You are on page 1of 12

FEDERAL DEMOCRATIC

REPUBLIC OF ETHIOPA
PROMINENT ENGINEERING FAL GENERAL
ETHIOPIAN ROADS
SOLUTION P.L.C CONTRACTOR
AUTHORITY
(ERA)

PROJECT : BABILE-FIK Road Upgrading Project Lot I: Km 0+000- Km 36+000


EMPLOYER : ETHIOPIAN ROADS AUTHORITY
CONSULTANT : PROMINENT ENGINEERING SOLUTION P.L.C
CONTRACTOR : FAL GENERAL CONTRACTOR

CALIFORNIA BEARING RATIO TEST


TEST METHOD :AASHTO T-193
SOURCE STATION Km 10+500, offset 50m LHS SAMPLE TAKEN FROM Stockpile

REPRESENTED SECTION Borrow Material DATE SAMPLED 28/05/2019

MATERIAL DESCRIPTION Light brown soil with gravel fragments DATE AND TIME SOAKED 30/05/2019, 8 PM

PUROPSE Embankment and Capping Construction DATE AND TIME TESTED 03/06/2019, 8 PM

DEPTH Stockpile Sample Lab. No. OO4


DENSITY DETERMINATION
10 Blows 30 Blows 65 Blows
SOAKING CONDITION
BEFORE AFTER BEFORE AFTER BEFORE AFTER
MOLD NUMBER E-10 F-30 E-65
WEIGHT OF SOIL + MOLD ( g) W1 9859 10209 10371
WEIGHT OF MOLD ( g) W2 6596 6604 6574
VOLUME OF MOLD (Cm3) V 2133 2142 2119
WEIGHT OF WET SOIL ( g) W3 = W1 - W2 3263 3605 3797
WET DENSITY OF SOIL ( g/cm3) Wd = (W3/V) 1.53 1.68 1.79
DRY DENSITY OF SOIL ( g/cm3) Dd = Wd/(100+m)*100 1.31 1.44 1.54

MOISTURE DETERMINATION
10 Blows 30 Blows 65 Blows
SOAKING CONDITION BEFORE SOAKING AFTER BEFORE SOAKING AFTER BEFORE SOAKING AFTER
BC AC SOAKING BC AC SOAKING BC AC SOAKING
CONTAINER NUMBER
WET SOIL + CONTAINER ( g) a 590 814 595 785 511 749
DRY SOIL + CONTAINER ( g) b 520 709 514 691 448 654
WEIGHT OF CONTAINER ( g) c 87 90 47 89 55 89
WEIGHT OF WATER ( g) d=a-b 70 105 81 94 63 95
WEIGHT OF DRY SOIL ( g) e=b-c 433 619 467 602 393 565.0
MOISTURE CONTENT ( %) m =( d/e)*100 16.17 16.96 17.34 15.61 16.03 16.81
AVG. MOIST. CONTENT ( %) 16.6 16.5 16.4

PENETRATION TEST DATA


PENETRATION 10 Blows 30 Blows 65 Blows

(mm) DIAL RDG LOAD (kn) COR. LOAD (kn) CBR % DIAL RDG LOAD (kn) COR. LOAD (kn)) CBR % DIAL RDG LOAD (kn) COR LOAD (kn)) CBR %

0 0 0 0 0 0 0
0.64 20 0.8120 55 2.2330 93 3.7758
1.27 31 1.2586 128 5.1968 213 8.6478
1.96 36 1.4616 180 7.3080 310 12.5860
2.54 42 1.7052 12.8 219 8.8914 66.6 390 15.8340 118.7
3.18 47 1.9082 249 10.1094 455 18.4730
3.81 52 2.1112 274 11.1244 505 20.5030
4.45 56 2.2736 298 12.0988 550 22.3300
5.08 60 2.4360 12.2 315 12.7890 63.9 584 23.7104 118.6
7.62
10.16
12.7

SWELL RING FACTOR

Height of Specimen(mm) 116.43 MDD (gm/cc) 1.526


No. OF BLOWS 10 30 65
RDG (BEFORE SOAKING) 0.51 3.26 0.42
0.0406 KN/Division OMC % 17.4
RDG (AFTER) SOAKING) 1.92 3.62 0.70
PERCENT SWELL 1.21 0.31 0.24
95% of MDD 1.45
AVERAGE PERCENT SWELL : 0.59

