California Bearing Ratio - 10+500
California Bearing Ratio - 10+500
REPUBLIC OF ETHIOPA
PROMINENT ENGINEERING FAL GENERAL
ETHIOPIAN ROADS
SOLUTION P.L.C CONTRACTOR
AUTHORITY
(ERA)
MATERIAL DESCRIPTION Light brown soil with gravel fragments DATE AND TIME SOAKED 30/05/2019, 8 PM
PUROPSE Embankment and Capping Construction DATE AND TIME TESTED 03/06/2019, 8 PM
MOISTURE DETERMINATION
10 Blows 30 Blows 65 Blows
SOAKING CONDITION BEFORE SOAKING AFTER BEFORE SOAKING AFTER BEFORE SOAKING AFTER
BC AC SOAKING BC AC SOAKING BC AC SOAKING
CONTAINER NUMBER
WET SOIL + CONTAINER ( g) a 590 814 595 785 511 749
DRY SOIL + CONTAINER ( g) b 520 709 514 691 448 654
WEIGHT OF CONTAINER ( g) c 87 90 47 89 55 89
WEIGHT OF WATER ( g) d=a-b 70 105 81 94 63 95
WEIGHT OF DRY SOIL ( g) e=b-c 433 619 467 602 393 565.0
MOISTURE CONTENT ( %) m =( d/e)*100 16.17 16.96 17.34 15.61 16.03 16.81
AVG. MOIST. CONTENT ( %) 16.6 16.5 16.4
(mm) DIAL RDG LOAD (kn) COR. LOAD (kn) CBR % DIAL RDG LOAD (kn) COR. LOAD (kn)) CBR % DIAL RDG LOAD (kn) COR LOAD (kn)) CBR %
0 0 0 0 0 0 0
0.64 20 0.8120 55 2.2330 93 3.7758
1.27 31 1.2586 128 5.1968 213 8.6478
1.96 36 1.4616 180 7.3080 310 12.5860
2.54 42 1.7052 12.8 219 8.8914 66.6 390 15.8340 118.7
3.18 47 1.9082 249 10.1094 455 18.4730
3.81 52 2.1112 274 11.1244 505 20.5030
4.45 56 2.2736 298 12.0988 550 22.3300
5.08 60 2.4360 12.2 315 12.7890 63.9 584 23.7104 118.6
7.62
10.16
12.7
REMARK:
C C B
C
- )
C -
C
x
A 1 A A
0
(A 0 (
A (
A
A A A
(A FEDERAL DEMOCRATIC ( (A
+
AA REPUBLIC OF ETHIOPA A+A PROMINENT ENGINEERING A +A FAL GENERAL
B ETHIOPIAN ROADS AUTHORITY
+B SOLUTION P.L.C + B CONTRACTOR
)(+A (ERA)
B) ()
B
A
-B A
)- )+ -
C ( -C( 36+000 C(
PROJECT :)+A BABILE-FIK Road Upgrading Project Lot I: Km 0+000- Km -B+A
-B CA C
)B
EMPLOYER :C (
) ETHIOPIAN
+ ROADS AUTHORITY + -) +
-A C-
CONSULTANT :CBPROMINENT ENGINEERING SOLUTION P.L.C B C(B
+ A
) ) )
CONTRACTOR : FAL GENERAL CONTRACTOR
B +
-) CALIFORNIA- BEARING RATIO TEST -
TEST MATHOD :AASHTO T-193 B
C
- C C
)
SOURCE STATION Km 10+500, offset 50m LHS SAMPLE TAKEN FROM Stockpile
C -
REPRESENTED SECTION Borrow Material DATE SAMPLED 28/05/2019
C
MATERIAL DESCRIPTION Light brown soil with gravel fragments DATE AND TIME SOAKED 30/05/2019, 8 PM
PUROPSE Embankment and Capping Construction DATE AND TIME TESTED 03/06/2019, 8 PM
20
19 110
18
17 100
16
15 90
14
13 30 80
Soaked CBR (%)
12
11 70
10
9 60
8
7 50
6
5 40
4
3 30
2
10
1 20
0
10
0 2.54 5.08
1.29 1.33 1.37 1.41 1.45 1.49 1.53 1.57
PENETRATION (mm)
Dry density (g/cc)
1.3
1.2
Summary of Results 1.1
1.0
MDD (g/cc) : 0.9
Swell (g/cc)
0.8
OMC (%) : 0.7
0.6
93% of MDD (g/cc) 0.5
0.4
CBR at 93% of MDD 70 0.3
0.2
Swell (%) 0.3 1.29 1.31 1.33 1.35 1.37 1.39 1.41 1.43 1.45 1.47 1.49 1.51 1.53 1.55 1.57
REMARKS:
MATERIAL DESCRIPTION Light brown soil with gravel fragments DATE AND TIME SOAKED 30/05/2019, 8 PM
PUROPSE Embankment and Capping Construction DATE AND TIME TESTED 03/06/2019, 8 PM
MOISTURE DETERMINATION
10 Blows 30 Blows 65 Blows
SOAKING CONDITION AFTER AFTER AFTER
BEFORE BEFORE BEFORE
TOP 1 in. AVG. TOP 1 in. AVG. TOP 1 in. AVG.
