 Nominal Budget: 15 L
associated line for a distance
of 3.466 Km.

400 kV Peenya: Establishing


2x500 MVA, 400/220 kV Sub
Station( 400 kVGIS &220kV
AIS) at existing 220kV SRS
Peenya premises
Bengaluru.Running of single
43315.05 & FY 19-20
7 AA1199 circuit 220kV single core Bengaluru Urban 0.00 10.00
28.11.18 Civil: 100 L
10000sqmm XLPE Copper UG
Cable fo aroute length of
10.265 Kms from proposed
400/200kV Peenya sub-sation
to existing 220/66kV "A"
station.

Sahakarinagar: FY 19-20
14960.67 &
8 AA1193 Establishing 2x150 MVA, Bengaluru Urban 0.00 500.00 S/E/C - 7500L 50% of the DPR
19.07.18
220/66/11kV GIS sub station cost

Audugodi GIS: Conversion of


existing 66/11 kV Audugodi
substation(AIS) to GIS 4442.40 & FY 19-20
9 AA1202 Bangalore Urban 0.00 10.00
substation in Bengaluru South 18.12.18 Supply+Erection+Civil: 1000 L
Taluk, Benglauru Urban
District.

Thorlakki:Establishing 1x12.5
MVA, 66/11kV Substation at 801.15& FY 19-20
10 AD1047 Kolar 0.00 100.00
Torlakki with associated 26.12.18 S+E+C : 500 L
line&Bay
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Talgunda:
Establishing 2x8MVA,
789.26& FY 19-20
11 AD1020 66/11kV sub -station at Kolar 0.00 100.00
31.12.18 S+E+C=500L
Talagunda village in Kolar
Taluk &District.

25149.10&
HBR:
28.12.17 Ratification to proposal
Establishing 2x150 MVA,
12 AA1180 Bengaluru Urban revised 0.00 0.00 500.00 approved in 74th TCCM held on
220/66/11kV GIS sub station
/16718& 20.06.17
at HBR Layout
07.01.19

Gownpalli :Establishing
1004.35& FY 19-20
13 AD1048 2x12.5MVA, 66/11kV Sub- Kolar 0.00 100.00
14.01.19 S+E+C : 500 L
Station with associated line

Alipura:Estabilishing 1 x 12.5
MVA, 66/11kV Sub-Station at 1055.32&
FY 19-20
14 AE1025 Alipura in Gowribidanur Chikkaballapura 25.02.19 0.00 100.00
Supply: 100 L
Taluk, Chikkaballapura
District

Establishing 2x150MVA Trf at


Sobha dreams balagere 7319.9 &
15 AA1204 Bengaluru Urban 0.00 0.00 100.00
varthur hobli Bangalore east 12.03.19
taluk.

15 Total of Sub-stations 320.96 104.75 425.71 99.07 2443.00

Hoody: Providing 3rd


555 & FY-19-20
1 AA1151 additional 1x31.5 MVA, 66/11 Bengaluru Urban 0.00 0.00 5.00
10.05.17 Nominal Budget: 5 L
kV transformer.
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Rajarajeshwarinagar:
Replacement of 2X20MVA by
700.03 & FY-19-20
2 AA1173 2X31.5MVA transformer at Bengalulru urban 0.00 0.00 200.00
09.06.17 Tr supply + Erection: 200 L
66/11kV Rajarajeshwarinagar
S/s

Kumbalgodu:
Replacement of 1x12.5MVA by
276.38 & FY-19-20
3 AA1174 1x31.5MVA 66/11kV Bengalulru urban 0.00 0.00 200.00
09.06.17 Nominal Budget: 3 L
Transformer at 66/11kV
Kumbalagodu Substation

Prestige Shanthinikethan:
Replacing 1X20MVA by
1X31.5MVA 66/11kV Power 248.90 & FY-19-20
4 AA1175 Bengalulru urban 0.00 0.00 200.00
transformerat 66/11kV 15.07.17 Tr supply + Erection: 2 L
Prestige Shanthinikethan
substation .

Attibele:
Replacement of 1x20 MVA,
319.13 & FY-19-20
5 AA1182 66/11 kV transformer by Bengaluru Urban 0.00 0.00 200.00
05.12.17 Nominal Budget: 5 L
1x31.5MVA 66/11kV
Transformer

Peenya:
Augmentation of 2x20MVA,
66/11kV power transformer
597.33 & FY-19-20
6 AA1184 no.II & III by 2x31.5MVA, Bengaluru Urban 0.00 0.00 200.00
205.05.17 Tr supply + Erection: 200 L
66/11kV power transformer at
SRS Peenya 220/66/11kV
Substation

Abbigere: Replacement of
2x12.5MVA, 66/11kV by 546.12 & FY-19-20
7 AA1185 Bengaluru Urban 0.00 1.29 5.00
2x20MVA, 66/11kV 29.05.17 Nominal Budget: 5 L
transformer
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

IISC: Replacing of 2x20MVA,


66/11kV power transformer 676.65 & FY-19-20
8 AA1186 Bengaluru Urban 0.00 0.00 200.00
by 2x31.5MVA power 03.07.17 Nominal Budget: 5 L
transformer

Raj Mahal Vilas (RMV):


Augmentation of 2x20MVA, 530.00 & FY-19-20
9 AA1187 Bengaluru Urban 0.00 0.00 5.00
66/11kV by 2x31.5MVA, 13.11.17 Nominal Budget: 5 L
66/11kV transformer

Byadarahally: Replacement of
1x20MVA, 66/11kV Power 351.00 & FY-19-20
10 AA1188 Bengaluru Urban 0.00 0.00 5.00
Transformer by 1x31.5MV, 26.10.17 Nominal Budget: 5 L
66/11kV power transformer

Brindavaan: Replacement of
2x20MVA, 66/11kV Power
635.30 & FY-19-20
11 AA1189 Transformer II & III by Bengaluru Urban 0.00 0.00 200.00
08.11.17 Nominal Budget: 5 L
2x31.5MVA, 66/11kV power
transformer

Naganathapura : Replacing
530.00 & FY-19-20
12 AA1194 2X20MVA by 2X31.5MVA Bengaluru Urban 0.00 0.00 5.00
30.11.17 Nominal Budget: 5 L
66/11kV Power transformer

Adugodi: Replacing 3X20MVA


10.01.07 & FY-19-20
13 AA1195 by 3X31.5MVA 66/11kV Bengaluru Urban 0.00 0.00 200.00
13.03.19 Tr supply + Erection: 200 L
Power transformer

Nelagadaranahalli: Replacing
2x20MVA, 66/11kV by 668.45& FY-19-20
14 AA1196 Bengaluru Urban BCR 0.951 0.00 172.11 5.00
2x31.5MVA, 66/11kV 25.05.17 Tr supply + Erection: 200 L
transformer
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Anekal.:
Replacing 1X20MVA by 282.61& FY-19-20
15 AB1059 Bangalore rural 0.00 0.00 5.00
1X31.5MVA , 66/11KV Power 09.06.17 Nominal Budget: 5 L
transformer at 66/11KV S/S,

66/11KV S/s Volvo:


Replacing of 1X6.3 MVA by 139.36& FY-19-20
16 AB1060 Bengaluru Rural BCR 0.76 0.00 0.00 120.00
1X12.5 MVA Transformer at 13.07.17 Nominal Budget: 5 L
66/11KV S/S Volvo

Sulibele :
Replacing of 2 x 12.5MVA 206.87& FY 19-20
17 AB1062 Bengalore Rural BCR 0.60 0.00 0.00 5.00
Transformers by 2x 20MVA 05.12.17 Tr supply+Erection: 175 L
transformers

Nanadagudi :
Replacing 2 x12.5MVA 397.39& FY-19-20
18 AB1063 Bengalore Rural BCR 0.63 0.00 0.00 5.00
Transformers by 2x 20 MVA 24.08.17 Nominal Budget: 5 L
Transformers

CBPura(I/A):
Replacing 1x12.5MVA NGEF
264.07& FY-19-20
19 AB1064 make Tr-1, 66/11kV by Bengaluru Rural BCR 0.61 0.00 0.00 5.00
09.06.17 Nominal Budget: 5 L
1x20MVA, 66/11kV
Transformer

220KV EKARAJAPURA:
a) Providing additional 1x100
MVA, 220/66 kV transformer
b) Providing additional 1x12.5
MVA, 66/11 kV transformer
1351& FY-19-20
20 AB1065 and replacing the existing Bengalore Rural BCR 2.24 0.00 0.00 50.00
09.04.18 Nominal Budget: 5 L
1x20 MVA, 66/11 kV
transformer by 1x12.5 MVA
transformer at 220 kV
Hosakote(Ekarajapura) sub-
station..
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Channapatna:
Augmentation of 1X12.5 MVA 181.74 & FY 19-20
21 AC1049 Ramanagara 0.00 0.00 180.00
66/11 kV Tr. By 1 X 20 MVA 05.06.15 Tr supply+Erection:180 L
at 66/11 kV Channapatna

Magadi:
Replacing 1x12.5MVA by
175.95 & FY-19-20
22 AC1067 1x20MVA, 66/11kV Pwer Ramanagara 0.00 0.00 5.00
17.02.16 Nominal Budget: 5 L
Transformer at 66/11kV
Magadi

Gudemaranahalli:
Replacing 2x8MVA by 394.72 & FY-19-20
23 AC1071 Ramanagara 0.00 0.00 5.00
2x20MVA 66/11kV Power 16.06.17 Nominal Budget: 5 L
Transformer

Dalasanur:
Replacing 1x8MVA, 66/11kV 121.55 & FY-19-20
24 AD1025 Kolar BCR 0.72 0.00 0.00 5.00
by 1x12.5MVA, 66/11kV 26.10.11 Nominal Budget: 5 L
Transformer

S.M.Mangala:
121.55 &
Replacing 1x8MVA, 66/11kV FY-19-20
25 AD1028 Kolar BCR 0.72 27.08.11 0.00 0.00 5.00
by 1x12.5MVA, 66/11kV Labour portion: 5 L
Transformer

Masti:
Replacing 2nd 2x12.5MVA, 286.15 & FY-19-20
26 AD1029 Kolar 35.00 35.00 134.17 2.00
66/11kV by 2x20MVA, 20.02.13 Nominal Budget: 2 L
66/11kV Transformer

Anderdsonpet :
Replacing 2x8MVA, 66/11kV 269.61 & FY-19-20
27 AD1039 Kolar 0.00 0.00 2.00
by 2x12.5MVA, 66/11kV 05.11.14 Nominal Budget: 5 L
Transformer
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Srinivasapura:
Replacing 1x12.5MVA, 205.12& FY-19-20
28 AD1043 Kolar BCR 0.61 0.00 0.00 2.00
66/11kV by 1x20MVA, 11.10.17 Nominal Budget: 5 L
66/11kV Transformer

Thayalur:
Replacing 1x8MVA, 66/11kV 142.06& FY-19-20
29 AD1045 Kolar BCR 0.52 0.00 0.00 2.00
by 1x12.5MVA, 66/11kV 31.10.17 Nominal Budget: 5 L
Transformer

Malasandra:
Replacing 1x8MVA, 66/11kV 140.87& FY-19-20
30 AD1046 Kolar BCR 0.52 0.00 0.00 2.00
by 1x12.5MVA, 66/11kV 26.09.17 Nominal Budget: 5 L
Transformer

M.G.Halli:
Replacing 1x8MVA, 66/11kV 110.49 & FY-19-20
31 AE1017 C.B.Pura BCR 1.25 0.00 0.01 2.00
by 1x12.5MVA, 66/11kV 09.11.10 Nominal Budget: 5 L
Transformer

Cheemangala:
Replacing 1x6.3MVA, 143.26 & FY-19-20
32 AE1031 C.B.Pura BCR 0.97 0.00 0.43 2.00
66/11kV by 1x12.5MVA, 16.12.17 Nominal Budget: 5 L
66/11kV Transformer

Talagavara:
Replacing second 1x12.5MVA, 204.67& FY-19-20
33 AE1051 CBPura BCR 0.61 0.00 0.00 2.00
66/11kV by 1x20MVA, 12.02.18 Nominal Budget: 5 L
66/11kV transformer

Cheemangala:
Replacing second 1x6.3MVA, 142.26& FY-19-20
34 AE1052 CBPura BCR 0.51 0.00 0.00 2.00
66/11kV by 1x12.5MVA, 12.02.18 Nominal Budget: 5 L
66/11kV transformer

Replacing of 2x8 MVA by 272.12& FY-19-20


35 AE1053 Chikkaballapura 0.00 0.00 2.00
2x12.5 MVA at Manchenahalli 05.06.15 Nominal Budget: 5 L
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Widia S/s:
555.00& FY 19-20
36 AA1197 Providng addnl 1X20MVA, Bengaluru 0.00 0.00 150.00
18.07.18 S+E+C-250L
66/11kV Power Transformer.

BTM 4th Stage:Providing


1x31.5MVA, 66/11 kV Power
Transformer at existing
296.20 & FY 19-20
37 AA1200 66/11 kV BTM 4th Stage Sub- Bengaluru Urban 0.00 200.00
01.10.18 Supply+Erection+Civil : 200 L
station in Subramanyapura
TL&SS Division Bengaluru
Urban District.

ELITA PROMENEDE:
Providing additional 1x20MVA,
66/11kV Power Transformer
at existing 66/11kV ELITA 297.92 & FY 19-20
38 AA1201 Bengaluru Urban BCR 1.80 0.00 100.00
PROMONEDE Sub-station in 01.10.18 Supply+Erection+Civil : 150 L
Subramanyapura TL&SS
Division, Banaglore South
Taluk & Urban District.

Gudemaranahalli:Providing
1X20MVA spare power
transformer as spare with
256.02 & FY 19-20
39 AC1086 associated bay at 66/11kV , Ramnagara 0.00 5.00
24.11.18 S/E /C - 10L
Gudemaranahalli S/s in
Magadi Taluk, Ramanagara
District

Koramangala: Replacing
527.18 &
40 AA1204 2X20MVA by 2X31.5MVA Bengaluru Urban BCR 1.14 0.00 200.00
24.12.18
66/11kV Power transformer
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Augmentation of 2 X 8 MVA
Power Transformer by 2 X
283.15 &
41 AB1070 12.5MVA Power Transformer Mandya BCR 0.58 0.00 5.00
26.12.18
at 220/66/11 kV Substation
T.K.Halli

220/66kV
Hoody:Replacement of
2x100MVA Power Transformer 1648.00 FY 19-20
42 AA1203 Bengaluru Urban BCR 1.06 0.00 5.00
by 2x150MVA 220/66kV & 1.1.19 Nominal Budget : 5 L
Power Transformer at
220/66kV Hoody Sub-station.

Providing additional 1X 12.5


MVA, 66/11 kV Tansformer
256.81 &
43 AC1088 at 66/11 kV MUSS Ramnagar BCR 0.84 0.00 1.00
07.01.19
Sankalgere along with
Capacitor bank

DoddaballapuraProviding
additional (3rd)1X100MVA,
1035.61 FY 19-20
44 AB1069 220/66kV Power Transformer Bengaluru Rural BCR 2.80 0.00 10.00
& 5.2.19 10L
at 220/66kV NRS
Doddaballapura substation .

Enhancement of 66/11kV
power transformer 2 of
140.11 &
45 AD1049 capacity 1x6.3MVA to Kolar BCR 0.71 0.00 2.00
01.03.19
1x12.5MVA at 66/11kV sub-
station, Byrakur

Enhancement of 66/11kV
power transformer 2 of
141.58 &
46 AD1050 capacity 1x6.3MVA to Kolar BCR 0.69 0.00 2.00
05.03.19
1x12.5MVA at 66/11kV sub-
station, Mudiyanur.
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Lakkur: Replacing of 1X 8
MVA Power Transformer-2 by
144.14 &
47 AD1051 1X12.5 MVA Power Kolar BCR 0.47 0.00 2.00
05.03.19
Transformer at 66/11 KV S/S
Lakkur.

Providing 1X12.5MVA,
66/11kV Power transformer
216.97 &
48 AE1054 as a SPARE at Ganjigunte C.B.Pura 0.00 1.00
12.03.19
66/11kV S/s with associated
bay equipments

Malur (Town): Augementation


of existing 1x8 MVA, 66/11 kV
(PTR No:2) by 1x12.5MVA, 144.08 &
49 AD1052 Kolar BCR 0.47 0.00 2.00
66/11 kV transformer at 15.03.19
66/11 kV Malur (Town) sub-
station.

HSR Layout: Replacing


263.29 &
50 AA1205 1X20MVA by 1X31.5MVA Bengaluru Urban 0.00 10.00
19.03.19
66/11kV Power transformer

Tamaka :
Replacing 1x12.5MVA, 191.14 &
51 AD1053 Kolar BCR 1.02 0.00 2.00
66/11kV by 1x20MVA, 23.03.19
66/11kV Transformer

Bangarpet:
Replacing second 1x12.5MVA, 208.62 &
52 AD1054 Kolar BCR 0.99 0.00 2.00
66/11kV by 1x20MVA, 08.04.19
66/11kV Transformer
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Bangarpet:
augmentation of 1X12.5 MVA,
66/11 kV power transformer-
208.62
2 by 1X20 MVA, 66/11 kV BCR
53 AD1055 Kolar & 0.00 2.00
power transformer at 66/11 0.55
08.04.2019
kV Bangarpet sub-station in
Bangarpet Taluk, Kolar
District

Tekal:-augmentation of
existing 1X8 MVA, 66/11 kV
power transformer-2 by
BCR 144.08 &
54 AD1056 1X12.5 MVA, 66/11 kV power Kolar 0.00 3.00
0.47 08.04.19
transformer at 66/11 kV
Tekal sub-station in Malur
Taluk, Kolar District

KGF:-Replacing 1x8 MVA,


66/11 kV transformer by 1x20
MVA, 66/11 kV transformer at BCR 210.81 &
55 AD1057 Kolar 0.00 2.00
66 kV KGF sub-station in 1.10 09.04.19
Bangarpet Taluk, Kolar
District

Ranganadoddi:-Replacement
of 2nd 1x12.5 MVA, 66/11 kV
power transformer by 1X20
MVA, 66/11 kV Power BCR 205.12 &
56 AC1089 Ramanagara 0.00 150.00
transformer at 66/11kV 1.10 22.02.19
Ranganadoddi sub-station in
Kanakapura taluk,
Ramanagara district
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Vemagal:Augmentation of
1x12.5MVA Power
Transformer-1 by 1x20MVA 191.55 &
57 AD1058 Kolar BCR 1.04 0.00 2.00
Power Transformer at 27.03.19
66/11kV Vemagal Substation
in Kolar Taluk

57 Total of Augmentation 0.00 35.00 35.00 308.01 2898.00

Construction of 66kV MC/DC


line in the existing corridor of
66kV Somanahalli -
4157.00& FY 19-20
1 AC1084 Kanakapura - T.K.Halli DC Ramanagara NA 0.00 0.00 100.00
17.04.18 Supply/Erection - 1000L
line B1 & B2 having old H
frame towers and cat
conductor

66kV DC line to 66/11kV


Maralavadi S/s:
Replacing of existing 66 KV SC
Tower of 66KV Maralwadi line
by Constructing DC Tower,
656.00& FY 19-20
2 AC1081 Drake DC line from tapping Ramanagara NA 0.00 0.00 10.00
01.06.18 Supply/Erection - 100L
point of existing 66KV
Kanakapura-Chatra (Tappping-
Marlawadi Tapping)-
Hanumanthanagara-
Yedamadu-Somanahalli line -1

HAL-Amarjyothi:
Strengthening of existing 66kV
481.6 &
3 AA1040 line by replacing Coyote by Bengaluru Urban 0.00 0.00 5.00
21.06.11
HTLS Conductor for a
distance of 3.21 kms
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Somanahalli -
Subramanyapura :
i) Construction of 220kV -
66kV MC - MV line from
Somanahalli in the Existing
corridor
ii) Rearrangement of existing 4118.9 & FY-19-20
4 AA1047 Bengaluru Urban 29.12. 6666.28 0.00 6666.28 0.00 5.00
220kv lines around 220kV 02.06.11 Nominal Budget: 5 L
14
Somanahalli Station.
iii) 220kV DC line using AAAC
Moose conductor in
Somanahalli- Peenya SC line
corridor upto Nagarabhavi tap
point.

Amarjyothi-Audugodi:
Replacement of Existing
Coyote ACSR Conductor by
665.24 & FY-19-20
5 AA1139 HTLS Conductor for a route Bengaluru Urban 0.00 0.00 100.00
05.11.14 Nominal Budget: 5 L
length of 4.20Kms in the
existing 66kV DC Audugodi-
Amarjyothi line.

Nelagadarenhalli to WIDIA:
Running of 66kV 1000sqmm
SC UG cable from existing 2359.00 & FY 19-20
6 AA1181 Bengaluru Urban 0.00 0.00 100.00
66/11kV Nelagadarenahalli 25.05.17 Supply+Erection+Civil - 1100L
S/s to existing Widia S/s for a
route length of 3.540Kms

66KV D.B.Pura -Devanahalli


line: Strengthening the 66KV 950& FY 19-20
7 AB1066 Bengaluru rural 0.00 0.00 10.00
D.B.Pura -Devanahalli line by 28.11.17 Supply/Erection - 100L
Drake conductor 20KMS
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

D cross to Thondebhavi:
Strengthening of about 31
Kms 66kV line from D cross to Bengaluru Rural & 1177.04& FY 19-20
8 AB1067 0.00 0.00 10.00
Thondebhavi limites (Existing CBPura 01.03.18 Supply/Erection - 500L
fabricated small tower and
rabit conductor)

Ranganadoddi Sub-Station:
Providing 66kV LILO
41.00 & FY-19-20
9 AC1035 arrangement to 66/11kV Sub- Ramanagara 0.00 0.00 5.00
24.01.12 Nominal Budget: 5 L
Station for a distance of 0.10
kms.

Conversion of existing 66kV


SC line to DC line from 142.00& FY-19-20
10 AC1082 Ramanagara NA 0.00 0.00 10.00
Harobele station to 17.03.18 Nominal Budget: 10 L
Kodihalli station

Siddlaghatta -
Y.Hunasenahalli:
Running of 2nd Circuit on
existing DC Tower of
Siddlaghatta 66kV line upto 115.04& FY-19-20
11 AE1034 C.B.Pura 529.93 529.93 0.00 5.00
Tower No.51 and linking the 05.05.12 Nominal Budget: 5 L
same to Y.Hunasenahalli line
with TB at 220kV R/S
Chintamani for a distance of
12.3 kms.

Jangamkote Sub-Station:
Providing 66kV LILO
54.97 & FY-19-20
12 AE1036 arrangement to 66/11kV Sub- C.B.Pura 0.00 0.00 5.00
14.05.12 Nominal Budget: 5 L
Station for a distance of 7.00
kms.
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

66KV D.B.Pura - Vijaypura


line :
Strengthening of 66kV
Doddaballapura-Vijayapura
SC line from 220/66 kV NRS,
Doddaballapura to 66/11 kV 1586.00 & FY 19-20
13 AB1068 Bengaluru Rural 0.00 10.00
Vijayapura sub-station by 04.09.18 Nominal Budget: Rs. 10 L
replacing the existing SC
Coyote ACSR Conductor on SC
towers by SC Drake ACSR
Conductor on DC towers for a
distance of 28.211km.

Magadi-Byadarahalli:
Conversion of existing 66kV
Byadarahalli-Magadi S/C line
to DC line with Drake ACSR
conductor using proposed
110kV Narrow based DC 2232
Bengaluru Urban Fy-2019-20, Budget
14 AA1198 towers for a distance of 19.07.18/ 0.00 10.00
Ramanagara S+E+C-1100
28.990Kms and 66Kv 27.07.18
1000sqmm, UG cable from
existing 66/11Kv Byadarahalli
station to U.G. cable
terminating tower for a route
length of 0.098 Kms.

66kV SC line from 220kV


Kanakapura to Kunur
station: Construction of 66kV
SC line partially cable and 3149.00& FY 19-20
15 AC1083 Ramanagara NA 0 0.00 0.00 10.00
partially overhead line from 31.07.18 Supply/Erection - 1000L
Kanakapura to proposed
Kunur station for a distance of
7.481Km
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Construction of 220-66kV MC
line in the corridor of existing
66kV Kanakapura-
Chikkenahalli-Channapatna
SC line for providing 220kV
source to proposed 220/66kV
Kothipura sub station in 5798.00 &
16 AC1085 Ramanagara 0.00 1.00
kanakapura taluk 09.08.18
Ramanagara district with
construction of 2 nos of 220
kV terminal bays at 220kV
Kanakapura and 2 nos of
220kV terminal bays at
Kothipura substation.

Somanahalli Station to
T.K.Halli Station: Conversion
of existing 220kV SC
Somanahalli-T.K Halli line to
5000.00 & FY 19-20
17 AC1039 DC line from existing 220/66 Ramanagara 0.00 10.00
02.02.19 Nominal Budget: Rs. 10 L
kV T.K.Halli substation to
existing 220/66kV
Somanahalli sub-station for a
distance of 62.221 Kms
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Sarjapura station to 66 kV
Lakkur : Construction of 66 kV
DC line from 220 kV Sarjapura
station to 66 kV Lakkur sub-
station & construction of 66 kV
terminal bay at 220/66/11 kV
Sarjapura sub-station for
connecting already approved
698.00 &
18 AA1206 ACSR line on existing 66 kV SC Bengaluru Urban 0.00 1.00
05.03.19
line DC towers of Sarjapura-
Lakkur line from 20/66/11kV
Sarjapura sub-station up to the
existing 66/11 kV Lakkur sub-
station ; partly in the existing 78
kV line corridor using 66 kV NBT
KPTCL design towers for a route
length of 13.531 kMs

18 Total of Lines 7196.21 0.00 7196.21 0.00 407.00

90 Total for Bengaluru Zone 7517.17 139.75 7656.92 407.08 5748.00

Tumakuru transmission
zone

Vijapura:
Establishing 1x12.5 MVA, ES 550.46 &
1 BC1083 Chitradurga 0.00 100.00
66/11kV at Vijapura S/S in BCR 4.87 10.09.18
Chitradurga Taluk & Dist.

Honnenahalli:
Establishing 1 x 8 MVA 66/11 ES 716.84 & Tender under evaluation at
2 BA1145 Tumakuru 0.00 100.00
KV S/S with associated line in BCR 1.66 15.10.18 CEE.T&P.
Tumakuru Taluk & District.

Nandihalli:Estabilishing 1 x8
MVA, 66/11 kV sub-station at ES
3 BA1150 Tumakuru 533.00 & 0.00 100.00
Nandihalli cross in Gubbi BCR 4.83
taluk Tumakuru district.
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

3 Total of Sub-stations 0.00 0.00 0.00 0.00 300.00

Kolala:
Additional 1X10MVA is
Replacing 1x8 MVA,66/11kV 136.52 &
1 BA1105 Tumakuru BCR 0.80 0.00 0.00 0.00 5.00 proposed.Hence, the work may
by 1x 12.5 MVA, 66/11kV 15.04.14
be dropped.
Transformer.

