Contractor must attach compaction test results & surveying sheet for final review

and approval.
Contractor must attach Kerb strength result & surveying sheet for final review and
approval.
Contractor must attach surveying sheet for final review and approval.
Work found Accepted.
Contractor must attach compaction test results for final review and approval.
Contractor shall attach the correct compaction test result along with the approved
related shop drawings for review
Contractor shall ensure work ready for inspection and resubmit once complete.
Contractor shall attach the approved related shop drawings to obtain final
approval.
Work found Accepted but contractor shall attach approved related shop drawings to
obtain final approval.
Contractor must ensure work done and ready for inspection before submitting WIR
Contractor must resubmit the WIR and correct the chainage of inspected area (CH
0+410 TO 0+564) along with compaction test results & surveying sheet & for final
review and approval.