DOCUMENT REVIEW SHEET

RESIDENTIAL PROJECT FOR ISCON GROUP @ GOPALNAGAR,


PROJECT TITLE:
AHMEDABAD

CLIENT: ISCON GROUP

ARCHITECT: CONCEPTUAL DESIGN STUDIO

STRUCTURAL CONSULTANT: HNBS ASSOCIATES LLP

PMC: TONDON URBAN SOLUTIONS PVT. LTD.

DBR, STRUCTURAL MODEL & STRCTURAL DESIGN CALCULATION


DOCUMENT TITLE
REPORT

REVISION R0

DOCUMENT REVIEW FEEDBACK

CAT-1 APPROVED. WORK MAY PROCEED


CAT-2 APPROVED WITH COMMENTS
CAT-3 REVISE AND RESUBMIT. WORK SHALL NOT PROCEED
CAT-4 CANCELLED / SUSPENDED

BY: SHEEL SHAH DATE: 24-01-2024

* The authorization to proceed does not imply endorsement or approval of the Vendor/Contractor's developed
Design, Detailing, Calculations, Analysis, Test Procedures, or Materials. The Contractor/Vendor remains obligated
to fully comply with the contractual documents despite receiving permission to proceed further.
REF: EDEN/PROJ/2023/30
Jan 24, 2024

To,
Tondon Urban Solutions Pvt. Ltd.

Subject: RESIDENTIAL PROJECT OF ISCON GROUP AT GOPALNAGAR,


AHMEDABAD. Regarding submission & approval of Structural Design
Basis Report

Ref: 1) Design Basis Report


2) Structural Models
3) Structural Design Calculation Report

Dear Sir,

With respect to submission of document mentioned above, please find enclosed


comments/observations for submission from Structural Consultants.

The said submittals are approved in CAT-2 (approved with comments) which are
requested to be resubmitted with compliance of comments/observations mentioned
below.

Comments/Observations:

1) Kindly mention Tender ID, Tender Name and Revision History in


documentation.
2) OHWT Bottom slab thickness has been taken 125 mm. Kindly follow the clause
of min. thickness criteria of IS 3370 (Part 1-2)-2021 for water retaining
elements.
3) In Etabs Model of Block CF, Machine room slab has been taken as membrane.
Kindly consider it shell-thin element.
4) In Etabs Model of Block DE-CF, peripheral beam shall be checked & designed
according to torsion criteria of clause 41.2, 41.3, 41.4 from IS 456. Stiffness
modifier shall be taken at least up to 0.5.
5) In Etabs Model of Block DE-CF, Cantilever projection beams have been failed in
shear. Kind check.
6) As per KBM soil report job3237; SBC has been provided at 3m depth from
Natural Ground level. In Etabs Model of Block DE-CF, Ground Floor Level height
(up to Ground Beam) has been taken 1.5m. Kindly revise or clarify.