Thovinakere:
Replacement of 1x12.5MVA, 177.07 &
2 BA1107 Tumakuru BCR 1.028 0.00 0.00 0.00 5.00 Transformer to be allotted
66/11kV by 1x 20MVA, 08.04.14
66/11kV Transformer.

Kadaba:
Replacing 1x10 204.20 &
3 BA1123 Tumakuru BCR 1.14 0.00 0.00 5.00 Transformer to be allotted
MVA,110/11kV by 1x 20 11.05.17
MVA, 110/11kV Transformer.

Kolala:
Replacing 2nd 1x8 MVA, 139.07 &
4 BA1124 Tumakuru BCR 0.73 0.00 0.00 5.00 Transformer to be allotted
66/11kV by 1x 12.5 MVA, 17.05.17
66/11kV Transformer.

Sampige:
Replacing1x10MVA,110/11kV 204.20 &
5 BA1125 Tumakuru BCR 1.14 0.00 0.00 5.00 Transformer to be allotted
by 1x 20MVA, 110/11kV 17.05.17
Transformer.

K.G Temple:
Replacing1x10MVA,110/11kV 204.53 &
6 BA1126 Tumakuru BCR 1.14 0.00 0.00 5.00 .
by 1x 20MVA, 110/11kV 11.05.17
Transformer.

Bellavi:
Replacing 1x12.5MVA Power
203.49 &
7 BA1129 Trnasformer-1 by 1x20MVA Tumakuru BCR 0.84 0.00 0.00 5.00 Transformer to be allotted
27.09.17
Power Transformer at
66/11kV Bellavi Substation
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Tavarekere:
Replacing 1x8MVA, 66/11kV
142.26 &
8 BA1132 Power transformer-1 by Tumakuru BCR 0.73 0.00 0.00 5.00 Transformer to be allotted
27.09.17
1x12.5MVA 66/11kV Power
transformer

Koratagere:
Replacement of 1x 12.5MVA
206.30 &
9 BA1133 66/11kV Power Transformer Tumakuru BCR 0.83 0.00 0.00 5.00 Transformer to be allotted
10.10.17
by 1x 20 MVA, 66/11kV
Transformer.

Thimmasandra:
Replacing1x8MVA, 66/11kV 136.44&
10 BA1135 Tumakuru BCR 0.75 0.00 0.00 5.00 Transformer to be allotted
by 1x 12.5MVA, 66/11kV 27.09.17
Transformer.

Hebbur:
Replacing 1x12.5 MVA, 212.01&
11 BA1136 Tumakuru BCR 0.81 0.00 0.00 5.00 Transformer to be allotted
66/11kV by 1x 20 MVA, 10.10.17
66/11kV Transformer.

Sira:
Replacing 12.5MVA,66/11kV 214.02&
12 BA1137 Tumakuru BCR 0.8 0.00 0.00 0.00 5.00 Transformer to be allotted
by 1x 20 MVA, 66/11kV 28.03.18
Transformer.

Hirehalli:
For replacement of 1 x 12.5
204.16&
13 BA1138 MVA Tr.-1 by 1 X20 MVA Tr. Tumakuru BCR 0.84 0.00 0.00 200.00 Transformer to be allotted
15.02.18
at 66/11 KV Sub-station with
1IC+4F+1BC

Yadiyur: For replacement of


205.68&
14 BA1139 1 x 6.3 MVA by 1 X 20 MVA Tumakuru BCR 1.58 0.00 0.00 5.00
28.03.18
Tr. at 66/11 KV Sub-station
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Kunigal: For replacement of


1 x 12.5 MVA Tr-2 by 1 X 20 204.52&
15 BA1140 Tumkur BCR 0.84 0.00 0.00 5.00
MVA Tr. 1Bank + 4Feeders at 27.03.18
66/11 KV Sub-station

Honnudike: Replacing 1x8


MVA-1 66/11kV by 1x 12.5 145.00&
16 BA1141 Tumkur BCR 0.7 0.00 0.00 5.00
MVA, 66/11kV Transformer 15.02.18
(2nd Tr.)

Davanagere:
Providing Spare 1x20MVA, ES NA 253.24 &
17 BB1061 Davanagere 0.00 0.00 1.00
66/11kV Transformer at BCR 2.44 09.12.13
220/66kV Davanagere SRS.

Bidarekere:
18 BB1072 Providing Additional 1x8MVA, Davanagere BCR 0.877 179.01 & 0.00 0.00 150.00
66/11kV Power Transformer. 27.08.14

Obbajjihalli:
179.01 &
19 BB1073 Providing Additional 1x8MVA, Davanagere BCR 0.87 0.00 0.00 150.00
02.09.14
66/11kV Power Transformer

Avaregare:
Replacing 1x8MVA, 66/11kV 136.52 &
20 BB1074 Davanagere BCR 0.8 0.00 0.00 5.00
by 1x 12.5MVA, 66/11kV 05.09.14
Tranformer.

Mayakonda:
Replacing 1x8MVA, 66/11kV 137.84 &
21 BB1076 Davanagere BCR 0.792 0.00 0.00 10.00
by 1x 12.5MVA, 66/11kV 02.09.14
Transformer.
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Harapanahalli:
Replacing 1x12.5 MVA, 201.47 &
22 BB1081 Davangere BCR 0.62 0.00 0.00 1.00
66/11kV by 1x 20 MVA, 11.05.17
66/11kV Transformer.

Bharamasagara: Providing
ES NA 198.54 &
23 BC1060 Spare 1x12.5MVA, 66/11kV Chitradurga 0.00 0.00 1.00 Surrender of Rs. 5.00 lakhs
BCR 1.53 23.01.14
Transformer

Pandarahalli :
203.88&
Replacing 2nd 12.5 MVA,
24 BC1075 Chitradurga BCR 0.71 30.05.17 0.00 0.00 1.00
66/11kV by 20MVA, 66/11kV
Transformer.

Mylanahalli :
Replacing 1x8 MVA, 66/11kV 142.42&
25 BC1076 Chitradurga BCR 0.71 0.00 0.00 0.00 1.00
by 1x 12.5 MVA, 66/11kV 08.02.18
Transformer.

Thallak :
Replacing 1x6.3 MVA, 139.75&
26 BC1077 Chitradurga BCR 1.03 0.00 0.00 0.00 1.00
66/11kV by 1x 12.5 MVA, 23.02.18
66/11kV Transformer.

Hanagal:
Replacing 1x8 MVA, 66/11kV 156.71&
27 BC1078 Chitradurga BCR 0.69 0.00 0.00 1.00
by 1x12.5 MVA, 66/11kV 23.02.18
Transformer.

Chikkanayakanahalli:
Replacement of 1x10 MVA
power transformer-1 by 1x 20 212.26 & Estimate submitted for
28 BA1142 Tumakuru BCR 1.11 0.00 5.00
MVA, 110/11kV Transformer 03.04.18 Technical Sanction.
at 110/11kV
Chikkanayakanahalli
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Bidare:
Providing Additional 1x10
254.05 &
29 BA1143 MVA, 110/11kV Power Tumakuru BCR 0.90 0.00 120.00
08.05.18
Transformer at 110/11kV S/s
at Bidare.

Guligenahalli:
Replacing 1x6.3MVA,
66/11kV power Transformer 143.85 &
30 BA1144 Tumakuru BCR 1.00 0.00 5.00
by by 1x 12.5 MVA, 66/11kV 03.04.18
Transformer at 66/11kV
Guligenahalli.

Hosakere(Madhugiri):
Replacing 1x8MVA Power
Transformer by 1x12.5MVA, 142.00 & Estimate submitted for DPR
31 BA1146 Tumakuru BCR 0.48 0.00 5.00
66/11kV Power Transformer 23.11.18 preparation.
at 66/11kV
Hosakere(Madhugiri),

Holavanahalli :Replacing
1X8 Power Transformer-2 by
144.00 &
32 BA1147 1X12.5MVA 66/11KV Power Tumakuru BCR 0.47 0.00 5.00
23.11.18
Transformer at 66/11kV
Holavanahalli

Pulamaghatta:
Replacing 1x8 MVA, Power
Transformer -2 by 143.00 &
33 BA1148 Tumakuru BCR 0.45 0.00 5.00
1x12.5MVA, 66/11kV Power 23.11.18
Transformer at 66/11kV
Pulmaghatta S/s.
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Sokke:
Providing Additional 1x8MVA, 329.00 &
34 BB1091 Davanagere BCR 0.35 0.00 10.00
66/11kV Power Transformer 15.11.18
at 66/11kV Sokke S/S

Nagasamudra :
Providing addl. 1x8 MVA,
230.07 &
35 BC1079 66/11 KV Power Transformer Chitradurga BCR 0.07 0.00 10.00 Tendering under process
16.08.18
at 66/11KV Nagasamudra
S/S

Kalamaranahalli:
Providing addl. 1x8 MVA, 229.32 &
36 BC1080 Chitradurga BCR 0.74 0.00 10.00 Tendering under process
66/11 KV Power Transformer 06.09.18
at 66/11KV S/S

Hariyabbe:
Replacement of
1x6.3+1x8MVA, 66/11kV
286.43 &
37 BC1082 power transformer by 2x 12.5 Chitradurga BCR 0.85 0.00 100.00
23.05.18
MVA, 66/11kV Power
Transformer at 66/11 kV
hariyabbe S/s

P.D.Kote: Providing additional


1x8 MVA, 66/11 kV Power
transformer at 66/11kV 150.00& DPR Approved on 06.09.2018.
38 BC1084 Chitradurga BCR 0.73 0.00 150.00
P.D.Kote Sub-Station in 16.09.18 Tendering under Process.
Hiriyur Taluk, Chitradurga
District.
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Venkatapura: Replacement of
1x5 MVA Trasformer by
144.00 & 70th TCCM approved on
39 BC1085 1x12.5 MVA, Transformer at Chitradurga BCR 0.73 0.00 5.00
30.11.18 20.12.2016.
66/11kV Venkatapura Sub-
Staion.

Thallak: Providing additional


3rd 1x100 MVA, 220/66kV
power transformer at 964.51 &
40 BC1086 Chitradurga BCR 2.34 0.00 500.00 Tendering under Process..
220/66/11kV Thallak Sub- 03.11.18
Station in Challakere taluk
Chitradurga District.

Rampura :
Replacing 1x6.3 MVA,
66/11kV Power transformer 155.00 &
41 BC1087 Chitradurga BCR 0.67 0.00 5.00
by 1x12.5 MVA, 66/11kV 14.11.18
power Transformer at
66/11kV Rampura S/s .

Turuvanur:
Replacing 1x6.3MVA Power
144.00 &
42 BC1088 Transformer by 1x 12.5MVA, Chitradurga BCR 0.68 0.00 5.00
18.12.18
66/11kV Power Transformer
at 66/11kV Turuvanuru S/s.

Honnavalli:
Replacing 1x10 209.10 & Estimate submitted for
43 BA1151 Tumakuru BCR1.12 0.00 150.00
MVA,110/11kV by 1x 20 11.04.18 Technical Sanction.
MVA, 110/11kV Transformer.

Bevinahalli:
Replacing 1x8MVA, 66/11kV 142.56 & Estimate submitted for
44 BA1152 Tumakuru BCR0.71 0.00 100.00
by 1x 12.5MVA, 66/11kV 01.03.18 Technical Sanction.
Transformer.
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Balenahalli:
Replacing 1x8 MVA, 66/11kV 141.00 &
45 BC1090 Chitradurga BCR 0.48 0.00 5.00
by 1x12.5MVA, 66/11kV 26.12.18
Transformer.

Sanikere:
Replacing 1x6.3 MVA, 287.07 &
46 BC1091 Chitradurga BCR 0.85 0.00 5.00
66/11kV by 1x 12.5 MVA, 28.03.18
66/11kV Transformer.

Hiriyur:
Replacing 1x8 MVA, 66/11kV 145.48 &
47 BC1092 Chitradurga BCR 0.69 0.00 5.00
by 1x12.5 MVA, 66/11kV 11.06.18
Transformer.

Bharamasagara:
Replacing 2x12.5 MVA, 206.00 &
48 BC1093 Chitradurga BCR 0.56 0.00 5.00
66/11kV by 2x 20 MVA, 31.12.18
66/11kV Transformer.

Attigere:
Replacing 1x8MVA, 66/11kV 282.00 &
49 BB1094 Davangere BCR 0.73 0.00 5.00
by 1x 12.5MVA, 66/11kV 09.09.19
Transformer.

Punabghatta:
Replacing 1x8MVA, 66/11kV 212.77 &
50 BB1095 Davangere BCR 0.98 0.00 50.00
by 1x 20 MVA, 66/11kV 18.05.18
Transfformer.

Kurubarahalli:
Replacing 1x8MVA, 66/11kV 142.63 &
51 BB1096 Davangere BCR 0.48 0.00 50.00
by 1x12.5MVA, 66/11kV 17.09.18
Transformer.

Badavanahalli:
Replacing 2nd 1x12.5MVA, 206 &
52 BA1153 Tumakuru BCR 0.56 0.00 5.00
66/11kV by 1x 20MVA, 01.02.19
66/11kV Transformer.
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Bandihalli:
Replacing
207.08 &
53 BA1154 1x10MVA,110/11kV by 1x Tumakuru BCR 1.12 0.00 150.00
11.04.18
20MVA, 110/11kV
Transformer.

Chikkabanagere:
Replacing 1x12.5MVA, 205.99 &
54 BA1155 Tumakuru BCR 0.83 0.00 100.00
66/11kV by 1x 20MVA, 11.04.18
66/11kV Transformer.

K.B.Cross:
Replacing 1x10 MVA,
216.24 &
55 BA1156 110/11kV by 1x 20 MVA, Tumakuru BCR 1.08 0.00 5.00
18.05.18
110/11kV Transformer @
220/110kV

Mayasandra:
Replacing 2nd 10 215.88 &
56 BA1157 Tumakuru BCR 1.08 0.00 100.00
MVA,110/11kV by 1x 20 02.05.18
MVA, 110/11kV Transformer.

Nonavinakere:
Replacing 1x10 211.07 &
57 BA1158 Tumakuru BCR 1.10 0.00 150.00
MVA,110/11kV by 1x 20 11.04.18
MVA, 110/11kV Transformer.

Turuvekere:
Replacing 1x10 MVA, 214.87 &
58 BA1159 Tumakuru BCR 1.08 0.00 5.00
110/11kV by 1x 20 MVA, 02.05.18
110/11kV Transformer.

Pandrahalli :
Replacement of 2nd
1x12.5MVA, 66/11KV Power 203.88 &
59 BA1160 Tumakuru BCR 0.84 0.00 150.00
Transformer by 1x20MVA at 30.05.17
66/11KV S/S in Chitradurga
district.
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Pavagada: For replacement


of 1 x 12.5 MVA Tr-1 by 1 X 207.00 & DPR approved vide OM
60 BA1161 Tumakuru BCR 0.56 0.00 5.00
20 MVA Tr. at 66/11 KV Sub- 08.08.19 No.B19/5747/96-97/11.2.2019
station .

Aimangala :Replacing 1x12.5


210.00 &
61 BC1094 MVA, 66/11kV by 1x 20 MVA, Chitradurga BCR 0.55 0.00 5.00
31.12.18
66/11kV Transformer.

Guttur:Providing 125 MVAR


1138.00 &
62 BB1097 Bus Reactor at 400/220 KV Davanagere NA 0.00 5.00
05.03.19
Station Guttur

Nagalamadike :
Replacment of 1x8MVA power
transformer at 66/11kV 145.00&
63 BA1162 Tumakuru 0.45 0.00 1.00
nagalmadike substation in 11.03.19
pavagada taluk Tumkur
district

Anagodu: Replacement of
Existing 1x8 MVA power
transformer-1 by 1x20 MVA
Power transformer and 1x8
MVA power transformer-2 by 345.00 &
64 BB1098 Davangere BCR 0.76 0.00 1.00
1x12.5 MVA power 18.01.19
transformer at 66/11 kV
Anagodu Sub-station in
Davangere Taluk, Davangere
District.

Hireguntanur:
Replacing 1x8 MVA, 66/11kV 285.00 &
65 BC1095 Chitradurga BCR 0.48 0.00 1.00
by 1x 12.5 MVA, 66/11kV 14.01.19
Transformer.
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Chitradurga:
Replacing 1x12.5 MVA,
225.00 &
66 BC1096 66/11kV by 1x 20 MVA, Chitradurga BCR 0.51 0.00 100.00
05.01.19
66/11kV Transformer at
66/11 KV station chitradurga.

Chitrahalli:Replacement of
1x8MVA power transformer-2
by 1x12.5 MVA Power 140.00 &
67 BC1097 Chitradurga BCR 0.49 0.00 50.00
transformer at 66/11kV Sub- 31.12.18
Station in Holalkere Taluk,
Chitradurga district.

Doddasarangi:
Providing additional 1 x 8
250.00 &
68 BA1163 MVA 66/11kV Transormer at Tumakuru BCR 0.49 0.00 1.00
23.03.19
66/11kV Doddasrangi Sub-
station

Nayakanahatti:
Replacing 1x12.5 MVA, 218.00 &
69 BC1098 Chitradurga BCR 0.53 0.00 1.00
66/11kV by 1x 20 MVA, 28.03.19
66/11kV Transformer.

Somalapura : Providing
additional 1x10MVA,
266.00 &
70 BA1164 110/11kV Power Transformer Tumkur BCR 0.58 0.00 1.00
23.03.19
at 110/11KV S/S
Somapalapura

Sirigere:
Replacing 2nd 8MVA, 143.00 &
71 BC1099 Chitradurga BCR 0.48 0.00 1.00
66/11kV by 1x 12.5MVA, 09.01.19
66/11kV Transformer.

Kora:
Replacement of existing
1x8MVA power transformer-1
215.50 &
72 BA1165 by 1x20MVA, power Tumakuru BCR 0.90 0.00 1.00
27.04.19
transformer at 66/11kV
Kora substation in Tumakuru
Taluk.
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

72 Total of Augmentation 0.00 0.00 0.00 0.00 2750.00

Chelur Sub-Station:
Construction of DC line for a
length of 16.22 kms using
Drake conductor from Chelur 116.47 &
1 BA1079 Tumakuru 0.00 0.00 0.00 10.00
tap point to Chelur Sub- 23.04.14
Station and in the exisiting
corridor with modification of
66kV Bays

Chilur Station to Chilur Tap


point:
Conversion of SC line on SC
towers to DC line on DC
54.14&
2 BB1067 towers from Tap point to Davanagere 0.00 0.00 10.00 Rs. 10 Lakhs to be surrendered
20.06.17
Chilur 66kV Sub-Station for a
distance of 1 Km with TB at
Chilur station for LILO
arrangement.

Jagalur-Sokke 66KV line:


Recontruction of existing
66kV, age old coyote
conductor SC line from 66kV
401.10&
3 BB1088 Sub-Station Jagalur to 66kV Davanagere 0.00 0.00 10.00
29.06.18
Sub-Station Sokke as SC line
on DC towers with coyote
conductor for a distance of
20.961 Kms.

Sasvehalli Station to
Sasvehalli Tap
point:Providing LILO
arrangement at 66kv station 53.3&
4 BB1089 Davanagere NA 0.00 0.00 10.00
Sasvehalli from tap point of 20.06.17
Lingadahalli-Channagiri line
for a distance of 0.5 kms with
TB.
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Harihara Hospet line:


Providing LILO arrangement to
existing 66/11kv Harihara
Sub station from 66kV
Harihara-Hospete line at
LOC.78-79(79-80) to 66kV 43.50 &
5 BB1092 Davanagere 0.00 1.00
Harihara Substation by 17.11.18
stinging 2nd circuit on
existing DC tower withcoyote
conductor for a distance of
50m in Harihara Taluk,
Davangere District.

66kV Itagi-Bennehalli SC
line:Stringing of 66 kV second
circuit on existing 66kV Itagi-
Bennehalli SC line on DC
towers from 220kV Itagi
6 BB1093 station to 66/11kV bennehalli Davangere 0.00 100.00
for a distance of 19.06 Kms in
the existing corridor along
with construction of 1 no of
66kV terminal bay at both
stations

Hiriyur & J.G Halli :Stringing Hiriyur-Bevinahalli Line :


of second circuit on existing Proposal for conversion of 66kv
66kV Hiriyur-Bevinahalli (220 Hiriyur-Bevinahalli (Hiriyur
kV SRS Hiriyur to J.G Halli 220kv SRS to JG Halli muss)
sub-station) SC line on Single circuit line to double
existing DC towers using 547.00 & circuit line on existing line on
7 BC1089 Chitradurga 0.00 200.00
Coyote conductor with 15.02.19 existing double circuit towers by
construction of new TB at drawing 2nd circuit using coyote
both 220kV SRS Hiriyur & J.G conductor in existing corridor
Halli Sub-station for distance with extension of new terminal
of 21.352 kms in Hiriyur bay in both 220kv SRS Hiriyur
taluk, Chitradurga district. and 66/11kv Javagondanahalli
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Nagalamadike :
Construction of new 66kV SC
tap line on DC towers from
Pavagada tapping point to 211.20 & 04.11. Short closed already, proposed
8 BA1043 Tumakuru NA 197.11 0.00 197.11 41.30 10.00
Nagalamadike S/ S 03.03.11 11 for retendered
(Replacement of Rabbit
conductor on RCC poles) for a
distance of 13.46Kms.

Shylapura - Y. N. Hosakote:
Construction of new 66kV SC
line on DC towers
235.24 & 30.11. Short closed already, proposed
9 BA1044 (Replacement of Rabbit Tumakuru NA 265.00 0.00 265.00 71.62 10.00
11.05.11 11 for retendered
conductor on RCC poles by
Coyote conductor on 17.24
Kms.

9 Total of Lines 462.11 0.00 462.11 112.92 361.00

84 Total of Tumakuru Zone 462.11 0.00 462.11 112.92 3411.00


HASSANA TRANSMISSION
ZONE
Kundur Mata:
Establishing 1 X 8 MVA
,66/11 KV S/S at Kunduru
ES 0.92 491.91 &
1 CA1064 Mata in CR Patna Taluk, Hassana 0.00 0.30 400.00 Tendered at CE/ T&P
BCR 0.89 04.04.07
Hassana District along with
associated line for a distance
of 6.2Kms
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Sulia:
Up-gradation of existing 2 x 5
MVA, 33/11kV to 1 x 10
MVA, 110/33kV sub-station
ES5.56 1492.02 &
2 CC1018 & 1 x 10MVA, 110/11kV at Dakshina Kannada 0.00 0.00 5.00
BCR0.72 01.09.10
110/33/11kV Sullia Sub-
station in Sulliya Taluk, D.K.
District along associated line
for a distance of 20kMs.

Gangur : Est 1x8 MVA, 66/11


kV sub-station Gangur in
ES1.12 386.77&
3 CA1007 Belur taluk, Hassan District Hassan 0.00 300.00
BCR1.023 21.04.07
with associated line for a
distance of 13.14kMs.

Mavali:Establishing 1 x
10MVA, 110/11KV sub-
station at 110/11kV Mavali ES1.10 646.07&
4 CD1070 Shivamoggga 0.00 100.00 tendered
sub-station in Soraba Taluk, BCR0.869 09.01.19
Shivamogga District with
associated line.

Ulavi:Establishing 1x10MVA,
110/11kV Ulavi Sub-Station ES1.08 709.45&
5 CD1071 Shiamoga 0.00 100.00 tendered
in Soraba Taluk, Shivamogga BCR0.9628 06.02.19
District with associated line.

5 Total of Sub-stations 0.00 0.00 0.00 0.30 905.00

MSEZ: Providing 1 x20 MVA,


110/33/11kV Transformer as
285.41&
1 CB1055 spare at 220kV Station MSEZ, Dakshina Kannada 0.00 0.00 1.00 To be tendered.
13.11.17
Bajpe in Mangalore Taluk, DK
Dist
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Balligavi (Shiralkoppa):
Providing 1X20MVA,
110/11kV Spare Transformer
376.64 &
2 CD1061 at 220kV Balligavi Shivamogga 0.00 0.00 10.00 To be tendered
07.02.17
(Shiralkoppa) sub-station in
Shikaripura Taluk,
Shivamogga District .

Kumsi:Replacement of 2nd
1x 10MVA 110/11KV Power 1X20MVA Transformer is
transformer by 1 x 20 MVA, charged on 08.02.2019. other
3 CD1065 Shivamogga BCR 0.5 312.09 0.00 0.00 80.00
110/11KV power transformer related works are under
at existing 110/11KV Kumsi tendering stage.
S/s in Shimogga Taluk

Mudigere:
Creating 33kV reference by
installing 1x8MVA, 66/33kV
400.53&
4 CE1041 Transformer at 66/33/11kV Chikka-magalur BCR 1.75 0.00 0.00 150.00
20.03.18
Mudigere sub-station in
Chikkamagaluru Taluk &
District

Singtagere:
Providing additional
289.44&
5 CE1043 1x10MVA, 110/11KV Power Chikkamagalur BCR 0.68 0.00 10.00 To be re-tendered
22.05.18
Transformer at 110/11kV
Singatagere S/s Kadur Taluk

Tangli: Enhancement of 1 x
10MVA 110/11KV Power
transformer 2 by 1 x 20 MVA, 319.38&
6 CE1044 Chikkamagalur BCR 2.24 0.00 100.00 Tendered
110/11KV power transpower 18.05.18
at 110/11kV Tangli S/s in
Kadur Taluk.
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Panchanahalli :
Replacement of 1x6.3 MVA,
66/11 kV Power Transformer-
2 by 12.5MVA, 66/11 kV 277.33&
7 CE1045 Chikkamagalur BCR 2.05 0.00 50.00
power transformer at 66/11kV 11.04.18
Panchanahalli sub-station, in
Kadur Taluk, Chikkamagalur
District

Bandishettyhally: Providing
additional 1x8MVA, 66/11kV
Power Transformer at 216.95 &
8 CA1086 Hassan BCR 0.68 0.00 100.00 Tender invited
Bandishettyhally S/s in 24.09.18
Holenarasipura Taluk,
Hassan District

Mattanavile:
Replacement of 1x8MVA,
66/11kV Power Transformer
by 1x12.5MVA, 66/11kV 300.00 &
9 CA1087 Hassan BCR 0.49 0.00 100.00 Tender invited
Power Transformer at 17.11.18
66/11kV Mattanavile S/s in
Channarayapattana Taluk,
Hassan District

Juttanahally: Providing Spare


1x12.5MVA, 66/11kV Power
Transformer at 66/11k 213.14 &
10 CA1089 Hassan BCR 1.13 0.00 1.00 Tender invited on 06.03.2019
Juttanahally Sub-station in 17.11.18
Channarayapattana Taluk,
Hassan District
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Re-placement of
1x6.3MVA,66/11kV Power
transformer by 1x12.5MVA,
145.75 &
11 CA1090 66/11kV power Transformer Hassan BCR 0.86 0.00 10.00 To be tendered.
28.05.18
at 66/11kV Magge Sub
station in Alur Taluk, Hassan
District

Kulashekara: Providing
additional 1X20MVA, 110/11
KV Power Transformer at 251.85 &
12 CB1058 Dakshina Kannada BCR 1.31 0.00 50.00 DPR awaited.
110/33/11kV Kulashekar Sub- 17.11.18
Station in Mangaluru Taluk,
Dakshina Kannada District.

