Professional Documents
Culture Documents
LEC
INSTRUCTIONS TO CONTRACTORS
GENERAL NOTE:
INFORMATION SUPPLIED IN THIS APPLICATION MUST, WHERE NECESSARY, BE
ACCOMPANIED BY SUPPORTING DOCUMENTS OTHERWISE NO POINTS WILL BE
ALLOCATED.
1. All Contractors should submit their completely filled and spiral bind application forms at LEC
Management Block Tender Box on or before 25thMarch 2021 at 14:15. Late applications
will not be accepted
2. It is important that the Contractor answers each and every question fully, with certified and
verified (e.g. signed reference letters) supporting documents where required, as the
responses shall be carefully examined.
3. The applicants must note that they may be called for an interview on some or all answers in
the application form; and some of the responses may be physically verified.
4. The applicants must note that no individual, partnership or company shall be allowed to
register more than one electrical contracting business entity with Lesotho Electricity
Company; otherwise such applications will be disqualified.
5. The application form will not be considered if a valid Traders’ License, Tax clearance
certificate and company registration certificate (in case of companies) are not attached
7. Applications of Contractors who were employees of LEC and had been dismissed on
grounds of any misconduct will not be considered.
8. Applications of Contractors whose previous contracts with LEC were terminated for any
misconduct will not be considered.
9. Business entities or individuals who have previously been blacklisted are not eligible to
apply and their applications will not be considered should they apply to be registered with
LEC
11. Any false information supplied in this form and forms not certified under oath shall
automatically disqualify the applicant.
12.1 LEC will inspect Contractors’ personnel during implementation of jobs. Qualified staff
members included/shown in the application forms must be seen on site during the works
implementation and if such personnel are not found, the Contractor shall be automatically
disqualified. If the personnel in the application form are no longer employed by the
Contractor, LEC expects to be notified, in writing, of employment of another person with
equivalent or higher qualifications and experience.
12.2 In the case of other business entities other than sole proprietor, a resolution of Board of
Directors must be written to LEC specifying appointment/nomination of an electricity carter
qualified personnel to implement LEC works.
12.3 LEC will inspect the validity of any or all of the essential documents as and when
necessary (e.g. insurance covers, Tax clearance and traders license)
LEC recognizes a qualified electrical person as one who has gone for at least two years formal
training at a recognized Institution.
1.0 IDENTIFICATION
……………………………………..………………………………………………………………..
……………………………………………………......................
……………………………………………………......................
a) Registration number………………………………………………………………
b) Place of Registration…………………………………………
………………………….…………………………………….
………………………….…………………………………….
………………………….…………………………………….
………………………….…………………………………….
………………………………………………………………..
………………………………………………………………..
d) Are there any shareholders that are not Lesotho Citizens - yes/no?
………………………….…………………………………….
………………………….…………………………………….
………………………….…………………………………….
………………………….…………………………………….
………………………………………………………………..
………………………………………………………………..
a) Registration number………………………………………….
b) Place of Registration…………………………………………..
c) Names of the Partners
………………………….………………………………………..
………………………….………………………………………..
………………………….………………………………………..
………………………….………………………………………..
…………………………………………………………………...
…………………………………………………………………...
d) Are there any partners that are not Lesotho Citizens yes/no?
e) If the answer to the above is yes, state the percentage of their financial
interest into the partnership
………………………….………………………………………..
………………………….………………………………………..
………………………….………………………………………..
………………………….………………………………………..
c) Places of Registration of JV Partners
………………………….………………………………………..
……………………….………………………………………..
………………………….………………………………………..
d) Are there any JV partners that are not Lesotho Citizens - yes/no?
b) Passport/ID Number………………………………………………………….
b) Attach a certified proof of registration with a relevant body in the electrical industry if
you have been registered with any such body
5.0 INSURANCES
Successful applicants shall submit valid and certified copies of the Public Liability (third
party), contractors all risk and Workman’s Compensation insurance covers in line with
clause 6 of the general notes, in order to be awarded LEC jobs.
a) Attach Audited accounts of the business for at least the past two (2) years.
b) If Audited accounts are not available, please provide a letter from the bank stating to
which level they can provide you with a credit
7.0 RESOURCES – PROPERTY, PLANT AND TOOLS (LEC shall physically ascertain the
availability of these resources)
7.1 Immovable Property (Indicate whether rented or owned by company, attach lease if
owned or confirmation letter from owner if rented)
7.2.1 Detailed information of Plant and vehicles (attach certified copies of ownership
documents that reflect either name of contractor or name of any of the company’s
Directors)
Contractors shall not be awarded any category if they do not have set minimum assets.
