Elachi, Mahmoud

From: Kheshen, Samah


Sent: Sunday, July 3, 2022 2:22 PM
To: Rashid Mansur; Elachi, Mahmoud; Hamed, Mostafa; Samir Radi; Qadan, Majed
Subject: Fwd: Retender for K9 Project
Attachments: 2022-84160-AUH-08June-SLD-R0.dwg; B1S-2020-004484-CD03.pdf

Get Outlook for iOS


Best regards,

Samah Kheshen
Group Business Development Manager

P:+97125530557 Ext: 115 | M:+971525006226


E:Samah.Kheshen@enervo.ae | www.enervo.ae
Enervo Group P.O. Box 26180, Abu Dhabi, UAE
.

The content of this email is confidential and intended for the recipient specified in message only. It is strictly forbidden to share any part of this message
with any third party, without a written consent of the sender. If you received this message by mistake, please reply to this message and follow with its
deletion, so that we can ensure such a mistake does not occur in the future.
Think green! Please consider the environment before printing this e-mail.
.

From: Dar Al Handasa & Al Emara <ad@dareng.net>


Sent: Sunday, July 3, 2022 2:20:39 PM
To: Dar Al Handasa & Al Emara <ad@dareng.net>
Cc: Salah Ud Din <Salah.uddin@mauqah.com>; Shahzad Sarwar <Shahzad.sarwar@rts.ae>; Furrukh Javed
<furrukh.javed@rts.ae>
Subject: Retender for K9 Project

Dear Engineers

We are going to re-tender to make sure of all the prices with a normal cost , also to get the final and
discounted price .

tender opining on wednesday morning 06/07/2022


Project Duration = 12 month + 1 month mobilization.
*please note that we need full details on boq for all items ,all MEP items in full details.
. please make sure your prices include below items :
*All items shown in drawings, BOQ, Specifications under scope of contractor works.

*Supply and installation of transformer and addc fees under scope of contractor works.

1
*false ceiling required on Kennels building only.

*false ceiling required on main building only for offices and services

*boundary wall around the plot has to be a precast structure.


except the service block built on the wall.

*swimming pool must be with ceramic walls around the wet area.

*Generator must be included in the work.

* to make sure for Outdoor toilet area with a boundary 120 cm block +130 cm fence from three sides.

*for outdoor training area with boundary for four side 120cm block +130cm fence .

*outdoor training area needs natural grass with an irrigation system, granite footpath tiles as the drawings.

*Make sure of walls for kennel building blocks and ceramic tiles.

*Make sure the kennel building needs a fence around the building as shown in the drawings.

*External work pasco for floors, column lights each 10 meters , CCTV Cam around the blocks
outside and inside .

*Fire fighting as per the drawing(inisial approval).

*Water tank has to be underground.

*Remove the green area on the plot and make it sweet sand.

*Make sure to add the sky light on the swimming pool building as per the layout drawings .

*Steel work has to be under regulation and authority requirements.


* car parking shed and Wheel stopper needed.

* Road marking and Rood signage needed.

* Underground services surveying , Relocation and protection needed.

* shoring and dewatering work if need under contractor scope.

*Any authority fees to ADDC , ADCD, ADM, or DOT included.

*HV work outside the plot area included.

*Supply and Installation of Lighting control system.

*Supply and Installation of BMS, access control system and public address system.

* Any underground RCC storm water tank, sump pump.

‐‐

2
Thanks & Regards...
Eng. Hassan Abouoef - Mob.: 0559194003
Eng. Mohamed Youssef - Mob.: 0526930775
Dar Al Handasa & Al Emara L.L.C.
Consulting Engineers
TRN: 100260125800003
Abu Dhabi , U.A.E
Tel.: 02 6743915 - Fax: 02 6743915 - B.O.Box: 1990

You might also like