27 Summit - Tower A,B & C - Flooring and Cladding Works

Total Rate
Sl. No. Description Unit Tower A Tower B Tower C Quantity (Including Chemicals)

1.00 Flooring

Marble: Storing, shifting and cutting of 18mm thick marble as per prescribed grid numbers stipulated in the issued drawing or by the EIC. Cut marble slabs to be shifted
(via material hoist) & laid over 35mm to 45mm thick cement mortar bed (1 cement : 5 river sand) and 10mm thick white cement bed as per required finished floor levels
or slopes, placed with white cement slurry on the bottom side to allow for proper bonding to the cement bed. The marble shall be laid in a book matched pattern or
random as per the reference drawing grid, with paper joints and filled with matching epoxy resin based joint filler (Including pigment for colour). Stone protector shall be
used only for white marble on the back & sides.

After laying, the marble surface shall then be grinded, applicated with chemicals, and polished using diamond polishing machine in the following manner:
1) Grinding and preliminary polish
2) Application of epoxy
3) Floor Protection (heavy duty) - LDPE 250 GSM + 6mm SHERA Board
4) 2nd coat of polish
1.01 5) 3rd coat of polish
6) Application of Densifier
7) 5th & 6th coat of polish
8) Basic protection
9) Application of impregnator sealant
10) Final coat of polishing with extra shine chemical

Marble polish will be done to the satisfaction of the EIC and verified as per the gloss meter reading. The contractor is responsible for the removal of all debris, dust and
other materials after the installation, polishing and protection of the marble flooring, this will be deemed complete to the satisfaction of the EIC. The rate includes but
not limited to chamfering, half nosing, full nosing, edge polishing and hole cutting of the marble. All chemicals used must be as per the agreed make of material.
Note: White marble will be laid with cement based adhesive ONLY and stone protector will be applied on the reverse side.

All Consumables like cement, river sand, chemicals such as epoxy grout, polishing chemical, Adhesives, Spacers, Protection Material shall be provided by client. Labour,
Tools & Tackles shall be in contractor scope.

a Opera Fantasy - Foyer, Living & Dining, Family & Dry Kitchen, MS 02 BR, MS02 Toilet, Patio , BR 03 toilet SQM 4,431 4,431 4,005 12,867

b Fume Grey - MS 01 Toilet SQM 231 231 197 658

c Saran Colin - Powder Toilet SQM 107 107 83 296

d French Riviera Marble - Guest Bathroom SQM 152 152 162 467
27 Summit - Tower A,B & C - Flooring and Cladding Works

Total Rate
Sl. No. Description Unit Tower A Tower B Tower C Quantity (Including Chemicals)

Granite: Storing, shifting and cutting of 18mm/20mm thick granite as per prescribed grid numbers stipulated in the issued drawing or by the EIC. Cut granite slabs to be
shifted (via material hoist) & laid over 20mm to 50mm thick cement mortar bed (1 cement : 5 sand) as per required finished floor levels or slopes, placed with cement
slurry on the bottom side to allow for proper bonding to the cement bed. The granite shall be laid in a book matched pattern as per the reference drawing grid, with paper
joints and filled with matching cement based epoxy grout.

After laying Granite, the surface shall be prepared and protected in the following manner:
1.02 1) Application of matching cement based grout for joints filling
2) Protect the surface (heavy duty)

The contractor is responsible for the removal of all debris, dust and other materials after the installation and protection of the granite flooring, this will be deemed complete
to the satisfaction of the EIC. The rate includes but not limited to chamfering, half nosing, full nosing, edge polishing and hole cutting of the granite. All chemicals used
must be as per the agreed make of material. Only the granite will be provided by the Client, all other material is in the scope of the contractor unless otherwise mentioned.
Wastage greater than 10% will be on the account of the Contractor.

Staircase Treads & Landing SQM 1,047 1,047


Staircase Riser SQM 290 290

Vitrified/Ceramic/Porcelain Tile: Storing, shifting and cutting of Tiles as per prescribed grid numbers stipulated in the issued drawing or by the EIC. Tiles to be shifted
(via material hoist) & laid over 10mm thick cementitious polymer adhesive layer as per required finished floor levels or slopes. The Tiles shall be laid in a pattern as per
the reference drawing grid, with paper joints or spacers (2mm) as indicated and filled with matching epoxy polymer based grout. It's mandatory for the contractor to use
the following:
1) Tiles laid with a tile levelling system
2) Tiles to be cut using a tile cutting machine and NOT an angle grinder
3) Holes will be cut using a tile hole locater.
1.03
After laying the surface shall be prepared and protected in the following manner:
1) Application of matching epoxy polymer based grout for joints filling
2) Protect the surface (heavy duty)

The contractor is responsible for the removal of all debris, dust and other materials after the installation and protection of the tile flooring, this will be deemed complete to
the satisfaction of the EIC. The rate includes but not limited to chamfering and hole cutting of the tiles. Cut tiles with chipped edges will be rejected, all hole cutting must
be done with the use of tile cutting template. All chemicals used must be as per the agreed make of material. Only the Tiles will be provided by the Client, all other
material is in the scope of the contractor. Wastage greater than 5% will be on the account of the Contractor.

a Nexion Tile (2' x 2') - Wet Kitchen, Utility , staff room & Staff toilet SQM 1,174 1,174 976 3,324

b IPS Tile- MS01 , BR03 & Guest BR SQM 2,028 2,028 1,523 5,579

c Nexion Endless- Connecting Corridor SQM 2,319 2,319

2.00 Cladding/Dado
27 Summit - Tower A,B & C - Flooring and Cladding Works

Total Rate
Sl. No. Description Unit Tower A Tower B Tower C Quantity (Including Chemicals)

Marble: Storing, shifting and cutting of 18mm thick pre-polished marble as per prescribed grid numbers stipulated in the issued drawing or by the EIC. Cut marble slabs to
be shifted (via material hoist) & cladded to flush with the POP punning surface over 10 to 12mm thick cementitious polymer adhesive The marble shall be fixed in a book
matched pattern or random slabs as per the reference drawing grid, with paper joints and filled with clear epoxy resin based grout. Stone protector shall be used only for
white marble on the back & sides.

After fixing, the marble surface shall then be applicated with chemical, and polished using diamond polishing machine in the following manner:
2.01 1) 5th & 6th coat of polish
2) Application of impregnator sealant
3) Final coat of polishing with extra shine chemical

Marble polish will be done to the satisfaction of the EIC and verified as per the gloss meter reading. The contractor is responsible for the removal of all debris, dust and
other materials after the installation & polishing the marble, this will be deemed complete to the satisfaction of the EIC. The rate includes but not limited to chamfering,
half nosing, full nosing, edge polishing, grooves and hole cutting of the marble. All chemicals used must be as per the agreed make of material. All Consumables like
cement, river sand, chemicals such as epoxy grout, Adhesives, sealer shall be provided by client. Labour, Tools & Tackles shall be in contractor scope.

a Wood Vein (Plain) - MS 02 SQM 402 402 384 1,187

b Wood Vein (Band) - MS 02 SQM 213 213 109 535

c Saran Colin - Powder Toilet SQM 284 284 248 815

d French Riviera - Guest Toilet SQM 114 114 106 334

e Armani Bronze/Crema Jasper - MS 01 Toilet SQM 529 529 489 1,546

f Armani Bronze (Fluted)/Crema Jasper - MS 01 Toilet SQM 57 57 46 159

Vitrified/Ceramic/Porcelain Tile: Storing, shifting and cutting of Tiles as per prescribed grid numbers stipulated in the issued drawing or by the EIC. Tiles to be shifted
(via material hoist) & cladded to flush with the POP punning / plastering surface over 12 to 15mm thick cementitious polymer adhesive. The Tiles shall be laid in a pattern
as per the reference drawing grid, with paper joints or spacers (2 mm) as indicated and filled with matching epoxy polymer grout.

It's mandatory for the contractor to use the following:


1) Tiles laid with a tile levelling system
2) Tiles to be cut using a tile cutting machine and NOT an angle grinder
3) Holes will be cut using a tile hole locater.
2.02
After laying the surface shall be prepared and protected in the following manner:
1) Application of matching epoxy polymer based grout for joints filling
2) Protect the surface (heavy duty)

The contractor is responsible for the removal of all debris, dust and other materials after the installation and protection of the tile flooring, this will be deemed complete to
the satisfaction of the EIC. The rate includes but not limited to chamfering and hole cutting of the tiles. Cut tiles with chipped edges will be rejected, all hole cutting must
be done with the use of tile cutting template. All chemicals used must be as per the agreed make of material. Only the Tiles will be provided by the Client, all other
material is in the scope of the contractor. Wastage greater than 5% will be on the account of the Contractor.

a Rhombus Tile (150mm x 150mm) - Guest Toilet SQM 267 267 275 809
27 Summit - Tower A,B & C - Flooring and Cladding Works

Total Rate
Sl. No. Description Unit Tower A Tower B Tower C Quantity (Including Chemicals)

b Nexion Tile (2' x 2') - Staff toilet SQM 486 486 473 1,446

c Porcelain/Medley Tile (2' x 2') - MS 03 Toilet SQM 396 396 793

Sub-Total for Cladding/Dado (Rs.)


