Water Business Group

CH2M HILL Singapore Private Limited


150 Beach Road
Gateway West 34th Floor
Singapore 189720
O +65 6391 0350
F +65 6299 4739
www.ch2m.com

REQUEST FOR CONTRACT CLARIFICATION / INFORMATION


REQUEST NO: 661133/RFI/C22B/023

PROJECT: PUB – Changi Water Reclamation Plant Phase 2 Contract C22B


PROJECT NO: 1160602
CONTRACTOR: HSL Constructor Pte. Ltd.
Clarification/Information Requested By: _ Winston Huo Long ___________________

Regarding: Request to change DICL to CSCL pipe _____________________


Drawing Plan Sheet Reference: __ PUB/WRP/CWRP-2/37-C001____________________

Specifications Reference: _______________________________________

Description:
With reference to drawing number PUB/WRP/CWRP-2/37-C001 for Train 5 effluent pumping plan WWF feed
pipeline, the pipe material used by C21B (Koh Brothers) is Carbon Steel with Cement Lining (CSCL). However,
the pipe material after tie in under HSL’s supply is Ductile Iron with Cement Lining (DICl). As such, we would
like to request for approval to change the pipe material from DICL to CSCL to have the same material as the
pipe supply by C21B.

Quek 01 August 2017


Issued by Contractor: Name/Signature/Date Received by Consultant: Name/Signature/ Date

Response:
We approve the change in pipe material for 1500mm WWF effluent pipe from DICL to CSCL.
Cost reduction due to change in material shall be discussed separately.

28 August 2017
Issued by Consultant: Name/Signature/Date Received by Contractor: Name/Signature/ Date

CM.12105 Request for Clarification / Information Page 1 of 1 Rev A 01 JUN 16