Contractors shall not be awarded any category if they do not have set minimum assets.
1. Set of spanners up to
32mm
2. Set of screw drivers
(star & flat)
3. Allen keys
4. Insulated Combination
Pliers
5. Insulated Side cutters
6. Insulated Long nose
pliers
7. Ball-pin hammer
8. Cable knife
The Safety file must include the following documents as a minimum: (to be attached to
tenders awarded).
8. KEY PESONNEL
8.1 Attach signed CVs and certified copies of educational certificates of full time
employees. (Copies must be certified from January 2021 and not before then).
8.2 Please draw company structure on the space below or attach a separate sheet.
8.3 Engineers
8.5 Technician/Supervisor
8.7 Electricians
Name Qualification Experience In (years)
8.8 Artisans
Name Qualification Experience In (Years)
8.10Additional information
Provide any additional information that may enhance this application concerning the resources
that you have ……………………………………………………………….
………………………………………………………………………………..
………………………………………………………………………………..
………………………………………………………………………………..
………………………………………………………………………………..
………………………………………………………………………………..
………………………………………………………………………………..
………………………………………………………………………………..
………………………………………………………………………………..
List all principal/major projects carried out in the last three years (chronologically). You may
attach a separate sheet.
TOTAL
Please provide your trade references (i.e. suppliers, sub-contractors, clients, customers) at
least three with name, address, and telephone number
10.1………………………………………………………………………………
………………………………………………………………………………..
……………………………………………………………………………….
…………………………………………………………………………………
………………………………………………………………………….
10.2………………………………………………………………………...
…………………………………………………………………………………
…………………………………………………………………………………
..………………………………………………………………………………..
…………………………………………………………………………………
10.3 ……………………………………………………………………………….
…………………………………………………………………………………
…………………………………………………………………………………
…………………………………………………………………………………
…………………………………………………………………………………
Have you ever failed to complete any work awarded to you under the style in which you
apply or any other style? State the circumstances.
………………………………………………………………………………………………………
………………………………………………………………………………………………………
………………………………………………………………………………………………………
Has the penalty clause been invoked against you on any project? If yes, state with
whom, on what issue, under what circumstances.
………………………………………………………………………………………………………
………………………………………………………………………………………………………
………………………………………………………………………………………………………
………………………………………………………………………………………………………
Has an arbitration clause ever been invoked against you on any project? If yes, state
with whom, on what issues, under what circumstances.
………………………………………………………………………………………………………
………………………………………………………………………………………………………
………………………………………………………………………………………………………
………………………………………………………………………………………………………
The following criteria will be used to evaluate application forms submitted by the Contractors
NB:
1. No additional points shall be awarded above the set maximum points allocated
per criteria.
2. Contractors will not be awarded any category if they do not have set minimum
assets.
17.0 CATEGORIZATION
…………………………………………………. …………………………………………
Name of applicant/representative in full capitals Signature
COMMISSIONER OF OATH………………………………
19. It is mandatory that the attached checklist must be filled, dated and signed for by
contractor and failure to do so will result into disqualification of this form.
Joint Venture:
Certified copy of the JV
agreement
Resolution by JV partners
authorizing the
application for LEC
registration (original)
Resolution by JV partners
appointing Electricity
carter qualified personnel
to implement LEC works
(original)
Attach certified copy of ID
or Passport (sole
proprietor )
Singed CV (excluding
artisans
Copy of Certified
Educational Certificates
Audited accounts of the
business or letter from the
bank stating which level
they can provide you with
credit
Immovable property –
office and or store
Plant and vehicles:
Truck
Crane truck
4x4 Van
Compressor
Rented plant:
Certified copies of plant,
vehicles and an agreement
between renter and
contractor that plant will
be available when needed
Entered all heavy duty
tools
Entered all light duty tools
Entered all required
protective clothing and
equipment
Application signed
UNDER OATH