27 Summit - Tower A,B & C - Flooring and Cladding Works

Total Rate
Sl. No. Description Unit Tower A Tower B Tower C Quantity (Including Chemicals)

3.00 Skirting & Coping

Marble: Providing and fixing marble skirting of 75mm height projected to POP punning surface & Coping using 10 to 12mm thick cementitious polymer adhesive, 200mm
depth including necessary chipping, grinding, finishing, final polishing and finishing the edges even and level etc. as per the drawings and details. The rate includes but
3.01 not limited to chamfering, half nosing, full nosing, edge polishing, grooves and hole cutting of the marble. Marble will be supplied by client free of cost. All Consumables
like cement, river sand, chemicals such as epoxy grout, Adhesives, stone protector, sealer shall be provided by client. Labour, Tools & Tackles shall be in contractor
scope.

a Opera Fantasy - Living, Dining, Drawing Room, Patio & MS02 Toilet RMT 1,917 1,917 1,961 5,795

b Armani Bronze/Crema Jasper - MS 01 Toilet RMT 62 62 58 182

c Saran Colin - Powder Toilet RMT 78 78 67 223

d French Riviera - Guest Toilet RMT 30 30 29 89

e Wood vein (plain) - MS 02 bath RMT 41 41 61 144

Granite: Providing and fixing Granite skirting of 75mm height to flush with the plastering surface & coping using 10mm thick cementitious polymer adhesive, including
3.02 necessary chipping, finishing, final polishing and finishing the edges even and level etc., as per the drawings and details. Granite will be supplied by client free of cost. All
materials (excluding granite) and tools for marble works to be provided by the contractor.

a Staircase skirting RMT 1,374 1,374

Vitrified/Ceramic/Porcelain Tile: Providing and fixing 75mm tile skirting & coping over 6 to 10mm thick cementitious polymer adhesive to match the wall POP punning
level, including necessary chipping, finishing, etc., as per the drawings and details. The tiles shall be laid with paper joint and pointing with epoxy based polymer grout of
3.03 matching colour etc., complete as per drawings & as directed by Architect / Engineer in-charge. All materials (excluding tiles) and tools for tile works to be provided by
the contractor.
The Tiles must be cut using a Tile Cutting Machine. Surface cleaning agents to be used, no acid wash allowed.

a Nexion Tile (2' x 2') - Wet Kitchen, Staff & Utility RMT 950 950 897 2,796

b Nexion Endless Tile (2' x 2') - Service Lift lobby RMT 307 307

Paloma Stone: Providing and fixing Paloma stone skirting of 75mm height to flush with the plastering surface & coping using 10mm thick cementitious polymer adhesive,
3.04 including necessary chipping, finishing, final polishing and finishing the edges even and level etc., as per the drawings and details. Granite will be supplied by client free
of cost. All materials (excluding granite) and tools for marble works to be provided by the contractor.

Paloma Stone- Connecting Corridor RMT 1,080 1,080

Sub-Total for Skirting & Coping (Rs.)


4.00 Niche

Marble: Providing and fixing marble for Niches with necessary grooves using 10 to 12mm thick cementitious polymer adhesive including necessary chipping, finishing,
4.01 final polishing and finishing the edges even and level etc., as per the drawings and details. The rate includes but not limited to chamfering, half nosing, full nosing, edge
polishing, grooves and hole cutting of the marble. Marble will be supplied by client free of cost. Marble will be supplied by client free of cost. All Consumables like
cement, river sand, chemicals such as epoxy grout, laticrete, stone protector, sealer shall be provided by client. Labour, Tools & Tackles shall be in contractor scope.

a Armani Bronze - MS 01 SQM 13 13 13 39

b French Riviera - Guest Toilet SQM 25 25 25 76

c Wood vein (plain) - MS 02 bath SQM 13 13 13 38


27 Summit - Tower A,B & C - Flooring and Cladding Works

Total Rate
Sl. No. Description Unit Tower A Tower B Tower C Quantity (Including Chemicals)

d Opera fantasy - BR 03 bath SQM 24 24 48

Vitrified/Ceramic/Porcelain Tile: Providing and fixing tiles for Niches with necessary grooves using 12 to 15mm thick cementitious polymer adhesive including necessary
4.02 chipping, finishing, final polishing and finishing the edges even and level etc., as per the drawings and details. Tiles will be supplied by client at free of cost. All materials
(excluding tiles) and tools for tile works to be provided by the contractor.

a Nexion Tile (2' x 2') - Staff Toilet SQM -


b Medely Porcelain Rock Tile - MS 03 Toilet SQM -

Sub-Total for Niche (Rs.)


5.00 Counters

Marble: Collecting, Storing, Cutting and laying 18mm thick Pre-polished Marble counter of approved quality, selected and sorted for uniform colour of approved
dimensions, design and shade fixed over 19mm thick BWP plywood of approved make to the size of marble using approved adhesive of 4mm thick. Pointing the joints
with matching resin based grout and finished neat including final polishing, washing with necessary chemicals if required etc., complete. The slabs shall have the edges
machine cut and polished to produce very fine joints as approved and shown in detailed drawing. The M.S. brackets shall be firmly fixed by means of anchor bolts as per
5.10 drawing. The rate shall include for making openings in the marble counter for seating washbasins and making hole for pillar cock etc., as per the drawing and details. MS
brackets shall be with MS box 40x40mm, painted a matt black finish as shown in the drawing with spacing of 600mm c/c and covered with end plate of 6mm thick. Rate
to include 20mm edge polishing on the outer edge with groove at bottom and polishing the same as per drawing and as approved by the Engineer In-charge. Top area
shall be measured for payment. Marble will be supplied by client free of cost. All Consumables like MS brackets with paint, anchor bolts,Plywood, cement, river sand,
chemicals such as epoxy grout, stone protector, sealer, Adhesives shall be provided by client. Labour, Tools & Tackles shall be in contractor scope.

Co - Ordination should provided by marble contractor for level marking.


a Armani Brown MS-01 Toilet - Size - 2000 x 600 mm Nos 25 25 25 75

b Fume Grey Marble - MS-02 Toilet | White Marble Powder Toilet - Size - 1700 x 600 mm Nos 49 49 50 148

c Opera Fantasy - MS-03 Toilet | Guest Toilet - Size - 1150 x 600 mm Nos 47 47 24 118

Sub-Total for Counters (Rs.)


6.00 Ledge Wall

Marble: Collecting, Storing, Cutting and Fixing marble using 10 to 12mm thick cementitious polymer adhesive , including necessary chipping, holes for flush plates, bolts
6.10 etc.. and final polishing and finishing the edges even and level etc., as per the drawings and details. The rate includes but not limited to chamfering, half nosing, full
nosing, edge polishing, grooves and hole cutting of the marble. Marble will be supplied by client free of cost. All Consumables like cement, river sand, chemicals such as
epoxy grout, stone protector, sealer, Adhesives shall be provided by client. Labour, Tools & Tackles shall be in contractor scope.

a Wood Vein (Plain) - MS 02 SQM 84 84 169

b Saran colin (Standard) - Powder Toilet SQM -

c French Riviera - Guest Toilet SQM -

d Armani Bronze - MS 01 Toilet SQM -


27 Summit - Tower A,B & C - Flooring and Cladding Works

Total Rate
Sl. No. Description Unit Tower A Tower B Tower C Quantity (Including Chemicals)

Vitrified/Ceramic/Porcelain Tile: Collecting, Storing, Cutting and Fixing Tile using 10 mm thick cementitious polymer adhesive , including necessary chipping, Holes for
6.20 flush plates, bolts etc.. and final polishing and finishing the edges even and level etc., as per the drawings and details. Tiles will be supplied by client at free of cost. All
materials (excluding Tiles) and tools for tiling works to be provided by the contractor.

a Nexion Tile (2' x 2') - MS 03 Toilet SQM -

b Medley Porcelain Classic (2' x 2') - MS 03 Toilet SQM -

Sub-Total for Counter Slab (Rs.)


7.00 Jambs & Sills

Marble: Collecting, Storing, Cutting and Fixing marble with necessary grooves using 10 to 12mm thick cementitious polymer adhesive, including necessary chipping,
7.10 finishing, final polishing and finishing the edges even and level etc., as per the drawings and details. The rate includes but not limited to chamfering, half nosing, full
nosing, edge polishing, grooves and hole cutting of the marble. Marble will be supplied by client free of cost. All Consumables like cement, river sand, chemicals such as
epoxy grout, stone protector, sealer, Adhesives shall be provided by client. Labour, Tools & Tackles shall be in contractor scope.

a Armani Bronze - MS 01 Toilet SQM 12 12 6 30

b Saran colin - Power Toilet SQM -

c Wood vein - MS 02 SQM 6 6 6 19

d French Riviera - Guest Toilet SQM 19 19 45 84

e Opera Fantasy - Utility , Lift , MS 03 Toilet SQM 80 80 52 212

Vitrified/Ceramic/Porcelain Tile: Collecting, Storing, Cutting and Fixing Tile using 10 mm thick cementitious polymer adhesive , including necessary chipping, finishing
7.20 and finishing the edges even and level etc., as per the drawings and details. Tile will be supplied by client at free of cost. All materials (excluding Tile) and tools for tiling
works to be provided by the contractor.

a Porcelain Tile - MS 03 Toilet (size: 2'x2') SQM -

b Nexion Runa - Kitchen & Utility SQM 34 34 20 89

Granite: Collecting, Storing, Cutting and Fixing granite with necessary grooves using 12 to 15mm thick cementitious polymer adhesive, including necessary chipping,
7.30 finishing, final polishing and finishing the edges even and level etc., as per the drawings and details. Granite will be supplied by client at free of cost. All materials
(excluding granite) and tools for marble works to be provided by the contractor.
a Jambs- Service Lift Lobby SQM 182 182

Sub-Total for Jambs and Sills (Rs.)


8.00 Transition Profile

Transition Profile: Collecting, Storing, Cutting and Fixing the transition profile using 10 mm thick cementitious polymer adhesive , including necessary chipping, finishing
8.01 and finishing the edges even and level etc., as per the drawings and details. Transition profile will be supplied by client at free of cost. All materials (excluding Tile) and
tools for tiling works to be provided by the contractor.
a T - Profile (Brass profile)- Bedrooms Rmt 151 151 104 406
27 Summit - Tower A,B & C - Flooring and Cladding Works

Total Rate
Sl. No. Description Unit Tower A Tower B Tower C Quantity (Including Chemicals)

b L - Profile (SS Profile)- Kitchen, Utility & Staff Toilet Rmt 109 109 100 319
c Box Profile (Brass Profile)- Staff & Main Entrance Rmt 68 68 68 205

Sub-Total for Transition profile (Rs.)

9.00 Mirror Works

Supply and installation of 6mm thick mirror, with 9mm think BWP ply with nececcsary tools and tackles with epoxy adhesive. The ply shall be laid as per the reference
9.01 drawings.
a MS 01 - (1650mm x 550mm) - 2 pc SQM 136 136
b Staff toilet SQM 81 81

Sub-Total for Mirror Works (Rs.)

