Professional Documents
Culture Documents
Steel F. Paint
Steel F. Paint
Samah Kheshen
Group Business Development Manager
The content of this email is confidential and intended for the recipient specified in message only. It is strictly forbidden to share any part of this message
with any third party, without a written consent of the sender. If you received this message by mistake, please reply to this message and follow with its
deletion, so that we can ensure such a mistake does not occur in the future.
Think green! Please consider the environment before printing this e-mail.
.
Dear Engineers
We are going to re-tender to make sure of all the prices with a normal cost , also to get the final and
discounted price .
*Supply and installation of transformer and addc fees under scope of contractor works.
1
*false ceiling required on Kennels building only.
*false ceiling required on main building only for offices and services
*swimming pool must be with ceramic walls around the wet area.
* to make sure for Outdoor toilet area with a boundary 120 cm block +130 cm fence from three sides.
*for outdoor training area with boundary for four side 120cm block +130cm fence .
*outdoor training area needs natural grass with an irrigation system, granite footpath tiles as the drawings.
*Make sure of walls for kennel building blocks and ceramic tiles.
*Make sure the kennel building needs a fence around the building as shown in the drawings.
*External work pasco for floors, column lights each 10 meters , CCTV Cam around the blocks
outside and inside .
*Remove the green area on the plot and make it sweet sand.
*Make sure to add the sky light on the swimming pool building as per the layout drawings .
*Supply and Installation of BMS, access control system and public address system.
‐‐
2
Thanks & Regards...
Eng. Hassan Abouoef - Mob.: 0559194003
Eng. Mohamed Youssef - Mob.: 0526930775
Dar Al Handasa & Al Emara L.L.C.
Consulting Engineers
TRN: 100260125800003
Abu Dhabi , U.A.E
Tel.: 02 6743915 - Fax: 02 6743915 - B.O.Box: 1990