You are on page 1of 7

FOR APPROVAL

B 13-Nov-19 ECG PMG RB FOR APPROVAL

A 2-Oct-19 ECG PMG RB FOR APPROVAL

Rev. Date Prepared Checked Approved Details of Revision

Owner

Owner's Engineer

Contractor

DOOSAN HEAVY INDUSTRIES VIETNAM

Sub-Supplier

Project
NGHI SON 2 BOT THERMAL POWER PLANT PROJECT
(2 x 600MW)

Title

Inspection and Test Plan for Fire Detection System

Document No. Rev. Page-No.


NS2-DH01-P0ZEN-140013 B 6
NGHI SON 2 BOT THERMAL POWER PLANT PROJECT ID No : NS2-DH01-P0ZEN-140013
(2 x 600MW) Rev : B

WORK TITLE: INSPECTION AND TEST PLAN FOR FIRE DETECTION SYSTEM
Participation by
Codes & Standards
No Description of Inspection and Test Acceptance Criteria Record Format Sub- Sampling frequency Remark
Procedure Contractor Owner
Contractor

1 Material Receiving Inspection

Material Department Inspection


1.1 Material Check Refer to report of Material Department No damage H W W 100%
Report

2 Installation

as per Approved drawing/ as per Dwg no NS2-YQ04-


2.1 Support and Hanger Installation Erection Drawings P0CYE-120000 Fire Detection & Alarm NS2-DH01-P0ZEN-140013(1) H W W 100%
System_Typical Mounting & Installation Details
as per Approved drawing/ as per Dwg no NS2-YQ04-
2.2 Trunking & Conduit Installation Erection Drawings P0CYE-120000 Fire Detection & Alarm NS2-DH01-P0ZEN-140013(1) H W W 100%
System_Typical Mounting & Installation Details
as per Approved drawing/ as per Dwg no NS2-YQ04-
2.3 Cable Pulling Erection Drawings P0CYE-120000 Fire Detection & Alarm NS2-DH01-P0ZEN-140013(1) H W W 100%
System_Typical Mounting & Installation Details

Fire Alarm Panel, Fire Alarm and as per Approved drawing/ as per Dwg no NS2-YQ04-
2.4 Detection Device and Equipment Erection Drawings P0CYE-120000 Fire Detection & Alarm NS2-DH01-P0ZEN-140013(1) H W W 100%
Instalaltion System_Typical Mounting & Installation Details

3 Commissioning

Fire Alarm Panel, Fire Alarm and


3.1 Detection Device and Equipment Erection Drawings as per approved Logic Diagram NS2-DH01-P0ZEN-140013(2) H W W 100%
Function Test

4 Finalization

4.1 Final Inspection - - NS2-DH01-P0ZEN-140013(3) H W W 100%

Abbreviation: S: Surveillance R: Report Review RW : Random Witness W: Witness Inspection H: Hold Inspection
ID. NS2-DH01-P0ZEN-140013
INSPECTION AND TEST PLAN FOR DUCT ASSEMBLY & INSTALLATION
Rev. B

CONTENTS

1. INSPECTION & TEST PLAN FOR FIRE PROTECTION SYSTEM

2. INSTALLATION INSPECTION REPORT

3. INSTALLATION INSPECTION REPORT FOR FIRE ALARM PANEL & MIMIC PANEL

4. FUNCTION TEST REPORT

5. PUNCH LIST

ITP No.: DOC.NO.NS2-DH01-P0ZEN-140013


NGHI SON 2 BOT THERMAL POWER PLANT PROJECT
EPC Contractor

Inspection Report For Installation of Fire Alarm System

Report No. Sub-Contractor

Name Unit #1 #2

Inspection Item Date

Drawing Number

RESULT
Inspection Construction Drawing/
Inpection item REMARK
part Code & Standard ACCEPT REJECT N/A

Check Support if secure and


As per approved layout
1 aligned
drawings

Check Trunking and Conduit As per approved layout


2
Installation drawings

Check Fire Alarm Device As per approved layout


3
Installation drawings

Check Fire Alarm Panel As per approved panel


4
Installation and termination arrangement drawings

Manual/Automatic Activation As per approved layout


5
Detector installation Check drawings

Announcing, Control,
As per approved layout
6 Supervisory Devices
drawings
installation Check

Check cable termination as per As per approved single line


7
drawing drawings and cable list

<Remarks & Comment>

Subcontractor Contractor Owner/ Owner's Engineer

Signature

Full Name

Date

ITP No. NS2-DH01-P0ZEN-140013(1)


NGHI SON 2 BOT THERMAL POWER PLANT PROJECT
EPC Contractor

Inspection Report For Installation of Fire Alarm Panel and Mimic Panel

Report No. Sub-Contractor

Name Unit #1 #2

Inspection Item Date

Drawing Number

RESULT
Inspection Construction Drawing/
Inpection item REMARK
part Code & Standard ACCEPT REJECT N/A

Check Fire Alarm Panel or As per approved layout


1
Mimic Panel Location drawings

Check Fire Alarm Panel or


As per approved layout
2 Mimic Panel alignment and
drawings
elevation

Check Fire Alarm Panel or As per approved layout


3
Mimic Panel fastened securely drawings

As per approved layout


4 Check incoming trunking
drawings

Check Fire Alarm Battery As per approved panel


5
Installation arrangement drawings

<Remarks & Comment>

Subcontractor Contractor Owner/ Owner's Engineer

Signature

Full Name

Date

ITP No. NS2-DH01-P0ZEN-140013(2)


NGHI SON 2 BOT THERMAL POWER PLANT PROJECT
EPC Contractor

Inspection Report For Fire Alarm and Detection System Function Test

Report No. Sub-Contractor

Name Unit #1 #2

Inspection Item Date

Drawing Number

RESULT
Inspection Construction Drawing/
Inpection item REMARK
part Code & Standard ACCEPT REJECT N/A

Fire Alarm Panel termination


As per Approved drawing
check
Manual Activation Detector
as per Logic Diagram
Check
Automatic Activation Detector
as per Logic Diagram
Check

Announcing Devices Check as per Logic Diagram

Control Device Check as per Logic Diagram

Supervisory Devices Check as per Logic Diagram

Fire Alarm Interface with other


as per Logic Diagram
System check
Fire Alarm Panel Network
as per Block Diagram
check

Mimic Panel check as per approved drawing

<Remarks & Comment>

Subcontractor Contractor Owner/ Owner's Engineer

Signature

Full Name

Date

ITP No. NS2-DH01-P0ZEN-140013(3)


NGHI SON 2 BOT THERMAL POWER PLANT PROJECT
EPC Contractor
Punch List
Building/Structure Date

System Drawing Number

Completed By Checked By Agreed Closed By


Defects, Deficiencies, Location/ Date
Item No. Cat. Sub - EPC Owner/Owner' Remarks
Outstanding Works Drawing Completed
contractor contractor Engineer
1

10

11

12

Notes :
Category A.comment that commissioning can proceed only after closure of this comment.
Category B.comment that commissioning can proceed even if comment still not closed.

<Remarks/Comments>

Subcontractor Contractor Owner/ Owner's Engineer

Signature

Full Name

Date
ITP No.: NS2-DH01-P0ZEN-140013 (4)