You are on page 1of 1

BD STAGE

Tender Invitation

High Management Confirmation

Add the bid to the estimate register and server with a new number
and arrange to send an email notification to the relevant people at the
technical and commercial levels

T ENDER ♦ Arrange Packages and send

STAGE -.
Arrange For Time Frame for QS to take off Quantities inquiry for quotations
3 Quotations for each Item

Read All Tender Documents and arrange for RFI within 2 to
Should be collected

3 days

Arranging the preliminary project estimate file


Collect, review and confirm actual quantities with QS and
Quotations from DC

To Make Sure that Tender studied based on the final


documents received with Addendum

• +
I Arrange for Final Estimation File with Subcontract sub-summary and Tender Detailed Grand Summary


I Arrange for Tender study and brief for


management use
I
I

I Finalizing Tender study and summary including


all percentages with Management

I Arrange for Technical and Commercial Proposal based on the tender requirements along with updated company official
documnets.
• I To Confirm with focal
person about any extra
expenses that should be

I I
Submit the bid according to the date and time specified in the tender added to estimation file


documents and attach a letter acknowledging receipt

I Tender Follow Up after Submission

You might also like