8 • Safety Information
_• Tool List
•aComponent removal and installation
p can help you understand the basic knowledge of the machine, such as performance, features,
This guide
adjustment and service, and prevent safety accidents and machine damage due to improper service. Obeying the
guide can_
t service efficiency
• Improve field
• increase the
s service life of the machine
Do not service SEMu motor grader before you read this manual carefully!Caterpillar (Qingzhou) Co., Ltd. will not
take any responsibility for the consequences resulted from failure to follow relevant instructions.
_
g February 2019
a
t
o
t
Caterpillar:
4 Confidential Green Caterpillar: Confidential Green
General Hazard Information Trapped Pressure
J Pressure can be trapped in a hydraulic system. J
Releasing trapped pressure can cause sudden
M machine movement or attachment movement. Use
2 caution if you disconnect hydraulic lines or fittings.
High pressure oil that is released can cause a hose
8 to whip. High-pressure oil that is released can cause
oil to spray. Fluid penetration can cause serious
_ injury and possible death.
a Fluid Penetration
p Pressure can be trapped in the hydraulic circuit long
Attach a "Do Not Operate" warning tag or a
_
similar warning tag to the start switch or to the after the engine has been stopped. The pressure can
controls before you service the equipment or before cause hydraulic fluid or items such as pipe plugs to
t
you repair the equipment. escape rapidly if the pressure is not relieved
s correctly.
Know the width of your work tools in order to maintain
Do not remove any hydraulic components or parts
u
proper clearance when you operate the machine
until pressure has been relieved or personal injury
near fences or near boundary obstacles.
_
Be aware of high voltage power lines and power
may occur.
g
cables that are buried. If the machine comes in Containing Fluid Spillage
contact with these hazards, serious injury or death
may occur from electrocution. a Care must be taken in order to ensure that fluids are
contained during performance of inspection,
t maintenance, testing, adjusting and repair of the
o equipment. Prepare to collect the fluid with suitable
containers before opening any compartment or
t disassembling any component that contains fluids.
Caterpillar:
6 Confidential Green Caterpillar: Confidential Green
Tool List
J Number Tool Code Tool Name Code/Size Quantity Capability J
M 1
2 2
3
8
4
_
5
a6
7 p
8 _
9 t
10
s
11
u
12
13
_
14 g
15 a
16 t
17
o
18
t
8 Key points: welding requires firm and reliable, no flaw, and 8mm of welding height
_
a
p
_
t
s
u
_ 1
g
a
t
o
t
Symmetrical
bilaterally
after welding
Caterpillar:
8 Confidential Green Caterpillar: Confidential Green
2. Welding of Screw Holders (for retaining the hydraulic lines)
J 1) Scribe a line and weld 4 screw holders ① to the frame, the welding dimensions are shown below; J
M Key points: welding requires firm and reliable, no flaw, and 3mm of welding height
2
8
_
a 1
p
_
t
s Retaining
of lines
u
_
Welding of screw holders
g
a
t
o
t
J 1) Scribe a line and weld 1 fixed block ①, welding dimensions are shown below; J
M 2) Scribe a line and weld 1 holder assembly ②, welding dimensions are shown below;
Key points: welding requires firm and reliable, no flaw, and 8 mm of welding height
2
8
_
a
1
p
_ 2
t
s
u
_
g
a
t
o
t
Caterpillar:
10 Confidential Green Caterpillar: Confidential Green
4. Assembly of Column Assembly
J 1) Use a wrench to install 1 piece of transition connector (W 42000259) ① to the lifting cylinder, and tighten J
(Torque: 75±7 N.m);
M 2) Use wrench to install 1 connector (W 42000013) ② to the lifting cylinder, and tighten (Torque: 105±10 N.m);
2 3) Install 4 pieces of U-typed plastic③ to the slider assembly④;
8 Required tooling: torque wrench (19 27)
_
a
p
_
t 3
s 1 4
u
_
g
2
a
t
Installation of connector and U-typed plastic
4) Install the slider assembly on othe lift cylinder, insert the cylinder pin shaft, washer in order, and retain with the
shaft ring⑤;
t
5) Install the assembled lifting cylinder and the slider assembly into the column welding assembly⑥, insert the
cylinder pin shaft, washer in order, and secure the pin shaft with bolt⑦ (Torque: 105±20 N.m);
Required tooling: torque wrench (18)
Key points: Pay attention to cylinder installation direction (install in the direction as shown by the arrow in
the figure)
5
6
J 1) Install stand support assembly①, cylinder support assembly② to the column welding assembly, install the pin J
shaft, and then secure the pin shaft with the bolt and nut (Torque: 55±10 N.m);
M 2) Install the bowl③ to support assembly;
2 3) Install hanging board assembly④ to the column welding assembly, insert the pin shaft and thick washer in turn,
8 and fix the pin shaft with bolt (Torque: 60±12 N.m);
4) Install oil cup tohanging boardassembly
_
Required tooling: torque wrench (16)
a
p
1
_
t
s
3 u
_ 4
g
a
t
2 o
t
Installation of stand support assembly, cylinder support assembly and hanging board assembly
Caterpillar:
12 Confidential Green Caterpillar: Confidential Green
6. Installation of Support Assembly and Column Welding Assembly
J 1) Lift support assembly① to the front frame, insert bolt, thick washer, washer, nut in turn, and fasten it to the J
retainer plate of front frame (Torque: 900±100 N.m);
M 2) Lift column welding assembly② to the support assembly, insert the bolt, washer, nut in turn, and fasten it to the
2 support assembly (Torque: 900±100 N.m);
o
7. Installation of the Upper and Lower Connecting Rod Assembly
1) Installupper connecting rod assembly① t to the connection of the frame and support assembly, insert
bolt, washer, nut in order, and tighten (Torque: 900±100 N.m);
2) Installlower connecting rod assembly② to the connection of the frame and support assembly, insert
bolt, washer, nut in order, and tighten (Torque: 900±100 N.m);
Required tooling: torque wrench (36)
Key Points: Operate in a safe way.