Muthinakoppa:Replacement
of 1X10MVA 110/11kV Power
Transformer by
266.30 &
13 CE1046 1x20MVA,110/11kV Chikkamagalur BCR 0.7 0.00 50.00 Tendered
06.09.18
Muthinakoppa substation
Narasimharajanagara
(N.R.Pur)Taluk.

Kammaradi:
Providing additional 1X10MVA
269.16 &
14 CD1068 110/11kVPower Transformer Shivamogga BCR 0.58 0.00 10.00 Tender to be invited.
20.09.18
at 110/11kV kammaradi sub-
station in thirthahalli Taluk
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Thirthahalli:
Replacement of 1X10MVA
Power Transformer by 289.64 &
15 CD1069 Shivamogga BCR 0.58 0.00 50.00 tendered
1x20MVA,110/11kV power 16.10.18
transformer at 110/11kV
Thirthahalli substation

Kandli:
Replacement of 2 X 8 MVA, 279.73 &
16 CA1091 66/11 KV power Transformer Hassana BCR 0.59 01.02.19 0.00 1.00 to be tendered
by 2 X 12.5 MVA @ Kandli
S/S in Hassana Taluk

Chikkakondagola:
Replacement of 1x12.5MVA by
1x20MVA Power Transformer 200.58 &
17 CA1092 Hassan BCR 0.69 0.00 1.00 to be tendered
at 66/11kV S/s 20.01.19
Chikkakondagola in Hassan
Taluk, Hassan District.

Rampura:
Augmentation of 1x6.3MVA,
66/11kV Power Transformer
141.01&
18 CA1093 by 1x12.5MVA, 66/11kV @ Hassan BCR 0.83 0.00 1.00 to be tendered
01.02.2019
66/11 kV Rampura S/s in
Channarayapatna Taluk,
Hassan District

Sagara:
Replacement of 1 x 10MVA
,110/33kV Transformer by
228.25
19 CD1072 1x20MVA, 110/33KV Shivamogga BCR 0.83 0.00 50.00 DPR to be approved
18.03.19
transformer at 110/33/11kV
Sagara Sub-Station in Sagar
Taluk, Shivamogga District.
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Mugulavalli: Providing
additional 1 x 8MVA
transformer at 220/66/11KV
20 CE1047 Chikkamagalur 0.00 10.00 Estimate submitted
Mugulavalli sub-station in
Chikkamagaluru Taluk &
District.

MRS Shivamogga: Providing 1


x 100MVA, 220/66KV
Transformer and construction 1916.98 &
21 CD1073 Shivamogga BCR 1.00 0.00 100.00 DPR to be approved
of 66kV Terminal Bays at MRS 08.04.19
Shivamogga sub-station in
Shivamogga Taluk & District.

Yagati:
Replacement of 1 x 10MVA,
110/11kV transformer by 1 x
20MVA, 110/11kV 300.29&
22 CE1048 Chikkamagalur BCR 0.61 0.00 10.00 To be tendered
Transformer at 110/11kV 25.01.19
Yagati sub-station in Kadur
Taluk, Chikkamagaluru
District.

C.R. Patna: Replacement of


existing 1x12.5 MVA 66/11 kV
Transformer by 1 x20 MVA,
66/11 kV Transformer at 204.36 &
23 CA1094 Hassan BCR 0.68 0.00 50.00
66/11 kV Channarayapatna 27.04.2019
sub-station in
Channarayapatna Taluk,
Hassan District

Singapura: Replacement of 1
x8MVA, 66/11kV Transformer
by 1 x 12.5 MVA, 66/11kV
140.49 &
24 CA1095 Transformer at 66/11kV Hassan BCR 0.63 0.00 1.00
09.04.2019
Singapura Sub-station in
Holenarasipura Taluk, Hassan
District.
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Hallymysuru: Replacement of
1 x 6.3 MVA, 66/11kV
Transformer by 1 x 12.5 MVA,
141.66 &
25 CA1096 66/11kV Transformer at Hassan BCR 0.82 0.00 20.00
16.04.2019
66/11kV Hallymysuru Sub-
station in Holenarasipura
Taluk, Hassan District.

Jade:Providing additional
1X10 MVA, 110/11 kV
Transformer at existing 288.28 &
26 CD1074 Shivamogga BCR 0.64 0.00 50.00
110/11 kV Jade Sub-station 08.04.2019
in Sorabs Taluk , Shivamogga
District.

Ripponpete: Providing
additional 1X10 MVA, 110/11
kV Transformer at existing 286.15 &
27 CD1075 Shivamogga BCR 0.64 0.00 50.00
110/11 kV Ripponpete Sub- 08.04.2019
station in Hosanagara Taluk ,
Shivamogga District.

27 Total of Augmentation 0.00 0.00 0.00 0.00 1116.00

Atthichowdenahally:
Providing 66kV LILO to 66kV
Channarayapatna-Malali line 154.75 & Tendered Published on
1 CA1088 Hassan 0.00 50.00
at66/11kVAttichowdanahally 17.11.18 06.03.2019
Substation with 66kV
Terminal Bay, CR patna Taluk
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Gendehally - Arehally:
Construction of 66kV DC line
from 66kV Arehalli Sub-
station to LILO the existing 444.11 &
2 CA1033 Hassana 0.00 0.00 0.00 200.00 NIT Issued
66kV SC line between Belur- 24.11.09
Gendehally Sub-station along
with two Nos of 66kV TB's at
66kV Arehalli Sub-station
S K Pura to Arehall:
Stringing of 2nd Circuit with
Coyote ACSR Conductor on
existing 66KV SC line onDC
towers between 66/11KV S/s
at Sakaleshpura and 66/11 857.92 &
3 CA1048 Hassana 0.00 0.00 100.00 Re tendered
KV S/s at Arehally with TB at 13.06.17
both Sakaleshpura and
Arehalli S/s.

Reconstruction of 66kV SC
line in existing corridor of
66kV SC MBT(FTS Mysuru-
Bhadra) line on DC towers
To be tendered
from Hassan to H.N.Pura and 2108.42 &
4 CA1071 Hassan 0.00 0.00 100.00
reconstruction of 66kV sC line 02.04.08
in the existing 110kV SC
SMT(Shimoga-Mysuru) line
corridor on DC towers from
HN Pura to Hootagalli
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Vitla Sub-Station :
Construction of 1 No. of
110KV Terminal Bay at
exiscting 110KV Vittla
substation for making LILO of 262.38&
5 CB1030 Dakshina Kannada 0.00 80.00 Tendered
the proposed 110KV Line from 28.03.18
existing 110KV Netlamandur-
Salethur SC Line for a
Distance of 0.55 with 110KV
MC towers.

Shimoga Station to 220kV


Kadur Station:
Construction of 110kV SBT-
2DC line on DC tower for a
distance of 60.281 kms in the
existing Corridor of 110 KV To be tendered
2134.06 &
6 CE1028 SBT-2 SC line from Chikkamagaluru 0.00 0.00 10.00
08.06.17
220/110/66/11 KV M.R.S
Shivamogga to 220/110/11KV
Kadur Station along with
Construction of 110KV TB at
220KV M.R.S Shivamogga and
220KV Kadur Sation
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Re-conductoring of the
existing Lynx conductor by
drake conductor of 110kV
Kemar-Hiriyadka-Mudabidare
DC line between Khemar 84.59&
7 CC1034 Udupi 0.00 70.00 Tendered
220kV substation and 28.05.18
Kuntalpady village limits (from
Loc 01 to Loc 16) for a
distance of 1.727Kms in
Karakala Taluk.

Linganamakki to Iduvani:
Re-construction of two
numbers of 110kV Dc lines
from iduvani limits to
Linganamakki power House in
566.76&
8 CD1067 the existing corridor of 110kV Shimoga 0.00 10.00 To be tendered
01.06.18
JLT-3&4 DC line(4.6 Kms) and
110kV LST-3 &4 DC line
(4.7Kms) using Lynx
conductor for a distance of
9.28kms in Shimoga District.

Balligavi limit to 110KV


anvatti MUSS :
Stringing of 110kV 2nd Circuit
using vacant cross arms of
existing 110kV DC towers
250&
9 CD1076 from balligavi limits to 110kV Shivamogga 0.00 10.00 To be tendered
05.02.19
Anavatti (Kotipura) substation
for a distance of about 27 Kms
along with construction of
110kV TB at 110kV
Anavatti(Koti Pura) S/S

9 Total of Lines 0.00 0.00 0.00 0.00 630.00


(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Kulashekar:
1) Re-arranging of existing
110kV lines at 110/33/11kV
Kulashekara S/S inview of
R&M works of S/S.
716.04 &
1 CB1022 2) R&M of 110/33/11kV Dakshina Kannada BCR 0.55 0.00 0.00 0.11 1.00 To be tendered.
18.02.11
Kulashekara S/S and
providing additional
1X20MVA, 110/33kV Tr at
110/33/11kV Kulashekara
S/S

Kavoor:
1948.23 &
2 CB1023 R & M Works at Kavoor 220kV Dakshina Kannada 0.00 0.00 1.00 To be tendered.
30.04.11
Station.

Formation of 220KV rigid bus 236.89 &


3 CC1028 Udupi 0.00 0.00 1.00 Revised DPR awaited.
at 220KV RS, Kemar 04.12.09

Formation of 110KV rigid bus 236.89&


4 CC1033 Udupi 0.00 0.00 70.00 Tender invited
at 220KV RS, Kemar 04.12.09

Chikkamagalur:
Providing of 2Nos. of 66kV
SF6 CB to Incoming lines from
220kV R/S Mugluvalli
211.33 &
5 CE1031 (Chikkamagalur) & 2Nos of Chikka-magalur 0.00 0.00 10.00 To be tendered
15.06.17
66kV SF6 CB to Incoming
lines from Bhadra including
2Nos. bay at Chikkamagalur
Sub-Station

5 Total of TB's & Others 0.00 0.00 0.00 0.11 83.00


46 Total of Hassana Zone 0.00 0.00 0.00 22.41 2734.00

MYSURU TRANSMISSION
ZONE
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Kampalapura: Establishing
1x8MVA, 66/11kV Sub- ES 1.067 & 562.89
1 DA1044 Mysuru 0.00 0.00 0.00 200.00 Approved in 70th TCCM
Station with associated line for BCR 1.29 13.06.17
a distance of 1.837Kms

Chamalapura (B.Seehalli):
Establishing 1x8MVA,
ES 1.152 & 618.08 & DPR Received, To be Re-
2 DA1118 66/11kV Sub-Station with Mysuru 0.00 0.00 200.00
BCR 1.29 06.03.17 Tendered.
associated line for a distance
of 3.835Kms

Arkalavadi:
Establishing 1x8MVA,
ES 2.10 & 736.13&
3 DD1047 66/11kV Sub-Station with Chamarajanagar 0.00 0.00 200.00
BCR 1.71 1.9.18
associated line for a distance
of 10.368Kms

Ajjipura: Establishing
Es 0.850 645.20 &
4 DD1053 1x8MVA, 66/11kV Sub- Chamarajanagara 0.00 200.00
BCR 0.98 20.09.18
Station with associated line.

Yerahally Hand post :


Upgadation of 33/11KV SS to
Es 1.130 699.18 & CESC Land Handed over to
5 DA1125 1x8MVA,66/11kV Substation Mysuru 0.00 200.00
BCR 1.22 11.12.18 KPTCL
at Yarahalli(handpost) with
associated line.

Talagawadi /
Nelamakanahally limits :
Establishing 1x12.5MVA, Es 1.946 781.35 &
6 DB1110 Mandya 0.00 100.00 DPR Approved
66/11kV Sub-Station at BCR 1.84 18.12.18
Talagavadi (Nelamakanahalli)
with associated line.

6 Total of Sub-stations 0.00 0.00 0.00 0.00 1100.00


(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Bhogadhi:
225.70 &
1 DA1091 Providing Spare 1x20 MVA Mysuru BCR 2.15 0.00 0.00 1.00 To be Tendered.
12.09.14
66/11kV Transformer

Jayapura:
Replacing 2nd 8MVA, 134.19 & Tender Evaluation under
2 DA1092 Mysuru BCR 0.74 27.09. 0.00 0.00 10.00
66/11kV by 12.5MVA, 27.09.14 process
14
66/11kV Transformer

KHB Colony:
Replacing 1x6.3MVA, 138.86 & Tender Evaluation under
3 DA1094 Mysuru BCR 0.89 0.00 0.00 10.00
66/11kV by 1x12.5MVA, 03.11.14 process
66/11kV Transformer

Hebbal :
Estimate submitted for inviting
Replacement of 2 X 12.5 MVA, 371.90 &
4 DA1099 Mysuru BCR 0.98 02.07. 84.18 146.48 230.66 0.00 10.00 tender to SEE, T(W&M)Circle,
66/11 KV Power Transformer 27.02.15
16 Mysueru on 07.07.2018.
by 2 X 20 MVA .

Mandya KIADB:
Replacing 1x12.5MVA,
272.30&
5 DB1106 66/11kV by 1x20MVA, Mandya BCR 0.53 0.00 0.00 10.00
21.11.17
66/11kV Transformers with
SWGs

Hanur :
Replacement of 1 X 8 MVA by 158.64 &
6 DD1042 Chamarajanagar BCR 1.05 0.00 0.00 10.00 To be tendered
1 X 12.5 MVA, 66/11kV 16.11.15
Transformer.

Madhuvanhalli :
Replacement of 1X6.3
MVA,66/11 KV Power 141.91 &
7 DD1054 Chamarajanagar BCR 0.74 0.00 10.00
transformer by 1X12.5 MVA, 08.06.18
66/11kV Power transformer at
Madhuvanhalli
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Yelandur :
Replacement of 1x 8
MVA,66/11 KV transformers- 149.29 &
8 DD1055 Chamarajanagar BCR 0.49 0.00 10.00
2 by 1X12.5 MVA,66/11kV 01.06.18
Power transformers at
66/11kV Yelandur S/s.

Antharasanthe: Providing
additional 1x8MVA, 66/11kV 228.85 &
9 DA1137 Mysuru BCR 0.74 0.00 10.00 NIT Issued
Power Tr at Antharasanthe 27.09.18
S/s

Bilikere:
Replacement of 1x8 MVA
161.53 &
10 DA1138 66/11kV Power Tr. By 1x12.5 Mysuru BCR 0.57 0.00 10.00 To be Tendered
03.09.18
MVA , 66/11kV Power Tr at
Bilikere S/s Hunsur Taluk

B.Matakere: Providing
additional 1x8MVA, 66/11kV
228.85 &
11 DA1139 Power Tr at 66/11kV Mysuru BCR 0.74 0.00 10.00 NIT Issued
29.09.18
B.Matakere S/s in H.D Kote
Taluk

Chidravalli :
Providing additional 1x8MVA
66/11KV Power Transformer 239.897
12 DA1140 Mysuru BCR 0.70 0.00 10.00 To be Tendered
at Chidravalli 66/11KVSub 22.10.18
Station in TN Pura Taluk &
Mysuru Dist.

Mirle: Providing additional


232.25 &
13 DA1141 1x8MVA, 66/11kV Power Trat Mysuru BCR 0.73 0.00 10.00 To be tenderd
20.09.18
66/11kV Mirle S/s .
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Nanjanagud:
Replacing 1st 1x12.5 MVA,
240.31 &
14 DA1142 66/11kV Tr. by 1x20 MVA Mysuru BCR 0.70 0.00 10.00 To be Tendered
18.07.18
66/11kV power Tr. At
66/11kV Nanajanagud S/s

Talakadu:
Replacement of 2x8 MVA
315.63 &
15 DA1143 66/11kV Power Transformer Mysuru BCR 0.59 0.00 10.00 DPR Approved;To be Tendered
27.10.18
by 2x12.5 MVA 66/11kV
Talakadu S/s

Chunchanakatte: Providing
additional 1x8MVA, 66/11kV 225.66 &
16 DA1144 Mysuru BCR 0.59 0.00 10.00 To be Tendered
at Chunchankatte S/s Power 03.02.18
Tr.

Bherya: Providing additional


1x8MVA, 66/11kV Power 231.09 &
17 DA1145 Mysuru BCR 0.792 0.00 10.00 To be Tendered
Transformer at 66/11kV 18.01.18
Bherya substation .

Suntikoppa: Providing
additional 1x8MVA, 66/11kV 235.19 &
18 DC1016 Kodagu BCR 0.62 0.00 10.00 NIT Issued
Power Tr at 66/11kV 11.10.18
Suntikoppa Sub station

Alur-Siddapura: Providing
additional 1x8MVA, 66/11kV 250.64 &
19 DC1017 Kodagu BCR 0.58 0.00 10.00 DPR approved; To be tendered
Power Transformer at 18.12.18
66/11kV Alur Siddapura.
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

DMG Halli :
Providing additional 1 X 8
MVA, 66/11 KV Power
20 DA1128 Mysuru 0.00 10.00 To be Tendered
Transformer at DMG Halli
66/11KV Sub Station in
Mysuru Taluk & Mysuru Dist.

Gejjaianavaddaragudi :
Replacement of 1 X 8 MVA,
21 DA1146 Mysuru 0.00 10.00
66/11 KV Power Transformer
by 1 X 12.5 MVA.

Sinduvallipura:Replacement
of 2x8MVA,66/11kV Power
Transformer by 2x12.5MVA,
22 DA1147 66/11kV Power Transformer Mysuru 304.57 0.00 1.00
at 66/11kV Sinduvallipura
Substation in Nanjangud
Taluk, Mysuru District

Thandya:Repl of 1x12.5MVA
by 1x20MVA Transformer at
238.05 &
24 DA1148 66/11kV Thandya sub-station Mysuru BCR 0.66 0.00 1.00
16.04.19
in Nanjanagudu Taluk,
Mysuru District.

Begur (66kV S/S):Repl of 2nd


8MVA, Transformer by
12.5MVA, Transformer at 142.10 &
25 DD1056 Chamarajanagara BCR 0.48 0.00 1.00
66/11kV Begur sub-station in 26.04.19
Gundlupet Taluk,
Chamarajanagara District.

24 Total of Augmentation 84.18 146.48 230.66 0.00 204.00


(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Hootagalli - Bherya Limits:


Replacing of H - Frames by Re-
1025.04
1 DA1051 construction of 66kV SC line Mysuru 22.04. 0.00 0.00 10.00 To be re-tendered
22.04.16
between Hootagalli - Bherya 16
Limits to a distance of 54 km

Bettadapura Sub-station:
Reconstruction of 66 kV SC
line on SC towers by LILO line
from existing 66 kV
Chunchanahatti-Kushalnagar 94.25 &
2 DA1059 Mysuru NA 0.00 0.00 1.00 To be Re- tendered
line to 66/11 kV Bettadapura 18.08.12
S/S for a distance of 2.457
km in Periyapatna
Taluk,Mysuru District for a
distance of 2.46 kms

Jayapura :
Providing additional 1 No. of
66 kV TB and LILO of
Kadakola - Sargur 66kV line
58.00 &
3 DA1060 by constructing additional Mysuru NA 0.00 0.00 1.00 To be Re- tendered
06.09.11
Circuit on existing towers for a
distance of 6.0 kms along with
Terminal Bay at Jaipura for a
distance of 6 kms

Hootgalli-Kanayanbetta upto
Bavali limit:
Re-Construction of 220kV
415.2 &
4 DA1080 Hootgalli-Kanayanbetta line Mysuru 0.00 0.00 10.00 To be Re- tendered
26.03.15
upto Bavali limit for a distance
of 81kms as per Southern
Grid instruction.
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

K R Nagar to
Chunchanakatte:
Re-Construction of existing
155.96 &
5 DA1081 66kV line between K R Nagar Mysuru 0.00 0.00 9.00 To be retenderd
23.11.15
Sub-Station to
Chunchanakatte Sub-Station
for a distance of 5.8kms

After commissioning of
220/66/11 KV Shivasamudra
(Hebbani) Station, the load of
Shimsha - Mandya:
malavalli muss and mandya
Construction of 66kV SC link 431.53 &
6 DB1024 Mandya NA 31.07. 346.87 0.00 346.87 42.29 1.00 load will be bifurcated and feed
line in the existing corridor for 13.10.09
10 from proposed 220 kv station for
a distance of 44.57KMs.
which fresh proposal for this
work will be submitted for
TCCM approval

Hampapura :
LILO of Kadakola -
Santhesaguru 66kV line by
constructing additional Circuit
on existing towers for a 60.57 &
7 DB1053 Mandya 0.00 0.00 10.00 To be tendered
distance of 6.5km along with 06.09.11
Terminal Bay at Hampapura
(HD Kote) for a distance of 6.5
kms

Anegola LILO:
Construction of 2nd circuit on
existing 66kV DC towers for a 74.09 &
8 DB1090 Mandya 0.00 0.00 10.00
distance of 2.965 Kms for 12.06.15
Making LILO arrangement to
Anegola Sub-Station
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Santhemaranahalli
Sub-station:
Providing 66kV LILO 154.78 &
9 DD1029 Chamarajanagara 0.00 0.00 10.00
arrangment to existing 20.01.15
66/11kV Santhemaranahally
S/s along with 1 No TB

Ramapura LILO:
Construction of 66kV 2nd
circuit line for a distance
1.5Kms. on existing D/C 56.27 &
10 DD1036 Chamarajanagara 0.00 0.00 10.00
towers for making LILO 20.11.14
arrangement to Ramapura
Sub-Station along with
Terminal Bay.

Kadaballi LILO: Running of


2nd Ckt on Existing 66kV DC
Tower from Tapping Point to 56.24&
11 DB1111 Mandya 0.00 1.00 DPR to be approved
Kadaballi S/s for a distance of 05.02.19
about 1.5 Kms with TB at
Kadaballi S/s

Seelanere LILO: Running of


2nd Ckt on Existing 66kV DC
Tower from Tapping Point to 62.74&
12 DB1112 Mandya 0.00 1.00 DPR to be approved
Seelanere S/s for a distance of 06.02.19
about 1.75 Kms with TB at
Seelanere S/s

Yattambadi LILO: Running of


2nd Ckt on Existing 66kV DC
Tower from Tapping Point to 56.68&
13 DB1113 Mandya 0.00 1.00 DPR to be approved
Yattambadi S/s for a distance 16.02.19
of about 1.5 Kms with TB at
Yattambadi S/s
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Kolakaranadoddi LILO:
Running of 2nd Ckt on
Existing 66kV DC Tower from
Tapping Point to 54.64&
14 DB1114 Mandya 0.00 1.00 DPR to be approved
Kolakaranadoddi S/s for a 05.02.19
distance of about 0.75 Kms
with TB at Kolakaranadoddi
S/s

Shivalli (V.C.Farm) LILO:


Running of 2nd Circuit on
existing 66KV DC tower from
94.61&
15 DB1115 Tapping Point to Shivalli Mandya 0.00 1.00 DPR to be approved
05.02.19
(V.C.Farm) S/s for a distance
of about 7.6Kms with TB at
Shivalli (V.C.Farm) S/s.

15 Total of Lines 346.87 0.00 346.87 42.29 77.00


45 Total of Mysuru Zone 431.05 146.48 577.53 42.29 1381.00
BAGALKOTE
TRANSMISSION ZONE

Banavasi:
Establishing 1x10MVA, 4.04/ 938.90 &
1 ED1008 Uttara Kannada 0.00 0.00 1.00
110/11kV Sub-Station with 2.59 21.09.17
associated line & TB.

Mughalkod: For the Year 18-19


Establishing 2x100MVA, Token Budget- Rs 1.00 Lacs
220/110kV & 1x10MVA, For the Year 19-20
6.84/ 13600.36&
2 EE1059 110/11kV Sub Station at Belagum 0.00 0.00 1000.00 budget of Rs. 5000lakh is
0.46 10.12.18
Mughalkod(Kabbur) village in sought as the work pertains to
Raibagh Taluk, Belagavi green energy corridar.
District
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

For theYear 18-19


Haliyal:
Token Budget of Rs 1.00 Lac (
Upgradation of 2x5MVA,
as DPR approved )
33/11kV Haliyal Sub Station 4.28 961.02 &
3 EE1127 Belagavi 0.00 100.00 Say Rs 1.00 Lac
to 2x10MVA, 110/11KV Sub- 3.06 16.11.18
For theYear 19-20
Station at Haliyal in Athani
Token Budget of Rs 1.00 Lac
Taluk, Belagavi district
Say Rs 10.00 Lac

Alnavara:
Up-gradiation of 2x5 MVA,
33/11KV Alnvara sub-station
3.730 1757.08 &
4 EB1033 to 2X10MVA, 110/11KV & Dharwad 0.00 100.00
1.81 01.10.18
1x20 MVA, 110/33 kV Sub-
station at Alnvara in Dharwad
Taluk, Dharwad District. .

Aaheri: Establishing 2 x 100


MVA 220/110kV sub station 5.3 10437.35 &
5 EG1062 Vijayapura 0.00 500.00
at Aaheri in sindagi Taluk 1.51 31.12.18
Vijayapura District.

Kambagi : Establishing
2x10MVA,110/11kV Sub-
7.9/ 927.4 &
6 EG1064 Station at Kambagi in Vijayapura 0.00 100.00
5.78 11.02.19
Vijayapura Taluk, Vijayapura
District.

Diggewadi: Private Land identified in


Establishing 1x10MVA, 1259.58& Diggewadi - Jalalpur Area
7 EE1136 Belagavi 6.93/3.57 0.00 1.00
110/11kV Sub-Station at 29.04.19 Land Purchased on 14.08.2018
Diggewadi in Raibagh Taluk .
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Land lease deed executed on


25.09.2018
AEQUS 220kV : Establishing ( For 15 acre 01 Gunta)
2x100 MVA, 220/110 kV sub- Additional For theYear 18-19
station at AEQUS SEZ 8499.5& Token Budget of Rs 1.00 Lac ( if
8 EE1137 Belagavi 1.15 0.00 1.00
premises Hattaragi in 26.03.19 DPR approved )
Hukkeri Taluk, Belagavi Say Rs 1.00 Lac
District For theYear 19-20
Token Budget of Rs 1.00 Lac
Say Rs 1.00 Lac

Jumnal: Establishing 2x10


MVA, 110/11kV sub-station 6.84 990.00&
9 EG1068 Vijayapura 0.00 1.00
at Jumnal in Vijayapura 4.69 11.03.19
Taluk, Vijayapura District.

