HIGH PRESSURE/HIGH TEMPERATURE LET-DOWN STATION WITH DUAL OPERATING TRAINS WITH PURGING & FLUSHING OF COKE BUILD-UP
H H
G G
F F
E E
D D
C C
B B
8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
HIGH PRESSURE/HIGH TEMPERATURE LET-DOWN STATION WITH DUAL OPERATING TRAINS WITH PURGING & FLUSHING OF COKE BUILD-UP
H H
G G
F F
E E
D D
C C
B B
TOP VIEW
SPECIES ANALYTICS FZ-LLC - Registration No 47005015
806 LEAF TOWER - F9XV+GRX – Jazeerat Al Reem – Abu Dhabi
www.SpeciesAnalytics.com
8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
HIGH PRESSURE/HIGH TEMPERATURE LET-DOWN STATION WITH DUAL OPERATING TRAINS WITH PURGING & FLUSHING OF COKE BUILD-UP
H H
G G
F F
E E
D D
C C
B B
8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
HIGH PRESSURE/HIGH TEMPERATURE LET-DOWN STATION WITH DUAL OPERATING TRAINS WITH PURGING & FLUSHING OF COKE BUILD-UP
H H
G G
F F
E E
D D
C C
B B
8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
HIGH PRESSURE/HIGH TEMPERATURE LET-DOWN STATION WITH DUAL OPERATING TRAINS WITH PURGING & FLUSHING OF COKE BUILD-UP
H H
G G
F F
E E
D D
C C
B B
8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
HIGH PRESSURE/HIGH TEMPERATURE LET-DOWN STATION WITH DUAL OPERATING TRAINS WITH PURGING & FLUSHING OF COKE BUILD-UP
H H
Index:
2. Index Page 6
8. Control Valve Sizing for both the Fisher 461 & Masoneilan 73000 Page 16/17/18
9. Mogas Ball Valve and Y-Ball Valve exploded view. Page 19/20/21
E E
7. Mogas Valves with Purging/Flushing Arrangements Page 22
D 11. Pipe Stress Model and Pipe Stress Settings Page 27/28 D
B B
8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
HIGH PRESSURE/HIGH TEMPERATURE LET-DOWN STATION WITH DUAL OPERATING TRAINS WITH PURGING & FLUSHING OF COKE BUILD-UP
H H
Overview HPHT Pressure Letdown Station Overview HPHT Pressure Letdown Station
The High-Pressure, high-temperature (HPHT) Letdown Station is part of the LCF Reactor Loop. It Rotork IQ Electric Actuators drive all large-bore Mogas severe Ball valves.
performs the critical task of reducing the pressure from the HPHT Separator to the MPHT Separator All flange connections are with Grayloc Hubs, 4 Bolt Clamps, and Seal rings.
G and then onto the in-unit Hydrotreater. The Flushing/Purging Valves are CAS-2 - 1 1/2” Ball valves with Rotork IQ or Mogas pneumatic G
actuators.
Three similar Separators have their Letdown Stations: the Interstage Separator, the HPHT Separator,
and the MPHT Separator. All Purge/flushing connections to Ball valves are with Grayloc or Norsok Compact Flanges with
Seal Rings.
Here, we present the HP/HT Letdown Station and its associated Mechanical Instrument and Control
System. (see PFD page 6/7) (No socket welds allowed in sour service, and difficulty in performing NDT on the socket
F F
connection of the valve body).
Brief Process Control Operation:
HPHT Separator:
High-pressure, High-Temperature Overhead Effluent feed from the 1st LCF Reactor to the Interstage
Separator is then combined with Fresh Hydrogen and fed into the 2nd LCF Reactor. Vendor Designed and only the outlet Nozzle validated for Piping Connection to HPHT Let-
Down Station.
E Hot Oil Quenching of the Feed Stream occurs in the Separator. E
Instrument Control System and Logic Controller:
Flow Control Feed/Qeunch ratio is accomplished with the SP derived from the Separator Outlet
temperature on the outlet Nozzle. The PLCs are housed within an environmentally controlled Rittal Cabinet.
