FEDERAL DEMOCRATIC

REPUBLIC OF ETHIOPA
PROMINENT ENGINEERING FAL GENERAL
ETHIOPIAN ROADS
SOLUTION P.L.C CONTRACTOR
AUTHORITY
(ERA)

PROJECT : BABILE-FIK Road Upgrading Project Lot I: Km 0+000- Km 36+000


EMPLOYER : ETHIOPIAN ROADS AUTHORITY
CONSULTANT : PROMINENT ENGINEERING SOLUTION P.L.C
CONTRACTOR : FAL GENERAL CONTRACTOR

CALIFORNIA BEARING RATIO TEST


TEST METHOD :AASHTO T-193
SOURCE STATION 9+280 RHS SAMPLE TAKEN FROM Stockpile

REPRESENTED SECTION Base Course DATE SAMPLED 28/05/2019

MATERIAL DESCRIPTION DATE AND TIME SOAKED 30/05/2019, 8 PM

PUROPSE DATE AND TIME TESTED 03/06/2019, 8 PM

DEPTH Belt Sample Lab. No. OO4


DENSITY DETERMINATION
10 Blows 30 Blows 65 Blows
SOAKING CONDITION
BEFORE AFTER BEFORE AFTER BEFORE AFTER
MOLD NUMBER E-10 F-30 E-65
WEIGHT OF SOIL + MOLD ( g) W1 10849 11180 11346
WEIGHT OF MOLD ( g) W2 6576 6619 6581
VOLUME OF MOLD (Cm3) V 2119 2142 2142
WEIGHT OF WET SOIL ( g) W3 = W1 - W2 4273 4561 4765
WET DENSITY OF SOIL ( g/cm3) Wd = (W3/V) 2.02 2.13 2.22
DRY DENSITY OF SOIL ( g/cm3) Dd = Wd/(100+m)*100 1.81 1.96 2.07

MOISTURE DETERMINATION
10 Blows 30 Blows 65 Blows
SOAKING CONDITION BEFORE SOAKING AFTER BEFORE SOAKING AFTER BEFORE SOAKING AFTER
BC AC SOAKING BC AC SOAKING BC AC SOAKING
CONTAINER NUMBER
WET SOIL + CONTAINER ( g) a 687 687 678 678 633 633
DRY SOIL + CONTAINER ( g) b 623 623 630 630 593 593
WEIGHT OF CONTAINER ( g) c 70 70 68 68 69 69
WEIGHT OF WATER ( g) d=a-b 64 64 48 48 40 40
WEIGHT OF DRY SOIL ( g) e=b-c 553 553 562 562 524 524.0
MOISTURE CONTENT ( %) m =( d/e)*100 11.57 11.57 8.54 8.54 7.63 7.63
AVG. MOIST. CONTENT ( %) 11.6 8.5 7.6

PENETRATION TEST DATA


PENETRATION 10 Blows 30 Blows 65 Blows

(mm) DIAL RDG LOAD (kn) COR. LOAD (kn) CBR % DIAL RDG LOAD (kn) COR. LOAD (kn)) CBR % DIAL RDG LOAD (kn) COR LOAD (kn)) CBR %

0 0 0 0 0 0 0
0.64 39 1.5834 70 2.8420 46 1.8676
1.27 78 3.1668 160 6.4960 100 4.0600
1.96 115 4.6690 248 10.0688 162 6.5772
2.54 147 5.9682 44.7 330 13.3980 100.4 229 9.2974 69.7
3.18 175 7.1050 410 16.6460 293 11.8958
3.81 205 8.3230 483 19.6098 361 14.6566
4.45 230 9.3380 551 22.3706 425 17.2550
5.08 257 10.4342 52.2 618 25.0908 125.5 487 19.7722 98.9
7.62 3
10.16
12.7

SWELL RING FACTOR

Height of Specimen(mm) 116.43 MDD (gm/cc) 2.070


No. OF BLOWS 10 30 65
RDG (BEFORE SOAKING) 3.95 4.37 3.10
0.0406 KN/Division OMC % 8.8
RDG (AFTER) SOAKING) 4.90 4.43 3.27
PERCENT SWELL 0.82 0.05 0.15
95% of MDD 1.97
AVERAGE PERCENT SWELL : 0.34