9 Total of Sub-stations 0.00 0.00 0.00 0.00 1804.00

Gadag:
Providing additional 4th
786.94 &
1 EC1019 1x100MVA, 220/110kV Gadag BCR 2.3 0.00 0.00 100.00
29.12.16
Transformer at 220kV Gadag
station in Gadag Taluk

Konnur:
Providing additional
281.4&
2 EC1022 1X10MVA, 110/11kV Power Gadag BCR 0.59 0.00 0.00 50.00
17.06.17
Transformer at 110kV Konnur
S/s.
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Shiragaon : For theYear 18-19


Replacing 1x10MVA, 286.82& Token Budget - Rs 10.00 Lacs
3 EE1123 Belgaum BCR 0.45 0.00 0.00 50.00
110/11kV by 1x20MVA, 26.05.17 For theYear 19-20
110/11kV Transformer Token Budget - Rs 10.00 Lacs

Hirebagewadi: For theYear 18-19


Augmentation of 10 MVA Token Budget - Rs 10.00 Lacs
295.05&
4 EE1124 ,110/11 KV by 20 MVA, Belgaum BCR 0.44 0.00 0.00 50.00 For theYear 19-20
30.05.17
110/11 KV Power Transformer Budget of 150lakh sought
at 110 KV S/S Hirebagewadi exculding cost of the
transformer.

Bagalkot:
728.87&
5 EF1068 3rd 1x100MVA Transformer at Bagalkot BCR 1.99 0.00 0.00 100.00 DPR cost requested for 2019-20.
18.01.18
220/110KV Bagalkote S/s

110 kV S/S Bisnal : Creating


33 kV reference by installing
1x20 MVA, 110/33 kV 320.29&
6 EF1069 Bagalkot BCR 0.87 0.00 0.00 0.00 320.00 DPR cost requested for 2019-20.
transformer at 110 kV Bisnal 31.10.17
sub-station, in Bilagi Taluk,
Bagalkot District

Muddebihal:
Providing additional 179.3 &
7 EG1035 Bijapur BCR 1.09 0.00 5.75 50.00 DPR cost requested for 2019-20.
1x10MVA, 110/33kV 14.10.10
Transformer

Zalaki:
Replacement of 10MVA, 256.11 &
8 EG1052 Bijapur BCR 1.35 0.00 0.00 50.00 DPR cost requested for 2019-20.
110/11kV by 20MVA, 05.11.15
110/11kV Transformer

Chadachan:
Providing additional 287.07 &
9 EG1053 Bijapura BCR 0.58 0.00 0.00 50.00 DPR cost requested for 2019-20.
1x10MVA, 110/11kV 16.02.17
Transformer
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Katkol: Replacement of For theYear 18-19


1x10MVA, 10/11 KV by 20 Token Budget of Rs 1.00 Lac
MVA, 110/11 KV Power BCR 0.4 298.07 & Say Rs 1.00 Lac
10 EE1128 Belagavi 0.00 1.00
Transformer by 1x20MVA, 10.09.18 For theYear 19-20
110/11KV Power transformer Token Budget of Rs 1.00 Lac
at 110/33/11 KV S/S Katkol. Say Rs 1.00 Lac

110 KV S/S Yalapharatti


Creating 33 KV reference by For theYear 18-19
providing 1X20 MVA ,110/33 336.89 & Token Budget of Rs 1.00 Lac
11 EE1129 Belagavi 0.00 50.00
KV Transformer at 0.76 29.09.18 For theYear 19-20
Yalapharatti Sub station in Token Budget of Rs 1.00 Lac
Raibag Taluk, Belagavi Dist

110 KV S/S Yalapharatti :


Replacement of 1x10 MVA, Additional For theYear 18-19
110/11kV transormer by 1x20 Token Budget of Rs 1.00 Lac
296.89 &
12 EE1130 MVA, 110/11 KV transformer Belagavi 0.4 0.00 50.00 For theYear 19-20
12.10.18
at 110 kV Yalaparahatti sub- Token Budget of Rs 1.00 Lac
station, in Raibag Taluk,
Belagavi District.

110 KV Udyambagh
Creating 33 KV Reference by For theYear 18-19
providing additional 1X20 Token Budget of Rs 1.00 Lac
202.99
13 EE1131 MVA 110/33 KV Transformer Belagavi 1.37 0.00 50.00 For theYear 19-20
27.08.11
at 110 KV Udyambagh Sub Token Budget of Rs 1.00 Lac
Station in Belagavi Taluk,
Belagavi Dist
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

110 KV S/S Sadalaga


Providing spare 1X10 For theYear 18-19
MVA,110/11 KV Power Token Budget of Rs 1.00 Lac
203.61
14 EE1132 Transformer at existing Belagavi 0.00 10.00 For theYear 19-20
16.10.18
110/11 KV Sadalaga Sub - Token Budget of Rs 1.00 Lac
Station in Chikkodi Taluk,
Belagavi Dist

For theYear 18-19


220 KV Chikkodi
Token Budget of Rs 1.00 Lac
Providing 3rd 100 MVA ,at
Say Rs 1.00 Lac
220/110 KV power
886.14 & For theYear 19-20
15 EE1133 transformer at existing Belagavi 1.52 0.00 400.00
15.10.18 Budget ( Tender Cost excluding
220/110/11kV Chikkodi
Trf Cost ) of Rs 400.00 Lac
Sub Station in Chikkodi
Say Rs 400.00 Lac
Taluk, Belagavi District
Replaced Tr. Is already diverted.

Hosa Honnatti: Providing


Addl 1X10MVA, 110/11KV
Trfr at existing 110/11KV 286.45 &
16 EA1025 Haveri 0.58 0.00 50.00
Hosa Honnatti Sub station in 10.08.18
Ranebennur Taluk, Haveri
District.

110 kV S/S Tumminakatti :


Creating 33 kV reference by
Providing 1x20 MVA, 110/33
kV Power transformer at 336.04&
17 EA1026 Haveri 0.96 0.00 150.00
existing 110/11 kV 15.10.18
Tumminakatti sub-station, in
Ranebennur Taluk, Heveri
District
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Tiluvalli: Augmentation of
1X10MVA, 110/11KV Power
Tr by 1X20MVA, 110/11KV
248.06 &
18 EA1027 Power Tr at 110/33/11KV Haveri 0.63 0.00 50.00
22.10.18
Tiluvalli Sub station in
Hanagal Taluk, Haveri
District.

Hirehal :Interchanging of
1X20MVA,110/33kV Power Tr
at existing 110/33/11kV
24.87 &
19 EC1023 RON Sub-station and Gadag 0.00 10.00
30.10.18
1X10MVA,110/33kV Power Tr
at 110/33/11kV Hirehal S/S
in Ron Taluk, Gadag District.

Mundargi:Replacement of
1X10MVA,110/11kV Trf by
1X20MVA,110/11kV Trf at 280.58 &
20 EC1024 Gadag 0.55 0.00 150.00
110/33/11kV Mundargi S/S 10.08.18
in Mundargi Taluk, Gadag
District.

Sambapur Road: Providing


spare 1X20MVA, 110/33-
11KV Power Tr at existing
291.03 &
21 EC1025 110/11KV Sambapur Road Gadag 0.00 50.00
02.11.18
Sub station in Gadag Taluk,
Gadag District instead of
110kV Mundaragi station
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Muddebihal:Replacement of
1x10MVA, 110/11kV
transformer by 1x20MVA
290.40 &
22 EG1058 110/11kV transformer at Vijayapura 0.53 0.00 50.00
25.10.18
110kV Muddebihal substation
in Muddebihal taluk,
Vijayapura District.

Tikota: Replacement of 1x10


MVA, 110/11 kV transformer
by 1x20 MVA, 110/11 kV 315.39
23 EG1059 Vijayapura 0.48 0.00 150.00
Transformer at 110 kV Tikota 17.11.18
sub-station, in Vijayapura
Taluk, Vijaypura District.

Almel: Replacement of 1x10


MVA, 110/11 kV transformer-
1 by 1x20 MVA, 110/11 kV 202.18 &
24 EG1060 Vijayapura 0.79 0.00 60.00
transformer at 110 kV Almel 03.11.18
sub-station in Indi Taluk
Vijayapura District.

Jambagi K.D.: Providing


additional 1x10 MVA, 110/11
278.75 &
25 EF1070 KV Transformer at 110 KV Bagalkote 0.43 0.00 150.00
01.09.18
Jambagi K.D. S/S in Mudhol
Tq. Bagalkot Dist.

Aski :Creating 33kV reference


by providing 1 x 20 MVA,
110/33 kV power 274.56 &
26 EG1063 Vijayapura 0.56 0.00 50.00
transforemer at 110kV sub- 31.1.19
station Aski in Sindagi Taluk,
Vijayapura district
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

110 KV Taushi
Creating 33kV reference by
providing 1x20MVA,110/33 356.6&
27 EE1138 Belagavi 0.72 0.00 250.00
KV Power Transformer at 18.1.19
110kV Taushi(Balligeri) S/s in
Athni Taluk.

Replacement of 1X10MVA,
110/33KV Tr by 1X20MVA,
110/33KV Tr at 110KV 203.11&
28 EC1026 Gadag 0.85 0.00 1.00
Dambal Sub station in 26.12.18
Mundaragi Taluk, Gadag
District.

110 kV S/S Aremallapura :


Providing additional 1x10
MVA, 110/11 kV transformer 325.3&
29 EA1028 Haveri 0.46 0.00 1.00
at 110 kV Aremallapura sub- 26.12.18
station, in Ranebennur Taluk,
Haveri District

Uchagaon: Creating 33kV


reference by providing 1x20
MVA, 110/33kV transformer
379.03&
30 EE1139 along with 33kV bank & Belagavi 0.85 0.00 1.00
09.01.19
feeders bay at 110 kV
Uchagaon Sub-station in
Belagavi Taluk & District

Vijayapur: Providing
additional 1x10MVA,
110/11kV Power Transformer 278.03&
31 EG1065 Vijayapura 0.55 0.00 1.00
at 220/110/11 KV Vijayapur 21.03.19
Sub-statuib ub vijayapur
Taluk and District.
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Hiremasali: Providing 1x10


MVA, 110/11kV Power
transformer along with
287.19&
32 EG1066 1/C+5F+1AP3 switchgear at Vijayapura 0.53 0.00 1.00
24.01.19
110kV Hiremasali sub-station
in Indi Taluk & Vijayapur
District

Belagavi: Providing additional


3rd 100MVA 220/110kv
transformer along with other
renovation & modernisation 2227.42&
33 EE1140 Belagavi 0.56 0.00 1.00
works at existing 01.03.19
220/110/11kV Belagavi sub-
station in Belagavi Taluk &
District

BISNAL :Providing additional


1X10 MVA, 110/11 kV power
transformer along with 11kV 289.17 &
34 EF1071 Bagalkote 0.41 0.00 1.00
switchgears at existing 110/11 09.04.18
kV Bisnal Sub-station in Bilagi
Taluk , Bagalkot District

Augmentation of 1X10 MVA,


110/11kV power transformer
by 1X20 MVA, 110/11kV
289.27 &
35 EF1072 power transformer at Bagalkot 0.4 0.00 1.00
16.4.19
110/11kV Kaladagi sub-
station in Bagalkot Taluk and
District.
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Augmentation of 1X10 MVA,


110/11kV power transformer
by 1X20 MVA, 110/11kV
306.9 &
36 EF1073 power transformer at Bagalkot 0.4 0.00 1.00
27.4.19
110/11kV Uttur sub-station
in Mudhol Taluk and
Bagalkot District.

Babaleshwar : Augmentation
of 1X10 MVA, 110/11kV
power transformer-II by
1X20 MVA, 110/11kV power
294.56
37 EG1067 transformer along with 1I/C + Vijayapura 0.52 0.00 1.00
/30.4.19
6F + 1CB at 110 kV
Babaleshwar sub-station in
B.Bagewadi Taluk, Vijayapur
District.

37 Total of Augmentation 0.00 0.00 0.00 5.75 2561.00

220kV SRS Hubli -220kV


Haveri Station:
Conversion of existing S/C
line on /SC Towers to SC line Dharwad / Haveri / 2218.56&
1 EB1032 0.00 0.00 2000.00
on DC towers from UK 28.03.18
220/110kV SRS Hubli R/S to
220/110kV Haveri Station for
a length of 78Kms
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

110KV Kawalwad-Hubli Line:


Replacing of Exisisting
Dog/Wolf conductor by Lynx
Conductor of 110kV NK1 &
NK2 Line from 110kV
869.92 &
2 EB1029 Kavalavad S/s 220kV SRS Dharwad 0.00 0.00 0.00 1.00
15.04.15
Hubali S/s for a distance of
32kms along with
strenghthening of line by
replacing weakened Towers for
a distance of 32Kms

Gadag-Naregal-Ron:
Conversion of 110kV SC line
to DC line from 220kV Gadag
S/s to 110kV Naregal S/s
3 EC1017 and Stringing of 110kV 2nd Gadag 1194.72 & 0.00 0.00 250.00
Circuit from 110kV Naregal 19.03.15
S/s to 110kV Ron S/s for a
distance of 28.57 &
16.795Kms

Jog-Sirsi:
Replacement of Existing
Towers Dog/Coyote Conductor
by new towers and Lynx Shivamogga/Uttar
4 ED1019 1534.87 & 0.00 0.00 1.00
Conductor of 110kV NK1 & Kannada
02.02.15
NK-2 DC line form MGHE PH
Jog to 110kV Sirsi S/s for A
distance of 49.71 Kms

Sirsi and Kavalawada line


Replacement of 110kV
Dog/coyote ACSR conductor
1560.53 &
5 ED1020 by Lynx conductor of NK-1 North Canara 0.00 0.00 1.00
15.05.14
and NK-2 lines between Sirsi
and Kavalawada for a distance
of 67.376Kms
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Ambewadi - Kawalwad Line:


Replacement of Dog / Wolf
conductor 110kV NK-1 & 2
Uttar 879.91 &
6 ED1025 Line between Ambewdai and 0.00 0.00 1.00
Kannada 24.12.16
Kawalwad by Lynx conductor
along with line strengthning
by replacing weakened towers

Mudhol Tap line:


Conversion of existing 110kV
88.16 &
7 EF1049 Mudhol tap line to D/C line Bagalkote 0.00 0.00 1.00
17.05.14
along with 1 TB for a distance
of 1.176kms.

B.Bagewadi - Shahabad-
Moratagi line :
Replacement of MS towers by
GI towers along with
conductor of 110KV and
B.Bagewadi - Shahabad DC
Line from 220kV S/S
B.Bagewadi upto 110KV 3187.58 &
8 EG1061 Vijayapura 0.00 300.00
Moratagi Sub Station 18.12.18
(Loc.No194 to 415) in
Vijayapura Taluk, Vijayapura
District and Conversion of
110KV tap line of 110KV
Sindagi Sub Station to LILO
arrangement in Sindagi Taluk,
Vijapura District.
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

110kV Mahalingpur –
Athani: Conversion of 110 KV
SC Line on SC Towers
(Partially MS and Partially GI)
Bagalkote & 1273.1 &
9 EE1134 to new SC line on DC towers of 0.00 100.00
Belagum 09.01.19
110kV Mahalingpur - Athani
SC line from Loc No-1 to 117
for a distance of 33.184 Km in
Bagalkot and Belagavi Dist

Tarihal Akshaya Colony:


Construction of 110 kV link
line between 110 kV Tarihal
and 110 lV Akshaya Colony 4236.16 &
10 EB1034 Dharwad 0.00 100.00
sub-stations using 110 kV 23.02.19
EHV 630 sq.mm UG cable for
a distance of 7.922 kms along
with TBs at Hubli Taluk.

Construction of 110 KV SC
Link Line on DC Towers
between proposed 110 KV 463.88 >Proposed to be completed
11 EE1141 Belagavi -- 0.00 1.00
Shiraguppi and existing 110 09.01.19 subject to award
Kagwad Sub Station in Athani
taluk
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Mahalingapura-Kudchi:
Conversion of 110kV SC line
on SC towers to new SC line
on DC towers in the existing
corridor from Loc 07 to Loc 90 986.64 &
12 EE1142 Belagum 0.00 1.00
of 110 KV Mahalingapura- 22.02.19
Kudchi line for a distance
27.205 Kms in Jamakhandi &
Athani Taluks of Bagalkot &
Belagam Districts.

12 Total of Lines 0.00 0.00 0.00 0.00 2757.00

Mundaragi Sub-station:
Providing 1No of 110kV TB at
37.73 &
1 EC1013 Mundaragi station for Gadag 0.00 6.03 6.03 11.56 38.00
26.10.11
providing independent control
to 110kV Betagera Line.

For theYear 18-19


Token Budget of Rs 1.00 Lacs
Chikkodi 220kV R/S:
Say Rs 1.00 Lacs
Construction of 2 Nos of
362.32 &
2 EE1093 220kV TBs at 220kV Chikkodi Belagum 0.00 0.00 0.00 300.00
01.01.14 For theYear 19-20
S/s for Terminating 220kV
Budget DPR Cost- Rs 362.00
Ghataprabh-Chikkodi DC line.
Lacs
Say Rs 362.00 Lacs

2 Total of TB's & Others 0.00 6.03 6.03 11.56 338.00


60 Total of Bagalkote Zone 0.00 6.03 6.03 17.31 7460.00
KALABURAGI
TRANSMISSION ZONE
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Bayappur: Upgradation of 2x5


MVA, 33/11kV sub-station to
2x10 MVA, 110/11kV sub-
station at Bayapur by
constructing 110 kV SC line
on DC towers for a distance of ES 2.50 1286.94&
1 FA1054 Raichur 0.00 0.00 50.00
14.450 Kms and by BCR 1.44 17.12.18
constructing 110KV terminal
bay at 110/33/11 KV sub-
station at Mudgal in
Lingasugur Taluk, Raichur
District.

Ghanagapura:
Establishing 2x100MVA,
6911.68 & DPR approved ,tender under
2 FC1050 220/110/11kV Station with Kalaburagi BCR2.83 0.00 0.00 5.00
25.05.17 process
associated 220kV and 110kV
lines.

Kalaburagi switching station


- 400kV: ES 55.120 47401.63&
3 FC1052 Kalaburagi 0.00 0.00 5.00
Establishment of 400/220 kV BCR 1.10 09.03.18
Sub Station at Kalaburagi

Manhalli:(Yakatpur)
Up-gradation of 3x5MVA,
33/11kV Manhalli sub-station ES 3.386 1286.65 &
4 FE1022 Bidar 0.00 100.00
to 2x10MVA, 110/11KV Sub- BCR 1.82 06.12.18
Station at Manhalli(Yakatpur)
in Bidar Taluk, Bidar District.

Gandhinagar : Establishing
1x10MVA, 110/11kV Sub-
ES 1.390 870.66 & Approved in 75th TCCM dated
5 FA1058 Station at Gandhi nagar in Raichur 0.00 50.00
BCR 1.14 14.01.19 4.11.2017
Sindhanur Taluk, Raichur
District.
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Chilkmukhi:Up-gradation of
2x5 MVA, 33/11KV S/s to
2x10 MVA, 110/11kV S/s
with construction of 110kV ES 2.160 1302.04 & Approved in 74th TCCM, Dated:
6 FD1038 Koppal 0.00 10.00
line from existing 110kV BCR 1.25 16.02.19 20.06.2017.
Bevoor S/s for a distance of
12.709kms in Koppal Taluk &
District.

Jawalgera:Establishing
1x10MVA, 110/11kV Sub-
ES 1.204 606.96 &
7 FA1059 Station at Jawalagera in Raichur 0.00 25.00
BCR 1.48 22.02.19
Sindhanur Taluk, Raichur
district.

Hiresindhogi:
Upgradation of 2x5 MVA ES 2.610 1164.46 & Approved in 74th TCCM, Dated:
8 FD1039 Koppal 0.00 10.00
33/11kv S/S to 2x10MVA BCR 1.66 18.03.19 20.06.2017.
110/11kV S/S

Valaballari
Upgradation of existing
2X5MVA 33/11KV to
2X10MVA 110/11KV Sub-
ststion at Valaballari by
ES 2.720 1586.07&
9 FA1060 Constructing 110KV Raichur 0.00 25.00
BCR 1.24 23.02.19
Sindhnoor- Raichur Line -2
and constructing 110KV DC
line on DC Towers for a
distance of 15.142 Kms in
Sindhnoor Tq, Raichur Dist

9 Total of Sub-stations 0.00 0.00 0.00 0.00 280.00


(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Manvi:
Enhancement of 1x10MVA by
1x20MVA 110/11KV Power Budget for FY-2019-20
Transformer at 110KV S/S 213.52& Tfr cost : 160.73 Lakhs
1 FA1051 Raichur BCR 0.80 0.00 10.00
Manvi and providing 3 Nos of 16.4.18 Erection cost: 17.79 Lakhs
1x1000Sqmm XLPE cable to Total :178.52 Lakhs
11kV bank II at 110/11kV
manvi station

66/11KV S/S Ujjini:


Construction of new control
room building along with
shifting of equipments from
existing control to the
proposed control with
131.46 &
2 FB1092 providing protection for the Bellary NA 0.00 0.00 10.00 4 Lakhs to be Surrendered
28.03.18
existing equipment .
Providing LILO arrangement
for 66KV incoming Line (66KV
Kottur-Kudigi-Ujjini) along
with Constuction of TB at
Ujjini.

Budget for FY-2019-20


Venkatapura: Repl of Tfr cost: 117.13 Lakhs
1X8MVA by 1X12.5MVA, 155.46 & Switchgear: 5.3 Lakhs
3 FB1094 Bellary BCR 0.56 0.00 0.00 5.00
66/11KV Trf at 66/11KV S/S 03.04.18 Erection cost:13.15 Lakhs
Venkatapura Total : 135.63 Lakhs Rs. 10.00
Lakhs to be surrendered.
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Hampasagara: Enhancement
of 1X6.3MVA, 66/11KV Power Budget for FY-2019-20
Transformer by 1X12.5MVA, Tfr cost : 117.13 Lakhs
151.78 &
4 FB1098 66/11KV Power Transformer Bellary BCR 0.82 0.00 5.00 Switchgear: 4.30 Lahs
01.06.18
at 66/11KV Hampasagara Erection cost:10.97 Lakhs
Sub-station in H.B.Halli Total : 132.43 Lakhs
Taluk, Bellary District.

Yedrami:
Replacement of 1 x 10 MVA
110/33 KV Transformer by 1 196.66 &
5 FC1059 Kalaburagi BCR 1.190 0.00 0.00 5.00
x 20 MVA 110/33 KV 20.03.17
Transformer at 110 kv
Yedrami Sub-Station

Creating 33 KV reference by
providing additional 1 x 20
MVA 110/33kV Transformer
379.12 &
6 FC1061 along with construction of Kalaburagi BCR 1.187 0.00 0.00 0.00 100.00
03.07.17
33kV Terminal Bay at 110/11
kv Kalaburagi (South) Sub-
Station

Providing additional 1x10MVA,


110/33kV Power Transformer 287.72 & Approved in 75th TCCM,Dtd:
7 FC1063 Kalaburagi BCR 0.76 0.00 5.00
at 110/11kV Mandewal Sub 18.01.18 04.11.2017.
Station.

Koppal:
Providing spare 20 MVA,
287.27 &
8 FD1033 110/33/11 kV Power Koppal 0.00 0.00 5.00
01.04.19
Transformer at 110 kV S/S
Koppal
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Budget for FY-2019-20


Venkatagiri : Enhancement of
Tfr cost : 160.73Lakhs
1X10 MVA, 110/11kV Power
267.46& switchgear : 32.0 Lakh
9 FD1035 Transformer by 1X20 MVA Koppal BCR 0.62 0.00 0.00 5.00
16.04.18 Erection cost:37.28 Lakhs
110/11kV Power Transformer
Total : 230. Lakhs
at 110/11kV S/s Venkatagiri.

Enhanncement of 10MVA,
110/11kV power Transformer
NGEF Make by 20MVA,
279.13 &
10 FD1036 110/11KV POWER Koppal BCR 0.55 0.00 0.00 5.00
09.01.19
Transformer at
110/33/11kVkV MUSS
Koppal in Koppal Tq, District.

110KV Sriramnagar: Budget for FY-2019-20


Replacement of 1X10 MVA, Tfr cost : 160.73Lakhs
110/11kV by 1x20MVA 265.75 & switchgear : 32.34 Lakh
11 FD1037 Koppal BCR 0.60 0.00 0.00 5.00
110/11KV Power Transformer 03.06.17 Erection cost:37.28 Lakhs Total
at 110/11kV Sriram Nagar : 230.35 Lakhs
S/s.

Enhancement of 1x10MVA,
110/11kV Power Transformer
294.34&
12 FF1005 No. 1 by 1x20 MVA 110/11kV Yadgir BCR 0.76 0.00 0.00 5.00
21.02.18
Power Transformer at
110/11kV Shorapur.
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Enhancement of
1x10MVA,110/33kV power
transformer No.III by 207.60&
13 FF1006 Yadgir BCR 1.1 0.00 0.00 5.00
1X20MVA 110/33kV Power 12.02.18
Transformer at 110/33/11
kV Shahapur S/S

66KV S/S Huvina Hadagali:


Enhancement of 1x6.3MVA
66/11kV Power Transformer-
153.68&
14 FB1099 III by 1x12.5MVA 66/11kV Bellary BCR 0.81 0.00 1.00
28.06.18
Power Transformer at
66/11kV Huvinahadagali
S/s.

110/11kv Chidri :Re-


placement of 1x10MVA,
110/11kV Power Transformer- 287.81&
15 FE1021 Bidar BCR 0.45 0.00 50.00
1 by 1x20 MVA, 110/11kV 30.07.18
Power Transformer at
110/11kV Chidri S/s .

Sanklapura-Providing Spare
1x10MVA ,110/33-11kV 238.81 &
16 FB1101 Bellary BCR 0.845 0.00 1.00
Transformer at 110/11kV 21.06.18
Sanklapura.

Bellary( North) :Providing


Spare 1x10MVA, 110/33-11
Power Transformer at existing 235.71 &
17 FB1100 Bellary BCR 0.857 0.00 1.00
110/11kV Bellary(North) Sub- 27.06.18
Station in Hospet taluk,
bellary District.
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Mukunda:
Replacement of 1x10MVA by
228.00 &
18 FA1061 1x20MVA 110/11KV Power Raichur BCR 0.69 0.00 10.00 DPR Approved
19.01.19
Transformer at 110KV S/S
Mukunda

Turvihal:
Providing additional 1x10MVA
271.38 &
19 FA1062 ,110/11KV Power Raichur BCR 0.57 0.00 10.00
24.01.19
Transformer at 110KV S/S
Turvihal.

Kanakagiri:
Augumentation of 1x10 MVA
110/11kV Power Transformer -
227.52 &
20 FD1040 2 by 1x 20MVA 110/11KV Koppal BCR 0.69 0.00 5.00
26.03.19
power Transformer at
110/33/11kV Sub-station,
Kanakagiri

20 Total of Augmentation 0.00 0.00 0.00 0.00 248.00

Alipur to Bellary(South):
Stringing of 110kV 2nd Circuit
on exisitng DC towers from ES 0.3 51.95 &
1 FB1057 Bellary 0.00 0.00 0.00 1.00 DPR approved
Alipur Station to Bellary BCR 1.62 13.08.12
(South) Sub-Station for a
distance of 8.00 Km.
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

a) Construction of 110KV LILO


line to 110/11KV Kamalapura
sub-station on the existing DC
towers from the tapping point
for a distance of 5.8Kms along 86.33 &
2 FB1096 Bellary 0.00 1.00
with Construction of 110KV 18.05.18
terminal bay at existing
110/11KV Kamalapura sub-
station in Bellary Taluk and
District.

a) Construction of 110KV LILO


line to 110/11KV Bisilahalli
sub-station on the existing DC
towers from the tapping point
for a distance of 1.906Kms 57.37&
3 FB1097 Bellary 0.00 1.00
along with Construction of 21.04.18
110KV Terminal Bay for the
proposed line to 110KV/11KV
Bisilahalli Substation in
Bellary Taluk & District.