Grand Total Tower A (Rs.)


rks

Rate Amount Amount Previous Present Cumulative


(Excluding Chemicals) (Including Chemicals (Excluding Chemicals) Quantity Amount Quantity Amount Quantity Amount

- - - - - -

- - - - - -

- - - - - -

- - - - - -
rks

Rate Amount Amount Previous Present Cumulative


(Excluding Chemicals) (Including Chemicals (Excluding Chemicals) Quantity Amount Quantity Amount Quantity Amount

- - - - - -

- - - - - -

- - - - - -

- - -
rks

Rate Amount Amount Previous Present Cumulative


(Excluding Chemicals) (Including Chemicals (Excluding Chemicals) Quantity Amount Quantity Amount Quantity Amount

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -
rks

Rate Amount Amount Previous Present Cumulative


(Excluding Chemicals) (Including Chemicals (Excluding Chemicals) Quantity Amount Quantity Amount Quantity Amount

- - - - - -

- - - - - -

- - -
rks

Rate Amount Amount Previous Present Cumulative


(Excluding Chemicals) (Including Chemicals (Excluding Chemicals) Quantity Amount Quantity Amount Quantity Amount

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - -

- - - - - -

- - - - - -

- - - - - -
rks

Rate Amount Amount Previous Present Cumulative


(Excluding Chemicals) (Including Chemicals (Excluding Chemicals) Quantity Amount Quantity Amount Quantity Amount

- - - - - -

- - - - - -
- - - - - -

- - -

- - - - - -

- - - - - -

- - - - - -

- - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -
- - - -
rks

Rate Amount Amount Previous Present Cumulative


(Excluding Chemicals) (Including Chemicals (Excluding Chemicals) Quantity Amount Quantity Amount Quantity Amount

- - - - - -

- - - - - -

- - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - -

- - - - - -

- - - - -
rks

Rate Amount Amount Previous Present Cumulative


(Excluding Chemicals) (Including Chemicals (Excluding Chemicals) Quantity Amount Quantity Amount Quantity Amount

- - - - -

- - - - -

- - - - -
27 Summit - Tower B - Flooring and Cladding Works

Rate Rate
Sl. No. Description Unit Quantity (Including Chemicals) (Excluding Chemicals)

1.00 Flooring

Marble: Storing, shifting and cutting of 18mm/20mm thick marble as per prescribed grid numbers stipulated in the issued drawing or by the EIC. Cut marble slabs to be shifted (via material
hoist) & laid over 20mm thick cement mortar bed (1 cement : 5 sand) and 10mm thick white cement bed as per required finished floor levels or slopes, placed with white cement slurry on
the bottom side to allow for proper bonding to the cement bed. The marble shall be laid in a book matched pattern or random as per the reference drawing grid, with paper joints and filled
with matching resin based grout.

After laying, the marble surface shall then be grinded, applicated with chemicals, and polished using diamond polishing machine in the following manner:
1) Grinding and preliminary polish
2) Application of epoxy
3) Floor Protection (heavy duty)
4) 2nd coat of polish
1.01 5) Application of impregnator sealant
6) 3rd & 4th coat of polish
7) Application of impregnator sealant
8) 5th & 6th coat of polish
9) Final coat of polishing with extra shine chemical
10) Basic protection

Marble polish will be done to the satisfaction of the EIC and verified as per the gloss meter reading. The contractor is responsible for the removal of all debris, dust and other materials after
the installation, polishing and protection of the marble flooring, this will be deemed complete to the satisfaction of the EIC. The rate includes but not limited to chamfering, half nosing, full
nosing, edge polishing and hole cutting of the marble. All chemicals used must be as per the agreed make of material. Only the marble will be provided by the Client, all other material is in
the scope of the contractor unless specified otherwise. Wastage greater than 10% will be on the account of the Contractor.
Note: White marble will be laid with cement based adhesive ONLY and sealant protector will be applied on the reverse side.

a Opera Fantasy - Foyer, Living & Dining, Family & Dry Kitchen, MS 02 BR, MS02 Toilet, Patio SQM

b Fume Grey - MS 01 Toilet SQM

c Saran Colin - Powder Toilet SQM

d French Riviera Marble - Guest Bathroom SQM


27 Summit - Tower B - Flooring and Cladding Works

Rate Rate
Sl. No. Description Unit Quantity (Including Chemicals) (Excluding Chemicals)

Granite: Storing, shifting and cutting of 18mm/20mm thick granite as per prescribed grid numbers stipulated in the issued drawing or by the EIC. Cut granite slabs to be shifted (via
material hoist) & laid over 20mm to 50mm thick cement mortar bed (1 cement : 5 sand) as per required finished floor levels or slopes, placed with cement slurry on the bottom side to allow
for proper bonding to the cement bed. The granite shall be laid in a book matched pattern as per the reference drawing grid, with paper joints and filled with matching cement based epoxy
grout.

After laying Granite, the surface shall be prepared and protected in the following manner:
1.02 1) Application of matching cement based grout for joints filling
2) Protect the surface (heavy duty)

The contractor is responsible for the removal of all debris, dust and other materials after the installation and protection of the granite flooring, this will be deemed complete to the satisfaction
of the EIC. The rate includes but not limited to chamfering, half nosing, full nosing, edge polishing and hole cutting of the granite. All chemicals used must be as per the agreed make of
material. Only the granite will be provided by the Client, all other material is in the scope of the contractor unless otherwise mentioned. Wastage greater than 10% will be on the account of
the Contractor.

Staircase Treads, Raiser & Landing SQM

Vitrified/Ceramic/Porcelain Tile: Storing, shifting and cutting of Tiles as per prescribed grid numbers stipulated in the issued drawing or by the EIC. Tiles to be shifted (via material
hoist) & laid over 10mm thick polymer based adhesive layer as per required finished floor levels or slopes. The Tiles shall be laid in a pattern as per the reference drawing grid, with paper
joints or spacers (2mm) as indicated and filled with matching epoxy polymer based grout. It's mandatory for the contractor to use the following:
1) Tiles laid with a tile levelling system
2) Tiles to be cut using a tile cutting machine and NOT an angle grinder
3) Holes will be cut using a tile hole locater.

1.03 After laying the surface shall be prepared and protected in the following manner:
1) Application of matching epoxy polymer based grout for joints filling
2) Protect the surface (heavy duty)

The contractor is responsible for the removal of all debris, dust and other materials after the installation and protection of the tile flooring, this will be deemed complete to the satisfaction of
the EIC. The rate includes but not limited to chamfering and hole cutting of the tiles. Cut tiles with chipped edges will be rejected, all hole cutting must be done with the use of tile cutting
template. All chemicals used must be as per the agreed make of material. Only the Tiles will be provided by the Client, all other material is in the scope of the contractor. Wastage greater
than 5% will be on the account of the Contractor.

a Nexion Tile (2' x 2') - Wet Kitchen, Utility , staff room & Staff toilet SQM

b IPS Tile- MS01 , BR03 & Guest BR SQM

Sub-Total for Flooring Works (Rs.)


2.00 Cladding/Dado
27 Summit - Tower B - Flooring and Cladding Works

Rate Rate
Sl. No. Description Unit Quantity (Including Chemicals) (Excluding Chemicals)

Marble: Storing, shifting and cutting of 18mm/20mm thick pre-polished marble as per prescribed grid numbers stipulated in the issued drawing or by the EIC. Cut marble slabs to be shifted
(via material hoist) & cladded to flush with the POP punning surface over 12 to 15mm thick cementitious polymer adhesive The marble shall be fixed in a book matched pattern or random
slabs as per the reference drawing grid, with paper joints and filled with clear resin or mastic matching resin based grout.

After fixing, the marble surface shall then be applicated with chemical, and polished using diamond polishing machine in the following manner:
1) Application of impregnator sealant
2.01 2) 5th & 6th coat of polish
3) Final coat of polishing with extra shine chemical

Marble polish will be done to the satisfaction of the EIC and verified as per the gloss meter reading. The contractor is responsible for the removal of all debris, dust and other materials after
the installation & polishing the marble, this will be deemed complete to the satisfaction of the EIC. The rate includes but not limited to chamfering, half nosing, full nosing, edge polishing,
grooves and hole cutting of the marble. All chemicals used must be as per the agreed make of material. Only the marble will be provided by the Client, all other material is in the scope of
the contractor. Wastage greater than 10% will be on the account of the Contractor.

a Wood Vein (Plain) - MS 02 SQM

b Wood Vein (Band) - MS 02 SQM

c Saran Colin - Powder Toilet SQM

d Mosaic Pattern - Powder Toilet SQM

e French Riviera - Guest Toilet SQM

f Armani Bronze - MS 01 Toilet SQM

g Armani Bronze (Fluted) - MS 01 Toilet SQM

Vitrified/Ceramic/Porcelain Tile: Storing, shifting and cutting of Tiles as per prescribed grid numbers stipulated in the issued drawing or by the EIC. Tiles to be shifted (via material
hoist) & cladded to flush with the POP punning / plastering surface over 12 to 15mm thick cementitious polymer adhesive. The Tiles shall be laid in a pattern as per the reference drawing
grid, with paper joints or spacers (2 mm) as indicated and filled with matching epoxy polymer grout.

It's mandatory for the contractor to use the following:


1) Tiles laid with a tile levelling system
2) Tiles to be cut using a tile cutting machine and NOT an angle grinder
3) Holes will be cut using a tile hole locater.
2.02
After laying the surface shall be prepared and protected in the following manner:
1) Application of matching epoxy polymer based grout for joints filling
2) Protect the surface (heavy duty)

The contractor is responsible for the removal of all debris, dust and other materials after the installation and protection of the tile flooring, this will be deemed complete to the satisfaction of
the EIC. The rate includes but not limited to chamfering and hole cutting of the tiles. Cut tiles with chipped edges will be rejected, all hole cutting must be done with the use of tile cutting
template. All chemicals used must be as per the agreed make of material. Only the Tiles will be provided by the Client, all other material is in the scope of the contractor. Wastage greater
than 5% will be on the account of the Contractor.
27 Summit - Tower B - Flooring and Cladding Works

Rate Rate
Sl. No. Description Unit Quantity (Including Chemicals) (Excluding Chemicals)

a Rhombus Tile (150mm x 150mm) - Guest Toilet SQM

b Nexion Tile (2' x 2') - Staff toilet SQM

c Porcelain Tile (2' x 2') - MS 03 Toilet SQM

Sub-Total for Cladding/Dado (Rs.)