The Level control of the HP/HT Separator station Control Valve (Masoneilan 73000) is controlled by Foxboro Pressure Transmitters for HP and MP measurement circuits for the Control Valves are
the multi-selective Level Transmitters on the HP/HT Separator. located before the Level Control Valve and downstream of the control valve.
D D
The HPHT Letdown Station: Interface to the Rotork IQ Electric actuators and the pneumatic flush/purge valves is
accomplished via the PLC I/O interface.
Because of the High Conradson Index of the DILBIT Feed, coke build-up at high temperatures in the
Valves and Orifices leads to valve failures. PLC Interlock signals to the Main DCS are accomplished via Foundation Fieldbus.
Over the years, several protection schemes have implemented various valve types to enhance the life The Pneumatic Actuators on the flush/purging valves are controlled via the PLC Festo
C of the high-value Ball and Plug Control Valves. C
Electrical managed Pneumatic switches within the Pneumatic Control Cabinet below the PLC
Cabinet.
The Module contains two separate circuits, A & B, and the valve seats and body cavities are flushed
online and offline to purge the valve seat and body cavity of coke build-up. The Pneumatic flush/purging valve Actuators have visual and electrical indicators for
positional awareness.
A & B circuits are switched over regularly, flushed, and purged with hot quench oil at 190 degrees C.
B B
When placed online, the offline circuit is maintained at 190 degrees C to reduce thermal shock.
The Block Valves are Mogas CAS Severe service ball valves with Body Cavity, Seat Flush, and Body
SPECIES ANALYTICS FZ-LLC - Registration No 47005015
purging. 806 LEAF TOWER - F9XV+GRX – Jazeerat Al Reem – Abu Dhabi
www.SpeciesAnalytics.com
8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
HIGH PRESSURE/HIGH TEMPERATURE LET-DOWN STATION WITH DUAL OPERATING TRAINS WITH PURGING & FLUSHING OF COKE BUILD-UP
H H
Mechanical Layout - HPHT LET-DOWN STATION Mechanical Layout - HPHT LET-DOWN STATION (contd)
The Module is assembled into a strong, robust steel structure that can absorb high Piping Stress Analysis: (Contd)
thermal and pressure thrusts during operations and contend with the loads induced
during road and sea shipment. Operating Conditions during normal flow (460degC) and Warm-Up phased (190DegC)
G G
The Module comprises two decks: the upper deck containing the Y-Ball Valve and the MP Seismic Conditions Set Out in the Environment page 8 of this document.
and HP Pressure control valves.
Wind and Snow Loads comply with the Canadian NBC Building Code 2010. Ice loads were
The Upstream Y-Ball Valve assembly is anchored into the upper deck. not considered.
F The upstream block valves are placed in a vertical position. The high-pressure control The Pipe Stress Report is contained in a separate document. F
valve (Masonneilan 73000) is placed horizontally in the assembly, and the variable spring
hanger supports downstream block valves. (HP_HT_Letdown_Station_PipeStress_Report_Full_R1.pdf)
This arrangement reduces the force and fatigue loads from the expansion thrust on the Maintenance:
upstream elbows.
The vertical block valves can be removed via the rail system from the inlet side of the
E Placing the Flusing/Purge Pressure Control Valves on the upper deck clears the area Module. |(not shown) E
below for easy access. It has been noted that the lower deck is crammed with valves and
equipment in existing installations of this Module type. The outlet Y-Ball Valve can be removed from the rear of the Module using the building
rail system (not shown).
Insulation:
Insulation is provided with 4-6" insulation, and valves are covered with removable valve
D blankets). D
C The Control Valve, Block Valve, and Piping can be removed, crated, and loaded into a C
container. This reduction will reduce the width of the Module during Road transportation.
B The Module and Piping circuits were analyzed using the PassSuite Start Prof Software B
according to the ASME B31.3 2021 Piping Code.
