2 Row 6 Panel Stand
Step: 1 Keep all the Front Leg (60cm),
Middle Leg (106cm) and Back Leg Step: 2 Fix Rafter (333cm) on Legs with the Step: 3 Fix Side Jointers on Rafter With
Help of structure Nut & bolts. the help of Structure Nut & bolts
(151cm) on appropriate distance. keep Rafter Holes on upside
Step: 4 Fix Purlins (300cm) on Side Jointers
with the hep of Structure Nut & Bolts. Step: 5 Fix Solar Panel on Purlin with the Step: 6 Fix All the Legs with the help of
help of Solar panel Nut & bolts. Cement & Concrete. Can also use M10
Keep Purlins Capsule holes on Upper side The slope of solar panel should be in Fasteners For extra Strength
south direction
Components
2 Front Leg 2 Middle Leg 2 Back Leg
(60cm) (106cm) (151cm)
2 Rafter 4 Purlin
8 Side Jointers (200cm)
(333cm)
24 Solar Panel Nut 44 Structure Mounting
& Bolts (6mm) Nut & Bolts (10mm)