27 Summit - Tower B - Flooring and Cladding Works

Rate Rate
Sl. No. Description Unit Quantity (Including Chemicals) (Excluding Chemicals)

3.00 Skirting & Coping

Marble: Providing and fixing marble skirting of 75mm height projected to POP punning surface & Coping using 12 to 15mm thick cementitious polymer adhesive, including necessary
3.01 chipping, finishing, final polishing and finishing the edges even and level etc. as per the drawings and details. Marble will be supplied by client free of cost. All materials (excluding marble)
and tools for marble works to be provided by the contractor.

a Opera Fantasy - Living, Dining, Drawing Room, Patio & MS02 Toilet RMT

b Fume Grey - MS 01 Toilet RMT

c Saran Colin - Powder Toilet RMT

d French Riviera - Guest Toilet RMT

e Wood vein (plain) - MS 02 bath RMT

Granite: Providing and fixing Granite skirting of 100mm height to flush with the plastering surface & coping using 10mm thick cementitious polymer adhesive, including necessary
3.02 chipping, finishing, final polishing and finishing the edges even and level etc., as per the drawings and details. Granite will be supplied by client free of cost. All materials (excluding RMT
granite) and tools for marble works to be provided by the contractor.

Vitrified/Ceramic/Porcelain Tile: Providing and fixing 100mm tile skirting & coping over 6 to 10mm thick cementitious polymer adhesive to match the wall POP punning level,
3.03 including necessary chipping, finishing, etc., as per the drawings and details. The tiles shall be laid with paper joint and pointing with epoxy based polymer grout of matching colour etc.,
complete as per drawings & as directed by Architect / Engineer in-charge. All materials (excluding tiles) and tools for tile works to be provided by the contractor.
The Tiles must be cut using a Tile Cutting Machine. Surface cleaning agents to be used, no acid wash allowed.

a Nexion Tile (2' x 2') - Wet Kitchen, Staff & Utility RMT

Sub-Total for Skirting & Coping (Rs.)


4.00 Niche

Marble: Providing and fixing marble for Niches with necessary grooves using 12 to 15mm thick cementitious polymer adhesive including necessary chipping, finishing, final polishing and
4.01 finishing the edges even and level etc., as per the drawings and details. Marble will be supplied by client at free of cost. All materials (excluding marble) and tools for marble works to be
provided by the contractor.

a Armani Bronze - MS 01 SQM

b French Riviera - Guest Toilet SQM

c Wood vein (plain) - MS 02 bath SQM

d Opera fantasy - BR 03 bath SQM

Vitrified/Ceramic/Porcelain Tile: Providing and fixing tiles for Niches with necessary grooves using 12 to 15mm thick cementitious polymer adhesive including necessary chipping,
4.02 finishing, final polishing and finishing the edges even and level etc., as per the drawings and details. Tiles will be supplied by client at free of cost. All materials (excluding tiles) and tools
for tile works to be provided by the contractor.

a Nexion Tile (2' x 2') - Staff Toilet SQM


27 Summit - Tower B - Flooring and Cladding Works

Rate Rate
Sl. No. Description Unit Quantity (Including Chemicals) (Excluding Chemicals)

b Medely Porcelain Rock Tile - MS 03 Toilet SQM

Sub-Total for Niche (Rs.)


5.00 Counters

Marble: Collecting, Storing, Cutting and laying 18mm/20mm thick Pre-polished Marble counter of approved quality, selected and sorted for uniform colour of approved dimensions,
design and shade fixed over 20mm thick waterproof and smooth sanded plywood of approved make of size equal to the size of marble using approved adhesive of 4mm thick. Pointing the
joints with matching resin based grout/mastic and finished neat including final polishing, washing with necessary chemicals if required etc., complete. The slabs shall have the edges
5.10 machine cut and polished to produce very fine joints as approved and shown in detailed drawing. The M.S. brackets shall be firmly fixed by means of anchor bolts as per drawing. The rate
shall include for making openings in the marble counter for seating washbasins and making hole for pillar cock etc., as per the drawing and details. MS brackets shall be with MS box
40x40mm, painted a matt black finish as shown in the drawing with spacing of 600mm c/c and covered with end plate of 6mm thick. Rate to include 20mm edge polishing on the outer edge
with groove at bottom and polishing the same as per drawing and as approved by the Engineer In-charge. Top area shall be measured for payment. All materials (excluding marble) and
tools for marble works to be provided by the contractor.

a Armani Brown MS-01 Toilet - Size - 2000 x 600 mm Nos

b Fume Grey Marble - MS-02 Toilet | White Marble Powder Toilet - Size - 1700 x 600 mm Nos

c Opera Fantasy - MS-03 Toilet | Guest Toilet - Size - 1150 x 600 mm Nos

Sub-Total for Counters (Rs.)


6.00 Ledge Wall

Marble: Collecting, Storing, Cutting and Fixing marble using 12 to 15mm thick cementitious polymer adhesive , including necessary chipping, holes for flush plates, bolts etc.. and final
6.10 polishing and finishing the edges even and level etc., as per the drawings and details. Marble will be supplied by client at free of cost. All materials (excluding marble) and tools for marble
works to be provided by the contractor.

a Wood Vein (Plain) - MS 02 SQM

b Saran colin (Standard) - Powder Toilet SQM

c French Riviera - Guest Toilet SQM

d Armani Bronze - MS 01 Toilet SQM

Vitrified/Ceramic/Porcelain Tile: Collecting, Storing, Cutting and Fixing Tile using 10 mm thick cementitious polymer adhesive , including necessary chipping, Holes for flush plates, bolts
6.20 etc.. and final polishing and finishing the edges even and level etc., as per the drawings and details. Tiles will be supplied by client at free of cost. All materials (excluding Tiles) and tools
for tiling works to be provided by the contractor.

a Nexion Tile (2' x 2') - MS 03 Toilet SQM

b Porcelain Tile (2' x 2') - MS 03 Toilet SQM

Sub-Total for Counter Slab (Rs.)


7.00 Jambs & Sills
27 Summit - Tower B - Flooring and Cladding Works

Rate Rate
Sl. No. Description Unit Quantity (Including Chemicals) (Excluding Chemicals)

Marble: Collecting, Storing, Cutting and Fixing marble with necessary grooves using 12 to 15mm thick cementitious polymer adhesive, including necessary chipping, finishing, final
7.10 polishing and finishing the edges even and level etc., as per the drawings and details. Marble will be supplied by client at free of cost. All materials (excluding marble) and tools for marble
works to be provided by the contractor.

a Armani Bronze - MS 01 Toilet SQM

b Saran colin - Power Toilet SQM

c Wood vein - MS 02 SQM

d French Riviera - Guest Toilet SQM

e Opera Fantasy - Utility SQM

Vitrified/Ceramic/Porcelain Tile: Collecting, Storing, Cutting and Fixing Tile using 10 mm thick cementitious polymer adhesive , including necessary chipping, finishing and finishing the
7.20 edges even and level etc., as per the drawings and details. Tile will be supplied by client at free of cost. All materials (excluding Tile) and tools for tiling works to be provided by the
contractor.

a Porcelain Tile - MS 03 Toilet (size: 2'x2') SQM

b Nexion Runa - Staff, Staff Toilet, Kitchen & Utility SQM

Sub-Total for Jambs and Sills (Rs.)

8.00 Transition Profile

Transition Profile: Collecting, Storing, Cutting and Fixing the transition profile using 10 mm thick cementitious polymer adhesive , including necessary chipping, finishing
8.01 and finishing the edges even and level etc., as per the drawings and details. Transition profile will be supplied by client at free of cost. All materials (excluding Tile) and
tools for tiling works to be provided by the contractor.
a T - Profile (Brass profile)- Bedrooms Rmt
b L - Profile (SS Profile)- Kitchen, Utility & Staff Toilet Rmt
c Box Profile (Brass Profile)- Staff & Main Entrance Rmt

Sub-Total for Transition profile (Rs.)

Grand Total Tower B (Rs.)


Amount Amount Previous Present Cumulative
(Including Chemicals (Excluding Chemicals) Quantity Amount Quantity Amount Quantity Amount

- - - - - -

- - - - - -

- - - - - -

- - - - - -
Amount Amount Previous Present Cumulative
(Including Chemicals (Excluding Chemicals) Quantity Amount Quantity Amount Quantity Amount

- - - - - -

- - - - - -

- - - - - -

- - -
Amount Amount Previous Present Cumulative
(Including Chemicals (Excluding Chemicals) Quantity Amount Quantity Amount Quantity Amount

- - - - - -

- - - - - -

- - - - - -

Err:509 Err:509 - - - -

- - - - - -

- - - - - -

- - - - - -
Amount Amount Previous Present Cumulative
(Including Chemicals (Excluding Chemicals) Quantity Amount Quantity Amount Quantity Amount

- - - - - -

- - - - - -

- - - - - -

- - -
Amount Amount Previous Present Cumulative
(Including Chemicals (Excluding Chemicals) Quantity Amount Quantity Amount Quantity Amount

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -
Amount Amount Previous Present Cumulative
(Including Chemicals (Excluding Chemicals) Quantity Amount Quantity Amount Quantity Amount

- - - - - -

- - -

- - - - - -

- - - - - -

- - - - - -

- - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -
- - - -

- - - - - -

- - - - - -

- - -
Amount Amount Previous Present Cumulative
(Including Chemicals (Excluding Chemicals) Quantity Amount Quantity Amount Quantity Amount

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - -

- - - - - -

- - - - -

- - - - -

Err:509 Err:509 - - -
27 Summit - Tower C - Flooring and Cladding Works

Rate Rate
Sl. No. Description Unit Quantity (Including Chemicals) (Excluding Chemicals)

1.00 Flooring

Marble: Storing, shifting and cutting of 18mm/20mm thick marble as per prescribed grid numbers stipulated in the issued drawing or by the EIC. Cut marble slabs to be shifted (via material
hoist) & laid over 20mm thick cement mortar bed (1 cement : 5 sand) and 10mm thick white cement bed as per required finished floor levels or slopes, placed with white cement slurry on
the bottom side to allow for proper bonding to the cement bed. The marble shall be laid in a book matched pattern or random as per the reference drawing grid, with paper joints and filled
with matching resin based grout.