CONTAINER NUMBER B-5 N-10 Y-3 B-8 R-11 B-5
WET SOIL + CONTAINER ( g) a 590 814 595 785.00 569.00 825
DRY SOIL + CONTAINER ( g) b 520.00 709.00 514.00 691.00 501.00 722.00
WEIGHT OF CONTAINER ( g) c 87 90.00 47.00 89.00 55.00 81.00
WEIGHT OF WATER ( g) d=a-b 70.0 105.0 81.0 94.0 68.0 103.0
WEIGHT OF DRY SOIL ( g) e=b-c 433 619 467 602 446 641.0
MOISTURE CONTENT ( %) m =( d/e)*100 16.17 16.96 17.34 15.61 15.25 16.07
AVG. MOIST. CONTENT ( %) 16.6 16.5 15.7
(mm) DIAL RDG LOAD (kn) COR. LOAD (kn) CBR % DIAL RDG LOAD (kn) COR. LOAD (kn)) CBR % DIAL RDG LOAD (kn) COR LOAD (kn)) CBR %
0 0 0 0 0 0 0
0.64 20 0.8120 55 2.2330 88 3.5728
1.27 31 1.2586 128 5.1968 180 7.3080
1.96 36 1.4616 180 7.3080 267 10.8402
2.54 42 1.7052 12.8 219 8.8914 66.6 328 13.3168 99.8
3.18 47 1.9082 249 10.1094 372 15.1032
3.81 52 2.1112 274 11.1244 406 16.4836
4.45 56 2.2736 298 12.0988 438 17.7828
5.08 60 2.4360 12.2 315 12.7890 63.9 458 18.5948 93.0
7.62
10.16
12.7
REMARK:
C C B
C
- )
C -
C
x
A 1 A A
0
(A 0 (
A (
A
A A A
(A FEDERAL DEMOCRATIC ( (A
+
AA REPUBLIC OF ETHIOPA A+A PROMINENT ENGINEERING A +A FAL GENERAL
B ETHIOPIAN ROADS AUTHORITY
+B SOLUTION P.L.C + B CONTRACTOR
)(+A (ERA)
B) ()
B
A
-B A
)- )+ -
C ( -C( 36+000 C(
PROJECT :)+A BABILE-FIK Road Upgrading Project Lot I: Km 0+000- Km -B+A
-B CA C
)B
EMPLOYER :C (
) ETHIOPIAN
+ ROADS AUTHORITY + -) +
-A C-
CONSULTANT :CBPROMINENT ENGINEERING SOLUTION P.L.C B C(B
+ A
) ) )
CONTRACTOR : FAL GENERAL CONTRACTOR
B +
-) - BEARING RATIO TEST
CALIFORNIA -
TEST MATHOD :AASHTO T-193 B
C
- C C
)
SOURCE STATION Km 10+500, offset 50m LHS SAMPLE TAKEN FROM Stockpile
C -
REPRESENTED SECTION Borrow Material DATE SAMPLED 28/05/2019
C
MATERIAL DESCRIPTION Light brown soil with gravel fragments DATE AND TIME SOAKED 30/05/2019, 8 PM
PUROPSE Embankment and Capping Construction DATE AND TIME TESTED 03/06/2019, 8 PM
17 100
16
15 90
14
13 80
12
30 70
11
Soaked CBR (%)
10
9 60
8
7 50
6
5 40
10
4
30
3
2
20
1
0
10
0 2.54 5.08
1.29 1.33 1.37 1.41 1.45 1.49 1.53 1.57
PENETRATION (mm)
Dry density (g/cc)
0.4
Summary of Results
0.3
MDD (g/cc) :
Swell (g/cc)
0.2
OMC (%) :
REMARKS:
MATERIAL DESCRIPTION Light brown soil with gravel fragments DATE AND TIME SOAKED 30/05/2019, 8 PM
PUROPSE Embankment and Capping Construction DATE AND TIME TESTED 03/06/2019, 8 PM
MOISTURE DETERMINATION
10 Blows 30 Blows 65 Blows
SOAKING CONDITION AFTER AFTER AFTER
BEFORE BEFORE BEFORE
TOP 1 in. AVG. TOP 1 in. AVG. TOP 1 in. AVG.