Settings are outlined on page 26. SPECIES ANALYTICS FZ-LLC - Registration No 47005015
806 LEAF TOWER - F9XV+GRX – Jazeerat Al Reem – Abu Dhabi
www.SpeciesAnalytics.com
8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
G G
F F
E E
D D
C C
B B
8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
FIC SP To LIC (A) on HPHT Separator
14 x 16"
H LI H
LI LI
L L
E E
Quench/Purge Oil
TT
D D
HS
ET
2"
14 X 10"
C LIC
C
LCF - INTERSTAGE
HP/HT SEPARATOR
SEPARATOR LY LY OD CD
VE-003
VE-002 A B
B B
8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
To LIC (A) on HPHT Separator
Operating 16644
kPag
From HP/HT Separator VE-003 420oC
135 m3/hr
H ZSO ZSO ZSO H
To LIC (B) on HPHT Separator
ZSO ZSO
ZSO ZSO ZSO
Skin
XV XV
XV
TI PT PT
G Mogas
CAS-2 G
LV
LV M M M M 1008 Skin
1008 Mogas B
PIC TT TT
A CAS-2
TI
1 ½”
TG
Y-Globe
ET ET
Y ET ET
80 DegC TG
80 DegC 80 DegC Y-Globe
10"x8"
80 DegC
10 X 8"
80 DegC
Min
ET
F Body Flusing
1 ½” 1 ½” 1 ½” 1 ½”
EBP
F
Plug Liner Purge
1 ½” 1 ½”
Rotork 1 ½” Rotork
Air Air
PT
PT
Rotork
Rotork Rotork
Air
Air Air
M PG PG PG M
PG
Rotork Rotork
HP Purge Control Valve
Rotork
Air Air
Rotork PIC
Air Body Flusing Air
Masoneilan 21000 Globe
E PV E
2" M
PV M
Quench/Purge Oil
A B Quench/Purge Oil
HP Seat Flusing (Intermitant)
2"
Operating 2" 2" 2" 3" 4 X 3"
17423 kPag
149oC
PG
3 m3/hr
ZSO
PG
100 DegC
100 DegC
ET ET ET
C Y C
LP Purge Control Valve 1 ½” 1 ½”
Masoneilan 21000 Globe
M M
PV Rotork Rotork
Air
Rotork Rotork PV
Air Air Air
1 ½”
1 ½”
2"
M PG M PG M
M
B B
2"
80ET
DegC RS
8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
HIGH PRESSURE/HIGH TEMPERATURE LET-DOWN STATION WITH DUAL OPERATING TRAINS WITH PURGING & FLUSHING OF COKE BUILD-UP
H H
E E
MASONEILAN 73000
ANGLE CONTROL
VALVE OR FISHER 461
D D
LISEGA VARIABLE
SPRING HANGER
C C
TO MP/HT
SEPARATOR
8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
HIGH PRESSURE/HIGH TEMPERATURE LET-DOWN STATION WITH DUAL OPERATING TRAINS WITH PURGING & FLUSHING OF COKE BUILD-UP
H H
MASONIELIAN GLOBE - FLUSHING
CONTROL VALVE – HP CIRCUIT
MOGAS Y-BALL VALVE WITH
MASONIELIAN GLOBE - FLUSHING ROTORQ ELECTRIC
CONTROL VALVE – LP CIRCUIT ACTUATOR
G G
MOGAS BALL
VALVE
LISEGA VARIABLE
SPRING HANGER
E E
RILCO PYRO WRAP MASONEILAN 73000
ANCHOR ANGLED GLOBE
CONTROL VALVE
D D
ROTORQ PNEUMATIC
ACTUATR
C C
TO MP/HT MOGAS BALL VALVE
SEPARATOR GRAYLOK BREAK-OUT HUB +
CLAMP
DESPRESURIZATION
& FLUSHING LINE BERGEN POWER RESTING
SUPPORT WITH HOT INSULATION
(During Transport Strap Securely)
B RILCO PYRO WRAP HOT SHOE B
WITH PTP ADJUSTABLE SUPPORT
8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
F F
E E
C C
B B
1. For CodeWare Compress ASME BPVC Sect VIII Div 2 cl. 2 see 190-VE-0003.cw7 Code Check Document. HIGH PRESSURE/HIGH TEMPERATURE LET DOWN STATION
A A
SIZE FSCM NO DWG NO REV