After laying, the marble surface shall then be grinded, applicated with chemicals, and polished using diamond polishing machine in the following manner:
1) Grinding and preliminary polish
2) Application of epoxy
3) Floor Protection (heavy duty)
4) 2nd coat of polish
1.01 5) Application of impregnator sealant
6) 3rd & 4th coat of polish
7) Application of impregnator sealant
8) 5th & 6th coat of polish
9) Final coat of polishing with extra shine chemical
10) Basic protection

Marble polish will be done to the satisfaction of the EIC and verified as per the gloss meter reading. The contractor is responsible for the removal of all debris, dust and other materials after
the installation, polishing and protection of the marble flooring, this will be deemed complete to the satisfaction of the EIC. The rate includes but not limited to chamfering, half nosing, full
nosing, edge polishing and hole cutting of the marble. All chemicals used must be as per the agreed make of material. Only the marble will be provided by the Client, all other material is in
the scope of the contractor unless specified otherwise. Wastage greater than 10% will be on the account of the Contractor.
Note: White marble will be laid with cement based adhesive ONLY and sealant protector will be applied on the reverse side.

a Opera Fantasy - Foyer, Living & Dining, Family & Dry Kitchen, MS 02 BR, MS02 Toilet, Patio SQM

b Fume Grey - MS 01 Toilet SQM

c Saran Colin - Powder Toilet SQM

d French Riviera Marble - Guest Bathroom SQM


27 Summit - Tower C - Flooring and Cladding Works

Rate Rate
Sl. No. Description Unit Quantity (Including Chemicals) (Excluding Chemicals)

Granite: Storing, shifting and cutting of 18mm/20mm thick granite as per prescribed grid numbers stipulated in the issued drawing or by the EIC. Cut granite slabs to be shifted (via
material hoist) & laid over 20mm to 50mm thick cement mortar bed (1 cement : 5 sand) as per required finished floor levels or slopes, placed with cement slurry on the bottom side to allow
for proper bonding to the cement bed. The granite shall be laid in a book matched pattern as per the reference drawing grid, with paper joints and filled with matching cement based epoxy
grout.

After laying Granite, the surface shall be prepared and protected in the following manner:
1.02 1) Application of matching cement based grout for joints filling
2) Protect the surface (heavy duty)

The contractor is responsible for the removal of all debris, dust and other materials after the installation and protection of the granite flooring, this will be deemed complete to the satisfaction
of the EIC. The rate includes but not limited to chamfering, half nosing, full nosing, edge polishing and hole cutting of the granite. All chemicals used must be as per the agreed make of
material. Only the granite will be provided by the Client, all other material is in the scope of the contractor unless otherwise mentioned. Wastage greater than 10% will be on the account of
the Contractor.

Staircase Treads, Raiser & Landing SQM RO

Vitrified/Ceramic/Porcelain Tile: Storing, shifting and cutting of Tiles as per prescribed grid numbers stipulated in the issued drawing or by the EIC. Tiles to be shifted (via material
hoist) & laid over 10mm thick cementitious polymer adhesive layer as per required finished floor levels or slopes. The Tiles shall be laid in a pattern as per the reference drawing grid, with
paper joints or spacers (2mm) as indicated and filled with matching epoxy polymer based grout. It's mandatory for the contractor to use the following:
1) Tiles laid with a tile levelling system
2) Tiles to be cut using a tile cutting machine and NOT an angle grinder
3) Holes will be cut using a tile hole locater.

1.03 After laying the surface shall be prepared and protected in the following manner:
1) Application of matching epoxy polymer based grout for joints filling
2) Protect the surface (heavy duty)

The contractor is responsible for the removal of all debris, dust and other materials after the installation and protection of the tile flooring, this will be deemed complete to the satisfaction of
the EIC. The rate includes but not limited to chamfering and hole cutting of the tiles. Cut tiles with chipped edges will be rejected, all hole cutting must be done with the use of tile cutting
template. All chemicals used must be as per the agreed make of material. Only the Tiles will be provided by the Client, all other material is in the scope of the contractor. Wastage greater
than 5% will be on the account of the Contractor.

a Nexion Tile (2' x 2') - Wet Kitchen, Utility , staff room & Staff toilet SQM

b IPS Tile- MS01 , BR03 & Guest BR SQM

Sub-Total for Flooring Works (Rs.)


2.00 Cladding/Dado
27 Summit - Tower C - Flooring and Cladding Works

Rate Rate
Sl. No. Description Unit Quantity (Including Chemicals) (Excluding Chemicals)

Marble: Storing, shifting and cutting of 18mm/20mm thick pre-polished marble as per prescribed grid numbers stipulated in the issued drawing or by the EIC. Cut marble slabs to be shifted
(via material hoist) & cladded to flush with the POP punning surface over 12 to 15mm thick cementitious polymer adhesive The marble shall be fixed in a book matched pattern or random
slabs as per the reference drawing grid, with paper joints and filled with clear resin or mastic matching resin based grout.

After fixing, the marble surface shall then be applicated with chemical, and polished using diamond polishing machine in the following manner:
1) Application of impregnator sealant
2.01 2) 5th & 6th coat of polish
3) Final coat of polishing with extra shine chemical

Marble polish will be done to the satisfaction of the EIC and verified as per the gloss meter reading. The contractor is responsible for the removal of all debris, dust and other materials after
the installation & polishing the marble, this will be deemed complete to the satisfaction of the EIC. The rate includes but not limited to chamfering, half nosing, full nosing, edge polishing,
grooves and hole cutting of the marble. All chemicals used must be as per the agreed make of material. Only the marble will be provided by the Client, all other material is in the scope of
the contractor. Wastage greater than 10% will be on the account of the Contractor.

a Wood Vein (Plain) - MS 02 SQM

b Wood Vein (Band) - MS 02 SQM

c Saran Colin - Powder Toilet SQM

d Mosaic Tile - Powder Toilet SQM

e French Riviera - Guest Toilet SQM

f Armani Bronze - MS 01 Toilet SQM

g Armani Bronze (Fluted) - MS 01 Toilet SQM

Vitrified/Ceramic/Porcelain Tile: Storing, shifting and cutting of Tiles as per prescribed grid numbers stipulated in the issued drawing or by the EIC. Tiles to be shifted (via material hoist) &
cladded to flush with the POP punning / plastering surface over 12 to 15mm thick cementitious polymer adhesive. The Tiles shall be laid in a pattern as per the reference drawing grid, with
paper joints or spacers (2 mm) as indicated and filled with matching epoxy polymer grout.

It's mandatory for the contractor to use the following:


1) Tiles laid with a tile levelling system
2) Tiles to be cut using a tile cutting machine and NOT an angle grinder
3) Holes will be cut using a tile hole locater.
2.02
After laying the surface shall be prepared and protected in the following manner:
1) Application of matching epoxy polymer based grout for joints filling
2) Protect the surface (heavy duty)

The contractor is responsible for the removal of all debris, dust and other materials after the installation and protection of the tile flooring, this will be deemed complete to the satisfaction of
the EIC. The rate includes but not limited to chamfering and hole cutting of the tiles. Cut tiles with chipped edges will be rejected, all hole cutting must be done with the use of tile cutting
template. All chemicals used must be as per the agreed make of material. Only the Tiles will be provided by the Client, all other material is in the scope of the contractor. Wastage greater
than 5% will be on the account of the Contractor.
27 Summit - Tower C - Flooring and Cladding Works

Rate Rate
Sl. No. Description Unit Quantity (Including Chemicals) (Excluding Chemicals)

a Rhombus Tile (150mm x 150mm) - Guest Toilet SQM

b Nexion Tile (2' x 2') - Staff toilet SQM

c Porcelain Tile (2' x 2') - MS 03 Toilet SQM

Sub-Total for Cladding/Dado (Rs.)


27 Summit - Tower C - Flooring and Cladding Works

Rate Rate
Sl. No. Description Unit Quantity (Including Chemicals) (Excluding Chemicals)

3.00 Skirting & Coping

Marble: Providing and fixing marble skirting of 75mm height projected to POP punning surface & Coping using 12 to 15mm thick cementitious polymer adhesive, including necessary
3.01 chipping, finishing, final polishing and finishing the edges even and level etc. as per the drawings and details. Marble will be supplied by client free of cost. All materials (excluding marble)
and tools for marble works to be provided by the contractor.

a Opera Fantasy - Living, Dining, Drawing Room, Patio & MS02 Toilet RMT

b Fume Grey - MS 01 Toilet RMT

c Saran Colin - Powder Toilet RMT

d French Riviera - Guest Toilet RMT

e Wood vein (plain) - MS 02 bath RMT

Granite: Providing and fixing Granite skirting of 100mm height to flush with the plastering surface & coping using 10mm thick cementitious polymer adhesive, including necessary
3.02 chipping, finishing, final polishing and finishing the edges even and level etc., as per the drawings and details. Granite will be supplied by client free of cost. All materials (excluding RMT RO
granite) and tools for marble works to be provided by the contractor.

Vitrified/Ceramic/Porcelain Tile: Providing and fixing 100mm tile skirting & coping over 6 to 10mm thick cementitious polymer adhesive to match the wall POP punning level, including
3.03 necessary chipping, finishing, etc., as per the drawings and details. The tiles shall be laid with paper joint and pointing with epoxy based polymer grout of matching colour etc., complete as
per drawings & as directed by Architect / Engineer in-charge. All materials (excluding tiles) and tools for tile works to be provided by the contractor.
The Tiles must be cut using a Tile Cutting Machine. Surface cleaning agents to be used, no acid wash allowed.

a Nexion Tile (2' x 2') - Wet Kitchen, Staff & Utility RMT

Sub-Total for Skirting & Coping (Rs.)


4.00 Niche

Marble: Providing and fixing marble for Niches with necessary grooves using 12 to 15mm thick cementitious polymer adhesive including necessary chipping, finishing, final polishing and
4.01 finishing the edges even and level etc., as per the drawings and details. Marble will be supplied by client at free of cost. All materials (excluding marble) and tools for marble works to be
provided by the contractor.

a Armani Bronze - MS 01 SQM

b French Riviera - Guest Toilet SQM

c Wood vein (plain) - MS 02 bath SQM

Vitrified/Ceramic/Porcelain Tile: Providing and fixing tiles for Niches with necessary grooves using 12 to 15mm thick cementitious polymer adhesive including necessary chipping,
4.02 finishing, final polishing and finishing the edges even and level etc., as per the drawings and details. Tiles will be supplied by client at free of cost. All materials (excluding tiles) and tools
for tile works to be provided by the contractor.

a Nexion Tile (2' x 2') - Staff Toilet SQM


b Porcelain Tile - MS 03 Toilet SQM
27 Summit - Tower C - Flooring and Cladding Works

Rate Rate
Sl. No. Description Unit Quantity (Including Chemicals) (Excluding Chemicals)

Sub-Total for Niche (Rs.)


