You are on page 1of 4

List of changes New Old

1) Elevated floor from the landscape


level became visible from the sides,
resulting the slab on grade will be
designed as suspended slab,
increasing in structural members
and foundation.

2) Entrance hall is supported on 4 piles


with inclined members, please
clarify? As it is a complete change
from the current design.

3) Basement has been added.

4) Cantilever platform slab projected


from basement wall at the ground
level.

5) Circular display wall added


supported directly to foundation due
to removal slab at the circular wall.

6) Roof slopes of central building have


been refined.

7) Slopped suspended ramp with voids


at the sides instead of flat slab on
grade.

Clarify the slopped platform material


proposed and the new added stub circular
columns.
8) Central hallway pass extended, span
increased.
Additional queries
1) the cladding at the ramp areas is not continuous to the
ground and the orange column will be visible, the orange
columns of the ramp are not aligned below cladding,
additional column will be added to be aligned below the
cladding.

2) Entrance hall columns and foundation will be at the


corners inclined braces and piles not preferred.

3) Column bracing at the top of the column to be extended to the


end as shown in magenta.

4) Please confirm the basement depth 1.5m or 2.5 or 3 m from the


Ground level.
5) Please confirm ceiling required at entrance hall, exit hall and
center hallway.

You might also like