REMARK:

FOR CONTRACTOR FOR CONSULTANT

Tested by Checked by Checked by Approved by


x x
Name 1 Name Name 1 Name
0
x 0
x
0
1 0
1
Sign Sign Sign Sign
0
x 0
A 0
1 A 0 A
0
x x
1 1
0
x 0
A 0
1 A 0 A
Date Date Date Date
0
(A 0 (
A (
A
A A A
(A ( (
A
+
AA A+A A +A
B +B + B
)(+A B) ()
B
A
-B A
)- )+ -
C
)+( -C( -BC(
+A
-BA CA C
)B
C
) (+ -) +
+
-A C-
CB B C(B
+ A
) ) )
B +
-) - -

C C B
C
- )
C -

C
x
A 1 A A
0
(A 0 (
A (
A
A A A
(A FEDERAL DEMOCRATIC ( (A
+
AA REPUBLIC OF ETHIOPA A+A PROMINENT ENGINEERING A +A FAL GENERAL
B ETHIOPIAN ROADS AUTHORITY
+B SOLUTION P.L.C + B CONTRACTOR
)(+A (ERA)
B) ()
B
A
-B A
)- )+ -
C ( -C( 36+000 C(
PROJECT :)+A BABILE-FIK Road Upgrading Project Lot I: Km 0+000- Km -B+A
-B CA C
)B
EMPLOYER :C (
) ETHIOPIAN
+ ROADS AUTHORITY + -) +
-A C-
CONSULTANT :CBPROMINENT ENGINEERING SOLUTION P.L.C B C(B
+ A
) ) )
CONTRACTOR : FAL GENERAL CONTRACTOR
B +
-) CALIFORNIA- BEARING RATIO TEST -
TEST MATHOD :AASHTO T-193 B
C
- C C
)
SOURCE STATION Km 10+500, offset 50m LHS SAMPLE TAKEN FROM Stockpile
C -
REPRESENTED SECTION Borrow Material DATE SAMPLED 28/05/2019
C
MATERIAL DESCRIPTION Light brown soil with gravel fragments DATE AND TIME SOAKED 30/05/2019, 8 PM

PUROPSE Embankment and Capping Construction DATE AND TIME TESTED 03/06/2019, 8 PM

DEPTH Stockpile Lab No. OO4

LOAD (KN) CBR(%) SWELL


BLOWS
% DRY DENSITY Vs SOCKED C.B.R.
2.54mm 5.08mm 2.54mm 5.08mm
10 1.705 2.436 12.8 12.2 1.21 No # OF BLOWS 10 30 65
30 8.891 12.789 66.6 63.9 0.31 DRY DENSITY 1.31 1.44 1.54
65 15.834 23.710 118.7 118.6 0.24 SOACKED C.B.R. 12.8 66.6 118.7

24 65 DENSITY - CBR CURVE


23 130
22
21 120
UNIT LOAD ON PISTON (KN)

20
19 110
18
17 100
16
15 90
14
13 30 80
Soaked CBR (%)

12
11 70
10
9 60
8
7 50
6
5 40
4
3 30
2
10
1 20
0
10
0 2.54 5.08
1.29 1.33 1.37 1.41 1.45 1.49 1.53 1.57
PENETRATION (mm)
Dry density (g/cc)

1.3
1.2
Summary of Results 1.1
1.0
MDD (g/cc) : 0.9
Swell (g/cc)

0.8
OMC (%) : 0.7
0.6
93% of MDD (g/cc) 0.5
0.4
CBR at 93% of MDD 70 0.3
0.2
Swell (%) 0.3 1.29 1.31 1.33 1.35 1.37 1.39 1.41 1.43 1.45 1.47 1.49 1.51 1.53 1.55 1.57

Dry Density (g/cc)

REMARKS:

