Major Work Details

Hyd Shovel HS -25


Comissioning Date : 02.04.2012
HMR: 25913 as on 11.10.2023
Sl No Work Description Materials Req Possibility
1 Front & Rear Swing gear box major overhauling Swing G/B 01 no available
2 R/S & L/S Propel gear box Major Overhauling Propel G/B 01 no available
3 Engine & Hyd Pump Room Structure Crack - Beyond repair
4 Boom Assy Crack (Middle area) Boom 01 No Available
5 Radiator assy & Hydraulic Oil Cooler Assy have to
be replaced Not Available
6 New Engine fitted on 24.06.2019 at 17390 HMR
and life covered till ow around 8520 Hrs

7 Main hydraulic pump 03 nos fitted on 19.08.2016


at 11871 HMR and life covered around 14042
8 Front swing motor is to be replaced as it is running
since commissioning
9
Boom cylinder (R/S & L/S) seal kit is to be replaced Kit Available
10 Swing circle bearing assy is to be replaced Not Available
11 Level cylinder is to be replaced New 01 no available
12 Fender (FR) is to be replaced
13 CLS complete injector assy is to be replaced
14 Frequent AC system malfunctioning
15 Both side track link assy are to be replaced as its Under tender process
remaining life is 30%
16 Both side track sprockets are to be replaced Available
Complete wiring harness (Inside Cabin, PLC Room,
17 Cabine to Battery room and Battery room to
Engine) replacement Not Available
18 Front bucket is to be replaced Available
19 Hydraulic Control valve 1,2 & 3 overhauling
required
20

Hyd Shovel HS -26


Comissioning Date : 18.05.2012
HMR: 23572 as on 11.10.2023
Sl No Work Description Materials Req Possibility
1 R/S Track Frame Heavy Crack -
2 Front & Rear Swing gear box major overhauling Swing G/B 01 no available
3 R/S & L/S Propel gear box Major Overhauling Propel G/B 01 no available
4 Engine & Hyd Pump Room Structure Crack - Beyond repair
5 Boom Assy Heavy Crack (Middle area) Boom 01 No Available
6 Radiator assy & Hydraulic Oil Cooler Assy have to
be replaced Not Available
7 Recon Engine fitted on 02.10.2022 at 21992 HMR
and life covered till ow around 1580 Hrs
8 Front & rear swing motorare to be replaced as it is
running since commissioning
9
Boom cylinder (R/S & L/S) seal kit is to be replaced Kit Available
10 Swing circle bearing assy is to be replaced Not Available
11 Level cylinder is to be replaced New 01 no available
12 Fender (FR) is to be replaced
13 CLS complete injector assy is to be replaced
14 Frequent AC system malfunctioning
15 Both side track link assy are to be replaced as its Under tender process
remaining life is 30%
16 Complete harness (Inside Cabin, PLC Room, Battery
room to Engine) replacement
17 Silincer muffler complete replacement required
18 Hydraulic Control valve 1,2 & 3 overhauling
required
19 Track bottom rollers 06 nos to be replaced Available