5.00 Counters

Marble: Collecting, Storing, Cutting and laying 18mm/20mm thick Pre-polished Marble counter of approved quality, selected and sorted for uniform colour of approved dimensions, design
and shade fixed over 20mm thick waterproof and smooth sanded plywood of approved make of size equal to the size of marble using approved adhesive of 4mm thick. Pointing the joints
with matching resin based grout/mastic and finished neat including final polishing, washing with necessary chemicals if required etc., complete. The slabs shall have the edges machine cut
and polished to produce very fine joints as approved and shown in detailed drawing. The M.S. brackets shall be firmly fixed by means of anchor bolts as per drawing. The rate shall include
5.10 for making openings in the marble counter for seating washbasins and making hole for pillar cock etc., as per the drawing and details. MS brackets shall be with MS box 40x40mm, painted a
matt black finish as shown in the drawing with spacing of 600mm c/c and covered with end plate of 6mm thick. Rate to include 20mm edge polishing on the outer edge with groove at
bottom and polishing the same as per drawing and as approved by the Engineer In-charge. Top area shall be measured for payment. All materials (excluding marble) and tools for marble
works to be provided by the contractor.

a Armani Brown MS-01 Toilet - Size - 2000 x 600 mm Nos

b Fume Grey Marble - MS-02 Toilet | White Marble Powder Toilet - Size - 1700 x 600 mm Nos

c Opera Fantasy - MS-03 Toilet | Guest Toilet - Size - 1150 x 600 mm Nos

Sub-Total for Counters (Rs.)


6.00 Ledge Wall

Marble: Collecting, Storing, Cutting and Fixing marble using 12 to 15mm thick cementitious polymer adhesive , including necessary chipping, holes for flush plates, bolts etc.. and final
6.10 polishing and finishing the edges even and level etc., as per the drawings and details. Marble will be supplied by client at free of cost. All materials (excluding marble) and tools for marble
works to be provided by the contractor.

a Wood Vein (Plain) - MS 02 SQM

b Saran colin (Standard) - Powder Toilet SQM

c French Riviera - Guest Toilet SQM

d Armani Bronze - MS 01 Toilet SQM

Vitrified/Ceramic/Porcelain Tile: Collecting, Storing, Cutting and Fixing Tile using 10 mm thick cementitious polymer adhesive , including necessary chipping, Holes for flush plates, bolts
6.20 etc.. and final polishing and finishing the edges even and level etc., as per the drawings and details. Tiles will be supplied by client at free of cost. All materials (excluding Tiles) and tools
for tiling works to be provided by the contractor.

a Nexion Tile (2' x 2') - MS 03 Toilet SQM

b Porcelain Tile (2' x 2') - MS 03 Toilet SQM

Sub-Total for Counter Slab (Rs.)


7.00 Jambs & Sills

Marble: Collecting, Storing, Cutting and Fixing marble with necessary grooves using 12 to 15mm thick cementitious polymer adhesive, including necessary chipping, finishing, final
7.10 polishing and finishing the edges even and level etc., as per the drawings and details. Marble will be supplied by client at free of cost. All materials (excluding marble) and tools for marble
works to be provided by the contractor.
27 Summit - Tower C - Flooring and Cladding Works

Rate Rate
Sl. No. Description Unit Quantity (Including Chemicals) (Excluding Chemicals)

a Armani Bronze - MS 01 Toilet SQM

b Saran colin - Power Toilet SQM

c Wood vein - MS 02 SQM

d French Riviera - Guest Toilet SQM

e Opera Fantasy - Utility SQM

Vitrified/Ceramic/Porcelain Tile: Collecting, Storing, Cutting and Fixing Tile using 10 mm thick cementitious polymer adhesive , including necessary chipping, finishing and finishing the
7.20 edges even and level etc., as per the drawings and details. Tile will be supplied by client at free of cost. All materials (excluding Tile) and tools for tiling works to be provided by the
contractor.

a Porcelain Tile - MS 03 Toilet (size: 2'x2') SQM

b Nexion Runa - Staff, Staff Toilet, Kitchen & Utility SQM

Sub-Total for Jambs and Sills (Rs.)

8.00 Transition Profile

Transition Profile: Collecting, Storing, Cutting and Fixing the transition profile using 10 mm thick cementitious polymer adhesive , including necessary chipping, finishing
8.01 and finishing the edges even and level etc., as per the drawings and details. Transition profile will be supplied by client at free of cost. All materials (excluding Tile) and
tools for tiling works to be provided by the contractor.
a T - Profile (Brass profile)- Bedrooms Rmt
b L - Profile (SS Profile)- Kitchen, Utility & Staff Toilet Rmt
c Box Profile (Brass Profile)- Staff & Main Entrance Rmt

Sub-Total for Transition profile (Rs.)

Grand Total Tower C (Rs.)


Amount Amount Previous Present Cumulative
(Including Chemicals (Excluding Chemicals) Quantity Amount Quantity Amount Quantity Amount

- - - - - -

- - - - - -

- - - - - -

- - - - - -
Amount Amount Previous Present Cumulative
(Including Chemicals (Excluding Chemicals) Quantity Amount Quantity Amount Quantity Amount

- - - - - -

- - - - - -

- - - - - -

- - -
Amount Amount Previous Present Cumulative
(Including Chemicals (Excluding Chemicals) Quantity Amount Quantity Amount Quantity Amount

- - - - - -

- - - - - -

- - - - - -

Err:509 Err:509 - - - -

- - - - - -

- - - - - -

- - - - - -
Amount Amount Previous Present Cumulative
(Including Chemicals (Excluding Chemicals) Quantity Amount Quantity Amount Quantity Amount

- - - - - -

- - - - - -

- - - - - -

- - -
Amount Amount Previous Present Cumulative
(Including Chemicals (Excluding Chemicals) Quantity Amount Quantity Amount Quantity Amount

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -
- - - - - -
Amount Amount Previous Present Cumulative
(Including Chemicals (Excluding Chemicals) Quantity Amount Quantity Amount Quantity Amount

- - -

- - - - - -

- - - - - -

- - - - - -

- - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -
- - - -

- - - - - -

- - - - - -

- - -
Amount Amount Previous Present Cumulative
(Including Chemicals (Excluding Chemicals) Quantity Amount Quantity Amount Quantity Amount

- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - -

- - - - - -

- - - - -

- - - - -

Err:509 Err:509 - - -
27 S - F&C BREAK UP

Sl. No. Type Material Description Location UOM Wing B2 B1 GF 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th 14th 15th 16th 17th 18th 19th 20th 21st 22nd 23rd LP UP TF Terrace Above Terrace Total
sqm Tower A 164.25 192.05 164.33 192.05 164.33 192.05 164.33 192.05 164.33 192.05 164.33 192.05 164.33 192.05 164.33 192.05 164.33 192.05 164.33 192.05 164.33 192.05 164.33 235.63 111.28 4,431
1 Flooring Marble Opera Fantasy sqm Tower B 164.25 192.05 164.33 192.05 164.33 192.05 164.33 192.05 164.33 192.05 164.33 192.05 164.33 192.05 164.33 192.05 164.33 192.05 164.33 192.05 164.33 192.05 164.33 235.63 111.28 4,431
sqm Tower C 166.93 173.36 146.09 173.36 146.09 173.36 146.09 173.36 146.09 173.36 146.09 173.36 146.09 173.36 146.09 173.36 146.09 173.36 146.09 173.36 146.09 173.36 146.09 231.39 92.33 4,005
Rmt Tower A 74.80 79.97 74.51 79.97 74.51 79.97 74.51 79.97 74.51 79.97 74.51 79.97 74.51 79.97 74.51 79.97 74.51 79.97 74.51 79.97 74.51 79.97 74.51 90.68 52.27 1,917
2 Skirting Marble Opera Fantasy Rmt Tower B 74.80 79.97 74.51 79.97 74.51 79.97 74.51 79.97 74.51 79.97 74.51 79.97 74.51 79.97 74.51 79.97 74.51 79.97 74.51 79.97 74.51 79.97 74.51 90.68 52.27 1,917
Rmt Tower C 85.64 82.77 72.70 82.77 72.70 82.77 72.70 82.77 72.70 82.77 72.70 82.77 72.70 82.77 72.70 82.77 72.70 82.77 72.70 82.77 72.70 82.77 72.70 101.82 63.40 1,961
sqm Tower A 3.48 3.48 3.48 3.48 3.48 3.48 3.48 3.48 3.48 3.48 3.48 3.48 3.48 3.48 3.48 3.48 3.48 3.48 3.48 3.48 3.48 3.48 3.48 - - 80
3 Jambs Marble Opera Fantasy sqm Tower B 3.48 3.48 3.48 3.48 3.48 3.48 3.48 3.48 3.48 3.48 3.48 3.48 3.48 3.48 3.48 3.48 3.48 3.48 3.48 3.48 3.48 3.48 3.48 - - 80
sqm Tower C 2.27 2.27 2.27 2.27 2.27 2.27 2.27 2.27 2.27 2.27 2.27 2.27 2.27 2.27 2.27 2.27 2.27 2.27 2.27 2.27 2.27 2.27 2.27 - - 52
Nos Tower A 1 1 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 - - 23
4 Counter Marble Opera Fantasy Bedroom 3 Bath Nos Tower B 1 1 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 - - 23
Nos Tower C - - - - - - - - - - - - - - - - - - - - - - - - - -
sqm Tower A 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 - - 24
5 Niche Marble Opera Fantasy Bedroom 3 Bath sqm Tower B 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 - - 24
sqm Tower C - - - - - - - - - - - - - - - - - - - - - - - - - -
sqm Tower A 20.11 20.11 20.11 20.11 20.11 20.11 20.11 20.11 20.11 20.11 20.11 20.11 20.11 20.11 20.11 20.11 20.11 20.11 20.11 20.11 20.11 20.11 20.11 25.91 40.30 529
6 Cladding Marble Armani Bronze / Crema Jasper MS01 BTH sqm Tower B 20.11 20.11 20.11 20.11 20.11 20.11 20.11 20.11 20.11 20.11 20.11 20.11 20.11 20.11 20.11 20.11 20.11 20.11 20.11 20.11 20.11 20.11 20.11 25.91 40.30 529
sqm Tower C 18.64 18.64 18.64 18.64 18.64 18.64 18.64 18.64 18.64 18.64 18.64 18.64 18.64 18.64 18.64 18.64 18.64 18.64 18.64 18.64 18.64 18.64 18.64 18.64 41.38 489
Nos Tower A 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 25
7 Counter Marble Armani Bronze / Crema Jasper MS01 BTH Nos Tower B 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 25
Nos Tower C 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 25
sqm Tower A 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 2.24 3.72 12
8 Jambs Marble Armani Bronze / Crema Jasper MS01 BTH sqm Tower B 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 2.24 3.72 12
sqm Tower C 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 7
sqm Tower A 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.69 13
9 Niche Marble Armani Bronze / Crema Jasper MS01 BTH sqm Tower B 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.69 13
sqm Tower C 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.90 0.51 13
Rmt Tower A 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.40 6.40 62
10 Skirting Marble Armani Bronze / Crema Jasper MS01 BTH Rmt Tower B 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.40 6.40 62
Rmt Tower C 2.29 2.29 2.29 2.29 2.29 2.29 2.29 2.29 2.29 2.29 2.29 2.29 2.29 2.29 2.29 2.29 2.29 2.29 2.29 2.29 2.29 2.29 2.29 2.29 3.43 58
sqm Tower A 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 3.41 6.60 57
11 Cladding - Fluted Marble Armani Bronze / Crema Jasper MS01 BTH sqm Tower B 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 3.41 6.60 57
sqm Tower C 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 1.82 46
sqm Tower A 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 114
12 Cladding Marble French Riveria / Turkish Riveria Guest BTH sqm Tower B 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 4.74 114
sqm Tower C 4.42 4.42 4.42 4.42 4.42 4.42 4.42 4.42 4.42 4.42 4.42 4.42 4.42 4.42 4.42 4.42 4.42 4.42 4.42 4.42 4.42 4.42 4.42 4.42 106
sqm Tower A 6.35 6.35 6.35 6.35 6.35 6.35 6.35 6.35 6.35 6.35 6.35 6.35 6.35 6.35 6.35 6.35 6.35 6.35 6.35 6.35 6.35 6.35 6.35 6.35 152
13 Flooring Marble French Riveria / Turkish Riveria Guest BTH sqm Tower B 6.35 6.35 6.35 6.35 6.35 6.35 6.35 6.35 6.35 6.35 6.35 6.35 6.35 6.35 6.35 6.35 6.35 6.35 6.35 6.35 6.35 6.35 6.35 6.35 152
sqm Tower C 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 162
Nos Tower A 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 24
14 Counter Marble French Riveria / Turkish Riveria Guest BTH Nos Tower B 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 24
Nos Tower C 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 24
sqm Tower A 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 19
15 Jambs Marble French Riveria / Turkish Riveria Guest BTH sqm Tower B 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 19
sqm Tower C 1.89 1.89 1.89 1.89 1.89 1.89 1.89 1.89 1.89 1.89 1.89 1.89 1.89 1.89 1.89 1.89 1.89 1.89 1.89 1.89 1.89 1.89 1.89 1.89 45
sqm Tower A 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 25
16 Niche Marble French Riveria / Turkish Riveria Guest BTH sqm Tower B 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 25
sqm Tower C 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 25
Rmt Tower A 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 30
17 Skirting Marble French Riveria / Turkish Riveria Guest BTH Rmt Tower B 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 30
Rmt Tower C 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 29
sqm Tower A 8.97 8.97 8.97 8.97 8.97 8.97 8.97 8.97 8.97 8.97 8.97 8.97 8.97 8.97 8.97 8.97 8.97 8.97 8.97 8.97 8.97 8.97 8.97 9.35 15.17 231
18 Flooring Marble Fume Grey MS 01 BTH sqm Tower B 8.97 8.97 8.97 8.97 8.97 8.97 8.97 8.97 8.97 8.97 8.97 8.97 8.97 8.97 8.97 8.97 8.97 8.97 8.97 8.97 8.97 8.97 8.97 9.35 15.17 231
sqm Tower C 7.75 7.75 7.75 7.75 7.75 7.75 7.75 7.75 7.75 7.75 7.75 7.75 7.75 7.75 7.75 7.75 7.75 7.75 7.75 7.75 7.75 7.75 7.75 7.75 10.50 197
Nos Tower A 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 25
19 Counter Marble Fume Grey Powder Room Nos Tower B 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 25
Nos Tower C 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 25
Nos Tower A 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 24
20 Counter Marble Michelangelo MS 02 BTH Nos Tower B 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 24
Nos Tower C 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 25
sqm Tower A 4.26 4.26 4.26 4.26 4.26 4.26 4.26 4.26 4.26 4.26 4.26 4.26 4.26 4.26 4.26 4.26 4.26 4.26 4.26 4.26 4.26 4.26 4.26 4.26 4.26 107
21 Flooring Marble Saran Colin Powder Room sqm Tower B 4.26 4.26 4.26 4.26 4.26 4.26 4.26 4.26 4.26 4.26 4.26 4.26 4.26 4.26 4.26 4.26 4.26 4.26 4.26 4.26 4.26 4.26 4.26 4.26 4.26 107
sqm Tower C 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 3.33 83
sqm Tower A 11.34 11.34 11.34 11.34 11.34 11.34 11.34 11.34 11.34 11.34 11.34 11.34 11.34 11.34 11.34 11.34 11.34 11.34 11.34 11.34 11.34 11.34 11.34 11.34 11.34 283
22 Cladding Marble Saran Colin Powder Room sqm Tower B 11.34 11.34 11.34 11.34 11.34 11.34 11.34 11.34 11.34 11.34 11.34 11.34 11.34 11.34 11.34 11.34 11.34 11.34 11.34 11.34 11.34 11.34 11.34 11.34 11.34 283
sqm Tower C 9.92 9.92 9.92 9.92 9.92 9.92 9.92 9.92 9.92 9.92 9.92 9.92 9.92 9.92 9.92 9.92 9.92 9.92 9.92 9.92 9.92 9.92 9.92 9.92 9.92 248
Rmt Tower A 3.12 3.12 3.12 3.12 3.12 3.12 3.12 3.12 3.12 3.12 3.12 3.12 3.12 3.12 3.12 3.12 3.12 3.12 3.12 3.12 3.12 3.12 3.12 3.12 3.12 78
23 Skirting Marble Saran Colin Powder Room sqm Tower B 3.12 3.12 3.12 3.12 3.12 3.12 3.12 3.12 3.12 3.12 3.12 3.12 3.12 3.12 3.12 3.12 3.12 3.12 3.12 3.12 3.12 3.12 3.12 3.12 3.12 78
sqm Tower C 2.68 2.68 2.68 2.68 2.68 2.68 2.68 2.68 2.68 2.68 2.68 2.68 2.68 2.68 2.68 2.68 2.68 2.68 2.68 2.68 2.68 2.68 2.68 2.68 2.68 67
sqm Tower A 16.06 16.06 16.06 16.06 16.06 16.06 16.06 16.06 16.06 16.06 16.06 16.06 16.06 16.06 16.06 16.06 16.06 16.06 16.06 16.06 16.06 16.06 16.06 16.06 16.06 401
24 Cladding Marble Wood Vein MS 02 BTH sqm Tower B 16.06 16.06 16.06 16.06 16.06 16.06 16.06 16.06 16.06 16.06 16.06 16.06 16.06 16.06 16.06 16.06 16.06 16.06 16.06 16.06 16.06 16.06 16.06 16.06 16.06 401
sqm Tower C 15.36 15.36 15.36 15.36 15.36 15.36 15.36 15.36 15.36 15.36 15.36 15.36 15.36 15.36 15.36 15.36 15.36 15.36 15.36 15.36 15.36 15.36 15.36 15.36 15.36 384
sqm Tower A 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 213