FOR CONTRACTOR FOR CONSULTANT


Tested by Checked by Checked by Approved by
Name x Name Name x Name
1 1
Sign x
0 Sign Sign x
0 Sign
1
0 1
0
Date x
0 Date Date 0 Date
1
0 0
0
0
FEDERAL DEMOCRATIC
REPUBLIC OF ETHIOPA
PROMINENT ENGINEERING FAL GENERAL
ETHIOPIAN ROADS
SOLUTION P.L.C CONTRACTOR
AUTHORITY
(ERA)

PROJECT : BABILE-FIK Road Upgrading Project Lot I: Km 0+000- Km 36+000


EMPLOYER : ETHIOPIAN ROADS AUTHORITY
CONSULTANT : PROMINENT ENGINEERING SOLUTION P.L.C
CONTRACTOR : FAL GENERAL CONTRACTOR

CALIFORNIA BEARING RATIO TEST


TEST METHOD :AASHTO T-193
SOURCE STATION Km 10+500, offset 50m LHS SAMPLE TAKEN FROM Stockpile

REPRESENTED SECTION Borrow Material DATE SAMPLED 28/05/2019

MATERIAL DESCRIPTION Light brown soil with gravel fragments DATE AND TIME SOAKED 30/05/2019, 8 PM

PUROPSE Embankment and Capping Construction DATE AND TIME TESTED 03/06/2019, 8 PM

DEPTH Stockpile Sample Lab. No. OO4


DENSITY DETERMINATION
10 Blows 30 Blows 45 Blows
SOAKING CONDITION
BEFORE AFTER BEFORE AFTER BEFORE AFTER
MOLD NUMBER E-10 F-30 E-65
WEIGHT OF SOIL + MOLD ( g) W1 9859 10209 10347
WEIGHT OF MOLD ( g) W2 6596 6604 6618
VOLUME OF MOLD (Cm3) V 2133 2142 2142
WEIGHT OF WET SOIL ( g) W3 = W1 - W2 3263 3605 3729
WET DENSITY OF SOIL ( g/cm3) Wd = (W3/V) 1.53 1.68 1.74
DRY DENSITY OF SOIL ( g/cm3) Dd = Wd/(100+m)*100 1.31 1.44 1.51

MOISTURE DETERMINATION
10 Blows 30 Blows 65 Blows
SOAKING CONDITION AFTER AFTER AFTER
BEFORE BEFORE BEFORE
TOP 1 in. AVG. TOP 1 in. AVG. TOP 1 in. AVG.
CONTAINER NUMBER B-5 N-10 Y-3 B-8 R-11 B-5
WET SOIL + CONTAINER ( g) a 590 814 595 785.00 569.00 825
DRY SOIL + CONTAINER ( g) b 520.00 709.00 514.00 691.00 501.00 722.00
WEIGHT OF CONTAINER ( g) c 87 90.00 47.00 89.00 55.00 81.00
WEIGHT OF WATER ( g) d=a-b 70.0 105.0 81.0 94.0 68.0 103.0
WEIGHT OF DRY SOIL ( g) e=b-c 433 619 467 602 446 641.0
MOISTURE CONTENT ( %) m =( d/e)*100 16.17 16.96 17.34 15.61 15.25 16.07
AVG. MOIST. CONTENT ( %) 16.6 16.5 15.7

PENETRATION TEST DATA


PENETRATION 10 Blows 30 Blows 65 Blows

(mm) DIAL RDG LOAD (kn) COR. LOAD (kn) CBR % DIAL RDG LOAD (kn) COR. LOAD (kn)) CBR % DIAL RDG LOAD (kn) COR LOAD (kn)) CBR %

0 0 0 0 0 0 0
0.64 20 0.8120 55 2.2330 88 3.5728
1.27 31 1.2586 128 5.1968 180 7.3080
1.96 36 1.4616 180 7.3080 267 10.8402
2.54 42 1.7052 12.8 219 8.8914 66.6 328 13.3168 99.8
3.18 47 1.9082 249 10.1094 372 15.1032
3.81 52 2.1112 274 11.1244 406 16.4836
4.45 56 2.2736 298 12.0988 438 17.7828
5.08 60 2.4360 12.2 315 12.7890 63.9 458 18.5948 93.0
7.62
10.16
12.7