REMARK:

FOR CONTRACTOR FOR CONSULTANT

Tested by Checked by Checked by Approved by


x x
Name 1 Name Name 1 Name
0
x 0
x
0
1 0
1
Sign Sign Sign Sign
0
x 0
A 0
1 A 0 A
0
x x
1 1
0
x 0
A 0
1 A 0 A
Date Date Date Date
0
(A 0 (
A (
A
A A A
(A ( (
A
+
AA A+A A +A
B +B + B
)(+A B) ()
B
A
-B A
)- )+ -
C
)+( -C( -BC(
+A
-BA CA C
)B
C
) (+ -) +
+
-A C-
CB B C(B
+ A
) ) )
B +
-) - -

C C B
C
- )
C -

C
x
A 1 A A
0
(A 0 (
A (
A
A A A
(A FEDERAL DEMOCRATIC ( (A
+
AA REPUBLIC OF ETHIOPA A+A PROMINENT ENGINEERING A +A FAL GENERAL
B ETHIOPIAN ROADS AUTHORITY
+B SOLUTION P.L.C + B CONTRACTOR
)(+A (ERA)
B) ()
B
A
-B A
)- )+ -
C ( -C( 36+000 C(
PROJECT :)+A BABILE-FIK Road Upgrading Project Lot I: Km 0+000- Km -B+A
-B CA C
)B
EMPLOYER :C (
) ETHIOPIAN
+ ROADS AUTHORITY + -) +
-A C-
CONSULTANT :CBPROMINENT ENGINEERING SOLUTION P.L.C B C(B
+ A
) ) )
CONTRACTOR : FAL GENERAL CONTRACTOR
B +
-) CALIFORNIA- BEARING RATIO TEST -
TEST MATHOD :AASHTO T-193 B
C
- C C
)
SOURCE STATION 9+280 RHS SAMPLE TAKEN FROM Stockpile
C -
REPRESENTED SECTION Base Course DATE SAMPLED 28/05/2019
C
MATERIAL DESCRIPTION 0 DATE AND TIME SOAKED 30/05/2019, 8 PM

PUROPSE 0 DATE AND TIME TESTED 03/06/2019, 8 PM

DEPTH Belt Lab No. OO4

LOAD (KN) CBR(%) SWELL


BLOWS
% DRY DENSITY Vs SOCKED C.B.R.
2.54mm 5.08mm 2.54mm 5.08mm
10 5.968 10.434 44.7 52.2 0.82 No # OF BLOWS 10 30 65
30 13.398 25.091 100.4 125.5 0.05 DRY DENSITY 1.81 1.96 2.07
65 9.297 19.772 69.7 98.9 0.15 SOACKED C.B.R. 52.2 125.5 98.9

30 65 DENSITY - CBR CURVE


130
120
UNIT LOAD ON PISTON (KN)

110
100
20
90
30 80
Soaked CBR (%)

70
60
10
50
40
30
10
20
0
10
0 2.54 5.08
1.79 1.83 1.87 1.91 1.95 1.99 2.03 2.07
PENETRATION (mm)
Dry density (g/cc)

1.3
1.2
Summary of Results 1.1
1.0
MDD (g/cc) : 0.9
Swell (g/cc)

0.8
OMC (%) : 0.7
0.6
93% of MDD (g/cc) 5.08 0.5
0.4
CBR at 93% of MDD 98 123 0.3
0.2
Swell (%) 0.3 1.29 1.31 1.33 1.35 1.37 1.39 1.41 1.43 1.45 1.47 1.49 1.51 1.53 1.55 1.57

Dry Density (g/cc)

REMARKS:

FOR CONTRACTOR FOR CONSULTANT


Tested by Checked by Checked by Approved by
Name x Name Name x Name
1 1
Sign x
0 Sign Sign x
0 Sign
1
0 1
0
Date x
0 Date Date 0 Date
1
0 0
0
0
FEDERAL DEMOCRATIC
REPUBLIC OF ETHIOPA
PROMINENT ENGINEERING FAL GENERAL
ETHIOPIAN ROADS
SOLUTION P.L.C CONTRACTOR
AUTHORITY
(ERA)

PROJECT : BABILE-FIK Road Upgrading Project Lot I: Km 0+000- Km 36+000


EMPLOYER : ETHIOPIAN ROADS AUTHORITY
CONSULTANT : PROMINENT ENGINEERING SOLUTION P.L.C
CONTRACTOR : FAL GENERAL CONTRACTOR

CALIFORNIA BEARING RATIO TEST


TEST METHOD :AASHTO T-193
SOURCE STATION 9+280 RHS SAMPLE TAKEN FROM Stockpile

REPRESENTED SECTION Base Course DATE SAMPLED 28/05/2019

MATERIAL DESCRIPTION DATE AND TIME SOAKED 30/05/2019, 8 PM

PUROPSE DATE AND TIME TESTED 03/06/2019, 8 PM

DEPTH Belt Sample Lab. No. OO4


DENSITY DETERMINATION
10 Blows 30 Blows 65 Blows
SOAKING CONDITION
BEFORE AFTER BEFORE AFTER BEFORE AFTER
MOLD NUMBER E-10 F-30 E-65
WEIGHT OF SOIL + MOLD ( g) W1 10849 11180 11346
WEIGHT OF MOLD ( g) W2 6576 6619 6581
VOLUME OF MOLD (Cm3) V 2119 2142 2142
WEIGHT OF WET SOIL ( g) W3 = W1 - W2 4273 4561 4765
WET DENSITY OF SOIL ( g/cm3) Wd = (W3/V) 2.02 2.13 2.22
DRY DENSITY OF SOIL ( g/cm3) Dd = Wd/(100+m)*100 1.81 1.96 2.07

MOISTURE DETERMINATION
10 Blows 30 Blows 65 Blows
SOAKING CONDITION BEFORE SOAKING AFTER BEFORE SOAKING AFTER BEFORE SOAKING AFTER
BC AC SOAKING BC AC SOAKING BC AC SOAKING
CONTAINER NUMBER
WET SOIL + CONTAINER ( g) a 687 687 678 678 633 633
DRY SOIL + CONTAINER ( g) b 623 623 630 630 593 593
WEIGHT OF CONTAINER ( g) c 70 70 68 68 69 69
WEIGHT OF WATER ( g) d=a-b 64 64 48 48 40 40
WEIGHT OF DRY SOIL ( g) e=b-c 553 553 562 562 524 524.0
MOISTURE CONTENT ( %) m =( d/e)*100 11.57 11.57 8.54 8.54 7.63 7.63
AVG. MOIST. CONTENT ( %) 11.6 8.5 7.6

PENETRATION TEST DATA


PENETRATION 10 Blows 30 Blows 65 Blows

(mm) DIAL RDG LOAD (kn) COR. LOAD (kn) CBR % DIAL RDG LOAD (kn) COR. LOAD (kn)) CBR % DIAL RDG LOAD (kn) COR LOAD (kn)) CBR %

0 0 0 0 0 0 0
0.64 39 1.5834 46 1.8676 70 2.8420
1.27 78 3.1668 100 4.0600 160 6.4960
1.96 115 4.6690 162 6.5772 248 10.0688
2.54 147 5.9682 44.7 229 9.2974 69.7 330 13.3980 100.4
3.18 175 7.1050 293 11.8958 410 16.6460
3.81 205 8.3230 361 14.6566 483 19.6098
4.45 230 9.3380 425 17.2550 551 22.3706
5.08 257 10.4342 52.2 487 19.7722 98.9 618 25.0908 125.5
7.62
10.16
12.7

SWELL RING FACTOR

Height of Specimen(mm) 116.43 MDD (gm/cc) 2.070


No. OF BLOWS 10 30 65
RDG (BEFORE SOAKING) 3.95 4.37 3.10
0.0406 KN/Division OMC % 8.8
RDG (AFTER) SOAKING) 4.90 4.43 3.27
PERCENT SWELL 0.82 0.05 0.15
95% of MDD 1.97
AVERAGE PERCENT SWELL : 0.34