A3 R1
Page 14 SCALE NTS SHEET 14 OF 31
8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
HIGH PRESSURE/HIGH TEMPERATURE SEPARATOR – 190-VE-1003 BPVC SECT VIII Div 2 cl. 2
H H
G G
F F
E E
D D
C C
B B
8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
HIGH PRESSURE/HIGH TEMPERATURE LET-DOWN STATION – Level Control Valve – LV-2008A/B – Fisher F461 Sizing
H H
G G
F F
E E
D D
C C
B B
8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
HIGH PRESSURE/HIGH TEMPERATURE LET-DOWN STATION – Level Control Valve – LV-2008A/B – Fisher F461 Sizing
H H
G G
F F
E E
D D
C C
B B
190-PCV-2008A – FISHER F461 SWEPT FLOW ANGLE CONTROL VALVE FOR HP/HT LET-DOWN STATION SPECIES ANALYTICS FZ-LLC - Registration No 47005015
806 LEAF TOWER - F9XV+GRX – Jazeerat Al Reem – Abu Dhabi
www.SpeciesAnalytics.com
8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
HIGH PRESSURE/HIGH TEMPERATURE LET-DOWN STATION – Level Control Valve – LV-2008A/B – Masoneilan 73000 Sizing
H H
G G
F F
E E
D D
B B
Unit Warm Up Flow
SPECIES ANALYTICS FZ-LLC - Registration No 47005015
806 LEAF TOWER - F9XV+GRX – Jazeerat Al Reem – Abu Dhabi
www.SpeciesAnalytics.com
8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
MOGAS C-DRI 10" VALVE WITH ROTORK ACTUATOR WITH PURGING & FLUSHING CONNECTIONS
H H
ROTROK IE ELECTRIC ACTUATOR
G G
F F
E E
MOSGAS C-DRI 10in HP END
LP END
B B
Mogas C DRI Exploded View with Type I. II & Type III Purg & Flusing Connection
SPECIES ANALYTICS FZ-LLC - Registration No 47005015
806 LEAF TOWER - F9XV+GRX – Jazeerat Al Reem – Abu Dhabi
www.SpeciesAnalytics.com
8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
MOGAS C-DRI 10" VALVE WITH ROTORK ACTUATOR WITH PURGING & FLUSHING CONNECTIONS
TYPE I SEAT FLUSH CONNECTION WITH GRAYLOC OR NOSOK COMPACT FLANGE
H H
G G
F F
HP SEAT WITH BELLEVILLE SRING RETAINERS
BODY SEAL RING – HP END TO LP END
E E
Mogas C DRI – Bottom View Cut View with Type I. II & Type III Purg Connections
D D
TRUNION YOKE
C C
B B
8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
MOGAS CUSTOM 10" Y-VALVE WITH ROTORK ACTUATOR WITH PURGING & FLUSHING CONNECTIONS
H H
G G
F INLET OF VALVE
F
LP END
B B
Mogas Y VALVE - Exploded View with Type I. II & Type III Purg & Flusing Connection SPECIES ANALYTICS FZ-LLC - Registration No 47005015
806 LEAF TOWER - F9XV+GRX – Jazeerat Al Reem – Abu Dhabi
www.SpeciesAnalytics.com
8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
MOGAS CUSTOM 10" Y-VALVE & CAS-2 WITH ROTORK ACTUATOR WITH PURGING & FLUSHING CONNECTIONS
H H
G G
F F
E E
MOGAS CAS 10" BALL VALVE WITH ROTORK ACTUATOR WITH PURGING & FLUSHING MOGAS CUSTOM 10" Y-VALVE WITH ROTORK ACTUATOR WITH PURGING & FLUSHING
CONNECTIONS CONNECTIONS - UPSTREAM
D D
C C
B B
MOGAS Y-BALL VALVE NASTRAN FEA MOGAS Y-BALL VALVE NASTRAN FEA