SWELL RING FACTOR

Height of Specimen(mm) 116.43 MDD (gm/cc) 1.53


No. OF BLOWS 10 30 65
RDG (BEFORE SOAKING) 0.62 0.68 0.83
0.0406 KN/Division OMC % 17.4
RDG (AFTER) SOAKING) 0.75 1.02 1.22
PERCENT SWELL 0.11 0.29 0.33
95% of MDD 1.45
AVERAGE PERCENT SWELL : 0.25

REMARK:

FOR CONTRACTOR FOR CONSULTANT

Tested by Checked by Checked by Approved by


x x
Name 1 Name Name 1 Name
0
x 0
x
0
1 0
1
Sign Sign Sign Sign
0
x 0
A 0
1 A 0 A
0
x x
1 1
0
x 0
A 0
1 A 0 A
Date Date Date Date
0
(A 0 (
A (
A
A A A
(A ( (
A
+
AA A+A A +A
B +B + B
)(+A B) ()
B
A
-B A
)- )+ -
C
)+( -C( -BC(
+A
-BA CA C
)B
C
) (+ -) +
+
-A C-
CB B C(B
+ A
) ) )
B +
-) - -

C C B
C
- )
C -

C
x
A 1 A A
0
(A 0 (
A (
A
A A A
(A FEDERAL DEMOCRATIC ( (A
+
AA REPUBLIC OF ETHIOPA A+A PROMINENT ENGINEERING A +A FAL GENERAL
B ETHIOPIAN ROADS AUTHORITY
+B SOLUTION P.L.C + B CONTRACTOR
)(+A (ERA)
B) ()
B
A
-B A
)- )+ -
C ( -C( 36+000 C(
PROJECT :)+A BABILE-FIK Road Upgrading Project Lot I: Km 0+000- Km -B+A
-B CA C
)B
EMPLOYER :C (
) ETHIOPIAN
+ ROADS AUTHORITY + -) +
-A C-
CONSULTANT :CBPROMINENT ENGINEERING SOLUTION P.L.C B C(B
+ A
) ) )
CONTRACTOR : FAL GENERAL CONTRACTOR
B +
-) - BEARING RATIO TEST
CALIFORNIA -
TEST MATHOD :AASHTO T-193 B
C
- C C
)
SOURCE STATION Km 10+500, offset 50m LHS SAMPLE TAKEN FROM Stockpile
C -
REPRESENTED SECTION Borrow Material DATE SAMPLED 28/05/2019
C
MATERIAL DESCRIPTION Light brown soil with gravel fragments DATE AND TIME SOAKED 30/05/2019, 8 PM

PUROPSE Embankment and Capping Construction DATE AND TIME TESTED 03/06/2019, 8 PM

DEPTH Stockpile Lab No. OO4

LOAD (KN) CBR(%) SWELL


BLOWS
% DRY DENSITY Vs SOCKED C.B.R.
2.54mm 5.08mm 2.54mm 5.08mm
10 1.705 2.436 12.8 12.2 0.11 No # OF BLOWS 10 30 65
30 8.891 12.789 66.6 63.9 0.29 DRY DENSITY 1.31 1.44 1.51
65 13.317 18.595 99.8 93.0 0.33 SOACKED C.B.R. 12.8 66.6 99.8

20 DENSITY - CBR CURVE


19 65 110
18
UNIT LOAD ON PISTON (KN)

17 100
16
15 90
14
13 80
12
30 70
11
Soaked CBR (%)

10
9 60
8
7 50
6
5 40
10
4
30
3
2
20
1
0
10
0 2.54 5.08
1.29 1.33 1.37 1.41 1.45 1.49 1.53 1.57
PENETRATION (mm)
Dry density (g/cc)

0.4

Summary of Results
0.3
MDD (g/cc) :
Swell (g/cc)

0.2
OMC (%) :

93% of MDD (g/cc) 0.1

CBR at 93% of MDD 70


0.0
Swell (%) 1.28 1.32 1.36 1.40 1.44 1.48 1.52

Dry Density (g/cc)

REMARKS:

FOR CONTRACTOR FOR CONSULTANT


Tested by Checked by Checked by Approved by
Name x Name Name x Name
1 1
Sign x
0 Sign Sign x
0 Sign
1
0 1
0
Date x
0 Date Date 0 Date
1
0 0
0
0
FEDERAL DEMOCRATIC
REPUBLIC OF ETHIOPA
PROMINENT ENGINEERING FAL GENERAL
ETHIOPIAN ROADS
SOLUTION P.L.C CONTRACTOR
AUTHORITY
(ERA)

PROJECT : BABILE-FIK Road Upgrading Project Lot I: Km 0+000- Km 36+000


EMPLOYER : ETHIOPIAN ROADS AUTHORITY
CONSULTANT : PROMINENT ENGINEERING SOLUTION P.L.C
CONTRACTOR : FAL GENERAL CONTRACTOR

CALIFORNIA BEARING RATIO TEST


TEST METHOD :AASHTO T-193
SOURCE STATION Km 10+500, offset 50m LHS SAMPLE TAKEN FROM Stockpile

REPRESENTED SECTION Borrow Material DATE SAMPLED 28/05/2019

MATERIAL DESCRIPTION Light brown soil with gravel fragments DATE AND TIME SOAKED 30/05/2019, 8 PM

PUROPSE Embankment and Capping Construction DATE AND TIME TESTED 03/06/2019, 8 PM

DEPTH Stockpile Sample Lab. No. OO4


DENSITY DETERMINATION
10 Blows 30 Blows 56 Blows
SOAKING CONDITION
BEFORE AFTER BEFORE AFTER BEFORE AFTER
MOLD NUMBER E-10 F-30 E-65
WEIGHT OF SOIL + MOLD ( g) W1 9859 10209 10031
WEIGHT OF MOLD ( g) W2 6596 6604 6293
VOLUME OF MOLD (Cm3) V 2133 2142 2151
WEIGHT OF WET SOIL ( g) W3 = W1 - W2 3263 3605 3738
WET DENSITY OF SOIL ( g/cm3) Wd = (W3/V) 1.53 1.68 1.74
DRY DENSITY OF SOIL ( g/cm3) Dd = Wd/(100+m)*100 1.31 1.44 1.49

MOISTURE DETERMINATION
10 Blows 30 Blows 65 Blows
SOAKING CONDITION AFTER AFTER AFTER
BEFORE BEFORE BEFORE
TOP 1 in. AVG. TOP 1 in. AVG. TOP 1 in. AVG.
CONTAINER NUMBER B-5 N-10 Y-3 B-8 R-11 B-5
WET SOIL + CONTAINER ( g) a 590 814 595 785.00 539.00 969
DRY SOIL + CONTAINER ( g) b 520.00 709.00 514.00 691.00 470.00 849.00
WEIGHT OF CONTAINER ( g) c 87 90.00 47.00 89.00 69.00 86.00
WEIGHT OF WATER ( g) d=a-b 70.0 105.0 81.0 94.0 69.0 120.0
WEIGHT OF DRY SOIL ( g) e=b-c 433 619 467 602 401 763.0
MOISTURE CONTENT ( %) m =( d/e)*100 16.17 16.96 17.34 15.61 17.21 15.73
AVG. MOIST. CONTENT ( %) 16.6 16.5 16.5

PENETRATION TEST DATA


PENETRATION 10 Blows 30 Blows 65 Blows

(mm) DIAL RDG LOAD (kn) COR. LOAD (kn) CBR % DIAL RDG LOAD (kn) COR. LOAD (kn)) CBR % DIAL RDG LOAD (kn) COR LOAD (kn)) CBR %

0 0 0 0 0 0 0
0.64 20 0.8120 55 2.2330 91 3.6946
1.27 31 1.2586 128 5.1968 185 7.5110
1.96 36 1.4616 180 7.3080 260 10.5560
2.54 42 1.7052 12.8 219 8.8914 66.6 322 13.0732 98.0
3.18 47 1.9082 249 10.1094 370 15.0220
3.81 52 2.1112 274 11.1244 405 16.4430
4.45 56 2.2736 298 12.0988 439 17.8234
5.08 60 2.4360 12.2 315 12.7890 63.9 468 19.0008 95.0
7.62
10.16
12.7