Jewargi Sub-station:
Construction of 110kV LILO
line from existing Shahabad-
128.83 &
4 FC1051 Shahapur line to 110/33- Kalaburagi 0.00 0.00 10.00
16.06.17
11kV Jewargi sub-station in
the existing corridor for a
distance of 0.86Kms
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

Betagera to proposed 220kV


Station at Koppal:
Construction of 110kV SC line
on DC towers from proposed
220/110/11kV
1029.46 & Budget to be surrendered for FY
5 FD1030 Halavarthy(Koppal) S/s to the Koppal 0.00 0.00 10.00
07.06.17 18-19 Rs. 9.0 Lakhs
existing 110/33/11kV
Betagera S/s for a distance of
23.836Kms along with
construction of TB's at both
end

Construction of 110KV LILO


line to 110KV Somasamudra
S/s on the existing D/c tower
from the tapping point 110KV Estimates ( Cost Rs. 101.60 )
112.58 &
6 FB1102 Allipura-Ballari(North) Line Bellary 0.00 5.00 submitted for techincal sanction
09.04.19
for a distance of 4.1KM .
pertaining to TLM Sub-
Division Munirabad in TL&SS
Division Munirabad.

Construction of 2nd circuit


line from 220/110/11kV
Shahapur S/s to
110/33/11kV Khanapur S/s 446.20 & Approved in 74th TCCM,Dtd:
7 FF1007 Shahapur 0.00 5.00
on existing DC tower for a 15.03.19 20.06.2017.
distance of 19.261 Kms along
with Construction of TB at
both ends.

Conversion of existing 400kV


SC line to 400KV DC Quad
As per DPR Report included in
Moose line between BTPS ( 62964.14 &
8 FB1103 Ballari 0.00 10.00 APW 12-13 with work code
Excluding Jindal LILO line) 12.10.12
FA1035(b)
to Guttur around for a route
length of 137 Kms.
(Rs. In Lakhs)
Cost of
Cost of Cum Exp
Energy Deptly.
Sl. Original / Date of Cost of Total up to Budget
Work Code Name of the Work District Savings & Supplied Remarks
No. Revised LOI DWA Work Cost 31/03/19 2019-20
BCR Materials &
DPR & Date
others

8 Total of Lines 0.00 0.00 0.00 0.00 43.00

Munirabad Power House


Station:
Shifting of exisiting Control
1 FD1021 Room at 220kV Munirabad Koppal 315.78 & 0.00 0.00 1.00 10.00
Power House to existing work 06.07.13
shop building at 220kV
Munirabad Power House yard

Guddadahalli:
Providing Bus Bar protection
to 220kV KPTCL Bays at 160.37 &
2 FD1031 Koppal 0.00 0.00 10.00
400/220kV, Guddadahalli, 26.09.17
PGCIL Sub-station in Koppal
Taluk and District

2 Total of TB's & Others 0.00 0.00 0.00 1.00 20.00

39 Total of Kalaburagi Zone 0.00 0.00 0.00 1.00 591.00

364 Total of List-III for All Zones 8410.33 292.26 8702.59 603.01 21325.00
List-IV : Projects which have been cleared
either by Technical Advisory
Committee/Technical
co-ordination committee but administrative
sanctions are still to be obtained.

Sl.
Name of the Work District
No.

BENGALURU TRANSMISSION ZONE

Establishing 2x100 MVA, 220/66 kV sub-station at


1 Kolar
Srinivasapura in Kolar District.

Establishing 2x8 MVA, 66/11 kV sub-station at


2 Kodambally in Channapatna Taluk, Ramanagar Ramnagar
District.

Establishing 2 X 500 MVA, 400/220kV Dommasandra


GIS station, at Dommasandra, Bengaluru with revised
400 kV scheme and associated 220kV evacuation lines
3 along with additional 400 kV incoming line to proposed
3 X 500 MVA, 400/220kV Mylasandra sub-station
(Revised scheme for 75th TCCM appoval held on
04.11.2017).
Ratification to 69th TCCM proposal held on
17.08.2016): Establishing 220/66 kV sub-station in
the premises of existing 66/11 kV sub-station at
Nelamangala, Bengaluru Rural District
AND
4
Modification to the proposal approved in 70th TCCM
held on 20.12.2016:- Conversion of existing 66KV SC
Coyote line to DC Drake line between 66/11KV
Nelamangala sub-station to 66/11KV MEI sub-station –
Modification in scheme.
Establishing 2x 31.5 MVA, 66/11 kV sub-station at
Bengaluru
5 Sorahunse in Bengaluru East Taluk, Bengaluru Urban
Urban
District
Establishing 2x8MVA, 66/11kV Sub-Station at
6 Kolar
Rayalapadu in Srinivasapura Taluk, Kolar District

Establishing 1x12.5MVA, 66/11kV Sub-Station at Chikkaballapu


7
Guluru in Bagepalli Taluk, Chikkaballapura District ra
Establishing 1x12.5MVA, 66/11kV Sub-Station at
Chikkaballapu
8 Buradagunte in Chintamani Taluk, Chikkaballapura
ra
District
Establishing 2x150 MVA, 220/66/11 kV sub-station
at Nagarabhavi, Bengaluru North Taluk, Bengaluru
9 Urban District - Revision of 66 kV line connectivity for
the proposal approved in 76th TCCM held on
05.03.2018.

Establishing of 2x12.5 MVA, 66/11kV station at


Bengaluru
10 Dodderi in Bengaluru South Taluk, Bengaluru Urban
Urban
District.

10 Total of Sub-stations

Replacement of 1x20 MVA, 66/11 kV transformer by


1 1x31.5 MVA transformer at 66/11 kV Pottery Road
sub-station.
Replacement of 1x20 MVA, 66/11 kV transformer by
2 1x31.5 MVA transformer at 66/11 kV Yellar Bande
(L.R. bunde)sub-station.

Augmentation of existing 1x8 MVA, 66/11 kV


transformers by 1x20 MVA transformers at 66/11 kV Chikkaballapu
3
Vidurashwatha sub-station in Gowribidanur Taluk, ra
Chikkaballapura District.

Proposal for errection of 1X20MVA , 66/11KV Spare


Power Transformer by extending existing 66KV bay at
4
66/11 kV Bommasandra I/A sub-station in TL&SS
Division, Yerandanahalli.

Proposal for errection of 1X12.5MVA,66/11KV Spare


5 Power Transformer at 66/11 kV 'D' Cross sub-station
in TL&SS Division Doddaballapura.

Providing spare 1X100MVA, 220/66kV Power


6
transformer at 220/66kV Malur sub-station.

Providing additional 1X500 MVA, 400/220 kV power


7 transformer at proposed 400/220 kV Devanahalli
Hardware Park sub-station.

Providing 3rd 100 MVA, 220/66 kV power transformer


8 at 220/66 kV TK Halli sub-station at Malavalli taluk, Mandya
Mandya District.

Augmentation of 2x20MVA Power Transformers by


9 2x31.5MVA Power Transformer at 66/11KV Brigade
Metropolies Sub-station in Bengaluru.

Augmentation of 1x12.5MVA Power Transformer by


1x20MVA Power Transformer at 66/11KV Vijayapura Bengaluru
10
Sub-station in Devanahalli Taluk , Bengaluru Rural Rural
district.

Augmentation of 1x12.5MVA Power Transformers-2 by


11 1x20MVA Power Transformer at 66/11KV Shidalgatta
Sub-station in Chintamani.

172 List-IV
Sl.
Name of the Work District
No.

Augmentation of 1x8MVA Power Transformer-2 by


1x20MVA Power Transformer at 66/11KV Bengaluru
12
Gundamanagere Sub-station at D.B.Pura Tq in Rural
Bengaluru Rural Dist.

Augmentation of 2x20MVA Power Transformers by


13 2x31.5MVA Power Transformer at 66/11KV
Dommasandra Sub-station in Bengaluru.

Augmentation of 2x8MVA Power Transformers by


14 2x12.5MVA Power Transformer at 66/11KV N. G. Kolar
Hulkur Sub-station at Bangarupete Tq in Kolar.

Providing additional 1x31.5MVAPower Transformer at


15 66/11KV Prestige Shanthinikethan Sub-station in
Bengaluru

Providing additional 1x12.5MVA Power Transformer at


16 66/11KV Mallanayakanahalli Sub-station at Kolar
Mulabagilu in Kolar

Providing additional 1x31.5MVA Power Transformer at


17 66/11KV Provident Housing Ltd Sub-station in TL &
SS Division of Subramanyapura.

Providing additional 1x20MVA Power Transformer along


18 with associated Tr. bay at 220/66/11KV Gowribidanur
Sub-station in TL & SS Division of Gowribidanur .
Augmentation of 1x12.5MVA 66/11kV Power
Transformer-2 by 1x20MVA Power Transformer at Bengaluru
19
66/11kV Jadigenahalli Sub-station in Hosakote taluk, Rural
Bengaluru Rural District.

Augmentation of 1x12.5MVA 66/11kV Power


Transformer-1 by 1x20MVA Power Transformer at
20 Ramnagar
66/11kV Hejjala Sub-station in Ramanagara taluk
and, Ramanagara District.

20 Total of Augmentations

Conversion of existing 220 kV SC line to DC line from


1
Peenya to proposed 400 kV Mylasandra Station.

Re-submission of subjects:- Strengthening of 66 kV


Doddaballapura–DG Yalahanka- Line II by
replacement of 1/0 Copper Conductor by HTLS
2 Conductor with double circuit towers from 66 kV
‘D’Cross sub-station to DG plant for a distance of 29
kMs using the existing corridor as per the list-3 of
Annual Program of Works 14-15.

Construction of 220 kV DC line between Chintamani &


Mittemari with a new corridor from the proposed
220 kV Mittemari R/s to Dibburahalli limits and up-
3 gradation of existing corridor having 66 kV SC to
MCMV towers for extending 220 kV and 66 kV circuits
upto 220 kV Chintamani R/s from Dibburahalli limits
via Ganjigunte.

Conversion of existing 220 kV Gowribidanur - D.B.Pura


4 SC to DC line to an extent of 40km for taking supply
directly from 400 kV Devanahalli s/s

Conversion of existing 220 kV Gowribidanur -


5
Madhugiri SC to DC line

Replacement of Coyote ACSR Conductor of 66kV


Doddaballapura-Chikkaballapura I & II DC line by
Drake ACSR conductor with intermediate tower from
6
220/66 kV NRS Doddaballapura to 66 kV
Chikkaballapura Industrial Area sub-station for a
circuit length of approximately 23.6 kMs.

LILO arrangement from 66/11 kV Somenahalli


substation by stringing second circuit on existing 66 kV
7
Somenahalli DC towers upto tap point of the 66 kV
Gowribidanur - Peresandra line (7.87 kMs).

Construction of new 66kV SC line on DC towers from


existing 66/11KV Solur (Gudemaranahalli) sub-
8 station to 66/11KV Kudur with additional TB at
66/11KV Solur (Gudemaranahalli) and Kudur sub-
stations

Providing Alternate Source to 66/11 kV Harobele sub-


station by tapping existing 66 kV Kanakapura-
9 Ramnagar
T.K.Halli Line -2 in TL&SS Division, Kanakapura,
Kanakapura Taluk, Ramanagara dist.

Proposal for strenghthening of 66 KV Jigani-2A & 2B


circuit lines from ACSR coyote to ACSR drake in the Bengaluru
10
existing corridor from RBI tapping point to Jigani Rural
substation in Anekal Taluk, Bengaluru Rural District.

173 List-IV
Sl.
Name of the Work District
No.

Contruction of 220 kV multi-circuit, multi-voltage line


between 400/220 kV Somanahalli and 220/66 kV
11
Subramanyapura s/s in the existing 66 kV line
corridor.

Providing alternate 66 kV source to 66 kV Vidyanagar


sub-station by running 1000sqmm UG Cable from 220
12
kV Devanahalli Hardware Park sub-station for a
distance of 9.1 km

Providing 66KV Alternate Source to 66/11 kV


Anjanapura sub-station by tapping existing 66 kV
13 Somanahalli-J2 Line by laying 66KV SC line with
630/1000Sqmm XLPE UG cable in TL&SS Division,
Subramanyapura.

Revision of approved Scheme :Providing 66KV


Alternate Source to 66/11 kV Muddenahalli (Nandi)
sub-station by construction of 66KV LILO line from
14
66KV DC Doddaballapura- Chikkaballapura line for a
distance of 3.46Kms in Chikkaballapura Taluk &
District.

66 kV connectivity from proposed 2 X 100 MVA,


220/66 kV and 2 X20 MVA, 66/11 kV sub-station at
15
Harohalli TL&SS Division, Kanakapura, Kanakapura
Taluk, Ramanagara District.

Work of running of 66kV 1000sq mm UG cable from


220kV HBR Layout station to 66/11kV Pottery Road
sub-station for a distance of 3.75kms and replacement
of existing 66kV line circuit breaker by Hybrid
16
Switchgear and replacement of existing station bus of
coyote/lynx conductor by drake conductor at 66/11kV
Pottery Road substation in Bengaluru North Taluk,
Bengaluru District –Reg
Proposal for the work of providing 66kV alternate
source to 66/11kV Brigade Metropolis by tapping
existing 66kV HAL-1 or 2 line (Bagmane 1 or 2
17
feeding from 220/66kV Hoody) by laying 66kV,
1000sq mm single circuit XLPE insulated copper UG
cable -Reg
66 kV connectivity from proposed 2 X 100 MVA,
220/66 kV and 2 X20 MVA, 66/11 kV sub-station at
18
Harohalli TL&SS Division, Kanakapura, Kanakapura
Taluk, Ramanagara District- Ratification

Providing 66KV alternative source line by UG cable


from 66KV Bommasandra Industrail Area substation
19
to 66/11KV Jigani Industries Area Sub-station -
Submission of TCCM Proposal Regarding.

Reconductoring of existing DC line from Coyote ACSR to


20 HTLS Conductor for a length of about 3 kMs from 66KV
Austin Town to Koramangala LILO Point.

Reconductoring of existing SC line on SC towers with


Coyote ACSR to DC line on DC towers with HTLS
21 Conductor between Tapping point upto K&C Velley
substation for a length of about 1.5 kMs for LILO
arrangement.

Conversion of existing 66KV DC line with Coyote ACSR


to HTLS Conductor between 220KV Hebbal substation
22
to 66KV Gokul substation for a length of about 3.546
kMs

Conversion of 220 kV Gowribidanur-DB Pura SC line


with Drake ACSR conductor to 220 kV DC line with
AAAC Moose conductor by terminating one of the
23
circuits at D.B.Pura and other circuit at proposed 400
kV Devanahalli Hardware Park by using 1000sqmm
single circuit 220 kV UG Cable for a distance of 2.4km

Construction of 66 kV SC line partly by laying


1000/630Smm UG cable over a length of about 580
Mtrs towards 220/66/11KV Dobbaspete sub-station
out of approved 21KMs overhead line (using DRAKE
24 conductor) between 220/66/11KV Dobbaspete sub-
station and 66/11KV Doddbelavangala sub-station;
partly in the existing 66 kV Dabespet-Kolala Corridor
–Modification /Revised proposal for the proposal
approved in 71st TCCM held on 17.01.2017.

24 Total of Lines

Providing additional switchgars at various sub-station


1
coming under Somanahalli & T.K.Halli Division.

Proposal for replacement of old regid bus with new


2 Aluminium BUS at 220/66KV NRS sub-station,
Rajajinagar, Bengaluru North Taluk
Providing 2 Nos. of 66KV Terminal bays with
protection control system including the Breaker control
for the I/C lines and equipment of Gowribidanur-
3
Bagepalli line-1 & Somanathapura tap line in 66KV
Yenegadele- Chakavelu line at 66/11 kV
Somanatthapura sub-station

174 List-IV
Sl.
Name of the Work District
No.

Construction of 66KV TB at 220/66KV Sarjapura


substation for connecting 2nd circuit with Coyote ACSR
4
line on DC towers of Sarjapura- Attibele line from
220/66KV Sarjapura substation
TCCM Proposal Strengthening of 220KV Bus and
connected Renovation & Modernization works at
5
220/66/11KV Kolar substation in TL&SS Divison,
KPTCL, Kolar -Regarding.

Replacement of 3X167 MVA, 1 phase auto transformer


6 of ICT-1 bank by 500MVA, 3 phase power transformer
at 400 kV R/S Hoody

6 Total of TB's & Others

60 Total for Bengaluru Zone

TUMAKURU
TRANSMISSION ZONE

Establishing 400/200kv Sub station at Huliyurdurga in


1 Tumakuru
Tumakuru District

Establishing 1x8 MVA, 66/11 kV Sub-station at


Madikehalli with constructing 66 kV SC tap line from
2 proposed 66 kV Jiddigere SC line to the proposed Tumakuru
substation for a distance of 8 km in Kunigal Taluk,
Tumakuru District.
Establishing 2x8 MVA, 66/11 kV sub-station at
Nandigavi in Harihara Taluk, Davanagere District with
3 Tumakuru
66 kV LILO line from existing 66 kV Harihara-Hospet-
Banuvalli line for a distance of 6.0 km.

Establishing 1x10 MVA, 110/11kV sub-station at


4 Haridasanahally Turuvekere Taluk, Tumakuru Tumakuru
District.

Establishing 2x8 MVA, 66/11kV sub-station at


5 Tumakuru
Arsikere, Harapanahalli Taluk, Davangere District.

Establishing 2x8 MVA, 66/11 kV sub-station at


6 Konanatale (Gonigere) in Honnali Taluk, Tumakuru Tumakuru
District

Establishing 1x8 MVA, 66/11 kV sub-station at


7 Tumakuru
Alappanagudde in Kunigal Taluk, Tumakuru District

Establishing 1x8 MVA, 66/11 kV sub-station at


8 Tumakuru
Senabaghatta in Kunigal Taluk, Tumakuru District.

Establishing 1x8 MVA, 66/11 kV sub-station at J N


Kote (Jampanna Nayakana Kote) in Chitradurga
9 Taluk, Chitradurga District by constructing 66 kV Tap Tumakuru
line from existing 66 kV Chitradurga-Hiriyur line for a
distance of 7.0 km.

Establishing 1x12.5 MVA, 66/11 kV sub-station at


10 Tumakuru
N.G.Halli in Holalkere Taluk, Chitradurga District.

For Establishing 1x12.5 MVA, 66/11kV Sub-station,


11 Tumakuru
Konasagara in Molkalmuru Taluk, Chitradurga District
Establishing 1x10 MVA, 110/11 kV sub-station at
Bidaregudi in Tiptur Taluk, Tumakuru District by
12 constructing 110 kV LILO line from existing 110kV Tumakuru
Gandasi-DM Kurke SC line for a distance of 2 km with
Lynx Conductor.
Establishing 1x10 MVA, 110/11 kV sub-station at
Belavaththa (Gangakshetra) in Gubbi Taluk,
13 Tumakuru District by constructing 110 kV LILO line Tumakuru
from existing 110kV Nittur-Kadaba SC line for a
distance of 4 km with Lynx Conductor.

Establishing 1x12.5 MVA, 66/11 kV sub-station at


Doddabeeranahalli in Challakere Taluk, Chitradurga
14 District by constructing 66 kV single LILO line from Tumakuru
existing 66kV Parashurampura-Hiriyur DC line for a
distance of 2 km with Coyote Conductor.

Establishing 1x8 MVA, 66/11 kV sub-station at


Baragur (Pujar Muddanahalli) in Sira Taluk,
15 Tumakuru District by constructing 66 kV SC line on Tumakuru
DC towers from existing 66kV Hiriyur-
Pattanayakanahalli line for a distance of 11Kms
Ratification:
Establishing 1x8 MVA, 66/11 kV sub-station at
Daginakatte in Channagiri Taluk, Davanagere District
16 Tumakuru
by constructing 66 kV LILO line from existing 66kV
Honnali-Lingadahalli line-1 for a distance of 7 km with
Coyote Conductor.

Establishing 2x100MVA 220/66kV Sub-station at


17 Tumakuru
P.D.Kote in Hiriyur taluk, Davanagere district

Establishing 2x100MVA 220/66kV Sub-station near


18 Tumakuru
66/11 kV Hangal sub-station, Davanagere district

175 List-IV
Sl.
Name of the Work District
No.

Establishing 2x8 MVA, 66/11 kV Sub-station at


Kanchikere in Harapanahalli Taluk, Davanagere
Districtby constructing 66 kV LILO line from existing
19 66kV Neelagunga-Punabaghatta SC line for a distance Tumakuru
of 1 km with Coyote Conductor.Approved subject to
completion of the work of stringing of 66kV 2nd
circuit from 220/66kV Neelagunda to
Punabhaghatta LILO point

Establishing 1x8 MVA, 66/11 kV Sub-station at


Talagunda in Sira Taluk, Tumakuru Districtby
20 constructing 66kV SC line (tap line) on DC towers from Tumakuru
existing 66kV Madhugiri-Sira Line-1 for a distance of
8kms using Coyote conductor

Establishing 2x8 MVA, 66/11 kV Sub-station at


Kyasinkere (Chennenahalli) in Honnali Taluk,
21 Davanagere District by constructing 66kV LILO line on Tumakuru
DC towers from existing 66kV Honnali-Sasuvehalli line
for a distance of 2kms using coyote conductor

Establishing 1x8MVA 66/11kV Sub-station at


Sirivara in Tumakuru Taluk, Tumakuru District by
22 constructing 66 kV LILO line from existing 66kV Tumakuru
Anchepalya Line-1 for a distance of 7 km with Coyote
Conductor.

Establishing 1x10MVA 110/11kV Sub-station at


Karadalu in Tiptur Taluk, Tumakuru District by
23 constructing 110 kV LILO line from existing 110kV KB Tumakuru
Cross-Tiptur Line for a distance of 6 km with Lynx
Conductor.

Establishing 2X100 MVA, 220/66 kV sub-station at


24 Tumakuru
Bharamasagara in Chitradurga district

Establishing 1x10 MVA, 110/11 kV sub-station at


Torehalli in Gubbi Taluk, Tumakuru District by
25 constructing 110 kV LILO line on DC towers from Tumakuru
existing 110kV Nittur-Gubbi SC line for a distance
of 4 kms with Lynx Conductor.

Establishing 1x10 MVA, 110/11 kV sub-station at


MMA Kaval in Gubbi Taluk, Tumakuru District by
26 constructing 110 kV LILO line on DC towers from Tumakuru
existing 110kV Nittur-Gubbi SC line for a distance
of 4 kms with Lynx Conductor.

Establishing 2x 8MVA, 66/11KV Sub-Station at


(Irakasandra Colony) I. K. Colony
(Mannurathimmanahalli) in Koratagere Taluk, Tumkur
27 Tumakuru
District by constructing 66 KV LILO line on DC towers
to a distance of 10 Kms from existng 66kV Koratagere-
Beladara SC line with Coyote conductor.

Establishing 2 X 100 MVA , 220/66/11 kV sub-station


28 at Sirivara (Kodithimmanahalli) in Tumkur taluk, Tumakuru
Tumkur District.

Establishing 2x8 MVA, 66/11 kV sub-station at


29 Tumakuru
Hosahalli Gummanuru in Davanagere Taluk & district.

Establishing 1x8 MVA, 66/11 kV sub-station at


30 Bramhadevarahalli Madhugiri Taluk, Tumakuru Tumakuru
district.-Ratification

Establishing 1X8 MVA, 66/11 kV sub-station at Garani


31 Tumakuru
Gate in Madhugiri taluk, Tumkur dist.-Ratification

Establishing 1X8 MVA, 66/11 kV sub-station at


32 Kavanadala (Girigowdanahalli) sub-station in Tumakuru
Madhugiri taluk, Tumkur dist.-Ratification

32 Total of Sub-stations

Providing additional 1x12.5 MVA, 66/11 kV


1 Transformer at 66/11 kV Challakere Sub-station in Tumakuru
ChallakereTaluk, Chitradurga District.

Replacement of 1x12.5 MVA, 66/11 kV Power


Transformer by 1x20 MVA,66/11 kV Power
2 Tumakuru
Transformer at 66 kV Hosadurga sub-station in
Chitradurga District.

Replacement of 1x10 MVA Power Transformer by 1x20


3 MVA 110/11kV Power Transformer at 110/11kV Tumakuru
Tiptur substation in TipturTaluk, Tumakuru District.

Replacement of 1x8 MVA Power Transformer by 1x12.5


4 MVA 66/11kV Power Transformer at 66/11kV Honnali Tumakuru
substation in Honnali Taluk, Davanagere District.

For Providing additional 1x8 MVA, 66/11kV Sub-


5 Tumakuru
station Hindasaghatta.

For Replacement of 1x6.3 MVA Power transformer by


6 1x20 MVA Power transformer at 66/11kV sub-station Tumakuru
Chikkajajuru.

176 List-IV
Sl.
Name of the Work District
No.

For Augmentation of existing 2x8 MVA power


7 tranformer by 2x12.5 MVA power transformer at Tumakuru
66/11kV Sub-station, SASALAHALLA

Replacement of 1x12.5 MVA power transformer 1 by


1x20 MVA power transformer at 66/11 kV
8 Tumakuru
Basavapatna sub-station in Channagiri Taluk,
Davanagere District.
Replacement of 1x12.5 MVA power transformer 1 by
1x20 MVA power transformer at 66/11 kV
9 Tumakuru
Lingadahalli sub-station in Chennagiri Taluk,
Davanagere District.

Replacement of 1x8 MVA power transformer-2 by


10 1x12.5 MVA power transformer at 66/11 kV Bagur sub- Tumakuru
station in Hosdurga Taluk, Chitradurga District.

Replacement of 1x12.5 MVA power transformer-2 by


11 1x20 MVA power transformer at 66/11 kV H.D.Pura Tumakuru
sub-station in Holalkere Taluk, Chitradurga District.

Providing additional 1x12.5 MVA, 66/11 kV Power


12 Transformer at 220/66/11 kV Station Neelagunda in Tumakuru
Harapanahalli Taluk, Davanagere District

Replacement of existing 1x8 MVA power transformer 2


by 1x12.5 MVA power transformer with 2 No.s of
additional 11 kV Switchgears at 66/11 kV Garaga sub-
13 Tumakuru
station in Hosadurga Taluk, Chitradurga
District.Approved subject to commissioning of 3rd
100 MVA at 220kV Hiriyur Station

Replacement of existing 1x8 MVA power transformer by


14 1x12.5 MVA power transformer at 66/11 kV Nyamathi Tumakuru
Sub-station in Honnali Taluk, Davanagere District.