CONTAINER NUMBER B-5 N-10 Y-3 B-8 R-11 B-5
WET SOIL + CONTAINER ( g) a 590 814 595 785.00 539.00 969
DRY SOIL + CONTAINER ( g) b 520.00 709.00 514.00 691.00 470.00 849.00
WEIGHT OF CONTAINER ( g) c 87 90.00 47.00 89.00 69.00 86.00
WEIGHT OF WATER ( g) d=a-b 70.0 105.0 81.0 94.0 69.0 120.0
WEIGHT OF DRY SOIL ( g) e=b-c 433 619 467 602 401 763.0
MOISTURE CONTENT ( %) m =( d/e)*100 16.17 16.96 17.34 15.61 17.21 15.73
AVG. MOIST. CONTENT ( %) 16.6 16.5 16.5
(mm) DIAL RDG LOAD (kn) COR. LOAD (kn) CBR % DIAL RDG LOAD (kn) COR. LOAD (kn)) CBR % DIAL RDG LOAD (kn) COR LOAD (kn)) CBR %
0 0 0 0 0 0 0
0.64 20 0.8120 55 2.2330 91 3.6946
1.27 31 1.2586 128 5.1968 185 7.5110
1.96 36 1.4616 180 7.3080 260 10.5560
2.54 42 1.7052 12.8 219 8.8914 66.6 322 13.0732 98.0
3.18 47 1.9082 249 10.1094 370 15.0220
3.81 52 2.1112 274 11.1244 405 16.4430
4.45 56 2.2736 298 12.0988 439 17.8234
5.08 60 2.4360 12.2 315 12.7890 63.9 468 19.0008 95.0
7.62
10.16
12.7
REMARK:
C C B
C
- )
C -
C
x
A 1 A A
0
(A 0 (
A (
A
A A A
(A FEDERAL DEMOCRATIC ( (A
+
AA REPUBLIC OF ETHIOPA A+A PROMINENT ENGINEERING A +A FAL GENERAL
B ETHIOPIAN ROADS AUTHORITY
+B SOLUTION P.L.C + B CONTRACTOR
)(+A (ERA)
B) ()
B
A
-B A
)- )+ -
C ( -C( 36+000 C(
PROJECT :)+A BABILE-FIK Road Upgrading Project Lot I: Km 0+000- Km -B+A
-B CA C
)B
EMPLOYER :C (
) ETHIOPIAN
+ ROADS AUTHORITY + -) +
-A C-
CONSULTANT :CBPROMINENT ENGINEERING SOLUTION P.L.C B C(B
+ A
) ) )
CONTRACTOR : FAL GENERAL CONTRACTOR
B +
-) - BEARING RATIO TEST
CALIFORNIA -
TEST MATHOD :AASHTO T-193 B
C
- C C
)
SOURCE STATION Km 10+500, offset 50m LHS SAMPLE TAKEN FROM Stockpile
C -
REPRESENTED SECTION Borrow Material DATE SAMPLED 28/05/2019
C
MATERIAL DESCRIPTION Light brown soil with gravel fragments DATE AND TIME SOAKED 30/05/2019, 8 PM
PUROPSE Embankment and Capping Construction DATE AND TIME TESTED 03/06/2019, 8 PM
17 100
16
15 90
14
13 80
12
30 70
11
Soaked CBR (%)
10
9 60
8
7 50
6
5 40
10
4
30
3
2
20
1
0
10
0 2.54 5.08
1.29 1.33 1.37 1.41 1.45 1.49 1.53 1.57
PENETRATION (mm)
Dry density (g/cc)
0.4
Summary of Results
0.3
MDD (g/cc) :
Swell (g/cc)
0.2
OMC (%) :
REMARKS:
MATERIAL DESCRIPTION Light brown soil with gravel fragments DATE AND TIME SOAKED 30/05/2019, 8 PM
PUROPSE Embankment and Capping Construction DATE AND TIME TESTED 03/06/2019, 8 PM
MOISTURE DETERMINATION
10 Blows 30 Blows 65 Blows
SOAKING CONDITION AFTER AFTER AFTER
BEFORE BEFORE BEFORE
TOP 1 in. AVG. TOP 1 in. AVG. TOP 1 in. AVG.
