You are on page 1of 5

Job No Sheet No Rev

DEONAR RWRM
1
Software licensed to Part
CONNECTED User: User is not logged in to CONNECTION Client.
Job Title Ref

By Date14-Feb-17 Chd

Client File Date/Time 12-Oct-2023 16:04


300 mm saddle support.STD

Job Information
Engineer Checked Approved

Name:
Date: 14-Feb-17

Project ID
Project Name

Structure Type SPACE FRAME

Number of Nodes 208 Highest Node 299


Number of Elements 53 Highest Beam 172
Number of Plates 80 Highest Plate 204

Number of Basic Load Cases 7


Number of Combination Load Cases 4

Included in this printout are data for:


All The Whole Structure

Included in this printout are results for load cases:


Type L/C Name

Primary 1 DL
Primary 2 LL
Primary 3 SOIL LOAD
Primary 4 WATER LOAD
Primary 5 WL +Z
Primary 6 EQ +Z
Primary 9 EQ +X
Combination 7 COMB - 1.5 DEAD + 1.5 LIVE
Combination 8 COMB - 1.2 DEAD + 1.2 LIVE + 1.2 WIND
Combination 10 COMB - 1.2 DEAD + 1.2 LIVE + 1.2 SEISMIC-H
Combination 11 COMBINATION LOAD CASE 11

Section Properties
Prop Section Area Iyy Izz J Material
(cm2) (cm4) (cm4) (cm4)
2 Rect 0.75x0.30 2.25E+3 169E+3 1.05E+6 505E+3 CONCRETE
3 Cir 0.60 2.83E+3 636E+3 636E+3 1.27E+6 CONCRETE
4 PIP337M 3.070 3.600 3.600 7.209 STEEL

Print Time/Date: 12/10/2023 16:12 STAAD.Pro CONNECT Edition 22.12.00.142 Print Run 1 of 5
Job No Sheet No Rev
DEONAR RWRM
2
Software licensed to Part
CONNECTED User: User is not logged in to CONNECTION Client.
Job Title Ref

By Date14-Feb-17 Chd

Client File Date/Time 12-Oct-2023 16:04


300 mm saddle support.STD

Plate Thickness
Prop Node A Node B Node C Node D Material
(cm) (cm) (cm) (cm)
1 90.000 90.000 90.000 90.000 CONCRETE

Materials
Mat Name E  Density 
(kN/mm2) (kg/m3) (/°C)
1 STEEL 205.000 0.300 7.83E+3 12E -6
2 CONCRETE 25.000 0.170 2.55E+3 10E -6
3 ALUMINUM 68.948 0.330 2.71E+3 23E -6
4 STAINLESSSTEEL 197.930 0.300 7.83E+3 18E -6
5 STEEL_36_KSI 199.948 0.300 7.83E+3 11.7E -6
6 STEEL_50_KSI 199.948 0.300 7.83E+3 11.7E -6
7 STEEL_275_NMM2 205.000 0.300 7.85E+3 12E -6
8 STEEL_355_NMM2 205.000 0.300 7.85E+3 12E -6
9 Q235 206.000 0.300 7.85E+3 12E -6
10 Q345 206.000 0.300 7.85E+3 12E -6
11 Q355 206.000 0.300 7.85E+3 12E -6
12 Q390 206.000 0.300 7.85E+3 12E -6
13 Q420 206.000 0.300 7.85E+3 12E -6
14 Q460 206.000 0.300 7.85E+3 12E -6
15 TIMBER 10.342 0.150 400.462 3E -6

Primary Load Cases


Number Name Type

1 DL Dead
2 LL Live
3 SOIL LOAD Soil
4 WATER LOAD Live
5 WL +Z Wind
6 EQ +Z Seismic-H
9 EQ +X Seismic-H

Print Time/Date: 12/10/2023 16:12 STAAD.Pro CONNECT Edition 22.12.00.142 Print Run 2 of 5
Job No Sheet No Rev
DEONAR RWRM
3
Software licensed to Part
CONNECTED User: User is not logged in to CONNECTION Client.
Job Title Ref

By Date14-Feb-17 Chd

Client File Date/Time 12-Oct-2023 16:04


300 mm saddle support.STD

Combination Load Cases


Comb. Combination L/C Name Primary Primary L/C Name Factor

7 COMB - 1.5 DEAD + 1.5 LIVE 1 DL 1.50


2 LL 1.50
4 WATER LOAD 1.50
8 COMB - 1.2 DEAD + 1.2 LIVE + 1.2 WIND 1 DL 1.20
2 LL 1.20
4 WATER LOAD 1.20
5 WL +Z 1.20
10 COMB - 1.2 DEAD + 1.2 LIVE + 1.2 SEISMIC-H1 DL 1.20
2 LL 1.20
4 WATER LOAD 1.20
6 EQ +Z 1.20
11 COMBINATION LOAD CASE 11 1 DL 1.20
2 LL 1.20
3 SOIL LOAD 1.20
4 WATER LOAD 1.20
9 EQ +X 1.20

3D Rendered View

Print Time/Date: 12/10/2023 16:12 STAAD.Pro CONNECT Edition 22.12.00.142 Print Run 3 of 5
Job No Sheet No Rev
DEONAR RWRM
4
Software licensed to Part
CONNECTED User: User is not logged in to CONNECTION Client.
Job Title Ref

By Date14-Feb-17 Chd

Client File Date/Time 12-Oct-2023 16:04


300 mm saddle support.STD

Y
X
Z Load 4

water load

Print Time/Date: 12/10/2023 16:12 STAAD.Pro CONNECT Edition 22.12.00.142 Print Run 4 of 5
Job No Sheet No Rev
DEONAR RWRM
5
Software licensed to Part
CONNECTED User: User is not logged in to CONNECTION Client.
Job Title Ref

By Date14-Feb-17 Chd

Client File Date/Time 12-Oct-2023 16:04


300 mm saddle support.STD

Y
X
Z Load 5

earthquake load

Print Time/Date: 12/10/2023 16:12 STAAD.Pro CONNECT Edition 22.12.00.142 Print Run 5 of 5

You might also like