o
t
Connection of blade
and hanging board
Caterpillar:
14 Confidential Green Caterpillar: Confidential Green
9. Installation of Pushrod Assembly
J 1) Install mount assembly①to rear ripper②, insert the pin shaft,pin-cotter to fix them; J
M 2) Install pushrod assembly③to the front and rear connections, insert the bolt and nylon locknut in turn, and
fasten one end to the blade assembly,④and the other end to the mount assembly⑤(Torque: 900±100 N.m);
2 Required tooling: torque wrench (36)
8
_
a 4
p
_ 3
t
s
5
u
2 1
_
g
Installation of pushrod assembly
a
t
10. Assembling of Boom Assembly and the Side Pendulum Cylinder
o
1) Install wire cable assembly①to the boom assembly② With bolt (MG 19112180), nut (MG 19112179)③, bolt (B
t
040880001), nut (B 050333025)④ fasten both ends;
2) Install transition connector (W 42000259)③to the side pendulum cylinder④(Torque: 75±7 N.m);
Required tooling: torque wrench (19)
3
3
4 4
1
J 1) Lift the cylinder assembly① the boom assembly② to the welded column assembly connection, fasten one end J
of the cylinder assembly to the welded column assembly with bolt (MG 19112031) and nut (MG 19112179),
M and fasten the other end of the cylinder assembly to the upper boom assembly with bolt (MG 19112067) and
nut (MG 19112179);
2
2) Install the lower boom assembly③, use bolt (B 040880003), nut (B 050333025) to fasten one end to the upper
8 boom assembly, and the other end to the blade assembly with bolt (MG 19112180), nut (MG 19112179)
_ (Torque: 1600±200 N.m);
Required tooling: torque wrench (46)
a
Key Points:
p
_ 2
t
s
u
_1
g
3
a
t
o
Installation of upper and lower boom assembly side pendulum cylinder
t
12. Installation of the work valve assembly bracket assembly
1) Install 1 work valveright① and 1 work valve left②, install 1 transition connector (W 42000020) ③ to the upper
left of the work valve, install 3 transition connectors (W 42000019) ④ to the upper left of the work
valve,(Torque: 60±6 N.m)
2) Install 1 transition connector (W 42000282) ⑤, 1 transition connector (W 42000279) ⑥ to the bracket
assembly⑦, install 3 transition connectors (W 42000281) ⑧, 3 transition connectors (W 42000247) ⑨ to the
bracket assembly (Torque: 60±6 N.m);
Required tooling: torque wrench (24)
Key Points:
1 5 8 7
2
3
6 9
Caterpillar:
16 Confidential Green Caterpillar: Confidential Green
13. Installation of Work Valve Line
J 1) Install the bracket assembly① to the front frame, fasten it with bolt and washer (Torque: 55±10 N.m); J
M 2) Install 1 high voltage hose assembly (MG 19207002) ②, install 1 high voltagehose assembly (MG 19207004)
③, install 1 high voltage hose assembly (MG 19207006) ④, install 1 high voltage hose assembly (MG
2 19207008) ⑤ to the upper left of the work valve (high voltage hose④ Torque: 70±12 N.m, the remaining three
pieces: 49±7 N.m);
8
3) After connecting each high voltage hose, install a single line clip, and use bolt and washer to fix the high
_ voltage hose (Torque: 55±10 N.m);
a
Required tooling: torque wrench (16 22 27)
p
Key points: Please ensure the correct connection of each high voltage hose (for the detail, see the figure
below)
_
t
s
u
_ 2 4 3
g 5
a
t
1
o
Installation of the work valve line
t
14. Installation of High Voltage Hose (cylinder end)
1) Install 1 high voltage hose assembly (MG 19207014) ①, install 1 high voltage hose assembly (MG 19207016)
② (Torque: 49±7 N.m);
2) Install 1 high voltage hose assembly (MG 19207012) ③ (Torque: 49±7 N.m),Install 1 high voltage hose
assembly (MG 19207010) ④ (Torque: 70±12 N.m);
Required tooling: torque wrench (22 27)
Key points: Please ensure the correct connection of each high voltage hose (for the detail, see the figure
below)
4
3
1
2
J 1) Scribe a line and weld 2 collars① to the ripper stand assembly②, welding dimensions are shown in the figure J
bellow;
M Key points: welding requires firm and reliable, no flaw, and 3 mm of welding height
2
8
_
a
p 1
_
t
s
u 2
_
6296.6
g
a
t
o
711.2
t 890.7
1120.8
1130.8
4430.6
Caterpillar:
18 Confidential Green Caterpillar: Confidential Green
16. Installation of Wire Cable Assembly and the Edge
J 1) Install 1 wire cable assembly (W 41003000)① to the ripper stand assembly collar, and install 1 wire cable J
assembly (W 41004000) ② tothe stand assembly collar (for the detail, see the figure below);
M 2) Install the edge③, in turn insert bolt, nut and tighten (Torque: 270±40 N.m)
2 Required tooling: torque wrench (24)
8 Key points: Please ensure the correct connection of each high voltage hose (for the detail, see the figure
below)
_
a
p
_
t
s 1
u
_
2
g
a 3
t
o edge
Installation of wire cable assembly and the
Caterpillar:
20 Confidential Green Caterpillar: Confidential Green