CONTAINER NUMBER B-5 N-10 Y-3 B-8 R-11 B-5
WET SOIL + CONTAINER ( g) a 590 814 595 785.00 537.00 850
DRY SOIL + CONTAINER ( g) b 520.00 709.00 514.00 691.00 473.00 747.00
WEIGHT OF CONTAINER ( g) c 87 90.00 47.00 89.00 66.00 91.00
WEIGHT OF WATER ( g) d=a-b 70.0 105.0 81.0 94.0 64.0 103.0
WEIGHT OF DRY SOIL ( g) e=b-c 433 619 467 602 407 656.0
MOISTURE CONTENT ( %) m =( d/e)*100 16.17 16.96 17.34 15.61 15.72 15.70
AVG. MOIST. CONTENT ( %) 16.6 16.5 15.7
(mm) DIAL RDG LOAD (kn) COR. LOAD (kn) CBR % DIAL RDG LOAD (kn) COR. LOAD (kn)) CBR % DIAL RDG LOAD (kn) COR LOAD (kn)) CBR %
0 0 0 0 0 0 0
0.64 20 0.8120 55 2.2330 63 2.5578
1.27 31 1.2586 128 5.1968 160 6.4960
1.96 36 1.4616 180 7.3080 258 10.4748
2.54 42 1.7052 12.8 219 8.8914 66.6 345 14.0070 105.0
3.18 47 1.9082 249 10.1094 419 17.0114
3.81 52 2.1112 274 11.1244 471 19.1226
4.45 56 2.2736 298 12.0988 517 20.9902
5.08 60 2.4360 12.2 315 12.7890 63.9 550 22.3300 111.7
7.62
10.16
12.7
REMARK:
C C B
C
- )
C -
C
x
A 1 A A
0
(A 0 (
A (
A
A A A
(A FEDERAL DEMOCRATIC ( (A
+
AA REPUBLIC OF ETHIOPA A+A PROMINENT ENGINEERING A +A FAL GENERAL
B ETHIOPIAN ROADS AUTHORITY
+B SOLUTION P.L.C + B CONTRACTOR
)(+A (ERA)
B) ()
B
A
-B A
)- )+ -
C ( -C( 36+000 C(
PROJECT :)+A BABILE-FIK Road Upgrading Project Lot I: Km 0+000- Km -B+A
-B CA C
)B
EMPLOYER :C (
) ETHIOPIAN
+ ROADS AUTHORITY + -) +
-A C-
CONSULTANT :CBPROMINENT ENGINEERING SOLUTION P.L.C B C(B
+ A
) ) )
CONTRACTOR : FAL GENERAL CONTRACTOR
B +
-) - BEARING RATIO TEST
CALIFORNIA -
TEST MATHOD :AASHTO T-193 B
C
- C C
)
SOURCE STATION Km 10+500, offset 50m LHS SAMPLE TAKEN FROM Stockpile
C -
REPRESENTED SECTION Borrow Material DATE SAMPLED 28/05/2019
C
MATERIAL DESCRIPTION Light brown soil with gravel fragments DATE AND TIME SOAKED 30/05/2019, 8 PM
PUROPSE Embankment and Capping Construction DATE AND TIME TESTED 03/06/2019, 8 PM
20 100
19
18 90
17
16 80
15
14 30
13 70
Soaked CBR (%)
12
11 60
10
9 50
8
7
6 40
5 10
4 30
3
2 20
1
0
10
0 2.54 5.08
1.29 1.33 1.37 1.41 1.45 1.49 1.53 1.57
PENETRATION (mm)
Dry density (g/cc)
0.4
Summary of Results
0.3
MDD (g/cc) :
Swell (g/cc)
0.2
OMC (%) :
REMARKS: