Phase 1 Environmental Report

Why are they required?


We are often asked why a Phase 1 environmental report or desktop study is required. There is a growing
awareness of the potential impact of the environment on our health and wellbeing. Local authorities are
responsible for ensuring that potentially contaminated sites are assessed when planning applications are
made. You may be advised in Pre-Application discussions to submit a desktop with your application or a
contaminated land investigation may be one of the conditions applied to your decision notice when
permission is granted.

Sometimes a Phase 1 environmental report or desktop study is requested to demonstrate compliance with
Part C1 of the Building Regulations. Sometimes one may be required by a warrantee provider or bank. In all
cases the report will follow a similar format.

When purchasing a site either you or your funder may require a more in depth and site specific report than
can be obtained on line. We often prepare such due diligence reports for both UK and foreign investors,
banks and insurers. Those completed range from a coffee shop with flats above, located in Croydon to a
24acre industrial estate in Grays, Essex.

Some potential sources of contamination are obvious such as the local scrap yard or gas works; others are
less so. Typical examples of potential sources of contamination are old pits or cellars filled with
contaminated material or rotting rubbish producing methane and other gases, past rebuilding on bomb
damaged sites or old industrial complexes without consideration of chemicals we now know to be harmful.

Similar to the phase 1 report is the site condition report for environmental permits which we prepare for
submission to the Environment Agency.

What do they include? What happens to the completed report?


A walkover of the site is generally required but for very small residential sites this is not always necessary. The site The completed report should be submitted to the relevant local authority and possibly the Environment Agency as
walkover enables us to identify any local features that might not be picked up on maps and to check for visual or well as other stakeholders in the project for assessment prior to undertaking any further works or investigations.
olfactory evidence of contamination. Depending upon the findings of the Phase 1 report further investigations may be required in order to confirm that the
development may be safely used for the proposed purpose.
On larger sites or those with inaccessible areas we have a drone that enables us to review parts of the site that
might otherwise not be assessed.

A report should include an assessment of the geology of the area as well as the ground and surface water. Past and
Why use Go Contaminated Land Solutions?
current land use should be considered by reference to old maps and other data. Mineral extraction reports should be
reviewed; not every area has old coal mines but there may have been past workings to extract gravel, limestone, clay
Our managing director has been involved in the property industry for nearly 40 years and has been specialising in
or a wide range of other minerals.
contaminated land issues for over 25 years. We will ensure that the service we provide is exactly what is appropriate
This information is then used to develop a site specific conceptual model and risk assessment. This is based on the for your project. We guarantee that our reports will meet the requirements of the appropriate regulatory authority.
"source-pathway-receptor" model. This involves finding at any potential sources of contamination and assessing
the possibility of this reaching and affecting sensitive receptors, such as people, fauna, flora, surface or
groundwater, buildings or the wider environment.

What will it cost?


Clearly this depends upon the size of the site and the nature of the current land use or uses. It will cost you nothing
and you will not be under any obligation if you request a Phase 1 environmental report quotation.

If the report recommends further investigation?


If the report identifies potential contamination then a Phase 2 Intrusive Investigation will probably be recommended.

Need a Phase 1 Environmental Report?

REQUEST A QUOTE

GO Contaminated Land Solutions Ltd CONNECT:


4 De Frene Rd, London SE26 4AB This website uses cookies to
ensure you get the best experience
on our website
GO Contaminated Land Solutions Ltd © 2023
Tel: 020 8291 1354

Email: askgo@gosolve.co.uk
Got it!

Website by Qdos

You might also like