SPECIES ANALYTICS FZ-LLC - Registration No 47005015
806 LEAF TOWER - F9XV+GRX – Jazeerat Al Reem – Abu Dhabi
www.SpeciesAnalytics.com
8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
ROTORK IQ
POWER
CONTROL
CABINET
F PNEUMATIC CONTROL F
CABINET
MASONEILAN 73000
ACTUATOR
E E
D D
C BODY FLUSHING C
MASONEILAN 73000 ANGLE CONTROL
VALVE WITH FLUTE PLUG
B B
8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
H LISEGA VARIABLE SPRING & HANGER ASSEMBLY WITH PIPE CRADLE WITH HIGH STRENGTH ALLUMINIA SILICATE INSULATION H
ASIC W8X35
ASIC W8X35
F F
LISEGA ROD END
E E
LISEGA VARIABLE SPRING
B B
8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
G G
LISEGA ROD EYE
BACKING PLATE
F F
E E
B B
VARIABLE SPRING WITH LUG EYE ON PIPE SPECIES ANALYTICS FZ-LLC - Registration No 47005015
806 LEAF TOWER - F9XV+GRX – Jazeerat Al Reem – Abu Dhabi
www.SpeciesAnalytics.com
8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
LISEGA VARIABLE SPRING & HANGER ASSEMBLY WITH PIPE LUG – NASTRAN FEA WITH MAX +X DIRECTIONAL TRAVEL
H H
G G
F F
E E
D D
C C
42,000 LBS LOAD -Z
B B
8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
HIGH PRESSURE/HIGH TEMPERATURE LET-DOWN STATION – PASSUITE START-PROF - PIPE STRESS ANALYSIS
H H
G G
F F
190-VE-0003 HPHT
SEPARATOR
E E
LISEGA VS SPRING
D D
C 190-LV-0008A CONTROL C
VALVE
190-VE-0004 MPHT
SEPARATOR
1. Small Bore Flushing & Purging – only one circuit has modelled.(Left)
3. Spring Selection is Lisega + Pipe Supports Anvil & Rilco & PTP.
SPECIES ANALYTICS FZ-LLC - Registration No 47005015
4. For full Pipe Stress Report see Full Report 806 LEAF TOWER - F9XV+GRX – Jazeerat Al Reem – Abu Dhabi
www.SpeciesAnalytics.com
Depressurization & Flushing
HIGH PRESSURE/HIGH TEMPERATURE LET DOWN STATION
A A
SIZE FSCM NO DWG NO REV
A3 R1
Page 27 SCALE NTS SHEET 27 OF 31
8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
G G
F F
E E
D D
C C
B B
8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
G G
F F
E E
D D
C C
B B
8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
HIGH PRESSURE/HIGH TEMPERATURE LET-DOWN STATION – GRAYLOC PRESSSURE BOUNDARIES & MATERIALS
H H
G G
F F
E E
GRAYLOC X8410 CLAMP+HUB+SEAL RING
D D
C C
B B
8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
HIGH PRESSURE/HIGH TEMPERATURE LET-DOWN STATION – TRANSPORT BOX LAYOUTS & DIMENSIONS
H H
COG OF MODULE
G G
TRANSPORTATION
SUPPORTS &
STRAPS
F F
40' 6"
D D
17' 4"
17' 4"
21'
C C
B B
FRONT VIEW
SPECIES ANALYTICS FZ-LLC - Registration No 47005015
806 LEAF TOWER - F9XV+GRX – Jazeerat Al Reem – Abu Dhabi
www.SpeciesAnalytics.com
TOTAL WEIGHT OF MODULE – WITH OUTLYING TOP VIEW HIGH PRESSURE/HIGH TEMPERATURE LET DOWN STATION
A PIPING IN CONTAINER = 60 US TONS A
SIZE FSCM NO DWG NO REV
A3 R1
Page 31 SCALE NTS SHEET 31 OF 31
8 7 6 5 4 3 2 1