25 Cladding - Bands Marble Wood Vein MS 02 BTH sqm Tower B 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 8.50 213
sqm Tower C 4.38 4.38 4.38 4.38 4.38 4.38 4.38 4.38 4.38 4.38 4.38 4.38 4.38 4.38 4.38 4.38 4.38 4.38 4.38 4.38 4.38 4.38 4.38 4.38 4.38 110
sqm Tower A 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 6
26 Jambs Marble Wood Vein MS 02 BTH sqm Tower B 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 6
sqm Tower C 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 7
sqm Tower A 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 13
27 Niche Marble Wood Vein MS 02 BTH sqm Tower B 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 13
sqm Tower C 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 13
sqm Tower A 3.38 3.38 3.38 3.38 3.38 3.38 3.38 3.38 3.38 3.38 3.38 3.38 3.38 3.38 3.38 3.38 3.38 3.38 3.38 3.38 3.38 3.38 3.38 3.38 3.38 85
28 Ledge Marble Wood Vein MS 02 BTH sqm Tower B 3.38 3.38 3.38 3.38 3.38 3.38 3.38 3.38 3.38 3.38 3.38 3.38 3.38 3.38 3.38 3.38 3.38 3.38 3.38 3.38 3.38 3.38 3.38 3.38 3.38 85
sqm Tower C - - - - - - - - - - - - - - - - - - - - - - - - - -
Rmt Tower A 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 41
29 Skirting Marble Wood Vein MS 02 BTH Rmt Tower B 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 41
Rmt Tower C 2.42 2.42 2.42 2.42 2.42 2.42 2.42 2.42 2.42 2.42 2.42 2.42 2.42 2.42 2.42 2.42 2.42 2.42 2.42 2.42 2.42 2.42 2.42 2.42 2.42 61
sqm Tower A 11.12 11.12 11.12 11.12 11.12 11.12 11.12 11.12 11.12 11.12 11.12 11.12 11.12 11.12 11.12 11.12 11.12 11.12 11.12 11.12 11.12 11.12 11.12 11.12 267
30 Cladding Tile Diamond Tile Guest BTH sqm Tower B 11.12 11.12 11.12 11.12 11.12 11.12 11.12 11.12 11.12 11.12 11.12 11.12 11.12 11.12 11.12 11.12 11.12 11.12 11.12 11.12 11.12 11.12 11.12 11.12 267
sqm Tower C 11.46 11.46 11.46 11.46 11.46 11.46 11.46 11.46 11.46 11.46 11.46 11.46 11.46 11.46 11.46 11.46 11.46 11.46 11.46 11.46 11.46 11.46 11.46 11.46 275
sqm Tower A 4.73 4.73 4.73 4.73 4.73 4.73 4.73 4.73 4.73 4.73 4.73 4.73 4.73 4.73 4.73 4.73 4.73 4.73 4.73 4.73 4.73 4.73 4.73 109
31 Cladding Tile Medley Tile Blue BR 03 BTH sqm Tower B 4.73 4.73 4.73 4.73 4.73 4.73 4.73 4.73 4.73 4.73 4.73 4.73 4.73 4.73 4.73 4.73 4.73 4.73 4.73 4.73 4.73 4.73 4.73 109
sqm Tower C - - - - - - - - - - - - - - - - - - - - - - - -
sqm Tower A 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 288
32 Cladding Tile Medley Tile Blue Rock BR 03 BTH sqm Tower B 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 288
sqm Tower C - - - - - - - - - - - - - - - - - - - - - - - -
sqm Tower A 46.34 46.34 46.34 46.34 46.34 46.34 46.34 46.34 46.34 46.34 46.34 46.34 46.34 46.34 46.34 46.34 46.34 46.34 46.34 46.34 46.34 46.34 46.34 55.82 52.35 1,174
33 Flooring Tile Nexion Runa Staff, Staff Toilet, Kitchen & Utility sqm Tower B 46.34 46.34 46.34 46.34 46.34 46.34 46.34 46.34 46.34 46.34 46.34 46.34 46.34 46.34 46.34 46.34 46.34 46.34 46.34 46.34 46.34 46.34 46.34 55.82 52.35 1,174
sqm Tower C 39.69 39.69 39.69 39.69 39.69 39.69 39.69 39.69 39.69 39.69 39.69 39.69 39.69 39.69 39.69 39.69 39.69 39.69 39.69 39.69 39.69 39.69 39.69 40.02 23.06 976
sqm Tower A 18.56 18.56 18.56 18.56 18.56 18.56 18.56 18.56 18.56 18.56 18.56 18.56 18.56 18.56 18.56 18.56 18.56 18.56 18.56 18.56 18.56 18.56 18.56 18.56 40.84 486
34 Cladding Tile Nexion Runa Staff, Staff Toilet, Kitchen & Utility sqm Tower B 18.56 18.56 18.56 18.56 18.56 18.56 18.56 18.56 18.56 18.56 18.56 18.56 18.56 18.56 18.56 18.56 18.56 18.56 18.56 18.56 18.56 18.56 18.56 18.56 40.84 486
sqm Tower C 19.71 19.71 19.71 19.71 19.71 19.71 19.71 19.71 19.71 19.71 19.71 19.71 19.71 19.71 19.71 19.71 19.71 19.71 19.71 19.71 19.71 19.71 19.71 19.71 473
sqm Tower A 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.12 34
35 Jambs Tile Nexion Runa Staff, Staff Toilet, Kitchen & Utility sqm Tower B 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.12 34
sqm Tower C 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 20
Rmt Tower A 36.96 36.96 36.96 36.96 36.96 36.96 36.96 36.96 36.96 36.96 36.96 36.96 36.96 36.96 36.96 36.96 36.96 36.96 36.96 36.96 36.96 36.96 36.96 46.66 52.80 950
36 Skirting Tile Nexion Runa Staff, Staff Toilet, Kitchen & Utility Rmt Tower B 36.96 36.96 36.96 36.96 36.96 36.96 36.96 36.96 36.96 36.96 36.96 36.96 36.96 36.96 36.96 36.96 36.96 36.96 36.96 36.96 36.96 36.96 36.96 46.66 52.80 950
Rmt Tower C 36.25 36.25 36.25 36.25 36.25 36.25 36.25 36.25 36.25 36.25 36.25 36.25 36.25 36.25 36.25 36.25 36.25 36.25 36.25 36.25 36.25 36.25 36.25 41.08 21.75 897
sqm Core 89.19 89.19 89.19 89.19 89.19 89.19 89.19 89.19 89.19 89.19 89.19 89.19 89.19 89.19 89.19 89.19 89.19 89.19 89.19 89.19 89.19 89.19 89.19 89.19 89.19 89.19 2,319
37 Flooring Tile Nexion Endless Connecting Corridor sqm -
sqm -
Rmt Core 41.53 41.53 41.53 41.53 41.53 41.53 41.53 41.53 41.53 41.53 41.53 41.53 41.53 41.53 41.53 41.53 41.53 41.53 41.53 41.53 41.53 41.53 41.53 41.53 41.53 41.53 1,080
38 Skirting Stone Paloma Connecting Corridor Rmt -
Rmt -
sqm Tower A 81.84 81.84 81.84 81.84 81.84 81.84 81.84 81.84 81.84 81.84 81.84 81.84 81.84 81.84 81.84 81.84 81.84 81.84 81.84 81.84 81.84 81.84 81.84 50.98 94.60 2,028
39 Flooring IPS Tile IPS Tile MS01 , BR03 & Guest BR sqm Tower B 81.84 81.84 81.84 81.84 81.84 81.84 81.84 81.84 81.84 81.84 81.84 81.84 81.84 81.84 81.84 81.84 81.84 81.84 81.84 81.84 81.84 81.84 81.84 50.98 94.60 2,028
sqm Tower C 60.37 60.37 60.37 60.37 60.37 60.37 60.37 60.37 60.37 60.37 60.37 60.37 60.37 60.37 60.37 60.37 60.37 60.37 60.37 60.37 60.37 60.37 60.37 36.77 98.17 1,523
sqm East 15 15 15 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 474
40 Treads & Landing Granite Honed Granite Fire Staircase sqm West 15 15 15 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 15.30 459
sqm Ext 38 76 114
sqm East 4 6 6 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 137
41 Riser Granite Honed Granite Fire Staircase sqm West 4 6 6 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 4.31 133
sqm Ext 12 8 20
sqm East 3 3 3 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 91
42 Jambs Granite Honed Granite Service lift lobby sqm West 3 3 3 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 91
sqm Ext -
Rmt East 20 23 25 19.80 19.80 19.80 19.80 19.80 19.80 19.80 19.80 19.80 19.80 19.80 19.80 19.80 19.80 19.80 19.80 19.80 19.80 19.80 19.80 19.80 19.80 19.80 19.80 19.80 19.80 19.80 19.80 622
41 Skirting Granite Honed Granite Fire Staircase Rmt West 20 23 25 19.82 19.82 19.82 19.82 19.82 19.82 19.82 19.82 19.82 19.82 19.82 19.82 19.82 19.82 19.82 19.82 19.82 19.82 19.82 19.82 19.82 19.82 19.82 19.82 19.82 19.82 19.82 603
Rmt Ext 70 78 149
Rmt Tower A 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 2.10 4.20 151
42 Transition Profile T - Profile Brass Bedrooms sqm Tower B 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 2.10 4.20 151
sqm Tower C 4.20 4.20 4.20 4.20 4.20 4.20 4.20 4.20 4.20 4.20 4.20 4.20 4.20 4.20 4.20 4.20 4.20 4.20 4.20 4.20 4.20 4.20 4.20 2.10 5.20 104
Rmt Tower A 4.28 4.28 4.28 4.28 4
43 Transition Profile L - Profile SS Kitchen, Utility & Staff Toilet
Sr. No. Tower Level Unit Type Nos Space
58 Tower A FF 4 BHK 1 Kitchen
61 Tower A FF 4 BHK 1 Utility
127 Tower B FF 4 BHK 1 Kitchen
130 Tower B FF 4 BHK 1 Utility
181 Tower C FF 3.5 BHK 1 Kitchen
184 Tower C FF 3.5 BHK 1 Utility
258 Tower A TYP 1 4.5 BHK 11 Kitchen
261 Tower A TYP 1 4.5 BHK 11 Utility
328 Tower B TYP 1 4.5 BHK 11 Kitchen
331 Tower B TYP 1 4.5 BHK 11 Utility
383 Tower C TYP 1 3.5 BHK 11 Kitchen
386 Tower C TYP 1 3.5 BHK 11 Utility
459 Tower A TYP 2 4 BHK 11 Kitchen
462 Tower A TYP 2 4 BHK 11 Utility
528 Tower B TYP 2 4 BHK 11 Kitchen
531 Tower B TYP 2 4 BHK 11 Utility
583 Tower C TYP 2 3 BHK 11 Kitchen
586 Tower C TYP 2 3 BHK 11 Utility
647 Tower A PH LP 1 Kitchen
650 Tower A PH LP 1 Utility
706 Tower A PH UP 1 Laundry Area
750 Tower B PH LP 1 Kitchen
753 Tower B PH LP 1 Utility
809 Tower B PH UP 1 Laundry Area
869 Tower C PH LP 1 Kitchen
874 Tower C PH LP 1 Utility
Base Material Material Type Usage Finish L (m)
Tiles Nexion Runa Jambs Tiles
Tiles Nexion Runa Jambs Tiles
Tiles Nexion Runa Jambs Tiles
Tiles Nexion Runa Jambs Tiles
Tiles Nexion Runa Jambs Tiles
Tiles Nexion Runa Jambs Tiles
Tiles Nexion Runa Jambs Tiles
Tiles Nexion Runa Jambs Tiles
Tiles Nexion Runa Jambs Tiles
Tiles Nexion Runa Jambs Tiles
Tiles Nexion Runa Jambs Tiles
Tiles Nexion Runa Jambs Tiles
Tiles Nexion Runa Jambs Tiles
Tiles Nexion Runa Jambs Tiles
Tiles Nexion Runa Jambs Tiles
Tiles Nexion Runa Jambs Tiles
Tiles Nexion Runa Jambs Tiles
Tiles Nexion Runa Jambs Tiles
Tiles Nexion Runa Jambs Tiles
Tiles Nexion Runa Jambs Tiles
Tiles Nexion Runa Jambs Tiles
Tiles Nexion Runa Jambs Tiles
Tiles Nexion Runa Jambs Tiles
Tiles Nexion Runa Jambs Tiles
Tiles Nexion Runa Jambs Tiles
Tiles Nexion Runa Jambs Tiles
A (sqm) UoM Floor Qty Total Qty 1
0.26 SQM 0.26 0.26
1.12 SQM 1.12 1.12
0.26 SQM 0.26 0.26
1.12 SQM 1.12 1.12
0.26 SQM 0.26 0.26
0.58 SQM 0.58 0.58
0.26 SQM 0.26 2.88
1.12 SQM 1.12 12.28
0.26 SQM 0.26 2.88
1.12 SQM 1.12 12.28
0.26 SQM 0.26 2.88
0.58 SQM 0.58 6.38
0.26 SQM 0.26 2.88
1.12 SQM 1.12 12.28
0.26 SQM 0.26 2.88
1.12 SQM 1.12 12.28
0.26 SQM 0.26 2.88
0.58 SQM 0.58 6.38
0.26 SQM 0.26 0.26
1.12 SQM 1.12 1.12
1.12 SQM 1.12 1.12
0.26 SQM 0.26 0.26
1.12 SQM 1.12 1.12
1.12 SQM 1.12 1.12
0.26 SQM 0.26 0.26
0.58 SQM 0.58 0.58