SWELL RING FACTOR

Height of Specimen(mm) 116.43 MDD (gm/cc) 1.53


No. OF BLOWS 10 30 65
RDG (BEFORE SOAKING) 0.62 0.68 0.83
0.0406 KN/Division OMC % 17.4
RDG (AFTER) SOAKING) 0.75 1.02 1.22
PERCENT SWELL 0.11 0.29 0.33
95% of MDD 1.45
AVERAGE PERCENT SWELL : 0.25

REMARK:

FOR CONTRACTOR FOR CONSULTANT

Tested by Checked by Checked by Approved by


x x
Name 1 Name Name 1 Name
0
x 0
x
0
1 0
1
Sign Sign Sign Sign
0
x 0
A 0
1 A 0 A
0
x x
1 1
0
x 0
A 0
1 A 0 A
Date Date Date Date
0
(A 0 (
A (
A
A A A
(A ( (
A
+
AA A+A A +A
B +B + B
)(+A B) ()
B
A
-B A
)- )+ -
C
)+( -C( -BC(
+A
-BA CA C
)B
C
) (+ -) +
+
-A C-
CB B C(B
+ A
) ) )
B +
-) - -

C C B
C
- )
C -

C
x
A 1 A A
0
(A 0 (
A (
A
A A A
(A FEDERAL DEMOCRATIC ( (A
+
AA REPUBLIC OF ETHIOPA A+A PROMINENT ENGINEERING A +A FAL GENERAL
B ETHIOPIAN ROADS AUTHORITY
+B SOLUTION P.L.C + B CONTRACTOR
)(+A (ERA)
B) ()
B
A
-B A
)- )+ -
C ( -C( 36+000 C(
PROJECT :)+A BABILE-FIK Road Upgrading Project Lot I: Km 0+000- Km -B+A
-B CA C
)B
EMPLOYER :C (
) ETHIOPIAN
+ ROADS AUTHORITY + -) +
-A C-
CONSULTANT :CBPROMINENT ENGINEERING SOLUTION P.L.C B C(B
+ A
) ) )
CONTRACTOR : FAL GENERAL CONTRACTOR
B +
-) - BEARING RATIO TEST
CALIFORNIA -
TEST MATHOD :AASHTO T-193 B
C
- C C
)
SOURCE STATION Km 10+500, offset 50m LHS SAMPLE TAKEN FROM Stockpile
C -
REPRESENTED SECTION Borrow Material DATE SAMPLED 28/05/2019
C
MATERIAL DESCRIPTION Light brown soil with gravel fragments DATE AND TIME SOAKED 30/05/2019, 8 PM

PUROPSE Embankment and Capping Construction DATE AND TIME TESTED 03/06/2019, 8 PM

DEPTH Stockpile Lab No. OO4

LOAD (KN) CBR(%) SWELL


BLOWS
% DRY DENSITY Vs SOCKED C.B.R.
2.54mm 5.08mm 2.54mm 5.08mm
10 1.705 2.436 12.8 12.2 0.11 No # OF BLOWS 10 30 65
30 8.891 12.789 66.6 63.9 0.29 DRY DENSITY 1.31 1.44 1.49
65 13.073 19.001 98.0 95.0 0.33 SOACKED C.B.R. 12.8 66.6 98.0

20 DENSITY - CBR CURVE


19 65 110
18
UNIT LOAD ON PISTON (KN)

17 100
16
15 90
14
13 80
12
30 70
11
Soaked CBR (%)

10
9 60
8
7 50
6
5 40
10
4
30
3
2
20
1
0
10
0 2.54 5.08
1.29 1.33 1.37 1.41 1.45 1.49 1.53 1.57
PENETRATION (mm)
Dry density (g/cc)

0.4

Summary of Results
0.3
MDD (g/cc) :
Swell (g/cc)

0.2
OMC (%) :

93% of MDD (g/cc) 0.1

CBR at 93% of MDD 70


0.0
Swell (%) 1.28 1.32 1.36 1.40 1.44 1.48 1.52

Dry Density (g/cc)

REMARKS:

FOR CONTRACTOR FOR CONSULTANT


Tested by Checked by Checked by Approved by
Name x Name Name x Name
1 1
Sign x
0 Sign Sign x
0 Sign
1
0 1
0
Date x
0 Date Date 0 Date
1
0 0
0
0
FEDERAL DEMOCRATIC
REPUBLIC OF ETHIOPA
PROMINENT ENGINEERING FAL GENERAL
ETHIOPIAN ROADS
SOLUTION P.L.C CONTRACTOR
AUTHORITY
(ERA)