REMARK:

FOR CONTRACTOR FOR CONSULTANT

Tested by Checked by Checked by Approved by


x x
Name 1 Name Name 1 Name
0
x 0
x
0
1 0
1
Sign Sign Sign Sign
0
x 0
A 0
1 A 0 A
0
x x
1 1
0
x 0
A 0
1 A 0 A
Date Date Date Date
0
(A 0 (
A (
A
A A A
(A ( (
A
+
AA A+A A +A
B +B + B
)(+A B) ()
B
A
-B A
)- )+ -
C
)+( -C( -BC(
+A
-BA CA C
)B
C
) (+ -) +
+
-A C-
CB B C(B
+ A
) ) )
B +
-) - -

C C B
C
- )
C -

C
x
A 1 A A
0
(A 0 (
A (
A
A A A
(A FEDERAL DEMOCRATIC ( (A
+
AA REPUBLIC OF ETHIOPA A+A PROMINENT ENGINEERING A +A FAL GENERAL
B ETHIOPIAN ROADS AUTHORITY
+B SOLUTION P.L.C + B CONTRACTOR
)(+A (ERA)
B) ()
B
A
-B A
)- )+ -
C ( -C( 36+000 C(
PROJECT :)+A BABILE-FIK Road Upgrading Project Lot I: Km 0+000- Km -B+A
-B CA C
)B
EMPLOYER :C (
) ETHIOPIAN
+ ROADS AUTHORITY + -) +
-A C-
CONSULTANT :CBPROMINENT ENGINEERING SOLUTION P.L.C B C(B
+ A
) ) )
CONTRACTOR : FAL GENERAL CONTRACTOR
B +
-) CALIFORNIA- BEARING RATIO TEST -
TEST MATHOD :AASHTO T-193 B
C
- C C
)
SOURCE STATION 9+280 RHS SAMPLE TAKEN FROM Stockpile
C -
REPRESENTED SECTION Base Course DATE SAMPLED 28/05/2019
C
MATERIAL DESCRIPTION 0 DATE AND TIME SOAKED 30/05/2019, 8 PM

PUROPSE 0 DATE AND TIME TESTED 03/06/2019, 8 PM

DEPTH Belt Lab No. OO4

LOAD (KN) CBR(%) SWELL


BLOWS
% DRY DENSITY Vs SOCKED C.B.R.
2.54mm 5.08mm 2.54mm 5.08mm
10 5.968 10.434 44.7 52.2 0.82 No # OF BLOWS 10 30 65
30 9.297 19.772 69.7 98.9 0.05 DRY DENSITY 1.81 1.96 2.07
65 13.398 25.091 100.4 125.5 0.15 SOACKED C.B.R. 44.7 69.7 100.4

30 DENSITY - CBR CURVE


130
65 120
UNIT LOAD ON PISTON (KN)

110

30 100
20
90
80
Soaked CBR (%)

70

10 60
10
50
40
30
20
0
10
0 2.54 5.08
1.79 1.83 1.87 1.91 1.95 1.99 2.03 2.07
PENETRATION (mm)
Dry density (g/cc)

1.3
1.2
Summary of Results 1.1
1.0
MDD (g/cc) : 0.9
Swell (g/cc)

0.8
OMC (%) : 0.7
0.6
93% of MDD (g/cc) 0.5
0.4
CBR at 93% of MDD 72 0.3
0.2
Swell (%) 1.29 1.31 1.33 1.35 1.37 1.39 1.41 1.43 1.45 1.47 1.49 1.51 1.53 1.55 1.57

Dry Density (g/cc)

REMARKS:

FOR CONTRACTOR FOR CONSULTANT


Tested by Checked by Checked by Approved by
Name x Name Name x Name
1 1
Sign x
0 Sign Sign x
0 Sign
1
0 1
0
Date x
0 Date Date 0 Date
1
0 0
0
0