Replacement of existing 1x8 MVA power transformer-1


by 1x12.5 MVA power transformer at 66/11 kV sub-
15 Tumakuru
station Mavinakatte in Davanagere Taluk, Davanagere
District.
For replacement of existing 1x6.3 MVA power
transformer-1 by 1x12.5 MVA power transformer at
66/11 kV Benkikere sub-station in Channagiri Taluk,
16 Tumakuru
Davanagere District.Approved subject to
commissioning of the 220kV Benkikere sub station
along with associated 66kV lines
Providing additional 1X10 MVA, 110/11 kV Power
17 transformer at 110/11 kV Tandaga sub-station in Tumakuru
Turuvekere taluk, Tumakuru district

Providing additional 1X10 MVA, 110/11 kV Power


18 transformer at 110/11 kV Talkere sub-station in Tumakuru
Turuvekere taluk, Tumakuru district

Augmentation of 1x2.5 MVA, 66/11 kV Power


transformers-1 by 1x20 MVA Power Transformer at
19 Tumakuru
66/11 kV Sub-station Bukkapatna in Tumakuru
Division.

Augmentation of 1x8 MVA, 66/11 kV Power


Transformer-2 by 1x12.5 MVA Power Transformer at
20 Tumakuru
66/11 kV Sub-station Pattanayakanahalli in
Tumakuru Division.
Augmentation of 1x10 MVA, 110/11 kV Power
Transformer by 1x20 MVA Power Transformer at
21 Tumakuru
110/11 kV Sub-station Handanakere in K.B. Cross
Division.
Augmentation of 1x10 MVA, 110/11 kV Power
Transformer by 1x20 MVA Power Transformer at
22 Tumakuru
110/11 kV Sub-station Shettigere in K.B. Cross
Division.
Augmentation of 1x10 MVA, 110/11 kV Power
Transformer by 1x20 MVA Power Transformer at
23 Tumakuru
110/11 kV Sub-station Thimmanahalli in K.B. Cross
Division.
Replacement of 12.5 MVA, 66/11 kV Power
24 Transformer -1 by 20 MVA, 66/11 kV Power Tumakuru
Transformer at 66/11 kV Parashuramapura
Replacement of 8 MVA, 66/11 kV Power Transformer -
25 1 by 12.5 MVA, 66/11 kV Power Transformer at 66/11 Tumakuru
kV Ranganathapura.

Replacement of 6.3 MVA, 66/11 kV Power Transformer -


26 1 by 12.5 MVA, 66/11 kV Power Transformer at 66/11 Tumakuru
kV Rangenahalli.

Augmentation of 1x12.5 MVA, 66/11 kV Power


Transformer -1 by 1x20 MVA Power Transformer at
27 Tumakuru
66/11 kV Sub-station Brahmasandra in Tumakuru
Division.

Providing additional 1x8MVA power transformer and


28 associated 11kV switchgears at 66/11kV Shyagale sub- Tumakuru
station in Davanagere taluk, Davanagere District.

Providing additional 1x8MVA Power Transformer and


29 associated 11kV switchgears at 66/11kV Jiddigere Tumakuru
sub-station in Kunigal taluk, Tumakuru District.

177 List-IV
Sl.
Name of the Work District
No.

Providing additional 1x12.5MVA Power Transformer


and associated 11KV switch gears at 66/11kV
30 Tumakuru
Nidasale sub-station in Kunigal taluk, Tumakuru
District.

Providing additional 1x8MVA Power Transformer and


31 associated 11kV switch gears at 66/11kV Puravara Tumakuru
sub-station in Kunigal taluk, Tumakuru District.

Augmentation of 1x8MVA by 1x12.5MVA, 66/11kV


32 Power Transformer at 66/11kV Devarahalli substation, Tumakuru
Channagiri taluk, Davanagere district.

Augmentation of 1X6.3 MVA by 1X 20 MVA, 66/11 KV


33 power transformer at 66/11kV Sowlanga (Savalanga) Tumakuru
Sub-station, Honnali Taluk Davanagere district.

Augmentation of 2x12.5MVA by 2x20MVA, 66/11kV


34 Power Transformers at 66/11kV Malebennur Tumakuru
substation, Harihara Taluk, Davanagere district.

Augmentation of existing 1X8MVA by 1X12.5MVA


35 Power Transformer at 66/11kV Hiremallanahole Tumakuru
substation, Jagalur Taluk, Davanagere District.

35 Total of Augmentations

Providing LILO arrangement to 66 kV Malebennur sub-


station by constructing new 66 kV DC line in the
1 Tumakuru
existing corridor for a distance of 0.4 kMs along with a
terminal bay.
Replacement of existing 66 kV line with Rabbit
conductor on fabricated tower by 66 kV DC line with
coyote Conductor from tapping point of multi-circuit
2 Tumakuru
line of 66/11 kV Pavagada sub-station to 66/11 kV
Venkatapura sub-station for distance of 20 km in the
existing corridor.
Ratification: Construction of 2nd circuit LILO of 220kV
3 Davanagere-Shimoga DC line to 220kV Honnali Tumakuru
Station
Construction of new 66 kV SC line on DC towers from
66 kV Kurubarahalli sub-station to 66 kV Guttur sub-
4 Tumakuru
station in the new corridor for a distance of 8 km along
with terminal bay at both stations
Replacement of existing 66kV SC line with Rabbit
conductor on RCC poles by 66kV DC line on DC towers
with Coyote Conductor from 66/11KV Nagalamadike
5 Sub station to tapping point at 66 KV Pavagada- Tumakuru
Shylapura line with Terminal bay at 66KV
Nagalamadike Sub station in existing corridor for a
distance of 16 Kms.
Replacement of existing 66kV SC line with Rabbit
conductor on fabricated lattice towers by 66kV SC line
on DC towers with Coyote Conductor from tapping
6 Tumakuru
point of 66/11 kV Venkatapura Sub station to
tapping point of proposed 220 kV Mittemari Sub-
station in existing corridor for a distance of 49.44 Kms.

Conversion of 66kV SC line on SC towers to DC line on


DC towers from 220kV Chitradurga Station to 66kV
7 Turuvanur Station in the existing corridor for a Tumakuru
distance of 22Kms along with construction of 1 No. of
66kV Terminal Bay at both stations.

Providing LILO arrangement to existing 66/11kV


Bharamasagara Substation by conversion of SC line on
SC towers to DC line on DC towers from tap point on
8 Tumakuru
66kV Davanagere-Chitradurga Line-1 to
Bharamasagara Sub-station for a distance of 3Kms
along with Terminal Bay Bharamasagara Sub-station.

Providing LILO arrangement to existing 66/11kV


Nyamathi Substation by conversion of SC line on SC
towers to DC line on DC towers from tap point on 66kV
9 Tumakuru
Honnali-Savalanga line to Nyamathi Sub-station for a
distance of 1.5 Kms along with construction of 66kV
Terminal Bay Nyamathi Sub-station.

Replacement of existing 66kV Davanagere- Harihara


Hospete SC line on SC towers by new 66kV SC line
10 with coyote conductor on DC towers from Shamanur Tumakuru
limits (Loc. No. 19) to Harihara Limits (Loc. No: 93) in
the existing corridor for a distance of 15Kms.

a) Stringing of 66kV Second circuit on existing 66KV


Davanagere-Kukkawada line on DC towers from 220KV
SRS Davanagere to 66KV Kukkawada Sub-station for
a distance of 13.523 Kms in the existing corridor along
with formation of 1 TB at Kukkawada Sub-station &
11 1TB at 220KV Davangere Station. Tumakuru
b) Stringing of 2nd Circuit on exisiting DC tower from
66kV Kukkuwada station to 66kV Santhebennur
TAP point (LOC:133) for a distance of 18.170 Kms in
the exisiting corridor along with formation of 1-TB at
66kV Kukkuwada station

178 List-IV
Sl.
Name of the Work District
No.

1) Stringing of 66KV 2nd circuit from 220 KV


Neelagunda to 66KV Punabgatta LILO point on existing
DC tower.
2) Conversion of existing S/C line on SC tower to D/C
line on DC tower from 66KV Punabgatta LILO point to
66KV Uchangiduga Tap point Loc No: 81. i.e 66KV
Davanagere- Sokke line.
3) Conversion of SC line on DC tower from Loc No: 81
12 Tumakuru
to 66KV Bilichodu LILO point Loc No: 117 & total
distance of 46.5 Kms in the existing corridor ie.,
stringing of 2nd circuit on existing DC towers.
4) Providing LILO arrangements to 66KV Mellekatte
Sub-Station by constructing New 66KV DC line for a
distance of 0.25 Km.(loc no 69-70)
5) Formation of terminal bays at 220kV Neelagunda
R/S & 66KV Mellekatte Sub-station.
a) Stringing of 2nd Coyote circuit between 66kV
P.D.Kote and 66kV Hariyabbe S/s on existing D/C
towers for a distance of 12.25 Kms along with two nos
of new terminal bays, one at P.D.Kote and one at
Hariyabbe S/s.
b) Replacement of existing "66kV S/C coyote line on
S/C towers" between 66kV Hariyabbe S/s and
13 Hariyabbe tap point by "66kV D/C Drake line on D/C Tumakuru
towers" for a distance of 10.25 Kms and creation of one
termial bay at Hariyabbe S/s for providing LILO
arrangement.
c) Replacement of existing "66kV D/C coyote line on
D/C towers" between 220/66kV Hiriyur S/s and
Hariyabbe tap point by "66kV D/C Drake line on D/C
towers" for a distance of 18.0 Kms.
Ratification subjects:- A: Reconstruction of 66kV SC
idle line on SC towers having Coyote conductor from
66kV Chitradurga old S/s to 66kV Pandrahalli
substation for a distance of 17.5kms by 66kV SC line
on DC towers using Drake conductor in the existing
14 corridor. B: Providing additional 66 Tumakuru
kV circuit between H.D.Pura tap point and H.D.Pura
Substation for a distance of 10kms with Coyote
conductor to provide LILO arrangements at 66/11kV
H.D.Pura substation along with construction of 1 No of
66kV terminal bay at H.D.Pura substation.

Ratification subjects:- a) Construction of additional


66kV SC line having Coyote conductor from 66/11kV
HangalS/s to 66/11kV RampuraS/s with LILO at
66/11 kV Nagasamudra S/s for a distance of 28kms
15 approxalong with one number of 66kV terminal bay at Tumakuru
66/11kV Hangal & RampuraS/s and two numbers of
66kV terminal bay at 66/11kV Nagasamudra S/s.
b) Replacement of bus bar arrangement at 66/11 kV
Rampura S/s from Coyote to Drake.

Providing alternate source to existing 110/11kV


Handanakere Sub-station (feeding from 220kV K.B.
Cross Station) by constructing new 110kV SC line on
DC towers from existing 110/11kV D.M. Kurke Sub-
16 Tumakuru
station (feeding from 220kV Arasikere Station) for a
distance of 18kms using Lynx Conductor along with
construction of 110kV Terminal bays at 110kV
Handanakere and D.M.Kurke Sub-stations
Providing alternate source to existing 66/11kV
Kunigal Sub-station by constructing new 66kV LILO
17 line from existing 66kV Yadiyur line for a distance of Tumakuru
2.5 kms in new corridor with new terminal bay at 66kV
Kunigal Sub-station.
Stringing of 66kV 2nd Circuit on existing 66kV DC
towers from Loc. No: 33 on 66kV Honnali-Kundur
18 line to 66kV Kundur Sub-station for a distance of Tumakuru
6kms along with construction of 66kV Terminal Bay at
66kV Kundur Sub-station.
Providing LILO arrangement to 66kV Banuvalli Sub-
station by stringing 66kV new line on existing DC
towers from Loc. No.2 on 66kV Honnali-Banuvalli-
19 Nandigudi line to 66kV Banuvalli Sub-station for a Tumakuru
distance of 100 Mtrs using coyote conductor along
with formation of new 66kV Terminal Bay at 66/11kV
Banuvalli Sub-station
Stringing 66kV DC line on MC towers for connecting
66kV Kattige and 66kV Malebennur Sub-stations to
20 66kV Honnali Sub-station along with construction of Tumakuru
2 Nos. of 66kV terminal bays at 66kV Honnali Sub-
station.
a) Re-Construction of 66kV Hiriyur-Sira SC line on
SC towers by new 66kV SC line on DC towers/MC
towers in the existing corridor upto 66kV Tavarakere
Sub-station LILO point for a distance of 40Kms
21 b) Partial Re-Construction of 66kV Hiriyur- Tumakuru
Chitradurga SC line on SC towers by new 66kV SC
line on DC towers/MC towers in the existing corridor
up to Loc No: 18 at Sugar Factory Layout area near NH-
4 (Hiriyur) for a distance of 6Kms

Replacement of existing 66kV SC line with rabbit


conductor on fabricated lattice structures by 66kV SC
line on DC towers with coyote conductor from 66/11kV
22 Tumakuru
Sira Sub-station to 66/11kV Badavanahalli Sub-
station in the existing corridor for a distance of 20kms
in Sira Taluk, Tumakuru District.

179 List-IV
Sl.
Name of the Work District
No.

Providing Alternate source to existing 66/11 kV


Nagalamadike substation and to evacuate solar power
at Nagalamadike sub-station by constructing new 66
kV DC line with Drake conductor from 220 kV
23 Tumakuru
Pavagada substation (work under progress) to 66/11
kV Nagalamadike sub-station for a distance of 19 Km
in the new corridor with new terminal bays at
Nagalamadike & Pavagada 220 kV substation.
Proposal for conversion of existing 220kV Hiriyur-
Madhugiri SC line having Drake conductor on SC
tower to 220kV DC line on DC towers with Drake
conductor between 220kV Hiriyur receiving station
24 and tapping point of Antharasanahalli-Madhugiri Tumakuru
220kV line near Thonachagondanahalli (Madhigiri
taluq) for a distance of 61kms in the existing corridor
with new terminal bays at 220kV Hiriyur & Madhugiri
receiving stations in Tumkuru TLM subdivision

Replacement of existing 66 kV SC line Rabbit conductor


on fabricated Lattice structure tower by SC line on DC
towers with Coyote conductor from 66/11 kV
25 Tumakuru
Badavanahalli sub-station to 66/11 kV Madhugiri sub-
station in the existing corridor for a distance of 16 Kms
in TLM sub-division Tumakuru.

Stringing of 66 kV second circuit line on DC towers


from 220/66/11 kV Neelagunda receiving station to
26 Tumakuru
66 kV Yaragunta station in the existing corridor for a
distance of 32 Kms in Davanagere circle.

Construction of new 66 kV SC line on DC tower from


66/11 kV Bukkapatna sub-station to 66/11 kV
Hagalavadi sub-station for a distance of 18 Kms in the
new corridor using coyote conductor with new terminal
27 bays at Bukkapatna and Hagalavadi sub-station in Tumakuru
Tumakuru to Providing alternate source to existing
66/11 kV Sub-station at Bukkapatna (feeding from 220
kV receiving station Madhugiri) and 66/11 kV
Hagalavadi.

Replacement of old 66 kV SC line Owl conductor on old


SC tower by SC line on DC towers (NBT) with Coyote
ACSR conductor from 220/66 kV Antharasanahalli
28 Tumakuru
receiving station to 66/11 kV Tumakuru sub-station in
the existing corridor for a distance of 6 Kms in
Tumakuru District.

Construction of 66KV DC BG Kere line on DC towers


with coyote conductor in the existing corridor of SC line
29 on SC towers with 66 kV extension of bay in 66/11 kV Tumakuru
BG Kere sub-station for LILO arrangement for a
distance of 1.2kms.

Stringing of 2nd circuit of 66 kV Davanagere-


Chitradurga-2 line from 220 kV SRS Davanagere to 66
30 kV Anagodu sub-station LILO point for a distance of 18 Tumakuru
Kms in the existing corridor along with formation of
terminal bay.

Conversion of 66kV Thallak- Nayakanahatty SC line on


SC towers by DC line on DC towers in the existing
31 corridor with 66KV bay formation at both 220kV Tumakuru
Thallak and 66kV Nayakanahatty substation for a
distance of 15.4kMs.

Stringing of 2nd circuit on existing 66kV Thallak -


Parashurampura SC line on DC towers with terminal
32 Tumakuru
bay formation at 66/11kV Parashurampura and at
220kV Thallak substation for a distance of 40kms
Connecting existing 66kV Chitradurga –Thallak express
line (line connecting directly from 220/66kV
Chitradurga SRS to 220/66kV Thallak SRS) to
Challakere 66/11kV substation with LILO arrangement
33 Tumakuru
to Challakere line with constructing MC line on MC
towers in the existing corridor for a distance of 1.5km
with 66kV terminal bays in 66/11kV Challakere
substation.

33 Total of Lines

100 Total of Tumakuru Zone

HASSANA TRANSMISSION ZONE

Establishing 1x10 MVA, 110/11 KV sub-station at


1 Antaragatta village in kadur Taluk, Chickmagaluru
District

Establishing 2x10 MVA, 110/11 kV Udyavara sub-


2
station in Udupi Taluk and District.

Up-gradation of 2x5 MVA, 33/11 kV sub-station to


2x10 MVA, 110/11 kV sub-station at Hosanagara by
3 constructing 110 kV SC line on DC towers from 110 kV
proposed Ripponpete sub-station for a distance of 30
kms.
Establishing 1x10 MVA, sub-station and construction
4 of 0.3 KMS of 110 kV Single circuit line on DC Towers
in Bejjavalli Thirthahalli Taluk, Shivamogga District.

Establishing 2x8 MVA, 66/11kV Sub-station at


5 Nuggehalli village in Channarayapatna Taluk, Hassan
District

180 List-IV
Sl.
Name of the Work District
No.

Subject A20: Re-Submission of establishing 1x10 MVA,


110/11 kV sub-station at Thyagarthi Village in Sagar
6 Taluk, Shivamogga District by constructing 10kMs of
110kV SC line on DC towers from the existing 110 kV
SS-2 line.

Establishing 1x20 MVA, 110/33kV and 1x10 MVA, at


110/11kV Alankar Sub-station in Puttur Taluk, D.K.
7 District by constructing Appx. 12km 110kV SC line on
DC Towers from proposed 110kV Madavu sub-
station(Under Construction).

Establishing 1x10 MVA,110/11 KV Sub-Station at


Kepu in Bantwal taluk, D.K.District, by constructing
8
appx. 15 Km SC line on DC Towers from existing
110/11 KV sub-station at Vittla.

Establishing 1x10 MVA, 110/11kV Substation at


9
Kunkanadu in Kadur Taluk, Chikkamagaluru District.

Upgradation of 1X5 MVA, 33/11KV substation to 1 x


10MVA, 110/11KV substation at Sringeri, in sringeri
taluk, Chikkmagaluru District, by Constructing 25KMs
10
OF 110 kV SC Line on DC towers from existing 110/11
kV sub-station Kammaradi to 110/11kV sub-station at
Sringeri, in Sringeri Taluk, Chikkamagaluru District.
Establishing 1x10 MVA, 110/11KV Sub-station at
Kuppagadde village in Soraba Taluk, Shivamogga
11 District by constructing 110KV SC tap line from the
existing 110KV line near Togarsi Sub-station for a
distance of 8 Kms
Upgradation of 2x5 MVA, 33/11 kV substation at
Neharu Maidan to 1x20 MVA, 110/33kV & 2x10 MVA,
110/11 kV Gas Insulated switchgear (GIS) substation
at Nehru Maidan in Mangaluru Taluk by laying of
110kV, 630 sqmm XLPE Copper U.G.Cable SC line
12
(with one spare run) from existing 220/110/33/11kV
Kavoor substation to the proposed 110/33/11 kV
substation at Nehru Maidan for a distance of
12.0Km(approx) in Mangalore Taluk, Dakshina
Kannada District.
Revised TAC agenda for chnge of route of Proposed
110kV line from Nandikur to 1x10 MVA , 110/11 kV
13
Substation at Belapu in Udupi Taluk, Udupi District for
a distance of 10kms
Establishing 2X100MVA and 1 x 8 MVA, 220/66/11kV
14 Sub-Station near kaniyaru village in Arakalgud taluk,
Hassan District.
Establishing 2 x 20 MVA, 110/33kV and 1 x 10 MVA,
110/11kV substation at Panja in Sulya Taluk D.K.
15 District by constructing 21Kms 110kV SC line on DC
Towers from the proposed 110kV Madavu substation (
Under construction)
Establishing 2 X 10MVA, 110/11KV Sub-station at
Kadalakere in Marpadi Village (near Moodabidri)in
Mangaluru Taluk, and construction of 110KV LILO line
on 110KV D/C Monopole towers with single sided cross
16 arms from existing 110KV D/C Moodabidri-Mannapitlu
line of M/s.Soham Power Projects to the proposed
110/11 KV Sub-station at Kadalakere for a distance of
1.50Kms. (approx.) in Mangalore Taluk, Dakshina
Kannada District.
Establishing 2x10MVA, 110/11 kV sub-station at
Ayanur in Shivamogga Taluk, Shivamogga District by
17 constructing 110 kV LILO line from existing 110 kV
Sagara-Shivamogga No.1 line for a distance of
0.20Kms.
Establishing 1x10MVA, 110/11KV Sub-station at
Byndoor in Byndoor Taluk Udupi District by
18 constructing 13 Kms 110KV SC line from
110/33/11KV Sub –Station at Navunda and formation
of 1 No 110kV TB at Navunda
Establishing 1x10 MVA, 110/11 kV sub-station at
Kagodu in Sagar Taluk, Shivamogga District by
19
constructing 09 kms 110kV SC line from existing
110kV Sagar-Talguppa LST-4 MC line at Tattekoppa.

Transmission scheme for proposed 1x 500 MVA,


20
400/220kV Arasapadavu sub-station

Establishing 2x8 MVA, 66/11kV sub-station at Heragu


21
village, Hassan Taluk and District

Establishing 1x8 MVA, 66/11 kV sub-station at


22 Santhemaruru Village in Arakalgud Taluk, Hassan
District.
Establishing 1x8 MVA, 66/11 kV sub-station at
23 Doddabemmathi Village in Arakalgud Taluk, Hassan
District.

Establishing 1x8 MVA, 66/11 kV sub-station at


24
Belavadi Village in Arakalgud Taluk, Hassan District.

Establishing 1x8 MVA, 66/11 kV sub-station at


25 Mudibetta Kaval Village in Channarayapatna Taluk,
Hassan District.

Establishing 1x8 MVA, 66/11 kV sub-station at


26
Biccodu Village in Belur Taluk, Hassan District.

Establishing 1x8 MVA, 66/11 kV sub-station at


27
Byrapura Village in Alur Taluk, Hassan District.

181 List-IV
Sl.
Name of the Work District
No.

Establishing 2x10MVA, 110/11kV Sub-station at


28
Belapu in Kaup Taluk & Udupi District.

Establishing 1x8 MVA, 66/11 kV Sub-station at


29
Somanahally Village in Hassan Taluk, Hassan District

Establishing 1x8 MVA, 66/11 kV sub-station at


30 Hanike(channapura) village in Belur Taluk, Hassan
District

Establishing 1x10 MVA, 110/11 kV sub-station at


31
Kolagunda Gate in Arasikere Taluk, Hassan District

Establishing 1x8 MVA, 66/11 kV Sub-station at


32
Guddenahally village in Alur Taluk, Hassan District

Establishing 1x10MVA, 110/11kV and 1x10MVA


33 110/33kV sub-station at Karje in Brahmavara Taluk &
Udupi District

Establishing 1x10MVA, 110/11 kV & 1X10MVA,


34 110/33 kV sub-station at Koteshwara in Kundapura
Taluk, Udupi district

Establishing 2x10 MVA, 110/11 kV sub-station at


35
Adyar in Mangaluru Taluk, D.K District

Establishing 1x20 MVA, 110/33 kV and 2x10 MVA,


36 110/11 kV sub-station at Kaikara in Puttur Taluk,
D.K.District

Establishing 1x12.5 MVA, 66/11 kV sub-station at


37 Ganadalu in Chikkamagaluru Taluk, Chikkamagaluru
District

Establishing 2x8 MVA, 66/11 kV sub-station at


38 Jenugadde Village in Chikkamagaluru Taluk,
Chikkamgaluru District

a) Change in 110 kV line connectivity to the proposal


of establishing 1x10MVA, 110/11 kV sub-station at
Bejjuvalli Village in Thirthahalli Taluk,Shivamogga
District by LILO of 110 kV V3 line instead of tapping.
39
b) Providing radial connectivity to proposed 1x10MVA,
110/11 kV sub-station at Konandur Village in
Thirthahalli Taluk, Shivamogga District from proposed
110 kV Bejjuvalli sub-station

Change in 110 kV connectivity for the proposal for


establishing 1x10MVA, 110/11 kV sub-station at
40
Kuppagudde Village in Soraba Taluk, Shivamogga
District

Establishing 1x100 MVA, 220/66 kV & 1x100 MVA,


41 220/110 kV Sub-station at Dudda village in Hassan
Taluk, Hassan District

41 Total of Sub-stations

Providing additional 1x20 MVA, 110/33 kV transformer


1 with additional 1No. of 33 kV Bay at 110/33/11 kV
Konaje sub-station, in Bantwal Taluk, DK District

Providing additional 1x20 MVA, 110/33kV Power


Transformer along with one outgoing 33kV line Bay at
2
the existing 110/33/11 kV Guruvayanakere
substation in Belthangady Taluk, D.K.Dist.

Augmentation of 1x8MVA 66/11kV to 1x20 MVA


3
66/11kV Power Transformer at Hassan substation

Providing additional 1 x 8MVA Power Transformerat


4 66/11kV Mosalehosahally Substation in Hassan Taluk
& District.
Augmentation of existing 2 X 100 MVA, 220/110 kV
5 transformers by 2 X 150 MVA at 220/110kV Kemar
sub-station in Mangalore district

Providing additional 1x8 MVA, 66/11 kV transformer at


6 220/66/11KV Receiving Station, Mugalavalli in
Chikkamagalure Taluk, Chikkamagalure District.

Providing spare 1x12.5 MVA, 66/11 kV transformer at


7 220/66/11KV Receiving Station, Mugalavalli in
Chikkamagalure Taluk, Chikkamagalure District.

Enhancement of 1x5MVA, 66/11kV Power Transformer-


1 by 1x8MVA, 66/11kV Power Transformer along with
additional two numbers SWGs (one number in each
11kV Bank) with strengthening of 11kV ODS and
Providing Metering & Protection to 66kV Incoming line
8 and strengthening of 66kV ODS (replacement of
existing coyote conductor by drake) with necessary civil
works (viz replacement of un even and un-sized jelly as
per standards and formation of Cable duct) at 66/11kV
Hallymysore sub-station in Holenarasipura Taluk,
Hassan District.

182 List-IV
Sl.
Name of the Work District
No.

Providing additional 1 x 100MVA, 220/110kV Power


9 Transformer at 220/110/11kV Netlamudnur Sub-
station in Dakshina Kannada District
Providing spare 1 x 20MVA, 66/11kV Transformer at
10 66/11kV Hassan Sub-Station in Hassan Taluk and
District

Replacement of 1 x 10 MVA, 110/11kV Power


Transformer by 1 x 20 MVA, 110/11kV Power
11
Transformer at 110kV Moodabidri Sub-station, in
Mangaluru Taluk, Dakshina Kannada District

Replacement of existing 1x10 MVA 110/11 kV Power


Transformer-1 by 1 x20 MVA, 110/11kV power
12
transformer at 110/33/11kV Sagar Sub-station in
Sagar Taluk, Shivamogga District.

Replacement of 1 x 8 MVA, 66/11 kV Transformer by 1


13 x 12.5MVA, 66/11 kV at 66 kV Panchanahalli sub-
station, in Kadur Taluk, Chikkamagaluru District

Creating 33 kV reference by installing 1x20 MVA,


110/33 kV Transformer instead of 1x10 MVA, 110/33
14
kV Transformer at 110 kV Kammaradi sub-station in
Thirthahalli Taluk, Shivamogga District

Providing additional 1x8MVA, 66/11 kV transformer at


15 66/11 kV Attichowdenahally sub-station in
Holenarasipura Taluk, Hassan District

Providing additional 1x8 MVA, 66/11kV Transformer at


16 66/11kV Doddahally sub-station, in Holenarasipura
Taluk, Hassan District

Providing additional 1x8 MVA, 66/11kV Transformer at


17 66/11kV Doddakadanuru sub-station, in
Holenarasipura Taluk, Hassan District

Providing additional 1 x 8 MVA, 66/11kV Transformer


18 at 66/11kV Hariharapura sub-station, in
Holenarasipura Taluk, Hassan District

Providing additional 1x8 MVA, 66/11kV Transformer at


19 66/11kV Somanahally sub-station, in Holenarasipura
Taluk, Hassan District

Providing additional 1x100 MVA, 220/110 kV power


20 transformer at 220/110 kV Balligavi sub-station in
Shivamogga District

20 Total of Augmentations

Resubmission of proposal : Running 110 kV, 400


Sq.mm. XLPE copper U.G cable double circuit line for
the portion between 220 kV SRS Kavoor to location No.
1
5 of the proposed (under construction) 110 kV
Kavoor–Kulashekara double circuit lines in 33 kV line
corridor in Mangalore Taluk, D.K. District.

Providing LILO arrangements to 66kV DVG-1 line at


2 66/11kV Holaluru Sub-station Holalur in TL&SS
Division Shivamogga.

Providing LILO arrangements to 110kV SS-2 line at


3 110/11kV Kumsi Sub-station in TL&SS Division
Shivamogga.

Providing LILO arrangements and M&P equipment’s at


4 110/11kV Substation at Machenahalli in Bhadravathi
Taluk, Shivamogga District.

Conversion of existing 110kV Bhadravathi-3 (BDVT-3)


SC line to DC line from 220kV receiving station MRS to
110/11kV Sub-station Machenahalli for a distance of
8kms & construction of new 110kV SC line on DC
5
tower from 110/11kV Sub-station Machenahalli to NRS
VISL Bhadravathi for a distance 8 kms in existing
corridor of TL&SS Division KPTCL, Shivamogga
Jurisdiction.

Providing LILO arrangements to 110kV Bhadravathi-3


6 (BDVT-3) line at 110/33/11kV Bhadravathi Sub-
station in TL&SS Division Shivamogga.

Construction of 110KV DC Line from the existing


110/11KV Karaya sub-station to the existing
7
110/33/11KV Guruvayanakere sub-station for a
distance of 15 Kms in Belthangady Taluk, D K District.

183 List-IV
Sl.
Name of the Work District
No.

Construction of new 66kV SC line on DC towers in the


existing corridor of 66kV Mild steel H-frame Shimoga-
Mysore(SMT) from 220kV Receiving station Hassan to
8
66/11 kV Belur substation for a distance of about 35
kms with Terminal bay at Hassan and with LILO
arrangement at Hagare substation

Conversion of 66kV single circuit line on mild steel


single circui towers into 66kV double circuit line from
9 220kV sub-station Kadavinakote to 220kV sub-
station Yachenhally duly providing 66kV TB’s at both
sub Stations in Hassan district.

Construction of new 66kV SC line on DC towers in the


existing corridor of the 66kV H-Frame Shivamogga-
Mysore-1(SMT from 66kV HNpura substation to tap
point of Saligrama(Munjanahalli limits) line for a
10
distance of about 21Kms in HN Pura Taluk Hassan
District by using conventional Dc towers and Coyote
conductor with terminal bay at 66kV Holenarasipura
substation.

Conversion of 66kV Single Circuit line on Mild steel


single circuit towers to Double circuit line from 66kV
11
Channarayapatna to Hirisave sub-station with
Terminal bay each at both substation.

Bifurcation of 66kV Hiremagalur-Chikkmagaluru line


by constructing a new DC line from Mugulavalli
220/66kV Receiving Station to Hiremagaluru
Substation for a distance of 1.5km by utilizing the
12
existing the existing spare line terminal bay (Bhadra
bay at Mugalavalli 220/66kVreceiving station) and
existing idle SMT line corridor in TL&SS division,
KPTCL, Shivamogga Jurisdiction.

Construction of 66kV SC line between 66/11kV


13 Substation at Rampura and Didiga duly providing
66kV TBs at both substation in Hassan Disrtict.

Providing LILO arrangement to 66 kV Hallimysore sub-


station by stringing 66 kV 2nd circuit for a distance of
14
about 4.55 kms along with one number of 66kV
Terminal Bay in H.N.Pura Taluk, Hassan District

LILOing of 66 kV Hassan-C.R. Patna 2nd circuit line to


66 kV Udayapura sub-station for a distance of 75mtrs
15
along with 2 Nos. of 66kV Terminal Bays in C.R. Patna
Taluk, Hassan District
Stringing of 66 kV 2nd circuit with coyote conductor on
existing 66 kV DC towers from 220 kV MRS
Shivamogga sub-station to Holalur tapping
16
point(tower no 230A) for a distance of about 18.20kms
along with 66kV terminal bay at 220kV MRS
Shivamogga sub-station

Construction of 66kV SC link line between 66 kV


Attichowdanahally and 66 kV Hariharapura sub-
17
stations along with 66kV TBs at both sub-stations in
C.R. Patna Taluk, Hassan District.

Providing LILO arrangement to 66 kV Singapura sub-


station by stringing 66 kV 2nd circuit for a distance of
18
about 6.128 Kms along with one number of 66kV TB in
H.N. Pura Taluk, Hassan District

Providing LILO arrangement to 66 kV Magge sub-


station from one circuit of 66kV Hassan-
Sakaleshapura DC line duly converting 66kV SC tap
19 line having KEB make mild steel SC towers to DC
towers for a distance of about 9.50Kms along with one
no. of 66kV TB at 66kV Magge sub-station in Alur
Taluk, Hassan District
Conversion of existing 220 kV SC line from Kilara limits
to Balligavi limits for a distance of 52.817 kms to 220
20 kV DC line and construction of one no. of 220 kV
terminal bay at Sharavathi Generating station and one
at 220 kV Balligavi station in Shimoga district

Realignment of 220kV Shantigrama(PGCIL)-Gopalpura


M2 and Gopalpura-Kadavinkote-1 near 33/220kV
21
Suzlon wind pooling station at Gopalpura in
Holenarasipura Taluk

21 Total of Lines

Providing additional Terminal Bays at 66/11kV Belur


1
sub-station in Hassan District.

Providing 125 MVAr bus reactor at 400/220kV


2
Talaguppa Sub-station

Modification of the existing 220 kV Strung bus by Rigid


3
bus at 220 kV Khemar sub-station in Udupi District

3 Total of TB's & Others

85 Total of Hassana Zone


MYSURU TRANSMISSION ZONE

184 List-IV
Sl.
Name of the Work District
No.

Nagamangala: Establishment 2x100MVA, 220/66kV


1
Station along with associated Transmission lines

Establishing 2x100 MVA, 220/66 kV sub-station at


2
Maddur in Maddur Taluk, Mandya District

Establishing 1x8 MVA, 66/11 KV Sub station at


3
Somarapete in Chamarajanagara Taluk & District

Establishing 1x12.5 MVA (66/11 kV) & 1x8 MVA


(66/33 kV) 66/33/11kV sub-station at Hanagal
4 Shettyhalli (Somawarapete) in Somawarapete Taluk,
Kodagu District with construction of 66KV SC Line on
DC Towers for a distance of about 27Kms.
Upgradation of 33/11kV sub-station to 66/11kV sub-
5 station by providing 1X8 MVA, at Murnadu in Madikeri
Taluk, Kodagu District
Establishing 2x8 MVA 66/11kV sub-station at
6
Srimangala in Somvarpet Taluk, Kodagu District.

Establishing 1x8 MVA 66/11kV sub-station at Kudige


7
in Somvarpet Taluk, Kodagu District.

Establishing 1x8 MVA 66/11kV sub-station at


8 Lokkanahalli(Chennalinganahalli(C.N Halli)),
Kollegala Taluk, Chamarajanagar District.
Up-gradation of 33/11kV Sub-station to 66/11kV Sub-
station by providing 1X12.5MVA, at
9
Siddapura(Beeticadu) in Virajpet Taluk, Kodagu
District.

Establishing 2 x 100 MVA, 220/66 kV Sub-Station at


10
Adakanahalli, Nanjangud Taluk, Mysuru District

Establishing 1x8 MVA, 66/11kV Sub-station at


11 Pandithanahalli(Bachanahalli) in Malavalli Taluk,
Mandya District

Establishing 1x8 MVA, 66/11kV Sub-station at


12
Sunkathonnur in Pandavapura Taluk, Mandya District

Establishing 1x8 MVA, 66/11kV Sub-station at


13 Eechalagudda kaval(ganadahalli gate) at K.R.Pet
Taluk, Mandya District

Establishing 1x8 MVA, 66/11kV Sub-station at Varuna


14
in Mysuru Taluk, Mysuru District

Establishing 1x8 MVA, 66/11kV Sub-station at


15
Honganuru in Chamarajanagara Taluk and District

Establishing 2x100MVA 220/66/11kV sub-station at


16
Hunsur in Hunsur Taluk and Mysuru District.

Establishing 1x8 MVA, 66/11kV Sub-station at


17
Hadinaru in Nanjangudu Taluk, Mysuru District

Establishing 1x8 MVA, 66/11kV Sub-station at Goluru


18
in Nanjangudu Taluk, Mysuru District

Establishing 1x8 MVA, 66/11kV Sub-station at


19
Volagere in Nanjangudu Taluk, Mysuru District

Establishing 1x8 MVA, 66/11kV sub-station at


20 Bhagamandala(Kopatti) in Madikeri Taluk, Kodagu
District.

Establishing 2x500 MVA, 400/220 kV sub-station at


21
Kadakola in Mysore District

Establishing 1x8 MVA, 66/11 kV sub-station at


22 Kodlipet(Handpost) in Somawarapete Taluk, Kodagu
District

Establishing 1x8 MVA, 66/11 kV sub-station at Katte


23
Malalavadi Gate in Hunsur Taluk, Mysuru District

Establishing 1x8 MVA, 66/11 kV sub-station at


24 Maragowdanahally(Mavathur)in K.R.Nagar Taluk,
Mysuru District

185 List-IV
Sl.
Name of the Work District
No.

Establishing 1x8 MVA, 66/11 kV sub-station at Meluru


25
in K.R.Nagar Taluk, Mysuru District

Establishing 1x8 MVA, 66/11 kV sub-station at


26
Kyatanahalli in Pandavapura Taluk, Mandya District

Establishing 1x8 MVA, 66/11 kV sub-station at


27
Santhekasalagere in Mandya Taluk, Mandya District

Establishing 1x8 MVA, 66/11 kV sub-station at


28
Beeruvalli in K.R.Pete Taluk, Mandya District

Establishing 1x12.5 MVA, 66/11 kV sub-station at


29
Padukote in HD Kote Taluk, Mysuru District

Establishing 1x8 MVA, 66/11 kV sub-station at


30
Seeguru Gate in Periyapatna Taluk, Mysuru District

Establishing 1x8MVA, 66/11kV sub-station at


31
Hunasawadi in Periyapatna Taluk, Mysuru District

Establishing 1 x 8 MVA, 66/11 kV sub-station at


32
Mullur in Saragur Taluk, Mysuru District

Establishing 1x8 MVA, 66/11 kV sub-station at


33
Challahally in Hunsur Taluk, Mysuru District

Establishing 1x8 MVA, 66/11 kV sub-station at


34
Rathnapuri in Hunsur Taluk, Mysuru District

Establishing 1x8 MVA, 66/11 kV sub-station at Dodde


35
Koppalu Gate in Hunsur Taluk, Mysuru District

35 Total of Sub-stations

Providing 1x100 MVA, 220/66 kV spare transformer at


1
220 kV Kadakola sub-station.

Re-submission: Replacing 1x 6.3 MVA, 66/11 kV


2 transformer by 1x12.5 MVA transformer at 66 kV
Devanur(Nanjangud) Sub-station in Mysore District.

Replacing 1x8 MVA, 66/11 kV Transformer by 1x12.5


3 MVA, 66/11 kV Transformer-2 at 66 kV Megalapura
sub-station in Mysuru taluk and district

Replacing 2x8 MVA, 66/11 kV Transformer by 2x12.5


4 MVA, 66/11 kV Transformer at 66/11 kV
K.Honnalagere sub-station in Maddur Taluk and

Providing additional 1x8 MVA, 66/11 kV Power


5 Transformer at 66/11 kV Transformer Doora sub-
station in Mysuru Taluk and Mysuru district

Providing additinal1x8 MVA, 66/11kV Power


6 Transformer at 66/11KV Hura Sub-station in
Nanjanagud Taluk, Mysuru District.

a. Providing additional 1x8 MVA, 66/11kV Power


Transformer at 66/11kV Mugur Sub-station in
T.N.Pura Taluk, Mysuru District.
b. Shifting of 66kV Tapping point of 66/11kV S/s
7
Mugur from existing 66kV Doddarayapet-Kunthur-
Madhuvanahally Line to 66kV Chamarajanagar-
Kollegala-Madhuvanahally Line by constructing SC line
on DC Towers for 3Kms

Providing additional 1x8 MVA, 66/11kV Power


8 Transformer at 66/11kV Martally Sub-station in
Kollegala Taluk, Mysuru District.

a. Replacement of 2x8 MVA, Power Transformer by


2x12.5 MVA Power Transformer at 66/11 KV
Ramapura sub- station in Kollegal Taluk,
Chamarajnagara District.
b.Construction of 66kV DC Line on DC Tower by
9 replacement of existing SC Line on SC tower of 66kV
Hanur-Cowdally line of 17.4Kms along with Radial SC
line on DC towers from 66/11kV S/s Ramapura to
Proposed 66/11kV s/s Ajjipura for about 13Kms for
Ring main arrangement by replacing existing Radial
arrangement at Kollegala taluk,Chamarajanagar district
Replacement of 2x8 MVA, Power Transformer by 2x12.5
MVA Power Transformer at 66/11 KV Doddinduvadi
10
sub- station in Kollegal Taluk, Chamarajnagara
District.

186 List-IV
Sl.
Name of the Work District
No.

Providing additional 1x12.5MVA, 66/11kV at


11 Ganjigere sub-station, K.R.Pete Taluk, Mandya
District.

Providing additional 1x8 MVA, 66/11 kV transformer


12 at 66 kV Ayarahalli sub-station, in Mysuru Taluk and
District.

Providing additional 1x8 MVA, 66/11 kV transformer


13 at 66 kV Kabballi sub-station, in Gundlupet Taluk and
Chamarajanagara District

Providing additional 1x20 MVA, 66/11 kV transformer


14 at 66 kV Doddarayapete sub-station, in
Chamarajanagara Taluk and District

Replacing 1x12.5MVA, Power Transformer by 1x20MVA


15 Power Transformer at 66/11kV Koppa sub-station in
Maddur Taluk, Mandya District

Replacing 2x8MVA, 66/11 kV Transformers by


2x12.5MVA 66/11 kV Transformers at 66/11 kV
16
Mahadeshwarapura sub-station in Pandavapura Taluk
and Mandya District

Replacing 1x8 MVA, 66/11 kV Transformer by


1x20MVA 66/11 kV Transformer at 66/11 kV
17
Guddenahalli sub-station in Nagamangala Taluk and
Mandya District.

Replacing 1x8 MVA, 66/11 kV Transformer by


1x20MVA 66/11 kV Transformer at 66/11 kV
18
Chikkamandya sub-station in Mandya Taluk and
District.

Replacing 1x20 MVA, 66/11 kV Transformer by


1x31.5MVA 66/11 kV Transformer at 66/11 kV
19
Maddur sub-station in Maddur Taluk and Mandya
District

Replacing 2x12.5 MVA, 66/11 kV Transformers by


2x20MVA 66/11 kV Transformers at 66/11 kV
20
Nagamangala sub-station in Nagamangala Taluk and
Mandya District.

Replacing 1x12.5 MVA, 66/11 kV Transformer by


1x20MVA 66/11 kV Transformer at 66/11 kV
21
Gundlupete sub-station in Gundlupete Taluk and
Chamarajanagara District

Replacing 1x8 MVA, 66/11 kV Transformer-1 by


1x12.5MVA 66/11 kV Transformer at 66/11 kV
22
Hangala sub-station in Gundlupete Taluk and
Chamarajanagara District

Replacing 2x100 MVA, 220/66 kV Transformers by


2x150 MVA 220/66 kV Transformers at 220/66 kV
23
Tubinakare sub-station in Mandya Taluk and Mandya
District.

23 Total of Augmentations

Re-construction of 66 kV Vajamangala-SFC single


1
circuit idle line in Mysore & Mandya Districts

(Resubmission)Strengthening of 66 KV coyote SC line


on SC tower from Kadakola 220 KV sub-station to 66kV
2
Devanur (Nanjangud) sub-station by Drake conductor
on 110/66kv DC tower to a distance of 23 km.

Conversion of existing 220 kV SC Hootagally-


3 Vajmangala-TK Halli to DC line with Drake ACSR
conductor

a)Providing 66kV SC link line between 66kV Bhogadi


sub-station and 66kV Santhebachahally Sub-station
K.R.Pet Taluk, Mandya District.
4
b) Providing radial connectivity for 66 kV Bhogadi sub-
station from 66 kV Guddenahalli sub-station in K.R.Pet
Taluk, Mandya District.

Providing 66kV DC link line with coyote conductor


between 220kV Huygonahalli sub-station and 66kV
5
Chinakurali sub-station for a distance of about 20 kms
in K.R.Pet Taluk, Mandya District

Stringing of 66 kV 2nd circuit with coyote conductor on


existing 66kV DC towers of 66 kV Chamarajanagara-
6 Honnali SC line for a distance of about 17kms along
with 66 kV TBs at both ends in Chamarajanagara Taluk
and District

6 Total of TB's & Others

187 List-IV
Sl.
Name of the Work District
No.

64 Total of Mysuru Zone

BAGALKOTE TRANSMISSION ZONE

Establishing 2x100 MVA, 220/110 kV sub-station at


1 Bagalkot
Savalagi (Near Chikkalaki Cross), Bagalkot District

Establishing 1x10 MVA, 110/11 kV sub-station at


2 Thabakadahonnalli in Kalaghatagi Taluk, Dharwad Dharwad
District

Upgradation of 33/11 kV sub-station to 2x10 MVA,


3 110/11 kV sub-station at Haunsbhavi in Haveri Taluk, Haveri
Haveri District
Establishing 1x10 MVA, 110/11 kV sub-station at
4 Hiremural(Nalathawad) in Muddebihal Taluk, Vijayapura
Vijayapura District

Establishing 1x10 MVA, 110/11 kV sub-station at


Bagewadi in Mundaragi Taluk, Gadag District.
Modification in 110 kV line scheme proposed for
5 Gadag
establishing 1x10 MVA, 110/11 kV Sub-station at
Bagewadi in Mundaragi Taluk, Gadag District approved
in 73 rd TCCM on 20.3.17 .

Establishing 2x10 MVA, 110/11 kV sub-station at


6 Belagavi
Gosabal in Gokak Taluk, Belagavi District

Establishing 1x10 MVA, 110/11 kV sub-station at Itnal


7 Belagavi
in Soundatti Taluk, Belagavi District

Establishing 1x10 MVA, 110/11 kV sub-station at


8 Vijayapura
Telagi in B.Bagewadi Taluk, Vijayapura District

Establishing 1x10 MVA, 110/11 kV sub-station at


9 Dharwad
Hebballi in Dharwad Taluk, Dharwad District

Establishing 1x10 MVA, 110/11 kV sub-station at


10 Dharwad
Morab in Navalagund Taluk, Dharwad District

Establishing 2x10 MVA, 110/11 kV sub-station at


11 Belagavi
Nandagaon in Gokak Taluk, Belagavi District

Establishing 2x100 MVA, 220/110 kV sub-station at


12 Bagalkot
Bilagi in Bilagi Taluk, Bagalkot District

Establishing 1 x 10 MVA, 110/11 kV sub-station at


13 Bagalkot
Kainakatti in Badami Taluk, Bagalkot District

Establishing 1 x 10 MVA, 110/11 kV sub-station at


14 Bagalkot
Suthagundar in Bagalkot Taluk, Bagalkot District

Establishing 2 x 10 MVA, 110/11 kV sub-station at


15 Bagalkot
Hebbal in Mudhol Taluk, Bagalkot District

Establishing 1 x 10 MVA, 110/11 kV sub-station at


16 Dharwad
Hireharkuni in Kundagol Taluk, Dharwad District

Upgradation of 3x5 MVA,33/11 kV sub-station to 2 x


17 10 MVA, 110/11 kV sub-station at Kaginele in Byadagi Haveri
Taluk, Haveri District

Establishing 1 x 10 MVA, 110/11 kV sub-station at


18 Haveri
Belur in Ranebennur Taluk, Haveri District

Establishing 2 x 10 MVA, 110/11 kV sub-station at


19 Belagavi
Bellada Bagewadi in Hukkeri Taluk, Belagavi District

Upgradation of 2x5 MVA, 33/11 kV sub-station to 2 x


20 10 MVA, 110/11 kV sub-station at Dhulkhed in Indi Vijayapura
Taluk, Vijayapura District

Establishing 2 x 10 MVA, 110/11 kV sub-station at


21 Belagavi
Kodachawad in Khanapur Taluk, Belagavi District

Establishing 1 x 10 MVA, 110/11 kV sub-station at


22 Vijayapura
Gubbewad in Sindagi Taluk, Vijayapura District

Establishing 2x100 MVA, 220/110 kV sub-station at


23 Belagavi
Salahally in Ramadurga Taluk, Belagavi District

Establihing 2x100 MVA, 220/110 kV Sub-station at


24 Belgavi
Ramdurga Ramdurga Taluk, Belgavi District.

188 List-IV
Sl.
Name of the Work District
No.

Establishing 1x10 MVA, 110/11 kV sub-station at


25 Khanderayanahalli in Ranebennur Taluk, Haveri Haveri
District
Establishing 1x10 MVA, 110/11 kV sub-station at
26 Haveri
Kulenur in Haveri Taluk, Haveri District
Establishing 1x10 MVA, 110/11 kV sub-station at Uttara
27
Kanasur in Siddapura Taluk, Uttara kannada District Kannada

Establishing 1 x 10 MVA, 110/11 kV sub-station at


28 Vijayapura
Honwad in Vijayapura Taluk, Vijayapura District

Establishing 1 x 10 MVA, 110/11 kV sub-station at


29 Vijayapura
Kannur in Vijayapura Taluk, Vijayapura District

Establishing 2 x 10 MVA, 110/11 kV sub-station at


30 Vijayapura
Jambagi in Vijayapura Taluk, Vijayapura District

Upgradation of 2x5 MVA, 33/11 kV sub-station to


31 1X10 MVA, 110/11 kV & 1x20 MVA, 110/33 kV Sub Haveri
Station at Akkialur in Hangal Taluk, Haveri District

Re-submission :- Establishing 2x100 MVA, 220/110 kV


32 Haveri
Sub-station at Byadagi, Byadagi Taluk, Haveri District.

Establishing 2 x 10 MVA, 110/11 kV sub-station at


33 Vijayapura
Bellubbi in Vijayapura Taluk, Vijayapura District

Establishing 2 x 10 MVA, 110/11 kV sub-station at


34 Vijayapura
Arjunagi in Vijayapura Taluk, Vijayapura District

Establishing 1 x 10 MVA, 110/11 kV sub-station at Uttara


35
Hattaragi in Sirsi Taluk, Uttara Kannada District Kannada

Establishg 2x500 MVA, 400/220 kV sub-station at


36 Yalwar (Tentative Loacation) in Basavana Bagewadi Vijayapura
Taluk, Bijapur District.

Establishg 2x500 MVA, 400/220 kV sub-station at


37 Bagalkot
Lokapur in Mudhol Taluk, Bagalkot District.

Establishg 2x100 MVA, 220/110 kV sub-station at Ron


38 Gadag
in Ron Taluk, Gadag District.

220kV GIS station to replace existing 220kV Ambewadi


39 north canara
SS , Haliyal Tq, North canara Dist

Establishing 1X10 MVA,110/11 kV Sub-station at


40 Navage Industrial Area in Belgavi Taluk and District. Belagavi

Establishing 2X10 MVA, 110/11kV sub station at


41 Vijayapura
Hullur, Muddebihal Taluk, Vijaypura district.

Establishing 1x10 MVA, 110/11 kV sub-station at


42 Vijayapura
Kerur in Indi Taluk, Vijayapura District.

Establishing 2x10 MVA, 110/11 kV Sub-station at


43 Belagavi
Harugeri in Raibag Taluk, Belgaum District.

Establishing 2X10 MVA, 110/11 KV sub-station at


44 Chimmada in Jamakhandi Taluka, Bagalkot District. Bagalkot

Establishing 2x100 MVA, 220/110 kV, 1x10 MVA,


Uttara
45 110/11 kV Sub-station at Divagi in Kumta taluk,
Kannada
Uttara Kannada District.

Establishing 2x100 MVA, 220/110 kV Sub-station at


46 Belagavi
Desur, Belagavi District.

Establishing 2X10 MVA, 110/11 KV sub-station at


Dindawar
by making LILO arrangement from 110kV Bagewadi-
Sindagi line
47 for a distance of 1.5Kms in Basavan Bagewadi Taluk, Vijayapura
Vijayapura
District.

Establishing 2X10 MVA, 110/11 KV sub-station at


Yankanchi by making LILO arrangement from 110kV
48 Sindagi-Bagewadi line for a distance of 10Kms in Vijayapura
Sindagi Taluk, Vijaypur District.

Establishing 1X10 MVA, 110/11 KV sub-station at


Machakanur by making LILO arrangement from
49 Bagalkot
110kV Bagalkot-Lokapur line for a distance of 2.0 kms
in Mudhol Taluk, Bagalkot District.
Establishing 1X10 MVA, 110/11 KV sub-station at
Kendur by making LILO arrangement from 110kV
50 Bagalkot
Kerur-Badami line for a distance of 8 Kms in Badami
Taluk, Bagalkot District.

189 List-IV
Sl.
Name of the Work District
No.

Establishing 2X10 MVA, 110/11 KV sub-station at


Alagur
by construction of 110kV SC line on DC towers from
approved 220/110kV Chikkalaki cross (Savalagi) for a
51 Bagalkot
distance of 15Kms in Jamakhandi Taluk, Bagalkot
District.

Establishing 1X10 MVA, 110/11 KV sub-station at


Jigajevanagi by constructing S/C line on D/C towers
52 Vijayapura
for a distance of 10 Kms from existing 110 KV sub-
station Inchageri in Indi Taluk, Vijayapur District.
Upgradation of existing 2x5MVA, 33/11KV sub-station
to 2x10MVA,110/11KV sub-station at Naad in Indi
53 Taluka, Vijayapur District with construction of 110kV
SC line on DC towers from 110kV Hiremasali for a
distance of 9 kms.
Establishing 2X10 MVA, 110/11 KV sub-station at
Umaraj village by constructing S/C line on D/C tower
54 Vijayapura
with Lynx conductor for a distance of 18 km in Indi
Taluk, Vijayapur District.

Establishing 2X500 MVA, 400/220kV SS at Bijapur -


55 Bagewadi area at yalawar/ Shivanagi, Vijaypur Taluk & Vijayapura
dist

Upgradation of 33 kV sub-station to 2x10 MVA,


56 110/11 kV sub-station at Aralimatti in Gokak Taluk,
Belagavi District.

Upgradation of 33 kV sub-station to 2x10 MVA,


57 110/11 kV sub-station at Hallur in Gokak Taluk,
Belagavi District.

Establishing 2X10 MVA, 110/33/11 KV sub-station at


Madangeri near Gokarna by LILO arrangement from
58 110 Kumta – Karwar line for a distance of 0.03Kms in
Kumta Taluk, Uttara Kannada District.

Establishing 2x100 MVA, 220/110 kV Sub-Station at


59
Hungund, Hungund Taluk, Bagalkot district.

59 Total of Sub-stations

Replacement of MS and Deteriorated Towers and


Lines of 110 kV Supa-Goa DC line by new 110 kV DC Uttara
1
line with Lynx conductor using 110 kV GI towers in the Kannada
existing corridor in Uttara Kannada District
Providing additional 1x50 MVA, 220/11 kV Tr at 220
Uttara
2 kV Sirsi (Esle) sub-station, in Sirsi Taluk, Uttara
Kannada
Kannada District
Providing additional 1x100 MVA 220/110 kV Power
3 transformer at 220/110/11 kV Ghataprabha sub- Belagavi
station in Belagavi District.
Providing additional 1x10 MVA, 110/11 kV transformer
4 along with 1I/C+5F switchgear at 110 kV Nidagundi Vijayapura
sub-station in B.Bagewadi Taluk & Vijaypura District.

Creating 33kV reference by installing 1X20 MVA,


5 110/33 kV power transformer at 110kV Chadachan Vijayapura
sub station in Indi Taluk, Vijaypura District.
Providing 1x100 MVA, 220/110 kV Power transformer
6 at 220/110 /11 kV Kuduchi Sub-station in Raibhag
taluk.
Augmentation of existing 1x5 MVA, 110/11 kV Power
Transformer by 1x10 MVA, 110/11 kV power
7
transformer at 110kV Sub-station Siddapur in Sirsi
Taluk, Uttar Kannada District
Augmentation of 1X10 MVA, 110/11kV Power
Transformer by 1X20 MVA, 110/11kV Power
8
Transformer at 110/11kV Mamadapura Sub-station in
Gokak Taluk and Belgaum District.
Providing additional 1x10 MVA, 110/11 kV transformer
along with (1+5) 11kV switchgear at 110 kV
9 Dharwad
Ramankoppa sub-station in Kundagal Taluk ,
Dharwad District.
Providing additional 1x10 MVA, 110/33 kV transformer
along with one No. 33kV feeder bay at 110 kV Akshay
10
colony sub station in Hubli Taluk & District.

Providing additional 1x10MVA, 110/11kV Power


11 Transformer at 110/11kV Kawalawad sub-station in
Haliyal Taluk, Uttara Kannada District
Augmentation of 10MVA by 20MVA, 110/11KV power
transformer No-02 with additional (1+7) PCVCB switch
12
gears at 110/11KV Yallammanawadi sub station in
Athani Taluk, Belgaum District.
Augmentation of 10MVA by 20MVA, 110/11KV Power
transformer No-01 with additional (1+7) PCVCB
13
switchgears at 110/11KV Balligeri sub station in
Athani Taluk, Belgaum District
Augmentation of 10MVA, 110/11kV power transformer
No-02 by 20MVA, 110/11KV power transformer with
14
additional (1+7) MCVCB switch gears at 110/11KV
Ainapur sub station in Athani Taluk, Belgaum District

Augmentation of 10MVA, 110/11kV power transformer


by 20MVA, 110/11KV power transformer with
15 additional 1I/C+2F+1AP3 MCVCB switch gears at Vijayapura
220/110KV Basavan Bagewadi sub station in
B.Bagewadi Taluk, Vijaypura District.

190 List-IV
Sl.
Name of the Work District
No.

Augmentation of 10MVA, 110/11kV power transformer-


16 2 by 20 MVA, 110/11kV power transformer at 110kV belagavi
Yadwad sub station, in Gokak Taluk, Belagavi District
Providing additional 1x10 MVA, 110/11 kV
transformer along with PCVCB switchgear at 110 kV
17
Shiraguppi sub-station in Bilagi Taluk , Bagalkot
District.
Augmentation of 1X10 MVA, 110/11kV Power
Transformer –I by 1X20 MVA, 110/11kV Power
18 Transformer along with 11kV PCVCB switchgears at
110 kV Malaghan (Sindagi) sub-station in Vijayapur -
District.
Augmentation of 10MVA, 110/11kv power transformer
19 1 by 20MVA, 110/11kV power transformer at 110kV
station Mudalagi in Mudalagi Taluk & district.

Augmentation of 1X10MVA, 110/11KV Power


Transformer –I by 1X20MVA, 110/11KV Power
20
Transformer along with switchgears at 110/11KV Sub-
Station, Mukarthihal in Vijayapur Dist.

Augmentation of 1X10 MVA, 110/11kV Power


Transformer-I by 1X20 MVA, 110/11kV Power
21 Transformer along with 11kV PCVCB switchgears at
110/11kV Devarhipparagi Sub-station in sindagi
Taluk ,Vijayapur District.

Augmentation of 1X10 MVA, 110/11kV Power


Transformer-I by 1X20 MVA, 110/11kV Power
22
Transformer at 110/11kV Byadagi Sub-station in
Haveri District.

Providing additional 1x10 MVA, 110/11 kV transformer


23 along with switchgear at 110 kV Basavanakatti sub-
station in Haveri Taluk & District

Augmentation of 1X10 MVA, 110/11kV Power


Transformer-I by 1X20 MVA, 110/11kV Power
24
Transformer at 110/11kV Rattihalli Sub-station in
Haveri District.

Providing additional 1x100 MVA, 220/110 kV power


25 transformer at 220/110 kV Vijayapura sub-station in
Vijayapura district.

Providing additional 1x100 MVA, 220/110 kV power


26 transformer at 220/110 kV Indi sub-station in
Vijayapura district.

26 Total of Augmentations

220 kV Evacuation lines from the proposed 2400+1600


1 =4000 WM NTPC Super Critical TPS at Kudgi in Bijapur Bijapur
District - Modification reg.

Stringing of 110 kV 2nd circuit on existing 110 kV DC


2 GI towers from 110 kV KIADB sub-station to Tikota Vijayapura
S/S(from Loc 1 to 115) in Bijapur District

Conversion of 110 kV SC line to DC line from 220 kV


Athani sub-station to 110 kV Athani sub-station for a
3 distance of 3.7 kms with replacement of existing 110 Belagavi
kV SC line constructed on SC MS towers from location
125 to location 133 in Athani Taluk, Belagavi District
Construction of 110 kV SC line on DC towers with Lynx
conductor from 110 kV Shirabur to 110 kV Bisnal
4 Vijayapura
sub-stations for a distance of about 10 kms in
Vijayapura/Bagalkot District
Replacement of H frame towers by GI towers along with
conductor and ground wire of 110 kV SRS Hubli-
5 Bidnal-Annigeri-Gadag SC line from Loc no 1 to 21, Dharwad
27 to 182 and 182 to 304 for a distance of 54 kms in
Dharwad/Gadag District
Construction of 110 kV SC line on DC towers with Lynx
conductor from 110 kV Mamadapur sub-station to
6 Belagavi
110 kV Yaragatti sub-station with Terminal bays at
both ends in Belagavi District
Construction of 110 kV SC line on DC towers with Lynx
conductor from 110 kV Babaleshwara sub-station to
7 Vijayapura
110 kV Tikota sub-station with Terminal bays at
both ends in Vijayapura District
Construction of 110 kV SC line on DC towers from 110
kV Nippani sub-station to proposed 110 kV
Kugonalli sub-station for a distance of about 15 kms
8 Belagavi
and 110 kV Bhoj sub-station to 110 kV Boregaon sub-
station for a distance of about 14 kms in Belagavi
District
Stringing of 110 kV 2nd circuit on existing 110 kV DC
towers between 220 kV Belagavi sub-station to 110
9 Belagavi
kV Mache substation for a distance of about 29.54 kms
in Belagavi District
Replacement of MS Fabricated tower by GI lattice
tower along with conductor from 66 kV Multi circuit
10 to 66 kV Harihar-Hospet sub-station & Poly Fiber Haveri
station Harihar-Hospet in Haveri TLM section, Haveri
District
Providing alternate source to 220 kV Ranebennur sub-
11 station by LILOing 220 kV Haveri-Guttur line-1 at Haveri
Loc 94-95 in Ranebennur Taluk, Haveri District

191 List-IV
Sl.
Name of the Work District
No.

Replacement of rusted GI lattice towers along with


conductor and ground wire of 110 kV SRS Hubli-
12 Bidnal-Bagalkot DC line from loc no 01 to 15 & 18 Gadag
to 250 in TLM sub-Division jurisdiction Dharwad and
Gadag District
Construction of 2nd circuit LILO of 220kV
13 Mahalingpura-Kudachi DC line to 220kV Athani sub- Belagavi
station
Strengthening of 220 kV DC line between 220/110 kV
Gadag and Lingapur switching station via proposed
14 Gadag
400/220 kV Dhoni sub-station with Drake equivalent
HTLS conductor.
Replacement of partially MS towers by new DC GI
towers along with conductor & ground wire from Loc 01
to Loc 127 and replacing SC MS towers by DC
15 Vijayapura
Monopole towers from Loc 128 to Loc 147 of 110 kV
B.Bagewadi-Bijapur city SC line for a distance of
about 47.5 kms in Vijayapura District
Stringing of 110 kV 2nd circuit from tapping point to
110 kV Mattihal sub-station for a distance of about
16 Vijayapura
12.38 kms along with a TB at Mattihal sub-station in
Vijayapura District
Construction of 110 kV link line from 110 kV Hosa
Honnatti sub-station to Aremallapura tap line for a
distance of about 2.48 kms along with 110 TB at 110
17 Haveri
kV Hosa Honnatti sub-station to have independent
souce to 110 kV Aremallapura sub-station in
Ranebennur Taluk, Haveri District
Replacement of partially MS towers by new DC GI
towers along with conductor & ground wire from Loc
170 to Loc 162, Loc 171 to Loc 237 and Loc 238 to Loc
18 Belagavi
244 of 110 kV Chikkodi-Sankeshwara-Hukkeri SC
line for a distance of about 22.7 kms in Belagavi
District
Replacement of existing SC towers by DC towers with
Drake conductor from 220kV Bidanal to 220kV
19 Soundatti to 220kV Mahalingpura in existing corridor Belgaum
from Location 13 to 431 from 220kV Bidnal-Soundatti
line in Belgaum District.
Construction of 110kV SC line on DC towers from
110/11kV Toravi sub station to location No 140 of
Basavana Bagewadi- Vijayapura SC line and MC
narrow based tower from location No 140 : 147 for
20 Vijayapura
creating ring main circuit in Muncipal Corporation area
in Vijayapura District.

Construction of 110kv SC line on DC towers with Lynx


conductor from 110kv Kudal Sangam S/S in Bagalkot
21 Vijayapura
District to 110 kV Muddebihal S/S in Vijayapura
Dist.

Construction of 110 kV SC line on DC towers with Lynx


22 conductor from 110 kV Kaladagi to 110 kV Kataraki Bagalkot
sub-stations in Bagalkot District.
Stringing of second circuit on existing DC tower from
220/110 kV Athani receiving station to 110/11kV
23
MUSS Aigali for a distance of 21.08 kms in Athani
Taluk , Chikkodi District.

Replacement of existing 110kV MS SC line on SC


towers by DC line on GI DC Towers, conductors and
ground wires from 220KV Mahalingapur sub station
24 to 110kV Ghataprabha line from Loc No: 149 to 112 Bagalkot
for a distance of 13 kms (up to 110kV Dawaleshwar
sub station) with one number terminal bay at 220KV
R/S Mahalingapur in Bagalkot District.

Reconsidering the proposal of construction of 110kV


SC link line on DC towers from 110kV Hanagal Sub-
25 station to 110 kV Tiluvalli Sub-station, along with
110kV Terminal Bays at both ends in Haveri District
which was dropped in the 74th TCCM

Replacement of drake / porcelin insulators by HTLS


26 drake of outgoing 220kV lines from Kali generating
complex in uttara kannada Dist

Construction of 110 kV SC line on DC GI towers from


27 110 kV Bailhongal station to 110 kV Hosur sub-
station in Saundatti taluk, Belagavi district.

Stringing of 2nd circuit on existing SC line on DC tower


with Lynx conductor from 220 kV Ghataprabha to
28 110 kV Ankalagi and 110 kV Nehrunagar sub-station
for a distance of 49 kms and new line for a distance of
7.5 kms in Belgaum district.

Stringing of 2nd circuit on existing SC line on DC tower


with Lynx conductor from tower No. 53 near LILO
29
point of Munavalli station to 110 kV Yargatti sub-
station for a distance of 34 kms in Belgaum district.

Replacement of rusted GI Lattice SC towers along with


conductor and ground wire from 110kV Narendra sub
30
station to Kittur line with MC towers from tower No.
90 to 138 in Dharwad district.

192 List-IV
Sl.
Name of the Work District
No.

Modification for the already approved proposal :


Replacement of 110 Lattice type SC towers along with
Lynx conductor & ground wire by 110kV UG cable from
31
220 kV SRS Hubli sub-station to Anandanagar &
upto 110kV UG cable terminating structure near
Anandnagar from Loc : 01 to 11 in Dharwad District.

31 Total of Lines

Providing dedicated metering arrangement to 220 kV


1 Mudashinge and 220 kV Talandage line TBs at 220 Belagavi
kV Chikkodi in Belagavi District
Providing metering & protection to 5 MVA, 110/11 kV
Uttara
2 Transformer at 110/11 kV Anmod sub-station in
Kannada
Joida Taluk, Uttara Kannada District
Replacement of age old MS towers by new GI towers
along with conductor and ground wire of 220kV Bidnal
3 sub station to 110kV Bagalkot sub station (old) Bagalkot
from loc No:-251 to 388 for a distance of 44 kms in
Bagalkot district.
3 Total of TB's & Others

119 Total of Bagalkote Zone

KALABURAGI TRANSMISSION ZONE

Yadgir north:
1 Establishing of 2X10 MVA,110/11kV Substation at
Yadgir North in Yadgir Taluk & District.

Rudrawadi :
2 Establishing of 1X10 MVA,110/11kV Substation at
Rudrawadi village in Alanda taluk,Kalaburagi district.

Devapur Cross:
3 Establishing of 2X10 MVA,110/11kV Substationat
Devapur cross in Shorapur Taluk,Yadgir District.

Madana:
4 Establishing of 1X10 MVA,110/11kV Substation at
Madana village in Sedam taluk,Kalaburagi district.

Establishing 2 x 100 MVA, 220/110 kV Sub-Station at


5
Gangavathi in Gangavathi Taluk, Koppal District.

Jawahar Nagar:
Upgradation of 2X5MVA,33/11kV S/s to 2X10
6
MVA,110/11kV S/s at Jawahar Nagar in Raichur
Taluk & District.

Aurad: Upgradation of
7 2X5MVA,33/11kV S/s to 1X10 MVA,110/33-11kV S/s
at Aurad in Aurad Taluk,Bidar District.

Bhagyanagar:
Establishing 2x10MVA, 110/11kV Sub-Station with
8 construction of 110kV line from proposed 220kV R/S
Koppal (Halavarthy) sub-station for a distance of about
10 kms in Koppal Taluk & District.
Kalbelgundi:
Establishing 2x10MVA, 110/11kV Sub-Station near
9
Banadeshwar temple ,Kalbelgundi village in Yadgir
Taluk and District

Azadpur:
10 Establishing 1x10MVA, 110/11kV Sub-Station at
Azadpur in Kalaburagi Taluk & District.

Kadlur:
Establishing 1x20MVA 110/33 kV & 1x10MVA
11
110/11 kV S/S along with construction of 110kV line
at Kadlur village in Raichur Taluk & District.

Udnoor cross:
12 Establishing 1x10MVA, 110/11kV Sub-Station at
Udnoor cross in Kalaburagi Taluk & District.

Establishing 1x10 MVA, 110/11kV Sub-Station at


13
Kollur village in Chincholli Taluk,Kalaburagi District.

Establishing 1x10 MVA,110/11kV Sub-Station at


14
Tavaragera village in Kalaburagi Taluk and District.

Establishing 1x20 MVA,110/33 kV and 1X10


15 MVA,110/11kV Sub-Station at Sagnoor in Afzalpur
Taluk,Kalaburagi District.

193 List-IV
Sl.
Name of the Work District
No.

Establishing 2x10 MVA,110/11kV Sub-Station at


16
Bankalga village in Afzalpur Taluk,Kalaburagi District.

Establishing 2x10 MVA, 110/11kV Sub-Station at


17
Sirwal Village in Shahapur Taluk,Yadgir District.

Establishing 1x10 MVA, 110/11kV Sub-Station at M-


18
Kollur in Shahapur Taluk,Yadgir District.

Establishing 2x10 MVA, 110/11kV Sub-Station at


19
Honagera in Yadgir Taluk and District.

Establishing 1x10 MVA, 110/11kV Sub-Station at


20
Ashapur Road in Raichur Taluk and District.

Chilkanahatti :
21 Establishing 1x8 MVA, 66/11kV Sub-Station at
Chilkanahatti in Hospet Taluk,Ballari District.

Upgradation of 2X5MVA, 33/11kV Sub-station to 2X10


MVA,110/11kV and 1X10 MVA,110/33 kV Sub-
22
Station at H.V.Kunta in Yelburga Taluk,Koppal
District.

Upgradation of 2X5MVA, 33/11kV Sub-station to 2X10


23 MVA,110/11 kV Sub-Station at Vajrabandi village in
Yelburga Taluk,Koppal District.

Talakal :
Up gradation of 2X5 MVA,33/11 kV Sub-station to
24
1X10 MVA,110/11 kV Sub-station at Talakal Village in
Yelburga Taluk,Koppal District.

Sridhara Gadda :
Establishing 110/33/11 kV Substation by providing
25 2X10 MVA,110/11 kV and 1X20 MVA,110/33 kV at
Sridhara Gadda Village in Siruguppa Taluk,Bellary
District.

Kawloor Village:
26 Establishing 1X10 MVA,110/11 kV Sub-station at
Kawloor Village in Yadgir Taluk and District.

Naganoor Village :
27 Establishing 1X10 MVA,110/11 kV Sub-station at
Naganoor Village in Shorapur Taluk ,Yadgir District.

Establishing 2X100 MVA, 220/110 kV Sub-station at


28
Yelburga in Yelburga Taluk, Koppal District

Establishing 2 X 100 MVA , 220/110 kV sub-station at


29
Santhpur in Aurad taluk, Bidar District.

Gaddesugur:
30 Establishing 1X10 MVA,110/11 kV Sub-station at
Gaddesugur in Wadagera Taluk , Yadgir District

B Gudi:
Establishing 1X10 MVA,110/11 kV Sub-station at B
31
Gudi in Shahapur Taluk ,Yadgir District

Hanwal:
Establishing 1X10 MVA, 110/11 kV Sub-station at
32
Hanwal in Gangavathi Taluk, Koppal District

Nadavi Village :
Establishing 1X20 MVA, 110/33 kV and 2X10 MVA,
33 110/11 kV Sub-
station at Nadavi Village in Siraguppa Taluk, Ballari
District
Gunhadgi Village :
Establishing 1X10 MVA, 110/11 kV Sub-station at
34
Gundhagi Village in Yadgir Taluk, and District

Kandakoor Village :
Establishing 1X10 MVA, 110/11 kV Sub-station at
35
Kandakoor Village in Gurmitkal Taluk,Yadgir District

Yagapur :
36 Establishing 1X10 MVA,110/11 kV Sub-station at
Yagapur in Chittapura Taluk , Kalaburagi District

Itagi :
Up-gradation of existing 33/11 kV Sub-station to 2X10
37
MVA, 110/11 kV Sub-station at Itagi in Kampli Taluk,
Ballari District

194 List-IV
Sl.
Name of the Work District
No.

37 Total of Sub-Stations

1 110 kV Kolhar,20 MVA, 110 / 33-11 kV

2 110 kV Ladha,20 MVA, 110/ 33-11 kV

3 220kV Sedam, 20 MVA, 110/ 33-11 kV

4 110 kV Shahapur,20 MVA, 110/ 33-11 kV

5 110 kV Kalaburagi (South ),20 MVA,110/ 33-11 kV

6 110 kV Kavithal,20 MVA,110/ 33-11 kV

7 220 kV Raichur,20 MVA,110/ 33-11 kV

8 110 kV Rajeshwar,10 MVA,110/ 33-11 kV

9 220 kV Lingasugur,10 MVA,110/ 33-11 kV

10 110 kV Hiregonnagar,10 MVA,110/ 33-11 kV

11 220 kV Ittagi,12.5 MVA,66/ 11 kV

12 66 kV Chornur,12.5 MVA,66/ 11 kV

12 Total of Augmentations

Construction of new 66kV SC (Coyote) link line on DC


1 towers from 66kV Sub-station Banavikallu to 66kV sub-
station C.J.halli for a distance of 4 kms(Munirabad Div)

Reconstruction of 110kV SC line on SC towers having


wolf/patridge conductor from 220kV Shahabad R/S to
2 110kV University SS for a distance of 27kMs by 110kV
SC line on DC towers using LYNX conductor in the
existing corridor

Re -Construction of 110kV Sedam -Chittapur H type


3 tower SC line for a distance of 25 km in the existing
corridor.

Re -Construction of 110kV Shahabad -Chittapur H type


4 tower SC line for a distance of 33.7 km in the existing
corridor.

Re -Construction of 110kV Shahapur-Shahabad DC


5
line for a distance of 57km in the existing corridor.

Construction of 110kV SC link line on DC towers


existing Kapnoor 220kV R/s to the existing
110/33/11kV Gulbarga (university) S/s via 110/33-
11kV Gulbarga (west),110/11kV Gulbarga(south) over
a distance of 51 Kms circuit length with 01 number of
6
Terminal Bay at 220kV R/S Kapnoor,02 number of
Terminal Bay at 110/33-11kV Gulbarga (west) S/s,02
number of Terminal Bay at 110/11kV Gulbarga (south)
and 01 number of terminal bay at 110/11kV
Gulbarga(University) S/s in Gulbarga Taluk & District

Reconstruction of existing 110kV Gulbarga line-I SC


line on SC tower by constructing 110kV DC new line
on DC towers from 220/110kV R/s Kapnoor to 220kV
substation Humnabad,LILO at 110/33-11kV Mahagaon
7
substation and 110/11kV Margutti substation using
the existing corridor over a distance of 56 kms circuit
length with 04 no's of TB at 110kV Mahagaon
substation in Kalaburagi Taluk & District.

195 List-IV
Sl.
Name of the Work District
No.

Reconstruction of existing SC lines on SC towers by


new DC line on DC & MC towers from 220kV
substation Kapnoor to 110kV Gularga North
substation (08kms) and DC line on DC tower with
connectivity to MC tower for LILOing 110kV University
8
substation in the existing Corridor for a distance of
25Kms from center tap of MC towers from 220kV
Kapnoor to 110kV University S/s with 01 no of TB at
220kV substation Kapnoor in Kalaburagi Taluk &
District.

Re-conductoring of 110kV Munirabad-Sindhanoor-


9 Raichur I & II lines by providing intermediate towers in
Raichur District.

196 List-IV
Sl.
Name of the Work District
No.

Re-conductoring of 110kV Raichur-Shahapur DC line


10
by providing intermediate towers in Yadgir district.

Strengthening of 220 kV DC line between 220/110 kV


Kushtagi and proposed switching station at the LILO
11
point of Kushtagi-Lingapur-Lingasugur by replacing
existing Drake by higher ampacity conductor

Ratification : Reconstruction of 110 kV SC line on SC


towers having Lynx conductor from 220 kV Kushtagi
Substation to 110 kV Yelburga Sub station for a
12 distance of 28 kms by 110 kV DC line on DC towers
using Lynx conductor in the existing corridor along
with two terminal bays one at 220 kV Kushtagi Sub
station and one at 110 kV Yelburga Sub station

Construction of 110kV SC link line on DC towers from


existing 110/33-11kV Ladha sub-station to existing
13 110/33-11kV Kamalanagar sub-station for a distance
of 30 kms length with construction of Terminal Bays at
both stations

Construction of 110kV SC link line on DC towers from


existing 110/11kV Nirna sub-station to existing
14 110/33-11kV Mannaekheli sub-station for a distance
of 20 kms length with construction of Terminal Bays at
both stations

Strengthening of 220 kV Lingapura-Ittagi-Neelagunda-


15 Guttur SC line by replacing SC line with Drake
conductor by 220 kV DC line using Drake conductor

Stringing of 2nd circuit between 110 kV Janwad and


110 kV Bidar (Kolhar) sub-station on existing DC
16 towers for a distance of about 17.5 kms with Lynx
conductor along with two no's of new terminal bays,one
at Janawad and one at Bidar (Kolhar) Sub-station

Stringing of 2nd circuit between 110 kV P D Halli and


110 kV Bellary North sub-station on existing DC towers
17 for a distance of about 14.45 kms with Lynx conductor
along with two no's of new terminal bays,one at P D
Halli and one at Bellary North Sub-station

Modification in scheme for catering 66 kV Hangal Sub-


station load from 66/11 kV Kudligi sub station to
220/66 kV Badeladaku (Kudligi) sub-station Station
18 by dismantaling existing 66kV towers in Kudligi
Taluk,Ballari
District

18 Total of Lines

67 Total of Kalaburagi Zone


495 Total of List-IV for All Zones