PROJECT : BABILE-FIK Road Upgrading Project Lot I: Km 0+000- Km 36+000


EMPLOYER : ETHIOPIAN ROADS AUTHORITY
CONSULTANT : PROMINENT ENGINEERING SOLUTION P.L.C
CONTRACTOR : FAL GENERAL CONTRACTOR

CALIFORNIA BEARING RATIO TEST


TEST METHOD :AASHTO T-193
SOURCE STATION Km 10+500, offset 50m LHS SAMPLE TAKEN FROM Stockpile

REPRESENTED SECTION Borrow Material DATE SAMPLED 28/05/2019

MATERIAL DESCRIPTION Light brown soil with gravel fragments DATE AND TIME SOAKED 30/05/2019, 8 PM

PUROPSE Embankment and Capping Construction DATE AND TIME TESTED 03/06/2019, 8 PM

DEPTH Stockpile Sample Lab. No. OO4


DENSITY DETERMINATION
10 Blows 30 Blows 30/65 Blows
SOAKING CONDITION
BEFORE AFTER BEFORE AFTER BEFORE AFTER
MOLD NUMBER E-10 F-30 E-65
WEIGHT OF SOIL + MOLD ( g) W1 9859 10209 10390
WEIGHT OF MOLD ( g) W2 6596 6604 6609
VOLUME OF MOLD (Cm3) V 2133 2142 2133
WEIGHT OF WET SOIL ( g) W3 = W1 - W2 3263 3605 3781
WET DENSITY OF SOIL ( g/cm3) Wd = (W3/V) 1.53 1.68 1.77
DRY DENSITY OF SOIL ( g/cm3) Dd = Wd/(100+m)*100 1.31 1.44 1.53

MOISTURE DETERMINATION
10 Blows 30 Blows 65 Blows
SOAKING CONDITION AFTER AFTER AFTER
BEFORE BEFORE BEFORE
TOP 1 in. AVG. TOP 1 in. AVG. TOP 1 in. AVG.
CONTAINER NUMBER B-5 N-10 Y-3 B-8 R-11 B-5
WET SOIL + CONTAINER ( g) a 590 814 595 785.00 537.00 850
DRY SOIL + CONTAINER ( g) b 520.00 709.00 514.00 691.00 473.00 747.00
WEIGHT OF CONTAINER ( g) c 87 90.00 47.00 89.00 66.00 91.00
WEIGHT OF WATER ( g) d=a-b 70.0 105.0 81.0 94.0 64.0 103.0
WEIGHT OF DRY SOIL ( g) e=b-c 433 619 467 602 407 656.0
MOISTURE CONTENT ( %) m =( d/e)*100 16.17 16.96 17.34 15.61 15.72 15.70
AVG. MOIST. CONTENT ( %) 16.6 16.5 15.7

PENETRATION TEST DATA


PENETRATION 10 Blows 30 Blows 65 Blows

(mm) DIAL RDG LOAD (kn) COR. LOAD (kn) CBR % DIAL RDG LOAD (kn) COR. LOAD (kn)) CBR % DIAL RDG LOAD (kn) COR LOAD (kn)) CBR %

0 0 0 0 0 0 0
0.64 20 0.8120 55 2.2330 63 2.5578
1.27 31 1.2586 128 5.1968 160 6.4960
1.96 36 1.4616 180 7.3080 258 10.4748
2.54 42 1.7052 12.8 219 8.8914 66.6 345 14.0070 105.0
3.18 47 1.9082 249 10.1094 419 17.0114
3.81 52 2.1112 274 11.1244 471 19.1226
4.45 56 2.2736 298 12.0988 517 20.9902
5.08 60 2.4360 12.2 315 12.7890 63.9 550 22.3300 111.7
7.62
10.16
12.7

SWELL RING FACTOR

Height of Specimen(mm) 116.43 MDD (gm/cc) 1.53


No. OF BLOWS 10 30 65
RDG (BEFORE SOAKING) 0.62 0.68 0.83
0.0406 KN/Division OMC % 17.4
RDG (AFTER) SOAKING) 0.75 1.02 1.22
PERCENT SWELL 0.11 0.29 0.33
95% of MDD 1.45
AVERAGE PERCENT SWELL : 0.25

REMARK:

FOR CONTRACTOR FOR CONSULTANT

Tested by Checked by Checked by Approved by


x x
Name 1 Name Name 1 Name
0
x 0
x
0
1 0
1
Sign Sign Sign Sign
0
x 0
A 0
1 A 0 A
0
x x
1 1
0
x 0
A 0
1 A 0 A
Date Date Date Date
0
(A 0 (
A (
A
A A A
(A ( (
A
+
AA A+A A +A
B +B + B
)(+A B) ()
B
A
-B A
)- )+ -
C
)+( -C( -BC(
+A
-BA CA C
)B
C
) (+ -) +
+
-A C-
CB B C(B
+ A
) ) )
B +
-) - -

C C B
C
- )
C -

C
x
A 1 A A
0
(A 0 (
A (
A
A A A
(A FEDERAL DEMOCRATIC ( (A
+
AA REPUBLIC OF ETHIOPA A+A PROMINENT ENGINEERING A +A FAL GENERAL
B ETHIOPIAN ROADS AUTHORITY
+B SOLUTION P.L.C + B CONTRACTOR
)(+A (ERA)
B) ()
B
A
-B A
)- )+ -
C ( -C( 36+000 C(
PROJECT :)+A BABILE-FIK Road Upgrading Project Lot I: Km 0+000- Km -B+A
-B CA C
)B
EMPLOYER :C (
) ETHIOPIAN
+ ROADS AUTHORITY + -) +
-A C-
CONSULTANT :CBPROMINENT ENGINEERING SOLUTION P.L.C B C(B
+ A
) ) )
CONTRACTOR : FAL GENERAL CONTRACTOR
B +
-) - BEARING RATIO TEST
CALIFORNIA -
TEST MATHOD :AASHTO T-193 B
C
- C C
)
SOURCE STATION Km 10+500, offset 50m LHS SAMPLE TAKEN FROM Stockpile
C -
REPRESENTED SECTION Borrow Material DATE SAMPLED 28/05/2019
C
MATERIAL DESCRIPTION Light brown soil with gravel fragments DATE AND TIME SOAKED 30/05/2019, 8 PM

PUROPSE Embankment and Capping Construction DATE AND TIME TESTED 03/06/2019, 8 PM

DEPTH Stockpile Lab No. OO4

LOAD (KN) CBR(%) SWELL


BLOWS
% DRY DENSITY Vs SOCKED C.B.R.
2.54mm 5.08mm 2.54mm 5.08mm
10 1.705 2.436 12.8 12.2 0.11 No # OF BLOWS 10 30 65
30 8.891 12.789 66.6 63.9 0.29 DRY DENSITY 1.31 1.44 1.53
65 14.007 22.330 105.0 111.7 0.33 SOACKED C.B.R. 12.8 66.6 105.0

24 DENSITY - CBR CURVE


23 65 110
22
21
UNIT LOAD ON PISTON (KN)

20 100
19
18 90
17
16 80
15
14 30
13 70
Soaked CBR (%)

12
11 60
10
9 50
8
7
6 40
5 10
4 30
3
2 20
1
0
10
0 2.54 5.08
1.29 1.33 1.37 1.41 1.45 1.49 1.53 1.57
PENETRATION (mm)
Dry density (g/cc)

0.4

Summary of Results
0.3
MDD (g/cc) :
Swell (g/cc)

0.2
OMC (%) :

93% of MDD (g/cc) 0.1

CBR at 93% of MDD 70


0.0
Swell (%) 1.28 1.32 1.36 1.40 1.44 1.48 1.52 1.56

Dry Density (g/cc)

REMARKS:

FOR CONTRACTOR FOR CONSULTANT


Tested by Checked by Checked by Approved by
Name x Name Name x Name
1 1
Sign x
0 Sign Sign x
0 Sign
1
0 1
0
Date x
0 Date Date 0 Date
1
0 0
0
0

You might also like